Letter Sequence Approval |
---|
TAC:ME4506, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B (Approved, Closed) |
|
MONTHYEARULNRC-05725, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (LDCN 10-0020)2010-08-0505 August 2010 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (LDCN 10-0020) Project stage: Request ML1025905882010-09-16016 September 2010 Acceptance Review E-mail, License Amendment Request, Revise TSs to Adopt TSTF-425 Rev. 3, Relocate Surveillance Frequencies to Licensee Control-Risk Informed Technical Specification Task Force Initiative 5 Project stage: Acceptance Review ML1035106742010-12-17017 December 2010 Email, Request for Additional Information, License Amendment Request for Technical Specification Change Regarding Risk Informed Justification Project stage: RAI ML1106300632011-03-0303 March 2011 E-mail, Extension for RAI Response, License Amendment Request, Revise TSs to Adopt TSTF-425 Rev 3, Relocate Surveillance Frequencies to Licensee Control-Risk Informed Technical Specification Task Force Initiative 5b Project stage: RAI ULNRC-05762, Response to RAI on License Amendment Application for a Technical Specification Change That Would Relocate Specification Change That Would Relocate Specific Surveillance Frequencies to a Licensee Controlled Program2011-03-23023 March 2011 Response to RAI on License Amendment Application for a Technical Specification Change That Would Relocate Specification Change That Would Relocate Specific Surveillance Frequencies to a Licensee Controlled Program Project stage: Response to RAI ULNRC-05779, License Amendment Application Supplement for a Technical Specification Change That Would Relocate Specific Surveillance Frequencies to License Controlled Program2011-05-0303 May 2011 License Amendment Application Supplement for a Technical Specification Change That Would Relocate Specific Surveillance Frequencies to License Controlled Program Project stage: Supplement ULNRC-05808, Facility Operating License NPF-30, License Amendment Application Supplement for a Technical Specification Change That Would Relocate Specific Surveillance Frequencies to a Licensee Controlled Program (LDCN 10-0020)2011-07-25025 July 2011 Facility Operating License NPF-30, License Amendment Application Supplement for a Technical Specification Change That Would Relocate Specific Surveillance Frequencies to a Licensee Controlled Program (LDCN 10-0020) Project stage: Supplement ML1116618772011-07-29029 July 2011 Issuance of Amendment No. 202, Revise Technical Specifications to Adopt TSTF-425 Rev. 3, Relocate Surveillance Frequencies to Licensee Control-Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b Project stage: Approval ULNRC-05883, Request to Correct Typographical Error Identified in Technical Specification 3.1.9 Required Action A.32012-07-12012 July 2012 Request to Correct Typographical Error Identified in Technical Specification 3.1.9 Required Action A.3 Project stage: Request ML12201A2272012-08-0707 August 2012 Correction to Technical Specification (TS) Page Issued with Amendment No. 202 to Adopt TSTF-425 Rev. 3, Relocate Surveillance Frequencies to Licensee Control-Risk Informed TS Task Force Initiative 5b Project stage: Approval ML14290A3692014-10-28028 October 2014 Correction to TS Page 3.4-41 Amendment No. 202, Revise Technical Specifications to Adopt TSTF-425 Rev. 3, Relocate Surveillance Frequencies to Licensee Control-Risk Informed TSTF Initiative 5b Project stage: Other 2011-05-03
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000483/20240032024-10-23023 October 2024 Integrated Inspection Report 05000483/2024003 IR 05000483/20240132024-10-21021 October 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000483/2024013 IR 05000483/20244012024-10-0909 October 2024 Material Control and Accounting Program Inspection Report 05000483/2024401 Public ULNRC-06901, Concurrent Inoperability of Control Room Air Conditioning System Train and Opposite Train Emergency Diesel Generator Results in Condition Prohibited by Technical Specifications Limiting (Letter)2024-10-0101 October 2024 Concurrent Inoperability of Control Room Air Conditioning System Train and Opposite Train Emergency Diesel Generator Results in Condition Prohibited by Technical Specifications Limiting (Letter) ML24247A3042024-09-11011 September 2024 Regulatory Audit Questions