ML13310B043

From kanterella
Jump to navigation Jump to search
Revised Proposed Change 120 to Tech Specs,Clarifying 830720 & 0907 Submittals Re Boron Dilution,Reactor Criticality & Primary Plant Makeup Pump.Nrc Analysis of Proposed Change Should Be Limited to Refueling Mode Analysis & Results
ML13310B043
Person / Time
Site: San Onofre 
Issue date: 10/25/1983
From: Medford M
SOUTHERN CALIFORNIA EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8310270101
Download: ML13310B043 (3)


Text

Southern California Edison Company P. 0. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD. CALIFORNIA 91770 M.O. MEDFORD TELEPHONE MANAGER, NUCLEAR LICENSING October 25, 1983 (213) 572-1749 Director, Office of Nuclear Reactor Regulation Attention: Mr. H. R. Denton U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Gentlemen:

Subject:

Docket No. 50-206 Amendment No. 112 San Onofre Nuclear Generating Station Unit 1 Amendment No. 112, submitted by letter dated July 20, 1983 and later revised and resubmitted by letter dated September 7, 1983, consists of Proposed Change No. 120 to the Technical Specifications incorporated into Provisional Operating License No. DPR-13 as Appendices A and B. Subsequent to this resubmittal, discussions with NRC reviewers have resulted in the need to modify the Proposed Change in order to resolve concerns and provide clarification. These modifications are discussed below.

The first area of concern involved an inconsistency in the Basis for Technical Specification 3.8. This inconsistency was in the first paragraph of the basis which stated that maintaining the reactor subcritical by greater than 5% Ak/k with all rods inserted will be sufficient to maintain the reactor subcritical even if no control rods were inserted. Assuming the most conservative case (e.g., reactor subcritical by 5% Ak/k with all rods inserted), removal of the control rods could provide enough positive reactivity for the reactor to reach criticality. Therefore, this statement is not completely accurate and has been modified as shown in the attached enclosure. A reference to the Final Safety Analysis was provided in the original basis and has been removed accordingly. Change bars are used to indicate the areas where information has been changed or deleted.

The second area of concern involved the initial assumptions used in the boron dilution transient analysis for the cold shutdown mode of operation. Under certain initial conditions for the cold shutdown analysis, the results could be as conservative as the results of the refueling mode analysis. However, under no conditions during normal cold shutdown mode of operation could circumstances dictate more conservative results than the results of the refueling mode analysis. Therefore, the results of the refueling mode analysis are at least as conservative as the results of the cold shutdown analysis. For this reason, your evaluation of the Proposed Change Safety Analysis should be limited to the refueling mode analysis and results.

9310270101 831025 PDR ADOCK 05000206 P

PDR

Mr. H. R. Denton

-2 The last area of concern involved the capability of one primary plant makeup pump to inject water into the RCS. Information relative to the amount of water injected by one pump during a boron dilution event is not readily accessible. However, a dilution event involving one primary plant makeup pump would not be the worst case accident. More conservative accident scenarios were analyzed in the Proposed Change Safety Analysis (i.e., both primary plant makeup pumps running, one charging pump running, and both charging pumps running), and were concluded to have acceptable results. For this reason, your evaluation of the Proposed Change Safety Analysis should be limited to these more conservative accident scenarios and results.

If you have any questions or desire additional information in this regard, please contact me.

Very truly yours, Enclosures cc: J. 0. Ward, Chief, Radiological Health Branch, State Department of Health Services

ENCLOSURE "Basis:

During refueling the reactor refueling cavity is filled with approximately 240,000 gallons of borated water whose concentration

  • is sufficient to maintain the reactor subcritical by greater than 5% AK/K with all rods inserted. Operation of one method of decay heat removal is provided to assure continuous mixing flow of refueling water through the reactor vessel during the refueling period.(1) Borated water injection capability is provided as per Specification 3.2 Part A in the unlikely event there is any need during the refueling period."

In addition to the above safeguards, interlocks are utilized during refueling to insure safe handling.(2) These include:

(1) An interlock on the lifting hoist to prevent lifting of more than one fuel assembly at any one time.

(2) The spent fuel transfer mechanism can accommodate only one fuel assembly at a time.

The restriction on movement of loads in excess of 1,500 pounds (i.e., the nominal weight of a fuel assembly, RCC, and associated handling tool) over fuel assemblies in the storage pool ensures that in the event this load is dropped 1) the activity release will be limited to that contained in a single fuel assembly, and

2) any possible distoration of fuel in the storage racks will not result in a critical array. This assumption is consistent with activity release assumed in te accident analysis.

Requiring a minimum water elevation of 40'3" in the refueling pool, and similarly in the spent fuel storage pool, ensures that (1) at least 23 feet of water would be available to remove 99% of the Iodine gap activity assumed to be released in the event of a dropped and damaged fuel assembly, and (2) there will be at least twelve feet of water above the top of the fuel rods of a withdrawn fuel assembly so as to limit dose rates at the top of the water in accordance with Section 4.2.6 of the facility FSA. Reference elevation is sea level, mean lower low water.

Finally, detailed written procedures are provided, and are carried out under close supervision by licensed personnel.

The minimum requirement for reactor subcriticality prior to movement of irradiated fuel assemblies in the reactor pressure vessel assures that sufficient time has elapsed to allow the radioactive decay of short-lived fission products.

References:

(1) Supplement No. 1 to Ftnal Engineering Report and Safety Analysis, Section 5, Question 8 and 9.

(2) Final Safety Analysis, Paragraph 2.9.

MJT:0OllF