NRC Staff Hearing File Update 14
ML13030A349
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/30/2013
From: Harris B
NRC/OGC
To: William Froehlich, Kastenberg W, Nicholas Trikouros
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 24055, 50-346-LR, ASLBP 11-907-01-LR-BD01
Download: ML13030A349 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, DC 20555 - 0001 January 30, 2013 Administrative Judge Administrative Judge William J. Froehlich, Chair Nicholas G. Trikouros Atomic Safety and Licensing Board Atomic Safety and Licensing Board Mail Stop: T-3F23 Mail Stop: T-3F23 Washington, DC 20555-001 Washington, DC 20555-0001 Administrative Judge Dr. William E. Kastenberg Atomic Safety and Licensing Board Mail Stop: T-3F23 Washington, DC 20555-0001 In the Matter of FirstEnergy Nuclear Operating Co.

(Davis-Besse Nuclear Power Station, Unit 1)

Docket No. 50-346-LR

Dear Administrative Judges:

Pursuant to 10 C.F.R. §§ 2.1203 and 2.336 and as modified by the Atomic Safety and Licensing Boards (Board) Memorandum and Order dated June 15, 2011 (Order), the staff of the Nuclear Regulatory Commission (Staff) is providing an index identifying documents subject to disclosure under the Boards Order. On or about January 7, 2013, materials in the hearing file may be accessed through the Agencywide Documents Access and Management System (ADAMS) and through the Electronic Hearing Docket (EHD). The index contains the ADAMS accession number, document date, and the document title.

Pursuant to 10 C.F.R. § 2.336(c), attached is the Affidavit of Samuel Cuadrado De Jesus, certifying that all relevant materials required by this section have been disclosed, and that the disclosures are accurate and complete as to documents identified by January 25, 2013.

The NRC Staff notes that it has made a good faith effort to identify and characterize all documents meeting the criteria of 10 C.F.R. § 2.336(b) and 10 C.F.R. § 2.1203 in this proceeding. In identifying these documents, the Staff does not concede their relevance to the license renewal issues to be decided in this proceeding.

The NRC Staff notes the Safety Evaluation Report (SER) with open items was published July 31, 2012 and the Staff is currently expecting to publish the SER in July 2013. The Staff currently anticipates publication of the Draft Supplemental Environmental Impact Statement (DSEIS) in May 2013 and the Final SEIS in November 2013.

Respectfully submitted,

/signed (electronically) by/

Brian G. Harris Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 (301) 415-1392 Brian.harris@nrc.gov

Enclosures:

Attachment 1: Hearing File Index Attachment 2: Affidavit of Samuel Cuadrado De Jesus Attachment 1 - Davis-Besse License Renewal Hearing File Index Update 14 - January 30, 2013 ID No. Accession Number Document Title Date NRC00675 ML13016A376 12/14/2012 2012/12/14 Davis-Besse LR - RE: Commitment list NRC00676 ML13016A385 12/17/2012 2012/12/17 Davis-Besse LR - Davis Besse Telephone Conference Call NRC00677 ML13016A458 12/17/2012 2012/12/17 Davis-Besse LR - RE: Davis Besse Telephone Conference Call NRC00678 ML13016A381 12/17/2012 2012/12/17 Davis-Besse LR - Re: Shield Building Draft RAIs NRC00679 ML13016A382 12/17/2012 2012/12/17 Davis-Besse LR - Re: Shield Building Draft RAIs NRC00680 ML13016A380 12/17/2012 2012/12/17 Davis-Besse LR - Shield Building Draft RAIs NRC00681 ML13016A460 12/18/2012 2012/12/18 Davis-Besse LR - Davis Besse Teleconference-High Strength Bolts NRC00682 ML13016A374 12/18/2012 2012/12/18 Davis-Besse LR - Re: Davis Besse Teleconference-High Strength Bolts NRC00683 ML13016A472 12/19/2012 2012/12/19 Davis-Besse LR - Re: Shield Building Draft RAIs NRC00684 ML13016A470 12/19/2012 2012/12/19 Davis-Besse LR - RE: Shield Building Draft RAIs NRC00685 ML13016A465 12/19/2012 2012/12/19 Davis-Besse LR - Re: Telephone conference call on High Strength Bolts RAI NRC00686 ML13016A466 12/19/2012 2012/12/19 Davis-Besse LR - RE: Telephone conference call on High Strength Bolts RAI NRC00687 ML13016A464 12/19/2012 2012/12/19 Davis-Besse LR - Shield Building Draft RAIs NRC00688 ML13016A467 12/19/2012 2012/12/19 Davis-Besse LR - Telephone conference call on High Strength Bolts RAI 2012/12/20 Davis-Besse LR - FENOC Letter L-12-432 -- Supplemental Response to RAI NRC00689 ML13016A509 12/20/2012 B.2.2-3 NRC00690 ML13016A502 12/20/2012 2012/12/20 Davis-Besse LR - FW: DB High Strength Bolt Inspection Deferrals 2012/12/20 Davis-Besse LR - NRC-FENOC Telecon Notes re: Shield Building Draft RAIs NRC00691 ML13016A503 12/20/2012 -- 2012-12-18 NRC00692 ML13016A501 12/20/2012 2012/12/20 Davis-Besse LR - RE: Davis-Besse Contact Info NRC00693 ML13016A504 12/20/2012 2012/12/20 Davis-Besse LR - RE: DB High Strength Bolt Inspection Deferrals NRC00694 ML13016A507 12/20/2012 2012/12/20 Davis-Besse LR - RE: FW: DB High Strength Bolt Inspection Deferrals NRC00695 ML13016A505 12/20/2012 2012/12/20 Davis-Besse LR - Re: FW: DB High Strength Bolt Inspection Deferrals NRC00696 ML13016A520 1/7/2013 2013/01/07 Davis-Besse LR - Davis-Besse schedule change Telecon NRC00697 ML13016A521 1/7/2013 2013/01/07 Davis-Besse LR - SB Cracks Final RAI letter 2013/01/11 Davis-Besse LR - FENOC Telephone Conference Summary -- High Strength NRC00698 ML13016A523 1/11/2013 Bolting 2013/01/11 Davis-Besse LR - RE: FENOC Telephone Conference Summary -- High NRC00699 ML13016A524 1/11/2013 Strength Bolting 1 of 2

