Other: L-2012-309, FPL Review Comments on Extended Power Uprate Safety Evaluation, L-2012-382, Extended Power Uprate Cycle 24 Startup Report, ML11119A084, ML11119A085, ML112360230, ML12053A345, ML12165A511, ML12191A236, ML12194A287, ML12195A168
|
MONTHYEARL-2010-259, St. Lucie, Unit 1 - Transmittal of Affidavits from Westinghouse, Areva and Caldon Ultrasonica Technology Center Re License Amendment Request for Extended Power Uprate2010-11-22022 November 2010 St. Lucie, Unit 1 - Transmittal of Affidavits from Westinghouse, Areva and Caldon Ultrasonica Technology Center Re License Amendment Request for Extended Power Uprate Project stage: Request L-2010-302, License Amendment Request for Extended Power Uprate2010-12-15015 December 2010 License Amendment Request for Extended Power Uprate Project stage: Request ML1107302822011-02-25025 February 2011 License Amendment Request for Extended Power Uprate, Attachment 2; Supplemental Environmental Report Project stage: Supplement ML1105906632011-03-0909 March 2011 Acceptance for Review of License Amendment Request for Extended Power Uprate Project stage: Acceptance Review ML1110100982011-04-19019 April 2011 Request for Additional Information Regarding License Amendment Request for Extended Power Uprate Project stage: RAI NRC-2011-0128, St. Lucie, Unit 1 - Notice of Consideration of Issuance of Amendment to Facility Operating License, and Opportunity for a Hearing and Order Imposing Procedures for Documents Access to Sensitive Unclassified Nonsafeguards Information2011-06-0202 June 2011 St. Lucie, Unit 1 - Notice of Consideration of Issuance of Amendment to Facility Operating License, and Opportunity for a Hearing and Order Imposing Procedures for Documents Access to Sensitive Unclassified Nonsafeguards Information Project stage: Approval ML11119A0852011-06-0202 June 2011 Notice of Consideration of Issuance of Amendment to Facility Operating License, and Opportunity for a Hearing and Order Imposing Procedures for Documents Access to Sensitive Unclassified Nonsafeguards Information Project stage: Other ML11119A0842011-06-0808 June 2011 Transmittal Letter - Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for a Hearing and Order Imposing Procedures for Document Access to Sensitive Unclassified Non Safeguards Information Project stage: Other ML12037A1472011-07-21021 July 2011 NRR E-mail Capture - EFH Species for St. Lucie Project stage: Request ML1123602302011-09-0202 September 2011 Request for Concurrence on List of Species with Essential Fish Habitat in the Vicinity of the St. Lucie Plant, Units 1 and 2 Project stage: Other L-2011-397, Unusual or Important Environmental Event - Reportable Fish Kill2011-09-20020 September 2011 Unusual or Important Environmental Event - Reportable Fish Kill Project stage: Request L-2011-413, Submittal of Attachment 2, Response to NRC Reactor Systems Branch Request for Additional Information Re Extended Power Uprate License Amendment Request2011-09-29029 September 2011 Submittal of Attachment 2, Response to NRC Reactor Systems Branch Request for Additional Information Re Extended Power Uprate License Amendment Request Project stage: Request L-2011-410, Environmental Protection Plan Report 316(b) Related Documentation2011-09-30030 September 2011 Environmental Protection Plan Report 316(b) Related Documentation Project stage: Request 05000335/LER-2011-001, For St. Lucie, Unit 1, Regarding Unit 1 Manual Reactor Trip Due to High Condenser Backpressure Caused by Severe Influx of Jellyfish Into the Intake Structure2011-10-20020 October 2011 For St. Lucie, Unit 1, Regarding Unit 1 Manual Reactor Trip Due to High Condenser Backpressure Caused by Severe Influx of Jellyfish Into the Intake Structure Project stage: Request L-2011-450, Submittal of Final Revised Industrial Wastewater Facility Permit No. FL0002208, and Environmental Protection Plan Report2011-10-20020 October 2011 Submittal of Final Revised Industrial Wastewater Facility Permit No. FL0002208, and Environmental Protection Plan Report Project stage: Request ML11332A0202011-12-28028 December 2011 Transmittal Letter - Draft Environmental Assessment and Draft Finding of No Significant Impact Related to the Proposed Extended Power Uprate Project stage: Draft Other ML11332A0212011-12-28028 December 2011 Federal Register Notice - Draft Environmental Assessment and Draft Finding of No Significant Impact Related to the Proposed Extended Power Uprate Project stage: Request L-2011-566, Response to NRC Instrumentation & Controls Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2012-01-14014 January 2012 Response to NRC Instrumentation & Controls Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request Project stage: Request L-2012-043, Comment (1) of Richard L. Anderson, on Behalf of Florida Power & Light, Regarding Draft Environmental Assessment and Draft Finding of No Significant Impact Related the Proposed Extended Power