Letter Sequence RAI |
---|
|
|
MONTHYEARML0918106852009-08-14014 August 2009 Texas a & M (Triga) University, Change of Facility Project Manager Effective 04/01/2009 to William Schuster Project stage: Other ML11154A0842011-05-18018 May 2011 Response to Texas A&M University - Follow -Up on Request for Additional Information Regarding the Texas A&M University AGN-201M Reactor (TAC No. ME1588), October 9, 2009 Project stage: Request ML11250A0982011-08-25025 August 2011 Response to Request for Additional Information Regarding the Texas A&M University AGN-201M Reactor License Renewal Application Project stage: Response to RAI ML11272A1272011-09-19019 September 2011 Response to Texas A&M University - Request for Additional Information Regarding the Texas A&M University AGN-201M Reactor License Renewal Application (TAC No. ME1588), July 25, 2011. Project stage: Request ML11326A1872011-11-10010 November 2011 Response to Texas A&M University - Request for Additional Information Re License Renewal Application Project stage: Request ML11347A3632011-12-0202 December 2011 Response to Texas A&M University - Request for Additional Information Regarding the Texas A&M University AGN-201M Reactor License Renewal Application, July 25, 2011 Project stage: Request ML12018A1692011-12-22022 December 2011 Response to Texas A&M University - Request for Additional Information Regarding the Texas A&M University AGN-201 M Reactor License Renewal Application (Tac. No. ME1588), July 25,2011 Project stage: Request ML1202600102012-01-26026 January 2012 Texas A&M University - Approval of Request for an Extension, Response to NRC Request for Additional Information Dated July 25, 2011 (Tac No. ME1588) Project stage: RAI ML12060A0342012-02-15015 February 2012 Response to Texas A&M University - Request for Additional Information Regarding the Texas A&M University AGN-201M Reactor License Renewal Application, July 25, 2011 Project stage: Request ML12128A4282012-04-12012 April 2012 Response to Texas A&M University - Request for Additional Information Regarding the Texas A&M University AGN-201M Reactor License Renewal Application (TAC No. ME1588). Project stage: Request ML12312A2322012-12-0606 December 2012 Texas a & M University - Additional Clarification Requested Responses to NRC Request for Additional Information Dated July 25, 2011 Project stage: RAI ML13073A1222013-03-0606 March 2013 Texas A&M University, Additional Clarification to Responses to NRC Request for Additional Information Regarding the Review of AGN-201M Research Reactor License Renewal Project stage: Response to RAI ML13137A3382013-06-0606 June 2013 Texas A&M University - Financial Update Request for Additional Information Regarding the Review of the Texas A&M University AGN-201M Research Reactor License Renewal Project stage: RAI ML13193A0122013-06-28028 June 2013 Suspension of Texas A&M AGN-201M Reactor Operations Project stage: Request ML13189A0582013-07-30030 July 2013 Texas A&M University Aerojet General Nucleonics Model 201-Modified Reactor, Confirmatory Action Letter Regarding Shutdown Related to Reactor Safety System Project stage: Other ML14015A3152013-12-17017 December 2013 Response to Texas A&M University Aerojet General Nucleonics Model 201-Modified Reactor Confirmatory Action Letter Regarding Shutdown Related to Reactor Safety System Project stage: Request ML14087A0062014-03-10010 March 2014 Response to Texas A&M University Aerojet General Nucleonics Model 201-Modified Reactor Confirmatory Action Letter Regarding Shutdown Related to Reactor Safety System Project stage: Request ML14105A4422014-05-23023 May 2014 Texas A&M University Acknowledging Commitments in CAL No. EA-2013-154 to Address Shutdown Related to Reactor Safety System Project stage: Other 2012-12-06
[Table View] |
|
---|
Category:Letter
MONTHYEARML23350A0072023-12-16016 December 2023 Texas A&M University Engineering Experiment Station, Nuclear Engineering & Science Center (Tees) Submittal of Revised Emergency Plan ML23344A0012023-12-10010 December 2023 Texas A&M Univ., License Management Change ML22226A0012022-06-24024 June 2022 Texas A&M Univ., License Amendment Request Re Management Change IR 05000059/20212012021-10-25025 October 2021 Texas A&M University - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000059/2021201 IR 05000059/20212022021-10-20020 October 2021 Texas A&M University - U.S. Nuclear Regulatory Commission Security-Related Inspection Report No. 05000059/2021202 (Letter) ML21256A3042021-09-13013 September 2021 Notification of Changes in License Level Personnel for the