Letter Sequence Other |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
|
MONTHYEARML11109A0352011-04-15015 April 2011 Independent Spent Fuel Storage Installation, Nine Mile Point and Re. Ginna, Notice Regarding Change in Corporate Form of E.D.F. International SA Project stage: Request RS-11-084, Request for Threshold Determination Under 10 CFR 50.802011-05-18018 May 2011 Request for Threshold Determination Under 10 CFR 50.80 Project stage: Request ML1116000442011-06-0909 June 2011 Acceptance Review for Proposed Exelon/Constellation Merger Project stage: Acceptance Review ML11173A0672011-06-17017 June 2011 Independent Spent Fuel Storage Installation, Nine Mile, Units 1 & 2, R. E. Ginna and Independent Spent Fuel Storage Installation - Supplement to Application for Approval of Indirect Transfer of Control of Licenses Project stage: Request RS-11-105, Response to Request for Additional Information Regarding Request for Threshold Determination Under 10 CFR 50.802011-06-24024 June 2011 Response to Request for Additional Information Regarding Request for Threshold Determination Under 10 CFR 50.80 Project stage: Response to RAI ML1115803382011-06-28028 June 2011 Notice of Consideration of Approval of Application Regarding Proposed Corporate Merger and Opportunity for a Hearing - R.E. Ginna Nuclear Power Plant and R.E. Ginna Independent Spent Fuel Storage Installation Project stage: Other ML1115803442011-06-28028 June 2011 Notice of Consideration of Approval of Application Regarding Proposed Corporate Merger and Opportunity for a Hearing - R.E. Ginna Nuclear Power Plant and R.E. Ginna Independent Spent Fuel Storage Installation Project stage: Other ML1115803652011-06-28028 June 2011 Notice of Consideration of Approval of Application Regarding Proposed Corporate Merger and Opportunity for a Hearing - Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2, and Calvert Cliffs Independent Spent Fuel Storage Installation (TA Project stage: Other ML1115803762011-06-28028 June 2011 Notice of Consideration of Approval of Application Regarding Proposed Corporate Merger and Opportunity for a Hearing - Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2, and Calvert Cliffs Independent Spent Fuel Storage Installation (TA Project stage: Other ML1115804052011-06-28028 June 2011 Notice of Consideration of Approval of Application Regarding Proposed Corporate Merger and Opportunity for a Hearing - Nine Mile Point Nuclear Station, Unit Nos. 1 and 2 Project stage: Other ML1115804312011-06-28028 June 2011 Notice of Consideration of Approval of Application Regarding Proposed Corporate Merger and Opportunity for a Hearing - Nine Mile Point Nuclear Station, Unit Nos. 1 and 2 Project stage: Other ML1119304532011-07-14014 July 2011 Request for Additional Information - Proposed Merger Between Constellation Energy Group, Inc. and Exelon Corporation Project stage: RAI RS-11-127, Response to Request for Additional Information - Proposed Merger Between Constellation Energy Group, Inc. and Exelon Corporation2011-08-0303 August 2011 Response to Request for Additional Information - Proposed Merger Between Constellation Energy Group, Inc. and Exelon Corporation Project stage: Response to RAI ML11234A0622011-08-12012 August 2011 Response to Nrc'S Request for Additional Information on License Transfer Application Project stage: Request ML1122703802011-08-19019 August 2011 Request for Withholding Information from Public Disclosure for Proposed Merger Between Constellation Energy Group, LLC and Exelon Corporation Project stage: Withholding Request Acceptance ML1127006812011-10-0303 October 2011 Summary of September 26, 2011, Meeting with Constellation Energy Nuclear Group, LLC on the Proposed Merger Between Constellation Energy Group, Inc. and Exelon Corporation (TAC Nos. ME6234 - ME6238) Project stage: Meeting ML1128402172011-10-12012 October 2011 Request for Additional Information(Public) Proposed Merger Between Exelon Corporation and Constellation Energy Group, Inc (TAC Nos ME6234-ME6238) Project stage: RAI ML1128401992011-10-12012 October 2011 Transmittal Letter, Request for Additional Information (NON-PROPRIETARY) Proposed Merger Between Exelon Corporation and Constellation Energy Group, Inc. Project stage: RAI ML11335A0242011-11-10010 November 2011 Units 1 & 2, R. E. Ginna and Independent Spent Fuel Storage Installations - Response to Nrc'S Request for Addtional Information on License Transfer Application Project stage: Request RS-11-181, Submittal of Revised Post-Transaction Organization Related to Application for Approval of Indirect Transfer of Control of