Uprate2012-01-30030 January 2012 Comment (1) of Richard L. Anderson, on Behalf of Florida Power & Light, Regarding Draft Environmental Assessment and Draft Finding of No Significant Impact Related the Proposed Extended Power Uprate Project stage: Draft Other ML12044A1272012-02-13013 February 2012 Comment (2) from Edward W. Johnson Opposing NCR Permit Approval for St. Lucie 1 & 2 Project stage: Request ML12053A3452012-03-20020 March 2012 Request to Initiate Abbreviated EFH Consultation for Proposed Extended Power Uprate at St. Lucie Plant, Units 1 and 2 Project stage: Other L-2012-199, Response to Request for Additional Information on Draft Environment Assessment and Draft Finding of No Significant Impact Related to the Proposed Extended Power Uprate2012-05-0202 May 2012 Response to Request for Additional Information on Draft Environment Assessment and Draft Finding of No Significant Impact Related to the Proposed Extended Power Uprate Project stage: Draft Response to RAI ML12132A0672012-05-0202 May 2012 NRR E-mail Capture - FW: St. Lucie Unit 1 and 2 EPU - Draft EA RAI Responses Project stage: Draft RAI ML12144A0082012-05-21021 May 2012 NRR E-mail Capture - FW: NRC St Lucie Plant; NMFS Comments Project stage: Request ML12144A3162012-05-23023 May 2012 NRR E-mail Capture - Federal Consistency Review Regarding the CZMA Project stage: Request ML12165A5112012-06-25025 June 2012 Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate Project stage: Other ML12165A5122012-06-25025 June 2012 Federal Register - Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate Project stage: Request L-2012-281, Retraction of Extended Power Uprate License Amendment Request Proposed Technical Specification Change Related to Emergency Diesel Generator Surveillance Requirements2012-07-0505 July 2012 Retraction of Extended Power Uprate License Amendment Request Proposed Technical Specification Change Related to Emergency Diesel Generator Surveillance Requirements Project stage: Request ML12191A2362012-07-0909 July 2012 Technical Specification Pages Project stage: Other ML12156A2082012-07-0909 July 2012 Issuance of Amendment Regarding Extended Power Uprate Project stage: Approval L-2012-274, Submittal of 120-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2012-07-0909 July 2012 Submittal of 120-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident Project stage: Response to RAI ML12181A0192012-07-0909 July 2012 Issuance of Amendment Regarding Extended Power Uprate (Redacted) Project stage: Approval ML12194A2872012-07-12012 July 2012 Correction to Amendment No. 213 Regarding Extended Power Uprate Project stage: Other ML12195A1682012-07-13013 July 2012 Letters to H. Mueller, A. Hubbard, and S. Norton Re Environmental Assessment and Finding of No Significant Impact Related to Proposed Extended Power Uprate Project stage: Other L-2012-309, FPL Review Comments on Extended Power Uprate Safety Evaluation2012-08-0707 August 2012 FPL Review Comments on Extended Power Uprate Safety Evaluation Project stage: Other L-2012-382, Extended Power Uprate Cycle 24 Startup Report2012-10-19019 October 2012 Extended Power Uprate Cycle 24 Startup Report Project stage: Other 2011-09-30
[Table View] |
Text
0 FPL.
Florida Power & Light Company, 6501 South Ocean Drive, Jensen Beach, FL 34957 August 7, 2012 L-2012-309 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Re:
St. Lucie Plant Unit 1 Docket No. 50-335 Renewed Facility Operating License No. DPR-67 FPL Review Comments on Extended Power Uprate Safety Evaluation
Reference:
(1) T. Orf (NRC) to M. Nazar (FPL), "St. Lucie Plant, Unit 1 - Issuance of Amendment Regarding Extended Power Uprate (TAC No. ME509 1)" July 9, 2012 (Accession No. ML12156A208)
On July 9, 2012, the U. S. Nuclear Regulatory Commission (NRC) issued extended power uprate (EPU) Amendment No. 213 for Renewed Facility Operating License DPR-67 for St. Lucie Plant Unit 1 [Reference 1 ]. The amendment included the revised EPU license conditions and technical specifications, as well as a safety evaluation (SE). Florida Power & Light Company (FPL) reviewed the EPU proprietary SE and comments are provided in the attachment to this letter.
In accordance with 10 CFR 50.91 (b)(1), a copy of this letter is being forwarded to the designated State of Florida official.
Should you have any questions regarding this submittal, please contact Mr. Jack Hoffman, St. Lucie Extended Power Uprate LAR Project Manager, at 772-467-7493.
Very truly yours,
$F76V e President St. Lucie Plant Attachment cc" Ms. Cynthia Becker, Florida Department of Health.
AjjO I an FPL Group company
L-2012-309 Attachment Page 1 of 3 Review Comments on Extended Power Uprate Safety Evaluation Section, Page, No.
Paragraph, Document Statement Review Comment Suggested Change Line 2.4.1 "Therefore, the IR error RAI response to EICB-11 in Revise to replace "radiation" with pt 95 due to high radiation for FPL letter L-2011-565 (Acc.