Texas A&M Experiment Station NSCR (R-83) and the Texas A&M University Agn (R-23) ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards IR 05000059/20182012018-10-19019 October 2018 Texas A&M University - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 50-059/2018-201 IR 05000059/20172012018-03-0808 March 2018 Texas A&M University - U.S. Nuclear Regulatory Commission Security-Related Inspection Report No. 05000059/2017-201 - Cover Letter (Public) ML17031A1142017-06-30030 June 2017 Letter to Dr. Sean M. Mcdeavitt Response to Fee Waiver (Texas A&M University) ML16362A3172017-01-19019 January 2017 Texas A&M University - Issuance of Amendment No. 16 to Amended Facility Operating License No. R-23 to Modify License Conditions and Technical Specifications to Allow for the Unrestricted Use of Zachry Engineering Building ML17005A4162017-01-12012 January 2017 Letter - EA and Finding of No Significant Impact Regarding Amendment No.16 for Facility Operating License R-23 ML17010A0572017-01-0909 January 2017 Texas A&M Univ. - Final Status Survey Report Supplemental Information for the Zachry Engineering Center ML16352A0002016-12-16016 December 2016 Texas A&M University - Final Status Survey Report for the Zachry Engineering Center in Support of the November 21, 2016 License Amendment Request for AGN-201M ML16351A5022016-12-16016 December 2016 to the November 21, 2016 License Amendment Request for the Approval of the Unrestricted Release of the Zachry Engineering Center and Changes to the AGN-201M Facility License No. R-23, Docket 50-59, License and Technical Specifications ML16326A4472016-11-21021 November 2016 License Amendment Request for the Approval of the Unrestricted Release of the Zachry Engineering Center and Changes to the AGN-201M Facility License No. R-23, Docket 50-59, Technical Specification Sections 5.2 and 5.3 ML16316A0022016-11-10010 November 2016 Final Status Survey Plan Revision 1 for the Unrestricted Release of the Zachry Engineering Center ML16305A1962016-10-31031 October 2016 Texas A&M Triga and Agn Response to Us NRC Generic Letter 2016-01 ML16299A4092016-10-25025 October 2016 Texas A&M University (Tamu) - Fee Exemption Request for Review and Approval for a Model 9979 Type AF Shipping Package ML16299A5372016-10-18018 October 2016 Final Status Survey Plan for the Unrestricted Release of the Zachry Engineering Center ML16281A3802016-10-0707 October 2016 Changes to the Texas A&M University AGN-201M Technical Specifications, Facility License R-23, Docket Number 50-59 Associated with the November 11, 2016 License Amendment Request (ADAMS Accession No. ML15315A027) ML16279A0002016-10-0505 October 2016 Changes to the Texas A&M University AGN-201M Technical Specification Pages 11 and 14, Supporting the November 11, 2015, License Amendment Request for the AGN-201M Reactor ML16272A4932016-09-28028 September 2016 Texas A&M University - Fee Exemption Request for Review and Approval for a Model 9979 Type AF Shipping Package ML16272A4342016-09-27027 September 2016 Proposed Changes to Texas A&M University AGN-201M Technical Specification Page 15 Associated with License Amendment Request Dated November 11, 2015, for the AGN-201M Reactor ML16237A4402016-08-24024 August 2016 Texas A&M University - Proposed Changes to AGN-201M Technical Specification Table of Contents Associated with License Amendment Request Dated 11/11/2015, for AGN-201M Reactor ML16237A4392016-08-24024 August 2016 Texas A&M Engineering Experiment Station - Quality Assurance Program for the Model 9979 Type AF Shipping Package, Certificate Number 9979, Revision 0 ML16161A0042016-06-21021 June 2016 Examination Report No. 50-059/OL-16-01, Texas A&Amp;M University AGN-201 ML16169A3462016-06-17017 June 2016 Supplemental Information Regarding Texas A&M University License Amendment Request Dated November 11, 2015, for the AGN-201M Reactor ML16155A3882016-06-0303 June 2016 Supplemental Information Regarding Texas A&M University License Amendment Request Dated November 11, 2015 for the AGN-201M Reactor ML16162A1692016-06-0202 June 2016 Texas A&M University, Letter Regarding Change of Reviewing Officials ML16098A0772016-04-21021 April 2016 Texas A&M University - U.S. Nuclear Regulatory Commission Inspection Report 05000059/2016201, March 21�24, 2016 ML16063A3842016-03-0303 March 2016 Texas A&M Univ. - Response to Request for Additional Information from the NRC, Dated February 16, 2016, Regarding License Amendment Request Dated November 11, 2015 ML16032A0222016-02-16016 February 2016 Texas A&M University - Request for Additional Information