ML13162A745

From kanterella
Jump to navigation Jump to search
Email B. Dean to C. Miller Et Al., FW: NRC Daily Notes for April 19, 2012
ML13162A745
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 04/19/2012
From: Bill Dean
NRC Region 1
To: Clifford J, Mel Gray, David Lew, Chris Miller, Darrell Roberts, James Trapp, Wilson P
NRC Region 1
References
FOIA/PA-2013-0010
Download: ML13162A745 (2)


Text

Gray, Mel i l IjI From: Dean, Bill Sent: Thursday, April 19, 2012 6:09 PM To: Miller, Chris; Wilson, Peter; Trapp, James; Clifford, James; Roberts. Darrell; Gray, Mel Cc: Lew, David

Subject:

FW: NRC Daily Notes for April 19, 2012 Note item on the 2.206 FitzPatrick meeting.

from: NRC Daily Notes [mailto:EDO.GrouoAccount@nrc.govl Sent: Thursday, April 19, 2012 4:00 PM To: EDO GroupAccount Cc: Pena, Alex Subject' NRC Daily Notes for April 19, 2012

-Daily Notes for April 19,22012 bMSS Outside of Scope N4RR on /1%

C a4t__1

Oft April 17-I8, the staff held a public workshop with industry and public stakeholders to continue the development of the safety culture common language for power reactors. This workshop continued to refine and develop the draft common language document that resulted from the December 2011 workshop. Significant progress was made and by the end of this workshop, all stakeholders agreed to a list of draft attributes and the associated definitions.

Next steps include the development of examples for all the attributes and a future workshop w'll be convened to discuss them.

On April 17, Paul Gunter (Beyond Nuclear) and Jessica Azulay (Alliance for a Green Economy) addressed the Petition Review Board (PRB) at a public meeting regarding a 2.206 petition request to take emergency enforcement action against Entergy Nuclear Operations, Inc. with regard to the undue risk to the public health and safety caused by the continued operation of FitzPatrick. The petitioners asserted that the pre-existing ductwork containment vent system is not installed with the proper hardened venting system needed for operation of Fit.Patrick. Other petitioners addressing the PRB by phone included the Sierra Club (Atlantic Chapter), Citizen Awareness Network, and Citizen Environmental Coalition. This petition was sqibmitted by 8 joint petitioners and approximately 300 co-petitioners. A second meeting is planned.

Ri, 0n April 19, Duke Energy announced that Jim Morris, Catawba Site Vice President, will retire o4 May 1. George Hamrick, current Station Manager, will assume the Site Vice President role oh an interim basis until the Duke Energy/Progress Energy merger is finalized and a permanent replacement is named.

Irrom April 19 to 23, Nuclear Fuel Services, Inc. (NFS) in Erwin, TN may be subject to local demonstrations and protests coinciding with Earth Day. NFS has contacted local law enforcement authorities and is making preparations should a protest occur.

2