"temperature."
6 para normal and accident No. ML12019A067) does not
- 1.
3 rd line conditions is negligible."
describe radiation as a failure mechanism for insulation resistance. Temperature causes insulation resistance changes.
2.5.4.3
"... temperature by Typos Change "eat" to "heat" pg 136 minimizing eat removal 1st para and..."
7 th line 2.8.4.5 Shudown Coolinq System Change "Shudown" to "Shutdown"
- 2.
pg 193 Title 2.8.5.4.3 "Power level to a minimum Change to read:
pg 223 value in 3 seconds..."
"Power level drops to a minimum value in 3 3rd para seconds..."
2 nd line 2.8.5.2.3 Loss of Normal Feedwater Both steam generators Replace sentence with the following:
pg 207 Flow received auxiliary feedwater "Both SGs received auxiliary FW from two 3rd para "Only one SG received flow motor driven AFW pumps with an assumed
- 3.
3 rd line auxiliary FW due to an See EPU LAR Attachment 5 failure of the steam driven AFW pump."
assumed single failure in Section 2.8.5.2.3 the AFWS.
pg 2.8.5.2.3-4
L-2012-309 Attachment Page 2 of 3 Review Comments on Extended Power Uprate Safety Evaluation Section, Page, No.
Paragraph, Document Statement Review Comment Suggested Change Line 2.8.5.6.2.2
"... the containment steam Typo -
Change "182,750 Ibm" to "182,705 Ibm" pg 243 of 182,750 Ibm was See FPL letter L-2011-311
- 4.
2nd para after released from the affected pg 35 Table 7 bullets SG."
(Acc. No. ML11231A946) 1 1th line 2.8.5.6.3.1 SE refers to "ANP-Incorrect reference -
Change "ANP-2834(P)" to py 247 2834(P)"
See FPL letter L-2011-206 "ANP-2903(P) Rev. 1" 4t para (Acc. No. ML11153A048)
- 5.
6 h line &
6 th para 4 th line 2.8.5.6.3.1 "The licensee stated that Correct value is "29.97 percent" Change "26.7 percent" to "29.97 percent" pg 250 Amin was calculated to be See FPL letter L-2011-206
- 6.
1st para 26.7 percent..." pg 4-25 2 nd line (Acc. No. ML11153A048) 2.8.6 SE refers to "Monte Carlo Incorrect reference -
Change "MCNP5" to "MCNP4A" pg 257 code MCNP5" See EPU LAR Attachment 5 3 rd para Table 1.0-2
- 7.
4 th line &
pg 258 1 st para 3 rd line
L-2012-309 Attachment Page 3 of 3 Review Comments on Extended Power Uprate Safety Evaluation Section, Page, No.
Paragraph, Document Statement Review Comment Suggested Change Line 2.8.7.2
"...reached in less than 13 Incorrect based on revised Change the following:
pg 267 hours0.00309 days <br />0.0742 hours <br />4.414683e-4 weeks <br />1.015935e-4 months <br /> (12.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> with Natural Circulation Cooldown "12.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />" to "24.8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />" last para 30°F/hr and uses 177,000 evaluation "177,000 gallons" to "287,000 gallons" continued on gallons of condensate, or See FPL Letter L-2012-079 "11.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />" to "23.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />" pg 268 11.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> with 50 °F/hr (Acc. No. ML12086A202)
"170,000 gallons" to "291,500 gallons" and uses 170,000 gallons
- 8.
of condensate)."
pg 268 "The EPU analyses show Replace last sentence with the following:
1st para that the condensate "The increase in NCC condensate last sentence volume requirement in the requirements for EPU is acceptable as CLB is bounding for the makeup water can be supplied to the CST EPU Conditions."
from the two 500,000 gallon city water storage tanks consistent with the CLB."
2.9.2.2.2 "The licensee stated that This core design restriction is Delete the first three sentences.
pg 287 the St. Lucie 1 core not applicable to the EPU core.
Delete "conservatively," from the new first 3 rd para design... limited to 150 EPU LAR Attachment 5 sentence such that it reads:
1st to 5 th lines rods. Conservatively, the Section 2.9.2.2.1.1 pg 2.9.2-4, "The licensee evaluated the EPU AST
- 9.
licensee..."
Section 2.9.2.5.2 pg 2.9.2-11, & analyses..."
"...high burnup fuel rods Section 2.9.2.7.2 pg 2.9.2-15 Delete "from the actual 0.393 percent of the 1 0 th line from the actual 0.393 core" such that it reads percent of the core to
"... high burnup fuel rods to 4.608 4.608 percent..."
percent..."
2.12 "rehuested for St. Lucie 1 Typo -
Change "3020 MWt" to "3716 MWt"
- 10.
pg 341 (3026 MWt and 3020 MWt, See EPU LAR Attachment 5 1 st para respectively)..."
Section 2.12.1.2.2 pg 2.12-3 9 th line III