MONTHYEARGNRO-2013/00079, 2013-10-13 (GNRO-2013-00079) Response to RAI Set 49 (Dated Sep-12-2013)2023-10-11011 October 2023 2013-10-13 (GNRO-2013-00079) Response to RAI Set 49 (Dated Sep-12-2013) GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-06-0606 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GNRO-2021/00037, 2021 Annual Report of Changes and Errors to 10 CFR 50.46 Analysis Grand Gulf Nuclear Station, Unit 12021-11-30030 November 2021 2021 Annual Report of Changes and Errors to 10 CFR 50.46 Analysis Grand Gulf Nuclear Station, Unit 1 GNRO-2021/00017, Notification of Readiness for Supplemental Inspection2021-06-22022 June 2021 Notification of Readiness for Supplemental Inspection GNRO-2021/00014, Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency2021-06-0101 June 2021 Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency GNRO-2021/00015, Annual Radioactive Effluent Release Report2021-04-28028 April 2021 Annual Radioactive Effluent Release Report GNRO-2021/00011, Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 20202021-04-19019 April 2021 Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 2020 GNRO-2021/00012, Annual Report of Individual Monitoring - NRC Form 5 for 2020 Per 10 CFR 20.22062021-04-13013 April 2021 Annual Report of Individual Monitoring - NRC Form 5 for 2020 Per 10 CFR 20.2206 GNRO-2020/00045, 2020 Report of Changes and Errors to 10 CFR 50.46 Analysis2020-12-16016 December 2020 2020 Report of Changes and Errors to 10 CFR 50.46 Analysis GNRO-2020/00034, Notification of Spent Fuel Cask Use2020-10-0808 October 2020 Notification of Spent Fuel Cask Use GNRO-2020/00033, Response to NRC Integrated Inspection Report 05000416/20200022020-09-10010 September 2020 Response to NRC Integrated Inspection Report 05000416/2020002 GNRO-2020/00029, Report of 10 CFR 72.48 Evaluations July 1, 2018 Through June 30, 20202020-08-18018 August 2020 Report of 10 CFR 72.48 Evaluations July 1, 2018 Through June 30, 2020 GNRO-2020/00022, Report of Technical Specification Bases Changes2020-07-21021 July 2020 Report of Technical Specification Bases Changes GNRO-2020/00027, Core Operating Limits Report (COLR) Cycle 23 Revision 1 for Grand Gulf Nuclear Station, Unit 1 (GGNS)2020-07-16016 July 2020 Core Operating Limits Report (COLR) Cycle 23 Revision 1 for Grand Gulf Nuclear Station, Unit 1 (GGNS) GNRO-2020/00023, Response to Request for Additional Information - License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies2020-06-26026 June 2020 Response to Request for Additional Information - License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies GNRO-2020/00020, Core Operating Limits Report (COLR) Cycle 23, and Pressure and Temperature Limits Report (PTLR) Update for Grand Gulf Nuclear Station, Unit 1 (GGNS)2020-05-0505 May 2020 Core Operating Limits Report (COLR) Cycle 23, and Pressure and Temperature Limits Report (PTLR) Update for Grand Gulf Nuclear Station, Unit 1 (GGNS) GNRO-2020/00018, Annual Radiological Effluent Release Report2020-04-30030 April 2020 Annual Radiological Effluent Release Report GNRO-2020/00016, Annual Report of Individual Monitoring -NRC Form 5 for 2019 Per 10 CFR 20.22062020-04-16016 April 2020 Annual Report of Individual Monitoring -NRC Form 5 for 2019 Per 10 CFR 20.2206 GNRO-2020/00015, Response to Request for Additional Information - License Amendment Request for One-Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass Leakage Rate Test2020-04-0707 April 2020 Response to Request for Additional Information - License Amendment Request for One-Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass Leakage Rate Test GNRO-2020/00007, Spent Fuel Storage Radioactive Effluent Release Report for 20192020-02-20020 February 2020 Spent Fuel Storage Radioactive Effluent Release Report for 2019 GNRO-2020/00006, License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies2020-02-19019 February 2020 License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies GNRO-2019/00052, Report of Changes and Errors to 10 CFR 50.46 Analysis2019-12-13013 December 2019 Report of Changes and Errors to 10 CFR 50.46 Analysis GNRO-2019/00051, Notification of Readiness of 92723 Inspection2019-12-11011 December 2019 Notification of Readiness of 92723 Inspection GNRO-2019/00045, Emergency Plan, Revision 792019-10-29029 October 2019 Emergency Plan, Revision 79 GNRO-2019/00037, Notification of Spent Fuel Cask Use2019-09-20020 September 2019 Notification of Spent Fuel Cask Use GNRO-2019/00036, Correction to Gnro 2019-00017 Emergency Plan Revision 782019-08-0808 August 2019 Correction to Gnro 2019-00017 Emergency Plan Revision 78 GNRO-2019/00027, Notification