re License Amendment Request on Interim Storage of Special Nuclear Material ML16043A0482016-02-0808 February 2016 Texas A&M Univ. - Notification of Delegation of Level 2 Authority ML15315A0272015-11-11011 November 2015 Texas A&M Univ. - License Amendment Request for AGN-201M Reactor to Approve Changes to Technical Specification 5.2 and 5.3 Authorizing Interim Storage of the Special Nuclear Material and the Disassembled AGN-201M Reactor on the Tx A&M Engin ML14290A4862015-06-0303 June 2015 Y020140127 - Withdrawal of Order EA-05-007, Order Imposing Additional Security Measures IR 05000059/20152022015-04-24024 April 2015 Texas A&M University - NRC SECURITY-RELATED Inspection Report No. 50-059/2015-202 ML15183A4622015-04-15015 April 2015 Texas A&M Univ. - Letter Providing Overview of Planned Activities to Disassemble and Temporarily Relocate the Agn 201M Reactor to the Nuclear Science Center Site ML15043A0332015-01-21021 January 2015 to Provide an Overview of Planned Major Construction Upgrades to the Zachry Engineering Center and Disposition of the Agn 201M Reactor ML14276A0332014-09-16016 September 2014 Response to Texas A&M University Request for Additional Information Regarding Aerojet General Nucleonics Model 201 Modified Reactor Confirmatory Action Letter No. EA-2013-154 ML14156A4082014-06-13013 June 2014 Texas A&M University - Request for Additional Information Regarding the Texas A&M AGN-201M Research Reactor Confirmatory Action Letter No. EA-2013-154 (TAC M79581) ML14136A4882014-05-27027 May 2014 Texas A&M University Agn - Change of Facility Backup Project Manager ML14105A4422014-05-23023 May 2014 Texas A&M University Acknowledging Commitments in CAL No. EA-2013-154 to Address Shutdown Related to Reactor Safety System ML14087A0062014-03-10010 March 2014 Response to Texas A&M University Aerojet General Nucleonics Model 201-Modified Reactor Confirmatory Action Letter Regarding Shutdown Related to Reactor Safety System ML14015A3152013-12-17017 December 2013 Response to Texas A&M University Aerojet General Nucleonics Model 201-Modified Reactor Confirmatory Action Letter Regarding Shutdown Related to Reactor Safety System ML13226A0702013-08-12012 August 2013 Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit ML13189A0582013-07-30030 July 2013 Texas A&M University Aerojet General Nucleonics Model 201-Modified Reactor, Confirmatory Action Letter Regarding Shutdown Related to Reactor Safety System ML13198A5742013-07-18018 July 2013 Examination Results No. 50-059/OL-13-01, Texas A&M University AGN-201 ML13198A5692013-07-18018 July 2013 Examination Report No. 50-059/OL-13-01, Texas A&M University Agn 201M Reactor ML13193A0122013-06-28028 June 2013 Suspension of Texas A&M AGN-201M Reactor Operations 2023-12-16
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML16032A0222016-02-16016 February 2016 Texas A&M University - Request for Additional Information re License Amendment Request on Interim Storage of Special Nuclear Material ML14156A4082014-06-13013 June 2014 Texas A&M University - Request for Additional Information Regarding the Texas A&M AGN-201M Research Reactor Confirmatory Action Letter No. EA-2013-154 (TAC M79581) ML12312A2322012-12-0606 December 2012 Texas a & M University - Additional Clarification Requested Responses to NRC Request for Additional Information Dated July 25, 2011 ML0927405312009-10-0909 October 2009 Texas A&M University, Request for Additional Information License Renewal Application, AGN-201M Reactor ML0527004982005-10-0707 October 2005 RAI Letter - Security Measures - Berry 2016-02-16
[Table view] |
Text
December 6, 2012 Dr. Yassin Hassan Department Head- Acting, Nuclear Engineering Texas A&M University 337 Zachry Engineering Center College Station, TX 77843-3133
SUBJECT:
TEXAS A & M UNIVERSITY - ADDITIONAL CLARIFICATION TO RESPONSES TO NRC REQUEST FOR ADDITIONAL INFORMATION REGARDING THE REVIEW OF THE TEXAS A & M UNIVERSITY AGN-201M RESEARCH REACTOR LICENSE RENEWAL (TAC NO. ME1588)
Dear Dr. Hassan:
The U.S. Nuclear Regulatory Commission (NRC) is continuing its review of your application for the renewal of Facility Operating License No. R-23 for the Texas A & M University AGN-201M Reactor dated July 22, 1997, (a redacted version of the safety analysis report is available on the NRCs public Web site at www.nrc.gov under Agencywide Documents Access and Management System (ADAMS) Accession No. ML102790087). As part of our review, the NRC staff submitted requests for additional information (RAI) by letter dated July 25, 2011, (ADAMS Accession No. ML112000240).