Licenses2011-11-11011 November 2011 Submittal of Revised Post-Transaction Organization Related to Application for Approval of Indirect Transfer of Control of Licenses Project stage: Request ML11325A2582011-11-18018 November 2011 Units 1 & 2 and Independent Spent Fuel Storage Installation - Response to Nrc'S Request for Additional Information on License Transfer Application Project stage: Request RS-11-187, ISFSI, Nine Mile Point, Units 1 & 2, and R.E. Ginna & ISFSI, Submittal of Additional Information Exelon Consolidated Financial Statements Related to Application for Approval of Indirect Transfer of Control of Licenses2011-11-22022 November 2011 ISFSI, Nine Mile Point, Units 1 & 2, and R.E. Ginna & ISFSI, Submittal of Additional Information Exelon Consolidated Financial Statements Related to Application for Approval of Indirect Transfer of Control of Licenses Project stage: Request ML12032A1532012-01-25025 January 2012 Independent Spent Fuel Storage Installation, Nine Mile, Units 1 & 2, R. E. Ginna and Independent Spent Fuel Storage Installation - Supplemental Information Project stage: Request ML1203400102012-02-15015 February 2012 FRN: General Notice. Order Approving Application Regarding Proposed Corporate Merger and Indirect Transfer of License Project stage: Request ML1203400312012-02-15015 February 2012 FRN: General Notice. Order Approving Application Regarding Proposed Corporate Merger and Indirect Transfer of Licenses Project stage: Request ML1135603972012-02-15015 February 2012 FRN: General Notice. Order Approving Application Regarding Proposed Corporate Merger and Indirect Transfer of License Project stage: Request ML1135604082012-02-15015 February 2012 Safety Evaluation by the Office of Nuclear Reactor Regulation Indirect Transfer of Control of Facility Operating Licenses Due to the Proposed Merger Between Exelon Corp & Constellation Energy Group, Inc., Calvert Cliffs Nuclear Power Plant, Project stage: Request ML1135603812012-02-15015 February 2012 Order Approving Corporate Merger Between Exelon Corporation and Constellation Energy Group, Inc. and Resultant Indirect Transfer of Renewed Facility Operating Licenses - Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2, and Independent Project stage: Acceptance Review ML12081A0182012-03-12012 March 2012 Notification of Closing of Corporate Merger of Exelon Corporation and Constellation Energy Group, Inc Project stage: Other ML13037A3802012-12-17017 December 2012 Attachment 1b, 2012 Annual Report of the Ceng Independent Nuclear Advisory Committee Project stage: Other ML13037A3792013-01-30030 January 2013 R. E. Ginna, Submittal of Annual Report of the Nuclear Advisory Committee Project stage: Other ML16011A0032016-01-0707 January 2016 Submittal of Annual Report of the Nuclear Advisory Committee Project stage: Other 2011-06-28
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 IR 05000317/20230042024-02-0101 February 2024 Integrated Inspection Report 05000317/2023004 and 05000318/2023004 NMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 ML24029A0102024-01-29029 January 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000317/2024010 and 05000318/2024010 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of B Auxiliary Feedwater Pump NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24003A8872024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0033 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000318/LER-2023-004, Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-01-16016 January 2024 Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer ML24011A0732024-01-11011 January 2024 Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping 05000318/LER-2023-002, Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-01-0808 January 2024 Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer 05000318/LER-2023-003, Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip2024-01-0808 January 2024 Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24005A0222024-01-0505 January 2024 Revised Steam Generator Tube Inspection Reports ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23304A0642024-01-0202 January 2024 Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23291A4642023-12-0707 December 2023 Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants NMP1L3564, Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements RS-23-125, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) ML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-12-0404 December 2023 Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) IR 05000220/20234022023-11-28028 November 