of Readiness of 95001 Supplemental Inspections2019-07-0303 July 2019 Notification of Readiness of 95001 Supplemental Inspections GNRO-2019/00031, Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 - Corrected Report2019-06-25025 June 2019 Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 - Corrected Report GNRO-2019/00028, Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation.2019-06-13013 June 2019 Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation. GNRO-2019/00026, Response to Requests for Additional Information Regarding Relief Request Number GG-ISI-023, Inservice Inspection Impracticality - Limited Coverage Examinations During the Third 10-Year Inservice Inspection Interval2019-05-0606 May 2019 Response to Requests for Additional Information Regarding Relief Request Number GG-ISI-023, Inservice Inspection Impracticality - Limited Coverage Examinations During the Third 10-Year Inservice Inspection Interval GNRO-2019/00020, Annual Radiological Operating Report (AREOR)2019-04-30030 April 2019 Annual Radiological Operating Report (AREOR) GNRO-2019/00024, Annual Radioactive Effluent Release Report2019-04-30030 April 2019 Annual Radioactive Effluent Release Report GNRO-2019/00022, Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.22062019-04-22022 April 2019 Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 GNRO-2019/00017, Emergency Plan, Revision 782019-03-14014 March 2019 Emergency Plan, Revision 78 GNRO-2019/00014, Snubber Testing Program for Fourth Inspection Interval2019-03-13013 March 2019 Snubber Testing Program for Fourth Inspection Interval GNRO-2019/00012, Internal Events Probabilistic Risk Assessment (PRA) Sensitivity Study Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2019-03-0606 March 2019 Internal Events Probabilistic Risk Assessment (PRA) Sensitivity Study Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program GNRO-2019/00016, Spent Fuel Storage Radioactive Effluent Release Report for 20182019-02-21021 February 2019 Spent Fuel Storage Radioactive Effluent Release Report for 2018 GNRO-2019/00003, Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation2019-01-23023 January 2019 Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation GNRO-2018/00057, Submittal of Revision 17 to the Grand Gulf Nuclear Station Physical Security, Safeguards Contingency, and Training and Qualification Plan2018-12-0404 December 2018 Submittal of Revision 17 to the Grand Gulf Nuclear Station Physical Security, Safeguards Contingency, and Training and Qualification Plan GNRO-2018/00054, Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval2018-11-30030 November 2018 Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval GNRO-2018/00055, Response to Request for Additional Information for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a ...2018-11-30030 November 2018 Response to Request for Additional Information for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a ... GNRO-2018/00052, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Partial Response to Request for Additional Information and Extension of Response to Request for Additional Information2018-10-24024 October 2018 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Partial Response to Request for Additional Information and Extension of Response to Request for Additional Information GNRO-2018/00051, Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-10-23023 October 2018 Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control GNRO-2018/00047, Submittal of 2018 Inservice Inspection Summary Report2018-10-16016 October 2018 Submittal of 2018 Inservice Inspection Summary Report GNRO-2018/00046, Submittal of 2018 Report of Changes and Errors to 10CFR50.462018-10-16016 October 2018 Submittal of 2018 Report of Changes and Errors to 10CFR50.46 GNRO-2018/00048, Response to Request for Additional Information License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 62018-10-10010 October 2018 Response to Request for Additional Information License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 GNRO-2018/00042, Core Operating Limits Report Cycle 22, Revision 12018-09-18018 September 2018 Core Operating Limits Report Cycle 22, Revision 1 GNRO-2018/00043, Revised Offsite Dose Calculation Manual2018-09-18018 September 2018 Revised Offsite Dose Calculation Manual GNRO-2018/00039, Report of Technical Specification Bases Changes2018-08-20020 August 2018 Report of Technical Specification Bases Changes 2023-06-06
