ML12200A130

From kanterella
Jump to navigation Jump to search
Licensed Operator Positive Fitness for Duty Test
ML12200A130
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 07/17/2012
From: Chris Miller
Division of Nuclear Materials Safety I
To: Kearney F
Exelon Generation Co
References
Download: ML12200A130 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 21OO RENAISSANCE BOULEVARD, SUITE 1OO KING OF PRUSSIA, PENNSYLVANIA 1940G2713 July 17,2012 Mr. F. A. Kearney Vice President Limerick Generating Station Exelon Generation Company, LLC 3146 Sanatoga Road Pottstown, PA 19464

SUBJECT:

LIMERICK GENERATING STATION, UNITS 1 AND 2 LICENSED OPERATOR POSITIVE FITNESS FOR DUTY TEST

Dear Mr. Kearney:

On July 14,2012, yourfacility reported via 10 CFR 26.719 that an NRC-licensed operatortested positive following a random fitness-for-duty test administered on July 14,2012. Although we have obtained preliminary information, this letter is a formal request for information pertaining to this occurrence. Please provide, within 30 days after the date of this letter, answers to the questions listed in the enclosure and other records and information on this operator's fitness-for-duty that are relevant to this occurrence. We request that any personal, proprietary, or safeguards information in your response be contained in a separate enclosure and appropriately marked. The affidavit required by 10 CFR 2.390(b) must accompany your response, where applicable.

You should determine whether the operator meets the requirements of 10 CFR 55.33(aX1).

You should ensure that: (1) the operator meets the general health requirements of ANSI/ANS-3.4-1983; (2) the operator does not have a disqualifying condition under Section 5.3 of that standard; and (3) that documentation describing the designated physician's conclusion that the operator meets the requirements of ANSI/ANS-3.4-1983 is available for review by the NRC. lf a conditional license is requested per 10 CFR 55.25, that condition should be documented on NRC Form 396 and transmitted to the NRC.

lf you determine that the operator no longer meets the medical qualifications described in 10 CFR 55.33(a)(1), then, in accordance with 10 CFR 55.25, you must notify the NRC via a letter of the operator's permanent incapacitation. For example, you must notify the NRC if you determine, based on your employee assistance program in consultation with your designated physician, that the operator can no longer meet the medical criteria of ANSI/AN5-3.4-1983.

The NRC will evaluate the information in your reply to this letter to determine if further action is warranted pursuant to 10 CFR Part 50 or Part 55. The information supplied will be maintained in NRC Privacy Systems of Records-16 and will be subject to the Privacy Act.

lf you have any questions concerning this matter, please contact Mr. Donald E. Jackson, Chief, Operations Branch, (610) 337-5306. The requested information should be sent to Mr. Jackson's attention at the NRC Region I Office, 2100 Renaissance Blvd., Suite 100, King of Prussia, PA 19406-2713. Your cooperation is appreciated.

F. A. Kearney ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the runC puOtic Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room).

Sincerely, Division of Reactor Safety Docket No.: 50-352, 50-353 Licensee No.: NPF-39, NPF-85

Enclosure:

Fitness-for-Duty Req uest for Additional I nform ation cc M

Enclosure:

Distribution via ListServ

F. A. Kearney 2 ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RN Christopher G. Miller, Director Division of Reactor Safety Docket No.: 50-352, 50-353 Licensee No.: NPF-39, NPF-85

Enclosure:

Fitness-for-Duty Request for Additional Information cc w/

Enclosure:

Distribution via ListServ Distribution w/Enclosure J. McHale, Chief, NRRYDIRS/IOLB W. Dean, RA D. Lew, DRA D. Holody, Rl, OE C. Miller, RUDRS D P. Wilson, RIiDRS DD D. Roberts, RI/DRP D J. Clifford, RI/DRP DD P. Krohn, RI/DRP BC E. DiPaolo, RI/DRP SRI D. Jackson/Rl/DRS/OB C. Bixler, RI/DRS/OB (with concurrences)

DOCUMENT NAME: GTDRS\Operations Branch\Bixler\FitnessforDuty\FFD-LGS\7-14-12FFD-A.docx ADAMS ACCESSION NUMBER: 30 V Non-Sensitive V Publicly Available V suNstReview n Sensitive tr Non-PubliclyAvaitable OFFICE RI/DRS/OB RI/DRS NAME DEJackson CMiller DATE 7 t17 t12 7 t17 t12 OFFICIAL F

ElrcLosuRE Licensed OPerator Fitness-for-Dutv Request for Additional lnformation Limerick Generating Station is requested to provide the following information concerning the fitness-for-duty occurrence (10 CFR Parl26.719) reported on July 14,2012 regarding the involved licensed operator:

1. Name, Docket Number, and responsibilities of the operator'
2. A summary of the operato/s entire fitness-for-duty testing history. Please include the dates and times the operator was tested, the reasons for the tests (i.e.,

random, for-cause, or follow-up), the results of the tests, including quantification, and the dates that any tests were confirmed positive'

3. Whether the operator used, sold, or possessed illegal drugs. lf so, please provide the details of the circumstances Surrounding such use, sale, or possession.

OR Whether the operator consumed atcoholic beverages within the protected area' lf so, please provide the details of the circumstances surrounding such consumption.

4. Whether the operator was at the controls or supervising licensed activities while under the in1uence of illegal drugs or alcohol. lf so, please provide the details of the operator's performance of licensed duties while under the influence.
5. Whether the operator fulfilled a position that was required to meet minimum licensed operating staffing requirements (fire brigade, emergency plan operations, etc.) while under the influence.
6. Whether the operator was involved in procedural errors related to this occurrence. lf so, please provide the details of the procedural errors and the consequences of the errors.
7. The extent to which you reviewed the operator's past work history, both on the day of the occurrence and prior to July 14,2Q12'
g. your intentions with regard to the operator's resumption of duties under the 10 CFR part 50 anO pirt 55 licenses, including your plans for follow-up testing.