Forwards IE Insp Rept 50-361/79-08 on 790306-09 & Notice of Violation
ML13309A713
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 05/02/1979
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Johari Moore
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13309A711 List:
References
NUDOCS 7908090700
Download: ML13309A713 (2)


See also: IR 05000361/1979008

Text

\\6R REGU~

UNITED

STATES

NUCLEAR REGULATORY

COMMISSION

REGION V

SUITE 202, WALNUT CREEK PLAZA

1990 N. CALIFORNIA BOULEVARD

WALNUT CREEK, CALIFORNIA

94596

'Fi

Docket Nos. 50-361

50-362

Southern California Edison Company

P. 0. Box 800

2244 Walnut Grove Avenue

Rosemead, California

91770

Attention:

Mr. J. B. Moore

Vice President

Gentlemen:

Subject:

NRC Inspection -

San Onofre Units 2 and 3

This refers to the inspection conducted by Messrs. J. H. Eckhardt and

G. Hernandez of this office on March 6-9, 1979, of activities authorized

by NRC Construction Permit Nos..CPPR-97 and CPPR-98, and to the discussion

of our findings held with Mr. D. E. Nunn and other members of your staff

at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records,

interviews with personnel, and observations by the inspectors.

Based on the results of this inspection, it appears that one of

your activities was not conducted in full compliance with the NRC

requirements, as set forth in the Notice of Violation, enclosed

herewith as Appendix A. This item of noncompliance has been cate

gorized into a level as described in our correspondence to all NRC

licensees dated December 31, 1974.

This notice is sent to you pursuant to the provisions of Section 2.201

of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this office,

790S990-700

Southern California Edison Company

-2-

MAY

2 1979

within thirty (30) days of your receipt of this notice, a written

statement or explanation in reply including:

(1) corrective steps

which have been taken by you and the results achieved; (2)

corrective

steps which will be taken to avoid further violations; and (3) the

date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains any information that you be

lieve to be proprietary, it is necessary that you submit a written

application to this office, within 30 days of the date of this letter,

requesting that such information be withheld from public disclosure.

The application must include a full statement of the reasons why it

is claimed that the information is proprietary. The application

should be prepared so that any proprietary information identified is

contained in an enclosure to the application, since the application

without the enclosure will also be placed in the Public Document Room.

If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be

.

glad to discuss them with you.

Sincerely,

G.S.

Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1. Appendix A - Notice of Violation

2.

IE Inspection Report Nos.

50-361/79-08

50-362/79-08

cc w/o enclosure 2:

J. H. Drake, Vice President

Engineering & Construction, SCE