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML24351A1482024-12-16016 December 2024 Supplement to Entergy Application to Revise Technical Specifications, Criticality Safety Analysis, Technical Specification 4.3.1, Criticality and Technical Specification 5.5.15, Spent Fuel Storage Rack Neutron Absorber Monitoring ML24330A2342024-11-25025 November 2024 Application to Revise Technical Specifications; Criticality Safety Analysis, Technical Specification 4.3.1, Criticality and Technical Specification 5.5.15, Spent Fuel Storage Rack Neutron Absorber Monitoring Program ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions ML24116A0372024-04-25025 April 2024 Report of Technical Specification Bases Changes ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-06-0606 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23033A0492023-02-0101 February 2023 Emergency Action Level (EAL) Technical Bases Document Revision 3 ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21266A1612021-09-23023 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated ML21062A1982021-03-0303 March 2021 Supplement to License Amendment Request to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 ML20091M3632020-03-31031 March 2020 Request for One-Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass Leakage Rate Test CNRO-2020-00009, Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 12020-02-26026 February 2020 Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 GNRO-2020/00006, License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies2020-02-19019 February 2020 License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies CNRO-2020-00008, Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process2020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process CNRO-2020-00006, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 22020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 2 GNRO-2019/00045, Emergency Plan, Revision 792019-10-29029 October 2019 Emergency Plan, Revision 79 GNRO-2019/00028, Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation.2019-06-13013 June 2019 Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation. ML19072A2812019-03-13013 March 2019 Supplement 1 to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control CNRO-2019-00009, Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 22019-03-0707 March 2019 Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 2 CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 42019-01-31031 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 GNRO-2019/00003, Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation2019-01-23023 January 2019 Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation GNRO-2018/00051, Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-10-23023 October 2018 Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control GNRO-2018/00029, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-06-0707 June 2018 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) GNRO-2018/00008, (GGNS) - License Amendment Request: Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 62018-04-27027 April 2018 (GGNS) - License Amendment Request: Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 GNRO-2018/00013, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-04-12012 April 2018 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) GNRO-2018/00007, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control.2018-04-10010 April 2018 Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control. GNRO-2017/00061, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis2017-11-0303 November 2017 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis ML17268A2132017-09-21021 September 2017 ISFSI, River Bend Station Unit 1 & ISFSI, Waterford 3 Steam Electric Station & ISFSI, Grand Gulf Nuclear Station & ISFSI, Application for Order Approving Transfers of Licenses and Conforming License Amendments CNRO-2017-00005, and Isfsl - License Amendment Request for Administrative Change to Licensee Name2017-03-29029 March 2017 and Isfsl - License Amendment Request for Administrative Change to Licensee Name GNRO-2016/00062, License Amendment Request (LAR) for One Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass2016-12-29029 December 2016 License Amendment Request (LAR) for One Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass GNRO-2016/00051, Application to Revise the Technical Specifications to Allow the Adoption of Technical Specification Task Force Traveler TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System..2016-10-26026 October 2016 Application to Revise the Technical Specifications to Allow the Adoption of Technical Specification Task Force Traveler TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System.. GNRO-2016/00034, License