UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 23, 2012 Mr. Ken Langdon Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P. O. Box 63 Lycoming, NY 13093
SUBJECT:
NINE MILE POINT NUCLEAR STATION, UNIT NO.1 REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE RE: EPU POWER ASCENSION REPORT DATED SEPTEMBER 26,2012 (TAC NO.
ME8349)
Dear Mr. Langdon:
By letter dated September 26,2012 (Agencywide Documents Access and Management System (ADAMS) Package Accession No. ML122840230), Nine Mile Point Nuclear Station, LLC (the licensee) submitted following affidavits executed by Alan J. Bilanin, President and Senior Associate of Continuum Dynamics, Inc. (C.D.I. or COl):
(1)
Affidavit dated September 18,2012, regarding (COl REPORT NO.12-20P),
C.D.I. Report No.12-20P "Acoustic and Low Frequency Hydrodynamic Loads at 115% CL TP Target Power Level on Nine Mile Point Unit 2 Steam Dryer to 250 Hz Using ACM Rev. 4.1," Revision 0, (Attachment 5 of the letter),
(2)
Affidavit dated June 29,2012, regarding (COl REPORT NO.12-13P), C.D.I.
Technical Note No.12-13P "Limit Curves with ACM Rev. 4.1 for the 100% Power Level Basis at Nine Mile Point Unit 2," Revision 1 (in Attachment 6 of the letter),
(3)
Affidavit dated September 12,2012, regarding (COl REPORT NO.12-23P),
C.D.I. Technical Note No.12-23P "Limit Curves with ACM Rev. 4.1 for the 105%
Power Level Basis at Nine Mile Point Unit 2 with the Inboard RCIC Valve Closed," Revision 0 (in Attachment 6 of the letter),
(4)
Affidavit dated August 2,2012, regarding (COl REPORT NO.12-24P), C.D.I.
Technical Note No.12-24P "Limit Curves with ACM Rev. 4.1 for the 112.5%
Power Level Basis at Nine Mile Point Unit 2," Revision 0 (in Attachment 6 of the letter),
(5)
Affidavit dated September 12,2012, regarding (COl REPORT NO.12-28P),
C.D.I. Technical Note No.12-28P "Limit Curves with ACM Rev. 4.1 for the 115%
Power Level Basis with 92.5 Hz Peak at Nine Mile Point Unit 2," Revision 0 (in of the letter),
K. Langdon
- 2 (6)
Affidavit dated September 12, 2012, regarding (COl REPORT NO.12-26P),
C.O.I. Technical Note No.12-26P "Limit Curves with ACM Rev. 4.1 for the 110%
Power Level Basis at Nine Mile Point Unit 2 with the Inboard RCIC Valve Closed," Revision 0 (in Attachment 6 of the letter),
(7)
Affidavit dated September 12, 2012, regarding (COl REPORT NO.12-30P),
C.O.I. Technical Note No.12-30P "Limit Curves with ACM Rev. 4.1 for the 115%
Power Level Basis at Nine Mile Point Unit 2 with the Inboard RCIC Valve Closed," Revision 0 (in Attachment 6 of the letter),
Additionally, by the same letter mentioned above, in Attachment 6, the licensee submitted following affidavits executed by Milton E. Teske, Senior Associate of Continuum Dynamics, Inc.
(C.O.I. or COl):
(8)
Affidavit dated July 2,2012, regarding (COl REPORT NO.12-14P), C.O.I.
Technical Note No.12-14P "Limit Curves with ACM Rev. 4.1 for the 105% Power Level Basis at Nine Mile Point Unit 2," Revision 0, (9)
Affidavit dated July 10, 2012, regarding (COl REPORT NO.12-22P), C.O.I.
Technical Note No.12-22P "Limit Curves with ACM Rev. 4.1 for the 107.5%
Power Level Basis at Nine Mile Point Unit 2," Revision 0, (10)
Affidavit dated July 12, 2012, regarding (COl REPORT NO.12-15P), C.O.I.
Technical Note No.12-15P "Limit Curves with ACM Rev. 4.1 for the 110% Power Level Basis at Nine Mile Point Unit 2," Revision 0, (11)
Affidavit dated July23, 2012, regarding (COl REPORT NO.12-16P), C.O.I.
