MONTHYEARML13133A0332013-05-0303 May 2013 License Amendment Request for Changes to Technical Specification 3/4.7.11, Ultimate Heat Sink. Project stage: Request ML13133A0322013-05-0303 May 2013 License Amendment Request for Changes to Technical Specification 3/4.7.5 Ultimate Heat Sink. Project stage: Request ML13170A4772013-06-26026 June 2013 Millstone Power Station, Unit Nos. 2 and 3 - Acceptance Review Results Regarding Ultimate Heat Sink License Amendment Request (TAC Nos. MF1779 and MF1780) Project stage: Acceptance Review ML13197A4012013-07-18018 July 2013 Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3/4.7.11 Ultimate Heat Sink. Project stage: RAI ML13204A0352013-07-19019 July 2013 Response to Request for Additional Information Regarding License Amendment Request for Changes to Technical Specification 4/4.7.11, Ultimate Heat Sink Project stage: Response to RAI ML13213A0242013-07-30030 July 2013 Response to Request for Additional Information Regarding License Amendment Request for Changes to Technical Specification 3/4.7.11, Ultimate Heat Sink. Project stage: Response to RAI ML13192A2402013-07-30030 July 2013 Acceptance Review Results Regarding Ultimate Heat Sink License Amendment Requests Project stage: Acceptance Review ML13219A1092013-08-0101 August 2013 Response to Request for Additional Information Regarding License Amendment Request for Changes to Technical Specification 3/4.7.11, Ultimate Heat Sink. Project stage: Response to RAI ML13281A8092013-10-0202 October 2013 Response to Request for Additional Information Regarding License Amendment Request for Changes to Technical Specification 3/4.7.11, Ultimate Heat Sink Project stage: Response to RAI ML13347B0932013-12-19019 December 2013 Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3/4.7.5 Ultimate Heat Sink Project stage: RAI ML14023A6462014-01-15015 January 2014 Response to Request for Additional Information Regarding License Amendment Request for Changes to Technical Specification 3/4.7.5, Ultimate Heat Sink. Project stage: Response to RAI ML16015A1652014-04-18018 April 2014 Official Exhibit - NRC-043-00-BD01 - Letter from James Kim, Project Manager, NRC, to David A. Heacock, President and Chief Nuclear Officer, Dominion Nuclear, Millstone Power Station, Unit No. 2 - Issuance of Amendment Revise Technical . . Project stage: Approval ML15314A5762014-04-18018 April 2014 NRC-043 - Letter from James Kim, Project Manager, N.R.C., to David A. Heacock, President and Chief Nuclear Officer, Dominion Nuclear, Millstone Power Station, Unit No. 2 - Issuance of Amendment Revise Technical Specification 3/4.7.11 ... Project stage: Approval ML14037A4082014-04-18018 April 2014 Issuance of Amendment Revise Technical Specification 3/4.7.11 Ultimate Heat Sink Project stage: Approval ML14139A1002014-05-19019 May 2014 LAR Ultimate Heat Sink Project stage: Other ML14154A0912014-05-28028 May 2014 Response to Request for Additional Information Regarding License Amendment Request for Changes to Technical Specification 3/4.7.5, Ultimate Heat Sink. Project stage: Response to RAI ML14178A5992014-07-11011 July 2014 Issuance of Amendment Proposed Changes to Technical Specification 3/4 7.5, Ultimate Heat Sink (Tac MF1780) Project stage: Approval 2013-07-30
[Table View] |
|
---|
Category:Letter
MONTHYEARML24030A7522024-01-30030 January 2024 Technical Specification Bases Pages IR 05000336/20234022024-01-30030 January 2024 Security Baseline Inspection Report 05000336/2023402 and 05000423/2023402 (Cover Letter Only) ML23341A0172024-01-12012 January 2024 Issuance of Amendment No. 288 Revision to Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature Limitations Figures IR 05000336/20234402024-01-11011 January 2024 Special Inspection Report 05000336/2023440 and 05000423/2023440 (Cover Letter Only) ML24004A1052024-01-0404 January 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000336/2024010 & 05000423/2024010 ML23361A0942023-12-21021 December 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies and Core Operating Limits Report . ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23361A0312023-12-20020 December 2023 Intent to Pursue Subsequent License Renewal ML23352A0202023-12-18018 December 2023 Senior Reactor and Reactor Operator Initial License Examinations ML23334A2242023-11-30030 November 2023 Request for Exemption from Enhanced Weapons Firearms Background Checks, and Security Event Notifications Implementation ML23324A4222023-11-20020 November 2023 Reactor Vessel Internals Inspections Aging Management Program Submittal Related to License Renewal Commitment 13 ML23324A4302023-11-20020 November 2023 Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment 15 ML23317A2702023-11-13013 November 2023 Core Operating Limits Report, Cycle 23 IR 05000336/20230032023-11-0606 November 2023 Integrated Inspection Report 05000336/2023003 and 05000423/2023003 ML23298A1652023-10-26026 October 2023 Requalification Program Inspection IR 05000336/20234202023-10-0404 October 2023 Security Inspection Report 05000336/2023420 and 05000423/2023420 ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23226A0052023-09-26026 September 2023 Issuance of Amendment No. 287 Supplement to Spent Fuel Pool Criticality Safety Analysis IR 05000245/20230012023-09-19019 September 2023 Safstor Inspection Report 05000245/2023001 IR 05000336/20230102023-09-0808 September 2023 Commercial Grade Dedication Report 05000336/2023010 and 05000423/2023010 IR 05000336/20230052023-08-31031 August 2023 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Report 05000336/2023005 and 05000423/2023005) ML23248A2132023-08-30030 August 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise the Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature. ML23242A0142023-08-30030 