Renewal Documents to Support Review of Application for Renewal2016-10-10010 October 2016 License Renewal Documents to Support Review of Application for Renewal GNRO-2015/00087, Supplemental Letter to Application to Revise the Technical Specifications to Remove the Inservice Testing Program and to Clarify SR Usage Rule Application to Section 5.5 Testing to Provide Relief Request in Format Requested By..2015-12-0202 December 2015 Supplemental Letter to Application to Revise the Technical Specifications to Remove the Inservice Testing Program and to Clarify SR Usage Rule Application to Section 5.5 Testing to Provide Relief Request in Format Requested By.. GNRO-2015/00037, Application to Revise the Technical Specifications to Remove the Inservice Testing Program and to Clarify SR Usage Rule Application to Section 5.5 Testing2015-09-15015 September 2015 Application to Revise the Technical Specifications to Remove the Inservice Testing Program and to Clarify SR Usage Rule Application to Section 5.5 Testing GNRO-2015/00029, License Amendment Request - Cyber Security Plan Implementation2015-06-29029 June 2015 License Amendment Request - Cyber Security Plan Implementation GNRO-2015/00038, Response to Request for Additional Information Regarding Fluence License Amendment Request, Request for Commitment2015-06-11011 June 2015 Response to Request for Additional Information Regarding Fluence License Amendment Request, Request for Commitment GNRO-2015/00026, Application to Revise Technical Specifications for Permanent Extension of Type C Leak Rate Testing Frequency and Reduction of Type B and C Grace Intervals2015-05-27027 May 2015 Application to Revise Technical Specifications for Permanent Extension of Type C Leak Rate Testing Frequency and Reduction of Type B and C Grace Intervals GNRO-2014/00078, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month2014-12-15015 December 2014 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month GNRO-2014/00014, License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints2014-08-0101 August 2014 License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints GNRO-2013/00090, License Amendment Request - Cyber Security Plan Implementation Schedule2013-12-19019 December 2013 License Amendment Request - Cyber Security Plan Implementation Schedule GNRO-2013/00067, LAR Application for Technical Specification Changes; Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel..2013-11-0808 November 2013 LAR Application for Technical Specification Changes; Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel.. CNRO-2013-00008, Arkansas, Units 1, 2 & ISFSI, Grand Gulf, ESP and ISFSI, River Bend, Unit 1 and ISFSI and Waterford 3 and ISFSI, Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments2013-04-16016 April 2013 Arkansas, Units 1, 2 & ISFSI, Grand Gulf, ESP and ISFSI, River Bend, Unit 1 and ISFSI and Waterford 3 and ISFSI, Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments GNRO-2012/00132, License Amendment Request for Revision of Technical Specification Allowable Value for Primary Containment and Drywell Isolation Instrumentation Function 3.c RCIC Steam Supply Line Pressure - Low.2012-11-0909 November 2012 License Amendment Request for Revision of Technical Specification Allowable Value for Primary Containment and Drywell Isolation Instrumentation Function 3.c RCIC Steam Supply Line Pressure - Low. GNRO-2012/00125, Final Feedwater Temperature Reduction License Amendment Request2012-10-26026 October 2012 Final Feedwater Temperature Reduction License Amendment Request GNRO-2012/00096, License Amendment Request for Implementing a 24-Month Fuel Cycle, Grand Gulf Nuclear Station, Unit 12012-10-0202 October 2012 License Amendment Request for Implementing a 24-Month Fuel Cycle, Grand Gulf Nuclear Station, Unit 1 GNRO-2012/00102, Request to Revise the Standby Service Water Passive Failure Methodology2012-09-14014 September 2012 Request to Revise the Standby Service Water Passive Failure Methodology ML12157A1792012-05-23023 May 2012 Attachment 6 to GNRO-2012/00039 - Entergy Nuclear Grand Gulf Nuclear Station License Renewal Environmental Audit - Hydrology Patton - Attachment I Labeled GGNS NPDES Permit Renewal Application (2007) GNRO-2012/00001, License Amendment Request - Standby Liquid Control System2012-01-23023 January 2012 License Amendment Request - Standby Liquid Control System ML11308A4692011-10-28028 October 2011 Applicant'S Environmental Report, Operating License Renewal Stage, Attachment C - Clean Water Act Documentation, Part 1 of 4 2024-05-07
[Table view] |
Text
,.
~~Entergy Entergy Operatio ns, Inc.