for License Renewal Commitments 34 and 35 (EPID L-2024-LRO-0009) - Non-Proprietary IR 05000483/20244032024-08-28028 August 2024 Security Baseline Inspection 05000483-2024-403 IR 05000483/20240052024-08-14014 August 2024 Updated Inspection Plan for Callaway Plant (Report 05000483/2024005) IR 05000483/20253012024-08-0505 August 2024 Notification of NRC Initial Operator Licensing Examination 05000483/2025301 ML24212A2822024-08-0202 August 2024 Regulatory Audit Summary Concerning Review of Request No. C3R-01 for Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections IR 05000483/20240022024-07-18018 July 2024 And Independent Spent Fuel Storage Installation Integrated Inspection Report 05000483/2024002 and 07201045/2024001 ML24185A1032024-07-16016 July 2024 2024 Biennial Problem Identification and Resolution Inspection Report ULNRC-06892, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC00062024-06-26026 June 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0006 ULNRC-06891, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00052024-06-26026 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0005 ULNRC-06884, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00022024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0002 ULNRC-06886, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00042024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0004 ULNRC-06885, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00032024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0003 ML24144A0492024-06-11011 June 2024 Requests for Relief from ASME OM Code Pump and Valve Testing Requirements for Fifth 120-Month Inservice Testing Interval ML24158A5222024-06-0606 June 2024 Application to Revise Technical Specifications to Adopt Tstf-569, Rev. 2, Revise Response Time Testing Definition (LDCN 24-0008) ML24178A1132024-06-0606 June 2024 Ameren Missouris Intent to Adopt Revision 1 to Amendment 0 of Certificate of Compliance No. 1040 as Applicable to the ISFSI at the Callaway Plant Site ML24143A1632024-05-23023 May 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Storage Canister HGMPC0001 ULNRC-06882, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC00122024-05-16016 May 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0012 ML24137A2342024-05-16016 May 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Canister HGMPC0011 ML24122A1502024-05-0707 May 2024 Audit Plan to Support Review of Steam Generator License Renewal Response to Commitment Nos 34 and 35 ULNRC-06877, Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 252024-05-0606 May 2024 Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 25 IR 05000483/20244022024-05-0606 May 2024 Security Baseline Inspection Report 05000483/2024402 (Full Report) IR 05000483/20240112024-05-0101 May 2024 NRC Post-Approval Site Inspection for License Renewal (Phase 2) Report 05000483/2024011 ULNRC-06856, CFR 50.59 and 10 CFR 72.48 Summary Report2024-05-0101 May 2024 CFR 50.59 and 10 CFR 72.48 Summary Report ULNRC-06869, Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report ML24122A1132024-04-30030 April 2024 Submittal of Callaway, Unit 1, 2023 Annual Radioactive Effluent Release Report ULNRC-06876, Registration of Dry Spent Fuel Storage Canister HGMPC00102024-04-25025 April 2024 Registration of Dry Spent Fuel Storage Canister HGMPC0010 ML24108A1082024-04-17017 April 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0009 ULNRC-06871, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00072024-04-17017 April 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0007 ULNRC-06872, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00082024-04-17017 April 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0008 ULNRC-06866, Submittal of Cycle 26 Commitment Change Summary Report2024-04-17017 April 2024 Submittal of Cycle 26 Commitment Change Summary Report IR 05000483/20240012024-04-16016 April 2024 Integrated Inspection Report 05000483/2024001 IR 05000483/20244042024-04-0909 April 2024 Cyber Security Inspection Report 05000483/2024404 ML24088A3212024-04-0101 April 2024 Notification of Commercial Grade Dedication Inspection (05000483/2024013) and Request for Information ML24086A5132024-03-26026 March 2024 CFR 50.46 Annual Report Regarding ECCS Evaluation Model Revisions ULNRC-06863, Submittal of Annual Exposure Report for 