The NRC staff has reviewed your responses and identified in the attached table those RAI responses needing additional clarification. Please provide your responses within 90 days of the date of this letter. In accordance with Title 10 of the Code of Federal Regulations (10 CFR)
Section 50.30(b), you must execute your response in a signed original document under oath or affirmation. Your response must be submitted in accordance with 10 CFR 50.4, Written Communications. Information included in your response that is considered security, sensitive, or proprietary, that you seek to have withheld from the public, must be marked in accordance with 10 CFR 2.390, Public inspections, exemptions, requests for withholding.
If you have any questions regarding this review, please contact Patrick Boyle at (301) 415-3936 or by electronic mail at Patrick.Boyle@nrc.gov.
Sincerely,
/JLising for RA/
Geoffrey Wertz, Project Manager Research and Test Reactors Licensing Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-59
Enclosure:
As stated cc w/encl: See next page
Texas A&M University Docket No. 50-59 cc:
Mayor, City of College Station P.O. Box Drawer 9960 College Station, TX 77840-3575 Governors Budget and Planning Office P.O. Box 13561 Austin, TX 78711 Chris Crouch AGN-201M Reactor Supervisor Nuclear Engineering Department 129 Zachry Engineering Center College Station , TX 77843 Radiation Program Officer Bureau of Radiation Control Dept. Of State Health Services Division for Regulatory Services 1100 West 49th Street, MC 2828 Austin, TX 78756-3189 Technical Advisor Office of Permitting, Remediation & Registration Texas Commission on Environmental Quality P.O. Box 13087, MS 122 Austin, TX 78711-3087 Test, Research, and Training Reactor Newsletter University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611
ML12312A232 *via email TEMPLATE # NRR-088 OFFICE PRLB:NE PRLB:PM* PRLB:LA PRLB:ABC PRLB:PM NAME PBoyle GWertz GLappert PIsaac GWertz DATE 11/8/12 11/7/12 11/14 /12 12/6/12 12/6/12 OFFICE OF NUCLEAR REACTOR REGULATION ADDITIONAL CLARIFICATION ON RESPONSES FOR THE RENEWAL OF FACILITY OPERATING LICENSE TEXAS A & M UNIVERSITY AGN-201M RESEARCH REACTOR LICENSE NO. R-23 DOCKET NO. 50-59 The U.S. Nuclear Regulatory Commission (NRC) has reviewed your responses to our requests for additional information (RAIs) and has identified the following RAI responses that need additional clarification.
RAI RAI Original RAI Description Response Additional Clarification Needed No.
Date Please describe the hardware components and software associated with AGN computer discussed in Chapter 7 of the Safety Analysis Report (SAR). Include a discussion of what verification and validation was used for Describe the design criteria for 06 12/22/2011 the design and installation. Identify which reactor scram signals are the console upgrade.
generated by the AGN computer and which ones are hardwired directly to the scram circuit. Describe the design elements addressing the potential for a single failure disabling multiple scram inputs.
Please explain why the Limiting Conditions for Operation (LCO) for a scram Limiting Condition of Operation was proposed for section 3.4, Radiation Monitoring, Control, and Shielding 07 for the skirt radiation monitor 12/02/2011 instead of section 3.2 Control and Safety Systems which contains a listing scram.
of all of the other scram inputs Channel #2 Period Scram Please explain how the computer calculates the period and how frequently 08 design impact from the AGN 04/12/2012 this is compared to the trip set point. Explain the safety impact of using a computer computer for this function compared to the previously installed rate meter.
ENCLOSURE
RAI RAI Original RAI Description Response Additional Clarification Needed No.