P. O. Box 756 Port Gibson. MS 39150 Michael Perito Vice President. Operations Grand Gulf Nuclear Station Tel. (601) 437-6409 GNRO-2012/00102 September 14, 2012 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
Request to Revise the Standby Service Water Passive Failure Metho dology Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29
REFERENCES:
- 1. NRC Letter from Joseph D. Neighbors to John C. Brons Re:
Approval of Indian Point 3 Nuclear Power Plant Methodology Change for Postulating Service Water System Breaks (TAC No. 69404)
- 2. SECY-77-439, NRC Information Paper on Single failure Criterio n
dated August 1,1977 (ML060260236)
- 3. NUREG-0138, Staff Discussion of Fifteen Technical Issues Listed in Attachment to November 3, 1976 Memorandum from Director, NRR to NRR Staff, Issue No.7, Passive failures Following a Loss-of Coolant Accident, November 1976
Dear Sir or Madam:
Pursuant to 10 CFR 50.90, Entergy Operations, Inc. (Entergy) hereby requests approval of an amendment to Grand Gulf Nuclear Station, Unit 1 (GGNS) Facility Operating License No. NPF-
- 29. The proposed change would revise the Updated Final Safety Analysis Report (UFSAR) to describe the use of revised methodology for postulating single phase failures of the Standby Service Water (SSW) to be consistent with NRC guidance publish ed in References 2 and 3 which state that credible passive SSW failures that can result in a loss of fluid post-accident are limited to pump or valve seal leakage, not ruptures of SSW system piping. Grand Gulf requests approval by September 14, 2013 and requests an implementatio n date of 90-days from the receipt of the approved request to incorporate changes to the UFSAR There are no new commitments in this letter. If you have any questi ons or require additional information, please contact Christina L. Perino at 601-437-6299.
GNRO-2012/00102 Page 2 of 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on September 14th , 2012.
Sincerely, MP/jas
Attachment:
Request to Revise the Standby Service Water Passive Failure Methodology cc: U.S. Nuclear Regulatory Commission ATTN: Mr. Elmo E. Collins, Jr. (w/2)
Region Administrator, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 U. S. Nuclear Regulatory Commission ATTN: Mr. Alan Wang, NRRlDORL (w/2)
Mail Stop OWFN 8 B1 Washington, DC 20555-0001 Dr. Mary Currier, M.D., M.P.H State Health Officer Mississippi Department of Health P. O. Box 1700 Jackson, MS 39215-1700 NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150
Attachment GNRO*2012/00102 Request to Revise the Standby Service Water Passive Failure Methodology
Attachment to GNRO-2012/001 02 Page 1 of 6 I. Summary Grand Gulf Nuclear Station (GGNS) proposes the utilization of limited size breaks (through-wall leakage cracks) in the analysis of passive failures of Standby Service Water (SSW) piping during the post-LOCA phase of an accident. Postulating passive pipe ruptures and heat exchanger tube ruptures, and pipe fitting (tee, elbow, reducer, etc) ruptures in the SSW piping is overly conservative. SECY 77-439 underscores the fact that the probability of failure of the service water piping during the critical 24-hour period after a LOCA is so low that it does not constitute a credible event. Additionally, crack locations and sizes postulated under the guidance of Standard Review Plan (SRP)
(NUREG 0800) Sections 3.6.1 and 3.6.2 are applicable and bounding in terms of the consideration of passive failures as addressed in SECY 77-439, and are thus applicable to the Grand Gulf Nuclear Station pipe failure analysis.
In accordance with the Grand Gulf licensing basis and as stated in the Grand Gulf Final Safety Analysis Report (FSAR), the SSW system was designed to provide a continuous flow of cooling water to those systems and components necessary for plant safety either during normal operation or under abnormal and accident conditions. During accident conditions, SSW must provide the cooling water necessary to allow the engineered safety features to perform their intended function when subjected to:
- a. The single failure of any active component used during the injection phase of a postulated Loss-of-Coolant Accident (LOCA) or
- b. The single failure of any active or passive component used during the long-term recirculation phase.