20232024-03-20020 March 2024 Submittal of Annual Exposure Report for 2023 ML24079A1622024-03-19019 March 2024 Re Nuclear Property Insurance Reporting ML24066A1932024-03-0707 March 2024 2024 Callaway Plant Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ULNRC-06852, Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 262024-03-0505 March 2024 Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 26 IR 05000483/20230062024-02-28028 February 2024 Annual Assessment Letter for Callaway Plant Report 05000483/2023006 ML24052A3662024-02-26026 February 2024 Regulatory Audit Plan in Support of Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections ULNRC-06858, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-02-21021 February 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation ML24036A1712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0079 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 ML24008A0552024-01-19019 January 2024 Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code (EPID L-2023-LLR- 0061) IR 05000483/20230042024-01-19019 January 2024 – Integrated Inspection Report 05000483/2023004 ML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 2024-09-11
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23347A1212024-01-11011 January 2024 Issuance of Amendment No. 236 to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Volume Values to Licensee Control EPID L-2023-LLA-0046) ML23240A3692023-10-0505 October 2023 Issuance of Amendment No. 235 to Revise Technical Specifications to Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150) (Non-Proprietary) ML23228A0252023-09-25025 September 2023 Issuance of Amendment No. 234 to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23166B0882023-09-20020 September 2023 Issuance of Amendment No. 233 for Adoption of Alternative Source Term and Revision of Technical Specifications ML23093A0952023-05-10010 May 2023 Issuance of Amendment No. 232 Regarding Technical Specification Changes for Spent Fuel Storage ML22361A0702023-02-24024 February 2023 Issuance of Amendment No. 231 for Revision to Radiological Emergency Response Plan Regarding Response and Notification Goals ML23019A1752023-01-30030 January 2023 Issuance of Amendment No. 230 to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML23067A1482022-12-29029 December 2022 Operating License, Appendix C, Revision 078, Additional Conditions ML23067A1522022-12-29029 December 2022 67, Operating License Amendment Index ML23067A1512022-12-29029 December 2022 Facility Operating License, Table of Contents ML23067A1502022-12-29029 December 2022 Renewed Facility Operating License ML22301A0072022-12-0202 December 2022 Issuance of Amendment No. 229 to Revise Technical Specifications to Adopt TSTF-505, Revision 2, and TSTF-439, Revision 2 ML22220A1302022-10-21021 October 2022 Exemptions from the Requirements of 10 CFR 50.46 and 10 CFR Part 50 Appendix a, General Design Criteria 35, 38, and 41 (EPID L-2021-LLE-0021) (Cover Letter) ML22220A1322022-10-21021 October 2022 Issuance of Amendment No. 228 Re; Revise Technical Specifications to Address Generic Safety Isusue-191 and Respond to Generic Letter 2004-02 Using Risk-Informed Approach ML22220A2812022-08-15015 August 2022 Withdrawal of Requested Licensing Action LAR for TS Change and Exemption Request Transition to Allow Use of Framatome Gaia Fuel Submitted to NRC for Acceptance Review ML22053A2832022-04-0707 April 2022 Issuance of Amendment No. 227 Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-529, Revision 4, Clarify Use and Application Rules ML21344A0052021-12-29029 December 2021 Issuance of Amendment No. 226 Regarding Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants ML21195A2942021-06-22022 June 2021 78 to Operating License Appendix B - Environmental Protection Plan ML21195A2972021-06-22022 June 2021 64 to Operating License Amendment Index ML21195A2952021-06-22022 June 2021 Renewed Operating License ML21195A2932021-06-22022 June 2021 8 to Operating License Appendix C ML21053A1262021-03-24024 March 2021 Issuance of Amendment No. 225 to Revise Technical Specification Administrative Control 5.3.1 to Remove Details Specified for the Qualification of Certain Positions within the Unit Staff ML20218A4102020-11-0303 November 2020 Issuance of Amendment No. 224 Performance Based Method Alternative for Thermal