Date Describe how the AGN computer takes the signal from the picoammeter and generates a scram signal based on the output of the Channel #3 detector. How often is the signal compared to the set point and what Channel #3 Linear Power Scram processors are involved? What is the cumulative effect of the delay 09 design impact from the console 04/12/2012 associated with each step between an increase (or decrease for low power upgrade trip) in the detector output and initiation of a scram signal including processor delays associated with the other processor demands on the AGN computer? Explain what digital filtering is used and how this affects the overall response time.
Your statement that There was no Technical Specification (TS) requirement Reactor Control System does for this interlock feature is not consistent with the current wording TS 3.2.e, not show how the Interlock 11 12/22/2011 3.2.f and 3.2.g. Please explain how you are complying with the requirement Relay function was incorporated to have shield water level interlock, and shield water temperature into the upgrade.
interlock that will prevent a reactor start up and scram the reactor The proposed wording for LCO 3.2.k contains the word installed. It is not clear what is meant by the word installed. Please provide a definition for the word installed, to be included in section 1 or consider the use of a Incorporation of the watch-dog defined word such as operable or operating in the proposed LCO.
13 scram into the appropriate LCO 04/12/2012 and Chapter 13 update Please provide a safety analysis of the design change that discusses the AGN computer, its potential failure modes, and what features are relied upon to ensure operability (ability to perform its intended safety function).
Some of the survey locations indicate a dose rate greater than 10 milli-Roentgen Equivalent Man/hour (mrem/hr). What actions are being Radiation protection program implemented in these areas to ensure ALARA principles are considered?
and as low as reasonably The RAI response indicates three phantom monitors are present at the 14 08/25/2011 achievable ( ALARA) facility. What are these phantom monitors and how are they used? The RAI considerations response also indicated, facility personnel are supplied with dosimetry.
Who is considered to be facility personnel and what type of dosimetry is used?
RAI RAI Original RAI Description Response Additional Clarification Needed No.
Date The percentages of the 10 CFR Part 20 Appendix B Derived Air Concentration (DAC) and effluent release limits are provided in the RAI 15 Ar-41 production consideration 08/25/2011 responses which are based on a dose rate. Based on the maximum allowed operations, what annual dose does this represent to the occupational workers and to members of the public?
Are students allowed in the reactor room when the reactor is operating?
Personnel monitoring during 17 08/25/2011 What type of dosimetry is required for the students? Explain how this is experiment handling controlled (procedure, etc.).
Amendment 10 only considered one of the severe accidents (slow controlled excursion) 1% reactivity increase without the fuse melting. The original Evaluation of MHA related to 20 12/02/2011 MHA also consider a 2% step reactivity increase (runaway) with fuse melt.
occupational dose limits Please discuss why the 2% step reactivity increase MHA scenario was not considered in your analysis related to dose limits.
Add TS definitions per 12/02/2011 The proposed TS Section 1 definition for Reactor Shutdown (1.19) includes ANSI/ANS-15.1-2007 guidance a reference condition of $1.00. Please provide the relationship between 21 for: reactor secured, reactor $1.00 and the %k/k or propose wording for the definition of shutdown that shutdown, and shutdown is expressed in %k/k consistent with other TSs.
margin.
The proposed TS 3.2 and Table 12/02/2011 The previous console included interlocks for the Rod Drive Cable and Relay 3.1 do not include Interlock Chassis. Activation of these relays resulted in an automatic reactor scram.
Relay Scrams Please explain why these automatic scrams are no longer required including 24 a discussion of the safety impact of replacing these automatic scram functions with operator action.
RAI RAI Original RAI Description Response Additional Clarification Needed No.
Date TS 3.2.g states that a seismic 12/02/2011 Per TS 4.2.h - The shield tank water level interlock, shield water displacement interlock switch temperature interlock and seismic displacement safety channel shall be shall be installed. This requires tested by perturbing the sensing element to the appropriate set point. These a set point. tests shall be performed annually, but at intervals not to exceed 16 months.
25 The reply indicates the switch cannot be calibrated because of its design.
Please explain how Texas A&M is in compliance with TS 4.2.h if the set point cannot be verified. Additionally, please justify the use of this interlock.
Maximum Hypothetical Accident 12/02/2011 Please state how the fission barrier boundary integrity (core tank seal) is assumptions include no escape ensured via an appropriate TS LCO.
29 of fission products from the core tank. Propose changes to 3.4.f for core tank seal integrity