Attachment 1 - Davis-Besse License Renewal Hearing File Index Update 14 - January 30, 2013 ID No. Accession Number Document Title Date NRC00700 ML13016A525 1/14/2013 2013/01/14 Davis-Besse LR - Telephone conference call on DB SB follow-up RAIs NRC00701 ML13016A526 1/15/2013 2013/01/15 Davis-Besse LR - DB Shield Building RAIs Telephone Conference Call NRC00702 ML13016A528 1/15/2013 2013/01/15 Davis-Besse LR - RE: DB Shield Building RAIs Telephone Conference Call NRC00703 ML13016A527 1/15/2013 2013/01/15 Davis-Besse LR - Re: DB Shield Building RAIs Telephone Conference Call NRC00704 ML13024A256 1/16/2013 2013/01/16 Davis-Besse LR - Draft Teleconference Summary NRC00705 ML13024A262 1/16/2013 2013/01/16 Davis-Besse LR - Draft Teleconference Summary 10 23 2012 2013/01/21 Davis-Besse LR - FENOC License Renewal Letter L-12-455 (High Strength NRC00706 ML13024A267 1/21/2013 Bolting) Sent Today NRC00707 ML13024A275 1/22/2013 2013/01/22 Davis-Besse LR - Davis-Besse Updated Commitment List 2013/01/22 Davis-Besse LR - RE: FENOC License Renewal Letter L-12-455 (High NRC00708 ML13024A268 1/22/2013 Strength Bolting) Sent Today NRC00709 ML13024A263 1/22/2013 2013/01/22 Davis-Besse LR - teleconference call NRC00710 ML13024A270 1/23/2013 2013/01/23 Davis-Besse LR - Davis-Besse Telephone Conference Call NRC00711 ML13024A273 1/23/2013 2013/01/23 Davis-Besse LR - Re: Davis-Besse Telephone Conference Call 2013/01/24 Davis-Besse LR - FENOC Telephone Conference Summary 1/23/2013 --

NRC00712 ML13024A277 1/24/2013 Shield Building RAIs NRC00713 ML13024A276 1/24/2013 2013/01/24 Davis-Besse LR - RE: Draft Teleconference Summary 10 23 2012 2 of 2

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

FIRSTENERGY NUCLEAR OPERATING CO. ) Docket No. 50-346-LRA

)

(Davis-Besse Nuclear Power Station, Unit 1) )

)

AFFIDAVIT OF SAMUEL CUADRADO DE JESUS CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)

I, Samuel Cuadrado De Jesus, do hereby state as follows:

1. I am employed as a Project Manager in the Division of License Renewal in the U.S. Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. I serve as a project manager for the Davis-Besse Nuclear Power Station, Unit 1, license renewal application (LRA). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the LRA at issue in this proceeding.
2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed in the attached Hearing File Index and that the disclosures are accurate and complete for documents identified as of Janaury 25, 2013.
3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

Executed in Accord with 10 C.F.R. § 2.304(d)

Samuel Cuadrado De Jesus Executed in Rockville, Maryland this 30th day of January, 2013

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

FIRSTENERGY NUCLEAR OPERATING CO. ) Docket No. 50-346-LRA

)

(Davis-Besse Nuclear Power Station, Unit 1) )

)

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (revised), I hereby certify that copies of the Letter from Brian G. Harris to the Board; Attachment 1: Hearing File Index; and the Affidavit of Samuel Cuadrado De Jesus Concerning Mandatory Disclosure Requirement of 10 C.F.R. § 2.336(b),

each dated January 30, 2013, in the above-captioned proceeding have been served upon the Electronic Information Exchange, the NRCs E-Filing System, in the above captioned proceeding, this 30th day of January, 2013.

Signed (electronically) by Brian G. Harris Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 Telephone: (301) 415-1392 E-mail: brian.harris@nrc.gov Date of Signature: January 30, 2013