Insulation Material ML20246G5702020-10-16016 October 2020 Issuance of Amendment No. 223 One-Time Deferral of the Steam Generator Tube Inspections ML19283C4812019-12-0606 December 2019 Issuance of Amendment No. 221 Main Turbine Control Slave Relay Testing ML20209A1162019-11-13013 November 2019 Operating License Regarding Issuance of First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors ML20209A1522019-11-13013 November 2019 Operating License Re EA-12-051, Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation ML20209A1122019-11-13013 November 2019 Operating License Re Appendix C, Additional Conditions ML20209A1052019-11-13013 November 2019 Operating License, Table of Contents ML20209A1172019-11-13013 November 2019 Operating License, Appendix B, Environmental Protection Plan ML20209A1352019-11-13013 November 2019 Operating License Re EA-06-037, Issuance of Order Requiring Compliance with Updated Adversary Characteristic ML20209A1482019-11-13013 November 2019 Operating License Re NRC Order ML20209A1262019-11-13013 November 2019 Operating License Amendment Index ML20209A1072019-11-13013 November 2019 Operating License Re EA-13-237, Issuance of Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access for Callaway Plant Independent Spent Fuel Storage Installation ML20209A1132019-11-13013 November 2019 Operating License Re Renewed Facility Operating License ML20209A1252019-11-13013 November 2019 Operating License Re EA-03-009 Errata, Issuance of Errata to Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors ML20209A1312019-11-13013 November 2019 Operating License Re EA-05-007, Issuance of Order for Additional Security Measures on the Transportation of Radioactive Material Quantities of Concern ML20209A1392019-11-13013 November 2019 Operating License Re Order Modifying Licenses (Effective Immediately), EA-02-026 ML20209A1412019-11-13013 November 2019 Operating License Re Issuance of Order for Compensatory Measures Related to Fitness-for-Duty Enhancements Applicable to Nuclear Facility Security Force Personnel ML20209A1432019-11-13013 November 2019 Operating License Re EA-12-049, Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML20209A1532019-11-13013 November 2019 Operating License Re Issuance of Order Requiring Compliance with Revised Design Basis Threat for Operating Power Reactors ML19158A2902019-07-30030 July 2019 Issuance of Amendment No. 220 Regarding Emergency Action Level Scheme Changes ML19073A0012019-04-18018 April 2019 Issuance of Amendment No. 219 to Add New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System ML18124A0262018-05-30030 May 2018 Issuance of Amendment No. 218 FSAR Revision Compliance with Regulatory Guide 1.106 Regarding MOV Thermal Overload Protection ML17236A0822017-09-15015 September 2017 Issuance of Amendment No. 217 Replacement of Methodology in Technical Specification 5.6.5, Core Operating Limits Report (Colr), ML16020A5162016-02-29029 February 2016 Issuance of Amendment No. 216, Revise Technical Specification (TS) 2.1.1.1 and TS 5.6.5, to Remove Uncertainties from Departure from Nucleate Boiling Ratio Safety Limit and Adopt WCAP-14565-P-A Methodology ML15324A1142016-02-0202 February 2016 Issuance of Amendment No. 215, Adopt Technical Specification Task Force (TSTF) Traveler TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection ML15328A0592016-01-28028 January 2016 Issuance of Amendment No. 214, Request to Revise Operating License Condition Related to Cyber Security Plan Milestone 8 Full Implementation Date ML15258A5102015-10-28028 October 2015 Issuance of Amendment No. 213, Adopt Technical Specification Task Force Traveler TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation 2024-01-18
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 7,2012 Mr. Adam C. Heflin Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 6S2S1
SUBJECT:
CALLAWAY PLANT, UNIT 1 - CORRECTION TO TECHNICAL SPECIFICATION PAGE ISSUED FOR AMENDMENT NO. 202, ADOPTION OF TSTF-42S, REVISION 3, "RELOCATE SURVEILLANCE FREQUENCIES TO LICENSEE CONTROL - RITSTF INITIATIVE SB" (TAC NO. ME4S06)
Dear Mr. Heflin:
By letter dated July 29, 2011 (Agencywide Documetns Access and Management System (ADAMS) Accession No. ML111661877), the Nuclear Regulatory Commission (NRC) issued Amendment No. 202 to Facility Operating License No. NPF-30 for the Callaway Plant, Unit 1.
