ML13309B394

From kanterella
Jump to navigation Jump to search

Forwards Procedures Generation Package, Per Suppl 1 to NUREG-0737 Re Requirements for Emergency Response Capability
ML13309B394
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 04/06/1984
From: Medford M
Southern California Edison Co
To: Knighton G
Office of Nuclear Reactor Regulation
Shared Package
ML13309B395 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8404100222
Download: ML13309B394 (2)


Text

REGULATORY AORMATION DISTRIBUTION SYSqM (RIDS)

ACCESSION NBR:8404100222 DUC.DATE: 84/04/06 NOTARIZED; NO DOCKET #

FACIL:50-361 San Onotre Nuclear Station, Unit 2, Southern Californ 05000361 50-362 San.0nofre Nuclear Station, Unit 3, Southern Californ 05000362 AUTH.NAME AUTHOR AFFILIATION MEDFORD,M,0.

Southern California Edison Co, RECIP.NAME RECIPIENT AFFILIATION KNIGHTONG.W.

Licensing Branch 3

SUBJECT:

Forwards "Procedures eneration Package," per Suppl 1 to NUREG-0737 re requirements fortemergency response capability, DISTRIBUTION CODE: AO03S COPIES RECEIVED:LTR ENCL4 SIZE;ik-Jaf TITLE: OR/Licensing Submittal: Suppi 1 to NUREG-0737(Generic Ltr 82"33)

NOTES:J Hanchett Icy POR Documents, ELD Chandler icy.

05000361 J Hanchett Icy POR Documents. ELD Chandler icy.

05000362 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL NRR LB3 BC 7

7 INTERNAL: IE/DEPER/EP8 3

3 NRR PAULSONW 1

1 NRR/DHFS/HFEB 5

5 NRR/DHFS/PSRB 1

1 NRR/DL/ORA8 1

1 NRR/DL/ORBS 5

5 NRR/DSI/CPB 1

1 NRR/DSI/ICSB 1

1 NRR/DSI/METB 1

1 1

.1 NRR/DSI/RSB 1

1 REG Fl 1

1 RGN5 1

EXTERNAL: LPDR I

1 NRC PDR 1

1 NSIC 1

1 NTIS 1

1 NOTES:

2 2

TOTAL NUMBER OF COPIES REQUIRED: LTTR 36 ENCL 36

Southern California Edison Company P. 0. BOX Boo 2244 WALNUT GROVE AVENUE ROSEMEAD. CALIFORNIA 91770 M.O. MEDFORD April 6, 1984 TELEPHONE MANAGER, NUCLEAR LICENSING (213) 572-1749 Director, Office of Nuclear Reactor Regulation Attention:

Mr. George W. Knighton, Branch Chief Licensing Branch No. 3 U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:

Subject:

Docket Nos. 50-361 and 50-362 San Onofre Nuclear Generating Station Units 2 and 3

References:

A) Supplement 1 to NUREG-0737, Requirements for Emergency Response Capability B) NUREG-0899, Guidelines for the Preparation of Emergency Operating Procedures C) SCE to NRC letter dated May 13, 1983, same subject Reference A requires that each licensee submit a Procedures Generation Package (PGP) at least three months prior to beginning formal operator training on the Upgraded Emergency Operating Procedures.

Reference B provides additional NRC guidance for this requirement. Reference C addressed Southern California Edison's (SCE) approach and schedule for complying with NRC requirements.

The purpose of this letter is to submit the enclosed PGP consistent with NRC requirements.

SCE intends to use the PGP for preparing upgraded Emergency Operating Instructions (EOI's) for San Onofre Nuclear Generating Station, Units 2 and 3. Emergency Operating Procedures are identified as Emergency Operating Instructions in SCE's system of documents and procedures.

Consistent with NRC requirements, the enclosed PGP contains a description of the (1) method for converting CE Owner's Group (CEOG) generic guidelines to plant specific EOIs, (2) Plant Specific Writer's Guide, (3) Validation Program, and (4) Operator Training Program.

SCE considers that the enclosed PGP satisfies the schedular requirements of Reference A. If you have any questions or comments, please contact me.

8404I10222 84040Very truly yours, R 4002 8340406 PDR ADOCK 05000361 F.

.PDR Enclosure cc:

Mr. H. Rood, Project Manager Licensing Branch 3 A. E. Chaffee NRC Site Inspector