The Nuclear Regulatory Commission (NRC) Component Design Bases Inspection (CDBI) debrief provided the NRC's potential findings and conclusions. The proposed findings described at the debrief noted a discrepancy in FSAR Table 9.2-1 with the use of a 50.59 to change the table. NPEFSAR 87-0067 changed the FSAR using SECY 77-439 and NUREG 0138 as the basis for removing the requirements of passive failures of pipes, heat exchanger tubing and pipe fittings.
This submittal is not the result of changes to any accident analyses discussed in the UFSAR, since these analyses have previously assumed that only one pipe break or crack occurs at a time. The UFSAR which was revised in 1987 is consistent with NRC guidance published in SECY 77-439, which states that the implementation of the single failure criterion does not require significant ruptures of moderate energy piping subsequent to a LOCA, as this combined event would be extremely unlikely.
Currently Grand Gulf utilizes flow differential instrumentation between the discharge and return to detect leakages greater than 1200 gpm. For leakages less than 1200 gpm, an ONEP for low SSW basin level has been created. This criteria provides guidance that within 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> Operations is to begin monitoring SSW basin level when the SSW Basin low level alarm comes in. However, further evaluation has determined that the critical crack size for a moderate energy line break is 540 gpm and the time for monitoring can be extended out to 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> (see Calculation on Page 6 of this attachment).
Attachment to GNRO-2012/00102 Page 2 of 6 The FSAR change made by NPEFSAR 87-0067, revised the description of passive failures in the SSW system to be consistent with the system capabilities and NRC guidance in the form of SECY 77-439.
II. Regulatory and Technical Considerations
- 1. General Design Criteria The General Design Criteria (GDC) which formed the basis for the Grand Gulf design was published by the Commission on July 11, 1967 and was subsequently made part of 10CFR50. Of these original GDC, only Criterion 41 applies to the SSW system. These criterion require that:
Engineered Safety Features ... shall provide sufficient performance capability to accommodate the failure of any single active component without resulting in undue risk to the health and safety of the public.
Criterion 41 (1967) did not require consideration of passive failures for engineered safety features and, no coincident Loss of Offsite Power (LOP) following a LOCA.
However, in 1971 the Commission issued a new GDC in Appendix A to 10CFR50.
Criterion 44 was specifically applicable to the Grand Gulf SSW system. This criterion states that:
A system to transfer heat from structures, systems, and components important to safety to an ultimate heat sink shall be provided. The system safety function shall be to transfer the combined heat load of these structures, systems, and components under normal operating and accident conditions.
Suitable redundancy in components and features and suitable interconnection, leak detection and isolation capabilities shall be provided to assure that for onsite electric power system operation (assuming offsite power is not available) and for offsite electric power system operation (assuming onsite power is not available) the system safety function can be accomplished, assuming a single failure.
Within GDC 44 (1971), the single failure criterion is not specifically defined to encompass active and/or passive failures. Footnote 2 to Appendix A to 10CFR50 does, however, indicate that: "The conditions under which a single failure of a passive component in a fluid system should be considered in designing the system against a single failure are under development."
As further clarification of the single failure criterion for the SSW system, a review of NUREG 0800, Standard Review Plan, Section 9.2.1, Station Service Water System, does not require considerations of passive failures of the SSW under design basis conditions. However, the singular wording of footnote 2 to 10CFR50 Appendix A appears to indicate an element of jUdgment on the part of the staff when considering passive failure in fluid systems.
As noted in Section I, the postulated break in the 24 inch cooling water line to the Auxiliary Building during recirculation phase following a LOCA forms the design basis for Grand Gulf. The SSW system is capable of accommodating such a break while
Attachment to GNRO-2012/00102 Page 3 of 6 still fulfilling its intended safety function; but Grand Gulf does not believe that the size of the break postulated in the break analysis is representative of the type of break to be expected for SSW piping.
- 2. SECY 77-439 As further clarification for defining the types of passive failures to be considered for fluid system in nuclear power plants, in a memo from the staff to the Commissioners (SECY 77-439), NRC has concluded that:
".. , on the basis of the licensing review experience accumulated in the period since 1969, it has been judged in most instances that the probability of most types of passive failures in fluid system is sufficiently small that they need not be assumed in addition to the initiating failure in application of the single failure criterion to assure safety of a nuclear power plant."