The amendment changed the Technical Specifications (TSs) in response to your application dated August S, 2010, as supplemented by letters dated March 23, May 3, and July 2S, 2011.
The amendment revised the TSs by relocating specific surveillance frequencies to a licensee controlled program with the guidance of Nuclear Energy Institute (NEI) 04-10, "Risk-Informed Technical Specifications Initiative Sb, Risk-Informed Method for Control of Surveillance Frequencies." The amendment adopted NRC-approved Technical Specification Task Force (TSTF)-42S, Revision 3, "Relocate Surveillance Frequencies to Licensee Control - RITSTF
[Risk-Informed TSTF] Initiative Sb."
By letter dated July 12, 2012 (ADAMS Accession No. ML12194A683), your staff identified a typographical error in TS 3.1.9, "RCS Boron Limitations < SOooF," that occurred during the issuance of Amendment No. 202. The error on TS page 3.1-22 is that the ";::" symbol placed before the reactor coolant system cold leg temperature limit specified in Required Action A.3 was inadvertently changed from a symbol character to a text character in producing the clean, typed TS page. The correct character is displayed in the previous TS page issued with Amendment No. 174, dated August 21,2006 (ADAMS Accession No. ML062370104). There were no TS changes to the TS page between Amendment Nos. 174 and 202.
Please find enclosed the replacement TS page 3.1-22 for Amendment No. 202. This correction does not change any of the NRC staff's conclusions in the safety evaluation associated with the amendment.
A. Heflin -2 If you have any questions, please contact me at 301-415-2296 or via e-mail at Fred. Lyon@nrc.gov.
Sincerely, Carl F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483
Enclosure:
As stated cc w/encl: Distribution via Listserv
ENCLOSURE CALLAWAY PLANT, UNIT 1 CORRECTED TS PAGE 3.1-22 FOR AMENDMENT NO. 202
RCS Boron Limitations <: 500°F 3.1.9 3.1 REACTIVITY CONTROL SYSTEMS 3.1.9 RCS Boron Limitations <: 500 0 F LCO 3.1.9 The boron concentration of the Reactor Coolant System (RCS) shall be greater than the all rods out (ARO) critical boron concentration.
APPLICABILITY: MODE 2 with keff <: 1.0 with any RCS cold leg temperature <: 500°F and with Rod Control System capable of rod withdrawal.
MODE 3 with any RCS cold leg temperature < 500°F and with Rod Control System capable of rod withdrawal.
MODES 4 and 5 with Rod Control System capable of rod withdrawal.
ACTIONS COMPLETION CONDITION REQUIRED ACTION TIME A RCS boron concentration A.1 Initiate boration to Immediately not within limit. restore RCS boron concentration to within limit.
OR A2 Initiate action to place Immediately the Rod Control System in a condition incapable of rod withdrawal.
OR A3 ------ NOTE -------
Not applicable in MODES 4 and 5.
Initiate action to increase Immediately all RCS cold leg temperatures to ~ 500°F.
CALLAWAY PLANT 3.1-22 Amendment No. 202 Corrected
A. Heflin -2 If you have any questions, please contact me at 301-415-2296 or via e-mail at Fred. Lyon@nrc.gov.
Sincerely, IRA!
Carl F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483
Enclosure:
As stated cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrLAJBurkhardt Resource LPLIV Reading RidsOgcRp Resource RidsAcrsAcnw_MailCTR Resource RidsRgn4MailCenter Resource RidsNrrDorlLpl4 Resource RecordsAmend Resource RidsNrrPMCallaway Resource ADAMS Accession No.: ML12201A227 OFFICE NRR/LPL4/PM NRRlLPL4/LA NRRlLPL4/BC NRRlLPL4/PM NAME FLyon JBurkhardt MMarkley FLyon DATE 8/3/12 8/2/12 817/12 817/12 OFFICIAL RECORD COpy