Technical Note No.12-16P "Limit Curves with ACM Rev. 4.1 for the 115% Power Level Basis at Nine Mile Point Unit 2," Revision 0, All the affidavits requested that the information contained in the following documents be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390(a)(4):
A. CENG Letter to NRC, Nine Mile Point Nuclear Station, Unit No.2; Docket No.
50-410, Submittal of Extended Power Uprate Steam Dryer Power Ascension Testing Information in Accordance with Operating License Conditions 2.C.(20)(b)5 and 2.C.(20)(e), Attachment 7, C.O.I. Report No.12-20P "Acoustic and Low Frequency Hydrodynamic Loads at 115% CL TP Target Power Level on Nine Mile Point Unit 2 Steam Dryer to 250 Hz Using ACM Rev. 4.1," Revision 0 (Proprietary)" (Affidavit dated September 18, 2012).
B. CENG Letter to NRC, Nine Mile Point Nuclear Station, Unit No.2; Docket No.
50-410, Submittal of Extended Power Uprate Steam Dryer Power Ascension Testing Information in Accordance with Operating License Conditions 2.C.(20)(b)5 and 2.C.(20)(e), Attachment 8, "Steam Dryer Limit Curves," (Affidavits 2 through 11 listed above).
K. Langdon
- 3 All the affidavits stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
- 3. (a) a process or method, including supporting data and analysis, where prevention of its use by C.D.I.'s competitors without license from C.D.1. constitutes a competitive advantage over other companies; (b) Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a Similar product; (c) Information which discloses patentable subject matter for which it may be desirable to obtain patent protection.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the submitted information marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b )(5) and Section 1 03(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the baSis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
K. Langdon
- 4 Nonproprietary versions of CENG documents listed in paragraphs A and B above (Attachment 3 of the licensee's submittal, ADAMS Accession Nos. ML 112284A184, and Attachment 4 of the licensee's submittal, ML12284A185, respectively), have been placed in the NRC's Public Document Room and added to the ADAMS Public Electronic Reading Room.
If you have any questions regarding this matter, I may be reached at 301-415-3308.
Sincerely, Bhalchandra K. Vaidya, Project Manager Plant licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-410 cc:
(1) Alan J. Bilanin, President and Senior Associate Continuum Dynamics Inc.
34 Lexington Avenue Ewing, NJ 08618-2302 (2) Milton E. Teske, Senior Associate Continuum Dynamics Inc.
34 Lexington Avenue Ewing, NJ 08618-2302 Additional Distribution via Listserv
K. Langdon
-4 Nonproprietary versions of CENG documents listed in paragraphs A and B above (Attachment 3 of the licensee's submittal, ADAMS Accession Nos. ML 112284A 184, and Attachment 4 of the licensee's submittal, ML12284A185, respectively), have been placed in the NRC's Public Document Room and added to the ADAMS Public Electronic Reading Room.
If you have any questions regarding this matter, I may be reached at 301-415-3308.
Sincerely, Iral Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-410 cc:
(1) Alan J. Bilanin, President and Senior Associate Continuum Dynamics Inc.
34 Lexington Avenue Ewing, NJ 08618-2302 (2) Milton E. Teske, Senior Associate Continuum Dynamics Inc.
34 Lexington Avenue Ewing, NJ 08618-2302 Additional Distribution via Listserv DISTRIBUTION:
PUBLIC LPL1-1 Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDorlLpl1-1 Resource RidsNrrLAKGoldstein Resource RidsNrrDeEmcb Resource RidsNrrPMNineMilePoint Resource RidsOgcMailCenter Resource RidsRgn1 MailCenter Resource G. Dentel, Region 1 ADAMS Accession No.: ML12290A046 OFFICE NRR/LPL 1-1\\PM NRR/LPL 1-1\\LA INRR/EMCB/BC NAME BVaidya KGoldstein IMMurphy DATE 10/17/12 10/17/12 10/23/12 NRR/LPL1-1/BC NRR/LPL 1-1\\PM GWilson IBVaidya 10/23/12 10/23/12 OFFICIAL RECORD COpy