August 2023 Operator Licensing Examination Approval ML23223A0552023-08-18018 August 2023 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23223A0482023-08-18018 August 2023 Request for Withholding Information from Public Disclosure for License Amendment Request to Use Framatome Small Break and Realistic Large Break LOCA Evaluation Methodologies for Establishing COLR Limits IR 05000336/20230022023-08-0909 August 2023 Integrated Inspection Report 05000336/2023002 and 05000423/2023002 ML23188A0432023-07-31031 July 2023 Authorization and Safety Evaluation for Alternative Request No. IR-04-11 ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23188A0202023-07-26026 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000336/20234012023-07-17017 July 2023 Material Control and Accounting Program Inspection Report 05000336/2023401 and 05000423/2023401 - (Cover Letter Only) ML23175A0052023-07-12012 July 2023 Alternative Request P-07 for Pump Periodic Verification Testing Program for Containment Recirculation Spray System Pumps ML23193A8562023-06-28028 June 2023 Submittal of Updates to the Final Safety Analysis Reports ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23151A0742023-06-12012 June 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23159A2202023-06-0808 June 2023 Associated Independent Spent Fuel Storage Installation Revision to Emergence Plan - Report of Changes IR 07200047/20234012023-06-0808 June 2023 NRC Independent Spent Fuel Storage Installation Security Inspection Report No. 07200047/2023401 2024-01-04
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 26,2013 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
MILLSTONE POWER STATION, UNIT NOS. 2 AND 3 - ACCEPTANCE REVIEW RESULTS REGARDING ULTIMATE HEAT SINK LICENSE AMENDMENT REQUEST (TAC NOS. MF1779 AND MF1780)
Dear Mr. Heacock:
By letter dated May 3,2013, Dominion Nuclear Connecticut, Inc., the licensee, submitted a license amendment request (LAR) to increase the current ultimate heat sink water temperature limit from 75 degrees Fahrenheit to 80 degrees Fahrenheit for Millstone Power Station, Unit Nos. 2 and 3 (Millstone). The purpose of this letter is to provide the results of the Nuclear Regulatory Commission (NRC) staff's acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license, including the technical specifications, must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.
This section stipulates that the application address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
In order to make the application complete, the NRC staff requests that the licensee supplement the application to address the information requested in the enclosure by July 3, 2013. This will enable the NRC staff to complete its detailed technical review. If the information responsive to the NRC staff's request is not received by the above date, the application will not be accepted for review pursuant to 10 CFR 2.101, and the NRC staff will cease its review activities associated with the application. If the application is subsequently accepted for review, you will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.
The information requested and associated time frame in this letter was discussed with Bill Bartron of your staff on June 20, 2013.
D. Heacock -2 If you have any questions regarding this issue, please contact me at (301) 415-1016.
Sincer~y,
/ /7
/ . / ! /
/ ,/ ./
Nadiyah S. Morgan, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-336 and 50-423
Enclosure:
As stated cc w/encl: Distribution via Listserv
SUPPLEMENTAL INFORMATION REGARDING ULTIMATE HEAT SINK LICENSE AMENDMENT REQUEST DOMINION NUCLEAR CONNECTICUT, INC.
MILLSTONE POWER STATION, UNIT NOS. 2 AND 3 DOCKET NOS. 50-336 AND 50-423 By letter dated May 3, 2013 (Agencywide Documents Access and Management Systems Accession No. ML13133A032 and ML13133A033), Dominion Nuclear Connecticut, Inc.
submitted a license amendment request to increase the current ultimate heat sink water temperature limit from 75 degrees Fahrenheit CF) to 80 OF for Millstone Power Station, Unit Nos. 2 and 3. In order to complete its acceptance review, the Nuclear Regulatory Commission staff needs the following additional information:
A) Please provide the following information for each safety related heat exchanger cooled by service water:
- 1. Design heat load
- 2. Design fouling factor
- 3. As-tested fouling factor
- 4. Tube plug allowance
- 5. Actual number of plugged tubes
- 6. Calculated heat removal capability
- 7. Design minimum flow rate
- 8. Actual flow rate
- 9. Vendor supplied heat exchanger specification sheet
- 10. Description of Generic Letter 89-13 testing/cleaning program for each heat exchanger B) Provide an 18" x 24" piping and instrumentation diagram of the service water system.
C) Please state whether or not the increase in service water temperature from 75 OF to 80 OF will result in a derating of the emergency diesel generators.
Enclosure
D. Heacock -2 If you have any questions regarding this issue, please contact me at (301) 415-1016.
Sincerely, Ira!
Nadiyah S. Morgan, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-336 and 50-423
Enclosure:
As stated cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsN rrDorlLpl1-1 RidsNrrPM Millstone LPL1-1 RtF RidsNrrLAKGoldstein RidsAcrsAcnw_MailCTR RidsNrrDorlDpr RidsRgn1 MailCenter GPurciarello, NRR RidsOGCMailCenter RidsNrrDssSbpb RWolfgang, NRR RisNrrDeEpnb PSahay. NRR RidsNrrDeEeeb GCooper, NRR RidsNrrDraAfpb BTitus. NRR MHamm, NRR RidsNrrDssStsb KBucholtz. NRR ADAMS Accession No.: ML13170A477 *See email dated June 13, 2013 I'OFFICE LPLI-1IPM LPLI-1/LA DSS/SBPB/BC LPLI*1/BC
, NAME NMorgan KGoldstein GCasto RBeall (A)
DATE 6/25/13 6/21/13 6/13/2013* 6/26/13 OFFICIAL RECORD COpy