Elsewhere, the SECY 77-439 report asserts that:
"In the study of passive failures, it is current practice to assume fluid leakage owing to gross failure of a pump or valve seal during the long term cooling mode following a LOCA (24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or greater after the event) but not pipe breaks. No other passive failures are required to be assumed."
The SECY-77-439 report continues:
" ... an example of the application of a passive failure requirement is the approach to long-term recovery subsequent to a loss-of-coolant accident. Applicants are required to consider degradation of a pump or valve seal and resulting leakages in addition to initiating failure (LOCA)."
- 3. Formulation of Passive Failure Criteria A review of NRC regulations relative to passive failures indicates that whereas consideration of passive failure is required for high energy systems (SRP Section 6.3, Emergency Core Cooling System), the passive failure criteria is more relaxed for moderate energy lines (in particular for the Standby Service Water system, refer to SRP Section 9.2.1). Furthermore, although limited size breaks in moderate energy lines have been required, they have been taken as initiating events and not coincident with LOP and LOCA. The intent has been to eliminate or reduce the risk of affecting the operation of a system important to safety as a result of breaks in other moderate energy systems nearby.
However, if piping failures in a moderate energy fluid system such as Grand Gulf's Standby Service Water system piping are to be evaluated, questions arise as to available guidance regarding the location and size of the postulated failure.
Enveloping passive failures in fluid systems are those which result in the loss of structural integrity of the system, i.e., a pipe break of undefined size. A review of industry standards for piping has shown that in determining the criteria for postulating passive failures in fluid systems, it is important to distinguish pipe failures as initiating
Attachment to GNRO-2012/001 02 Page 4 of 6 events. A crack in a moderate energy line which is evaluated according to criteria in SRPs 3.6.1 and 3.6.2 is considered as an initiating event. To satisfy General Design Criterion 44, current NRC correspondence SECY 77-439 requires the consideration of a long term passive failure during post-LOCA recirculation in addition to the initiating event (in this case a LOCA). However, when supported by an analysis, the long term passive failure is limited to the "maximum flow through packing or mechanical seal rather than based on complete severance of the piping." (Ref.
SECY 77-439). Further, no passive failures need be postulated in the short term (up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after the initiating event).
Again, the NRC does provide guidance for the evaluation of pipe breaks to support their review of a licensee's conformance with General Design Criteria 44 in NUREG 0800, Standard Review Plan (SRP) Sections 3.6.1 and 3.6.2. These sections address the review of postulated ruptures of piping systems and the evaluation of the impact of the dynamic effects associated with postulated rupture on structures, system and components important to safety.
It should be re-emphasized that the review under SRP sections 3.6.1 and 3.6.2 does not deal with individual system design requirements necessary to ensure that the system performs as intended, but rather considers the protection necessary to assure the operation of such systems in the event of nearby piping failures. In addition, the criteria for evaluating postulated breaks in piping considers breaks only as single initiating events occurring during normal plant conditions and not as passive failures postulated during the recirculation phase of plant cooldown following a LOCA.
Since the SRP Section 3.6.1 and 3.6.2 criteria primarily are concerned with the protection of essential plant features from the dynamic effects associated with postulated pipe ruptures, only those portions of the SRP Criteria dealing with the size and location of postulated ruptures can be considered appropriate for use in this review of passive failure in the Grand Gulf SSW piping.
The Grand Gulf SSW system is considered a moderate energy fluid system. The definition of a moderate energy fluid system adopted by NRC is presented in SRP 3.6.1 as a system that experiences an operating temperature of 200°F or less and a maximum operating pressure of 275 psig.
The break type postulated in the SRP on the basis of stress and fatigue for all seismically analyzed moderate energy systems is a leakage crack which is described as a circulator opening of or equal to that of a rectangle one-half pipe diameter in length and one-half pipe wall thickness in width. The leakage crack is considered applicable to all moderate energy fluid system piping and branch runs exceeding a nominal pipe size of 1 inch.
