This letter contains proprietary information requested to be withheld from public disclosure under 10 CFR 2.390. The letter is non-proprietary upon removal of Attachment (1).

CENGS.

a joint venture of 100 Constellation Way Suite 200C Baltimore, MD 21202-3106 410.470.3312 Steven L. Miller, Senior Vice President General Counsel, Secretary 443.213.3680 Fax Constellation Energy10 'FeDF steven.miller@cengllc.com January 30, 2013 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION: Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos. 1 & 2; Docket Nos. 50-317 & 50-318 Nine Mile Point Nuclear Station Unit Nos. I & 2; Docket Nos. 50-220 & 50-410 R. E. Ginna Nuclear Power Plant Docket No. 50-244 Submittal of Annual Report of the Nuclear Advisory Committee

REFERENCE:

(a) Letter from D. V. Pickett (NRC) to C. M. Crane (Exelon), dated February 15, 2012, Orders Approving Corporate Merger Between Exelon Corporation and Constellation Energy Group, Inc., and Resultant Indirect Transfer of Renewed Facility Operating Licenses -Calvert Cliffs Nuclear Power Plant, Unit Nos. I and 2, and Independent Spent Fuel Storage Installation, Nine Mile Point Nuclear Station, Unit Nos. 1 and 2, and R. E. Ginna Nuclear Power Plant (TAC Nos. ME6234, ME6235, ME6236, ME6237, and ME6238)

The purpose of this letter is to provide the annual report of the Constellation Energy Nuclear Group, LLC (CENG) Nuclear Advisory Committee, as required by Reference (a). Reference (a) requires that the report be submitted within 30 days of the completion of the report or January 31, whichever comes first. The report was distributed to the CENG board of directors and declared final on January 22, 2013.

Attachment (1) is a proprietary version of the annual report of the Nuclear Advisory Committee to the CENG Board of Directors. Attachment (lb) contains a redacted version of the annual report. Attachment (2) is the 10 CFR 2.390 affidavit of Steven L. Miller.

This correspondence does not contain any regulatory commitments.

If there are any questions concerning this letter, please contact Everett (Chip) Perkins at everett.perkinsgcengl lc.com or 410-470-3928.

IkoDo

Document Control Desk January 30, 2013 Page 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on January 30, 2013.

Sincerel /

Steven L. Miller Senior Vice President General Counsel, Secretary Constellation Energy Nuclear Group, LLC SLM/EMT/bjd Attachments: (1) 2012 Report of the Nuclear Advisory Committee to the CENG Board of Directors (1b) 2012 Report of the Nuclear Advisory Committee to the CENG Board of Directors (Redacted)

(2) 10 CFR 2.390 Affidavit of Steven L. Miller cc: B. K. Vaidya, NRC Resident Inspector, NRC (Calvert Cliffs)

M. C. Thadani, NRC Resident Inspector, NRC (Ginna)

N. S. Morgan, NRC Resident Inspector, NRC (Nine Mile Point)

W. M. Dean, NRC S. Gray, Maryland DNR