Retraction of Extended Power Uprate License Amendment Request Proposed Technical Specification Change Related to Emergency Diesel Generator Surveillance Requirements
ML121910292
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 07/05/2012
From: Jensen J
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2012-281
Download: ML121910292 (2)


Text

Florida Power & Light Company, 6501 South Ocean Drive, Jensen Beach, FL 34957 FPL.July 5, 2012 L-2012-281 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Re: St. Lucie Plant Unit 1 Docket No. 50-335 Renewed Facility Operating License No. DPR-67 Retraction of Extended Power Uprate License Amendment Request Proposed Technical Specification Change Related to Emergency Diesel Generator Surveillance Requirements

References:

(1) R. L. Anderson (FPL) to U.S. Nuclear Regulatory Commission (L-2010-259), "License Amendment Request (LAR) for Extended Power Uprate," November 22, 2010, Accession No. ML103560419.

By letter L-2010-259 dated November 22, 2010 [Reference 1], Florida Power & Light Company (FPL) requested to amend Renewed Facility Operating License No. DPR-67 and revise the St.Lucie Unit 1 Technical Specifications (TS). The proposed amendment will increase the unit's licensed core thermal power level from 2700 megawatts thermal (MWt) to 3020 MWt and revise the Renewed Facility Operating License and TS to support operation at this increased core thermal power level. 'This represents an approximate increase of 11.85% and is therefore considered an Extended PowVer Uprate (EPU).As stated in EPU LAR Attachment 1 Section 3.1 Item 23, although not required for EPU, FPL proposed revising TS 3/4.8.1.1 Surveillance Requirements (SRs) associated with emergency diesel generator (EDG) testing. The SR changes address an existing plant condition related to the voltage and frequency tolerances.

FPL requests retraction of-the proposed change to TS SR 4.8.1 .1.2.e.6, 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> EDG endurance run. Implementation of the EPULAR is unaffected by this change. FPL will Submit, prior to the nrext.,scheduled EDG endurance run, a separate LAR to adopt NUREG-1432 Revision'4.0 Standard Technical Specifications

-Combustion Engineering Plants for this SR.an FPL Group company L-2012-281-Page 2 of 2 This submittal.does not alter the significant hazards consideration or environmental assessment-previously submitted by FPL letter L-2010-259

[Reference 1].In accordance with 10 CFR 50.91 (b)(1), a copy of this lette.ris being forwarded to the designated State of Florida official.Should you have any questions regarding this submittal, please contact Mr. Jack Hoffman, St. Lucie Extended Power Uprate LAR Project Manager, at 772-467-7493.

I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge.

Executedon

',., 5 1. i'Very truly yours, ,aa.5KJensen Site Vice President St. Lucie Plant cc: Ms. Cynthia Becker, Florida Department of Health