ML13316B399

From kanterella
Jump to navigation Jump to search
Amend 129 to License DPR-13,amend Revises Actuation Circuitry for Auxiliary Feedwater to Actuate on Narrow Range Steam Generator Level & Deletes High Steam Generator Level Turbine Trip from Actuation on Wide Range Level
ML13316B399
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 06/23/1989
From: Knighton G
Office of Nuclear Reactor Regulation
To:
Shared Package
ML13316B398 List:
References
DPR-13-A-129 NUDOCS 8906300127
Download: ML13316B399 (4)


Text

0 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 SOUTHERN CALIFORNIA EDISON COMPANY SAN DIEGO GAS AND ELECTRIC COMPANY DOCKET NO. 50-206 SAN ONOFRE NUCLEAR GENERATING STATION, UNIT NO. 1 AMENDMENT TO PROVISIONAL OPERATING LICENSE Amendment No.129 License No. DPR-13

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Southern California Edison Company and San Diego Gas and Electric Company (the licensee) dated June 13, 1989 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

P

-2

2. Accordingly, the license is amended by changes to the Technical Speci fications as indicated in the attachment to this license amendment, and paragraph 3.B. of Provisional Operating License No. DPR-13 is hereby amended to read as follows:

B. Technical Specifications

-The Technical Specifications contained in Appendix A, as revised through Amendment No. 129, are hereby incorporated in the license. Southern California Edison Company shall operate the facility in accordance with the Technical Specifications, except where otherwise stated in specific license conditions.

3. This license amendment is effective as of the date of its issuance and must be fully implemented no later than 30 days from the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION George W. Knighton, Director Project Directorate V Division of Reactor Projects III, IV, V and Special Projects Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: June 23, 1989

0 ATTACHMENT TO L1CENSE AMENDMENT NO.129 PROVISIONAL OPERATING LICENSE NO. DPR-13 DOCKET NO. 50-206 Revise Appendix A Technical Specifications by removing the page identified below and inserting the enclosed page. The revised page is identified by the captioned amendment number and contains a marginal line indicating the area of change.

REMOVE INSERT 33r 33r

TABLE 3.5.7-2 AUXILIARY FEEDWATER INSTRUMENTATION SETPOINTS FUNCTIONALUNIT TALL

a. Manual Actuation Not Applicable Not Applicable
b. Automatic Actuation Logic Not Applicable Not Applicable
c. Steam Generator Mater Level-Low

> 5% of narrow range

> 01 of narrow range Instrumuent span for each instruutent span for each

d. FW rai Inerlckssteam generator steam generatorI
d.

AFU Train Interlocks I. Decreasing Flow in Train B/

Start Train A Flow 23 gpmu

> 10 gp.

ii. Increasing Flow in Train 8/

Stop Train A Flow 37 gpmA 48 gpm

  • .Each flow switch monitoring Train B flow utilizes its set and reset points for permissive signals for starting and stopping Train A.
  • 1+