2023 Security Baseline Inspection Report 05000220/2023402 and 05000410/2023402 ML23331A2992023-11-27027 November 2023 Submittal of Condition Prohibited by Technical Specifications Due to Failure to Sample Diesel Generator Fuel Oil Storage Tank NMP1L3557, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000317/20230102023-11-20020 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000317/2023010 and 05000318/2023010 ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23318A4722023-11-14014 November 2023 Supplement to License Amendment Request to Adopt TSTF-59-A ML23317A1032023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23310A0442023-11-0707 November 2023 Project Manager Assignment IR 05000317/20230402023-11-0202 November 2023 95001 Supplemental Inspection Report 05000317/2023040 and Follow-Up Assessment Letter IR 05000317/20230032023-11-0101 November 2023 Integrated Inspection Report 05000317/2023003 and 05000318/2023003 IR 05000220/20234202023-11-0101 November 2023 Security Baseline Inspection Report 05000220/2023420 and 05000410/2023420 ML23305A0052023-11-0101 November 2023 Operator Licensing Examination Approval IR 05000317/20230902023-10-26026 October 2023 Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation; Inspection Report 05000317/2023090 IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 IR 05000220/20230032023-10-25025 October 2023 Integrated Inspection Report 05000220/2023003 and 05000410/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection IR 05000220/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000220/2023501 and 05000410/2023501 IR 05000220/20230112023-10-16016 October 2023 Comprehensive Engineering Team Inspection Report 05000220/2023011 and 05000410/2023011 2024-02-05
[Table view] |
Text
This letter contains proprietary information requested to be withheld from public disclosure under 10 CFR 2.390. The letter is non-proprietary upon removal of Attachment (1).
CENGS.
a joint venture of 100 Constellation Way Suite 200C Baltimore, MD 21202-3106 410.470.3312 Steven L. Miller, Senior Vice President General Counsel, Secretary 443.213.3680 Fax Constellation Energy10 'FeDF steven.miller@cengllc.com January 30, 2013 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION: Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit Nos. 1 & 2; Docket Nos. 50-317 & 50-318 Nine Mile Point Nuclear Station Unit Nos. I & 2; Docket Nos. 50-220 & 50-410 R. E. Ginna Nuclear Power Plant Docket No. 50-244 Submittal of Annual Report of the Nuclear Advisory Committee
REFERENCE:
(a) Letter from D. V. Pickett (NRC) to C. M. Crane (Exelon), dated February 15, 2012, Orders Approving Corporate Merger Between Exelon Corporation and Constellation Energy Group, Inc., and Resultant Indirect Transfer of Renewed Facility Operating Licenses -Calvert Cliffs Nuclear Power Plant, Unit Nos. I and 2, and Independent Spent Fuel Storage Installation, Nine Mile Point Nuclear Station, Unit Nos. 1 and 2, and R. E. Ginna Nuclear Power Plant (TAC Nos. ME6234, ME6235, ME6236, ME6237, and ME6238)
The purpose of this letter is to provide the annual report of the Constellation Energy Nuclear Group, LLC (CENG) Nuclear Advisory Committee, as required by Reference (a). Reference (a) requires that the report be submitted within 30 days of the completion of the report or January 31, whichever comes first. The report was distributed to the CENG board of directors and declared final on January 22, 2013.
Attachment (1) is a proprietary version of the annual report of the Nuclear Advisory Committee to the CENG Board of Directors. Attachment (lb) contains a redacted version of the annual report. Attachment (2) is the 10 CFR 2.390 affidavit of Steven L. Miller.
This correspondence does not contain any regulatory commitments.
If there are any questions concerning this letter, please contact Everett (Chip) Perkins at everett.perkinsgcengl lc.com or 410-470-3928.
IkoDo
Document Control Desk January 30, 2013 Page 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on January 30, 2013.
Sincerel /
Steven L. Miller Senior Vice President General Counsel, Secretary Constellation Energy Nuclear Group, LLC SLM/EMT/bjd Attachments: (1) 2012 Report of the Nuclear Advisory Committee to the CENG Board of Directors (1b) 2012 Report of the Nuclear Advisory Committee to the CENG Board of Directors (Redacted)
(2) 10 CFR 2.390 Affidavit of Steven L. Miller cc: B. K. Vaidya, NRC Resident Inspector, NRC (Calvert Cliffs)
M. C. Thadani, NRC Resident Inspector, NRC (Ginna)
N. S. Morgan, NRC Resident Inspector, NRC (Nine Mile Point)
W. M. Dean, NRC S. Gray, Maryland DNR