Requests Addl Info Re Application to Amend Licenses NPF-10 & NPF-15 Revising Tech Spec 3/4.5.1, Safety Injection Tanks. Util Request to Increase Safety Injection Tank Pressures Raises Questions Re LOCA Analysis & Requires Clarification
ML13303A831
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 02/23/1988
From: Hickman D
Office of Nuclear Reactor Regulation
To: Baskin K, Cotton G
SAN DIEGO GAS & ELECTRIC CO., SOUTHERN CALIFORNIA EDISON CO.
References
TAC-66822, TAC-66823, NUDOCS 8802290106
Download: ML13303A831 (3)


Text

February 23, 1988 Docket Nos.:

50-361 and 50-362 Mr. Kenneth P. Baskin Mr. Gary D. Cotton Vice President Senior Vice President Southern California Edison Company Engineering and Operations 2244 Walnut Grove Avenue San Diego Gas and Electric Company Post Office Box 800 101 Ash Street Rosemead, California 91770 Post Office Box 1831 San Diego, California 92112

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION, SAN ONOFRE 2 AND 3 Gentlemen:

By letter dated December 14, 1987, you submitted an application to amend Facility Operating Licenses NPF-10 and NPF-15 to revise Technical Specification 3/4.5.1, "Safety Injection Tanks." We find that additional information is required before we can complete our review of this application.

In your safety analysis of this change you state that:

"The proposed change in SIT nitrogen pressure is on the upper limit of the pressure band. Since LOCA analyses are based on the lower limit of the band (600 psig) which is unchanged, there will be no effect on reflood rate and hence no effect on core LOCA limits."

While the LOCA analysis was not required for the original upper limit of band (625 psig), your request to increase this limit raises questions concerning the LOCA analysis. Higher SIT pressures will affect the timing of the events occurring during a postulated LOCA, the flow rate from the SIT, and utimately the water level in the core and the peak fuel clad temperature. These issues must be addressed in your safety analysis and must be submitted for our review before we can complete action on your request.

Sincerely, origihal signed by George W. Knighton for Donald E. Hickman, Project Manager Project Directorate V DivisiQn of Reactor Projects -

III, IV, V and Special Projects See next page DISTIBLTION Dcke ie OGC (for info) 3B0223 NRC & LPDRs EJordan

(- 8 0 22 901660500036 PDR ADOCK. 0 R.

DEHickman PDV Plant File P

GHolahan JPartlow JLee ACRS (10)

SP/PDV DRSP/PDY 0 CDR DV e

DEika NRC fLPRso

~~Enordan DEHickman GW Kicma ton 88 2,-/If/88 88t

/88 OFFICIAL RECORD COPY

Mr. Kenneth P. Baskin San Onofre Nuclear Generating Southern California Edison Company Station, Units 2 and 3 cc:

Mr. James C. Holcombe Mr. Hans Kaspar, Executive Director Vice President - Power Supply Marine Review Committee, Inc.

San Diego Gas & Electric Company 531 Encinitas Boulevard, Suite 105 101 Ash Street Encinitas, California 92024 Post Office Box 1831 San Diego, California 92112 Mr. Mark Medford Southern California Edison Company Charles R. Kocher, Esq.

2244 Walnut Grove Avenue James A. Beoletto, Esq.

P. 0. Box 800 Southern California Edison Company Rosemead, California 91770 2244 Walnut Grove Avenue P. 0. Box 800 Mr. Stephen B. Allman Rosemead, California 91770 Manager, Nuclear Department San Diego Gas & Electric Company Orrick, Herrington & Sutcliffe P. 0. Box 1831 ATTN:

David R. Pigott, Esq.

San Diego, California 92112 600 Montgomery Street San Francisco, California 94111 Richard J. Wharton, Esq.

University of San Diego School of Alan R. Watts, Esq.

Law Rourke & Woodruff Environmental Law Clinic 701 S. Parker St. No. 7000 San Diego, California 92110 Orange, California 92668-4702 Charles E. McClung, Jr., Esq.

Attorney at Law Mr. S. McClusky 24012 Calle de la Plaza/Suite 330 Bechtel Power Corporation Laguna Hills, California 92653 P. 0. Box 60860, Terminal Annex Los Angeles, California 90060 Regional Administrator, Region V U.S. Nuclear Regulatory Commission Mr. C. B. Brinkman 1450 Maria Lane/Suite 210 Combustion Engineering, Inc.

Walnut Creek, California 94596 7910 Woodmont Avenue, Suite 1310 Bethesda, Maryland 20814 Resident Inspector, San Onofre NPS c/o U. S. Nuclear Regulatory Commission Mr. Dennis F. Kirsh Post Office Box 4329 U.S. Nuclear Regulatory Commission San Clemente, California 92672 Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Mr. Dennis M. Smith, Chief Radiological Programs Division Governor's Office of Emergency Services 2800 Meadowview Road Sacramento, California 95832

Southern California Edison Company San Onofre 2/3 (when specified) cc:

California State Library Government Publications Section Library & Courts Building Sacramento, CA 95841 ATTN:

Ms. Mary Schnell Mayor, City of San Clemente San Clemente, CA 92672 Chairman, Board Supervisors San Diego County 1600 Pacific Highway, Room 335 San Diego, CA 92101 California Department of Health ATTN:

Chief, Environmental Radiation Control Unit Radiological Health Section 714 P Street, Room 498 Sacramento, CA 95814 Mr. Jack McGurk, Acting Chief Radiological Health Branch State Department of Health Services 714 P Street, Building #8 Sacramento, California 95814