In summary, to postulate passive breaks in the Standby Service Water System during the recirculation phase of plant cooldown, the follOWing methodology should be employed: for seismically designed portions of the service water leakage cracks (1'2 pipe diameter x 1'2 pipe wall thickness) should be postulated to occur at any point on the pipe. This crack size is taken to envelope and bound other passive failures to be taken into consideration.
Attachment to GNRO-2012/001 02 Page 5 of 6
- 4. Probabilistic Risk Assessment (PRA)
To support the use of limited size breaks for GGNS SSW, the likelihood of catastrophic failures has been reviewed. The use of Probabilistic Risk Assessments (PRAs) has been utilized by the NRC and utilities as a state-of-the art tool in predicting the consequences of specific events on nuclear power plant safety.
The GGNS Revision 3 PRA model uses both generic and plant specific data per ASME/ANS PRA Standard. However, the PRA model does not analyze pipe rupture data for internal events PRA models with the exception of Internal Flooding PRAs 1 .
As a result, information in the table below has been obtained directly from the PRA model or from EPRI Report TR-1021086, "Pipe Rupture Frequencies for Internal Flooding Probabilistic Risk Assessments," which develops estimates of piping system failure rates for use in PRAs of accident sequences induced by internal flooding and high-energy line breaks. Utilizing Table ES-2 from the EPRI report for Class 3 BWR Service Water system with river water sources and applied to various SSW A pipe lengths, an annual frequency of 9.10 x 10-03 is obtained. This annual frequency was then converted to a probability in order to provide a comparison between similar data.
The likelihood of failure associated with SSW is summarized in the table below.
SSW hardware failures considers all failures for a single train of SSW such as pump fail to start on demand, pump fail to continue running, or failure of the isolation valve associated with that train.
Failure Probability SSW Hardware Failures 9.15E-04 SSW Failure (pipe rupture) 2.49E-05 It is clear that the most likely failure of SSW is dominated by the hardware failures associated with the system. In addition, when combined with the annual frequency associated with a large LOCA, as defined in PRA-GG-01-001 S06, the likelihood of SSW failure during the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period after a LOCA is 2.92E-08/year for hardware failures or 7.95E-10 for pipe ruptures. The results are summarized below and include a frequency calculation associated with all LOCAs at GGNS.
Description Frequency Large LOCA with SSW pipe failure 7.95E-10/year All LOCAs with SSW pipe failure 1.04E-08/year Large LOCA with SSW hardware failure 2.92E-08/year All LOCAs with SSW hardware failure 3.82E-07/year Therefore, the probability of failure of the service water piping during the 24 period after a LOCA is so low that it does not constitute a credible event when compared to service water hardware failures.
1 The GGNS Internal Flooding PRA Model is currently in DRAFT form only. However, the references used for that analysis have been reviewed to obtain an estimated pipe length for SSW A which is used in this evaluation. Specifically, 4'10" of 1",12'3" of 2",92' of 2 112", 343' of 3",
189'10" of 4", 161 '3" of 12", 65'9" of 18", 330'1" of 20" and 36'6" of 24" line was used in calculating the annual frequency for a rupture of SSW A resulting in a 100 gpm release.
Attachment to GNRO-2012/001 02 Page 6 of 6
- 5. Safety Evaluation Based on the arguments presented in this paper with regard to the use of moderate energy piping failure criteria as delineated in SRP Sections 3.6.1 and 3.6.2 and SECY 77-439, Entergy feels that passive failure of piping, heat exchanger tubes and pipe fittings exceeds the requirement of single failure criteria. In summary, Grand Gulf would consider a single passive failure of the SSW system would be a pump seal or valve leakage after 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> during a LOP/LOCA.
- 6. Calculation of assessment of critical crack in the SSW piping.
The largest pipe is 24 inch schedule 40 pipe. It is a thickness of 0.375 inches. The SSW operating pressure is 110 psig. Putting this in the moderate energy pipe break equation:
Q= (0.6)~( 0.:;5)(~)( ~~)7.48052X60)
The time that it would take for the volume of inventory left is Time = (397763 + 1115480)gallons = 46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> g~l )(60 min)
( 540 mm hour Therefore operator response would not have to occur for 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.