2012 Quad Cities Nuclear Power Station Initial License Examination Administered System JPMs
ML12174A148
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 06/30/2012
From:
Operations Branch III
To:
Exelon Nuclear
Shared Package
ML11354A184 List:
References
Download: ML12174A148 (110)


Text

Exelon Nuclear Job Performance Measure Insert Control Rods by De-Energizing the Scram Solenoids JPM Number: 2012 NRC JPM a (LS-029-I)

Revision Number: 06 Date: 03/04/2012 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date NRC JPM a.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 8

2012 NRC JPM a - Rev 06 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 through 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM a.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 8

2012 NRC JPM a - Rev 06 Revision Record (Summary)

Revision 05, JPM updated to reflect format and procedure changes.

Revision 06, JPM updated to reflect format and procedure changes for 2012 ILT NRC Exam.

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM a.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 8

2012 NRC JPM a - Rev 06 SIMULATOR SETUP INSTRUCTIONS

1. Reset to any IC.
2. Go to RUN.

(Note: Manual Actuations must be performed prior to running the CAEP file.)

3. Provide a current revision of QCOP 0300-28 with Prerequisites signed off by Unit Supervisor (US).
4. This JPM will de-energize RPS scram solenoids. If this results in a conflict with the other JPMs that are being performed concurrently, use the following commands to maintain reactor power:

imf rd13a 100 (Scram Discharge Volume North hydraulic lock) imf rd13b 100 (Scram Discharge Volume South hydraulic lock)

5. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
6. This completes the setup for this JPM.

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM a.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 8

2012 NRC JPM a - Rev 06 INITIAL CONDITIONS

- You are the Unit 2 Assist NSO.

- An ATWS has occurred on Unit 1 with reactor power currently at 15%.

- The scram valves are NOT open.

- QCOP 0300-28 has been entered. The following actions are being taken:

o The CRD 25 valve is open and the NSO is manually inserting Control Rods from the 5-panel.

o Reactor level is being controlled by the low flow valve.

o An operator has been sent to vent the scram air header.

- This JPM is not time critical.

INITIATING CUE Perform QCOP 0300-28 Step F.2.

Provide examinee with: QCOP 0300-28 when the candidate has located the correct packet in the QGA file.

EVALUATOR: Start the clock when the candidate starts implementation of 0300-28.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM a.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 8

2012 NRC JPM a - Rev 06 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number Obtain procedure and Locates packet for QCOP 0300- ___ ___ ___

equipment to be used. 28 in QGA equipment storage

  • QCOP 0300-28 cabinet in CR/Simulator.
  • Fuse Pullers CUE: After the necessary procedures/equipment have been obtained from the packet for QCOP 0300-28, provide the candidate with a (Yellow/Working) copy of QCOP 0300-28.

Identify the safety equipment to Safety Glasses and (if the ___ ___ ___

be used. candidates shirt is not 100%

cotton) the blue safety over-shirt are identified for safety equipment.

EVALUATOR: The fuses removed in the following steps will de-energize the scram solenoids. Control rod insertion is blocked to allow other JPMs to be performed concurrently. Step order is NOT critical Candidate removes the

  • F.2.a. *Remove fuses in the 901-15 ___ ___ ___

following fuses, with fuse panel at Terminal board C.

  • pullers:

F5, 590-715A F6, 590-715C F7, 590-715E F8, 590-715G Candidate removes the

  • F.2.b. *Remove fuses in the 901-17 ___ ___ ___

following fuses, with fuse panel at Terminal Board C.

  • pullers:

F5, 590-715B F6, 590-715D F7, 590-715F F8, 590-715H CUE: The Unit NSO reports that all control rods have fully inserted. The US is exiting QGA 101 and another Unit 2 operator will re-install the fuses.

EVALUATOR NOTE: The candidate should inform you that the task is complete.

JPM Stop Time:

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM a.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 8

2012 NRC JPM a - Rev 06 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Insert Control Rods by De-Energizing the Scram Solenoids JPM Number: 2012 NRC JPM a (LS-029-I) Revision Number: 06 Task Number and

Title:

SR-0300-P07 (Freq: LIC=B) Given a reactor plant in an ATWS condition (QGA), perform the NSO actions to insert control rods in accordance with QCOP 0300-28.

K/A Number and Importance: K/A: 295037 EA1.01 Rating: 4.6/4.6 ATWS: Ability to operate and/or monitor the following as they apply to SCRAM CONDITION PRESENT AND REACTOR POWER ABOVE APRM DOWNSCALE OR UNKNOWN: RPS Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QCOP 0300-28, Rev. 30, ALTERNATE CONTROL ROD INSERTION Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 7 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM a.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 8

INITIAL CONDITIONS

- You are the Unit 2 Assist NSO.

- An ATWS has occurred on Unit 1 with reactor power currently at 15%.

- The scram valves are NOT open.

- QCOP 0300-28 has been entered. The following actions are being taken:

o The CRD 25 valve is open and the NSO is manually inserting Control Rods from the 5-panel.

o Reactor level is being controlled by the low flow valve.

o An operator has been sent to vent the scram air header.

- This JPM is not time critical.

INITIATING CUE Perform QCOP 0300-28 Step F.2.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure JPM Title Here Formatted Return B Core Spray to Standby After Test Formatted JPM Number: XXYYZZXX2012 NRC JPM b Revision Number: ##01 Date: ## 04/ ## 05/ 2012##

Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date NRC JPM b Rev 1.docNRC JPM b Rev 1NRC JPM b Rev 1.docNRC JPM b Rev 1.docNRC JPM b.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 12

{JPM Number}2012 NRC JPM b - rev Rev 00XX JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date NRC JPM b Rev 1.docNRC JPM b Rev 1NRC JPM b Rev 1.docNRC JPM b Rev 1.docNRC JPM b.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 12SRRS: 3D.105 (when utilized for operator initial or continuing training)

{JPM Number}2012 NRC JPM b - rev Rev 00XX Revision Record (Summary)

Revision 00, {Put reason for writing this JPM under Revision 00, for all subsequent revisions annotate the changes that were made.}This JPM was developed new for the 2012 ILT NRC Exam.

NRC JPM b Rev 1.docNRC JPM b Rev 1NRC JPM b Rev 1.docNRC JPM b Rev 1.docNRC JPM b.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 12SRRS: 3D.105 (when utilized for operator initial or continuing training)

{JPM Number}2012 NRC JPM b - rev Rev 00XX SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC XX Reset the simulator to any IC at normal operating pressure; IC 20 for the 2012 NRC Exam.

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Do this second {Add steps to describe additional simulator setup steps (e.g., Load Computer Aided Exercise ZZZZ or jcae! ZZZZ)}Start the B Core Spray Loop in the Test mode:
  • Start the 1B Core Spray Pump. Formatted: Bullets and Numbering
  • Open the Test Valve 4B to achieve 4500 gpm.
3. Be prepared to insert the following commands during JPM performance:

(Commands are contained in JPM b.cae and 2012 NRC JPM Day 2 of 2 JPM.cae)

  • ior dilohs114024b2 off (Test Valve 4B Red light overridden off) Formatted
  • ior dihs114024b open (Test Valve 4B CS overridden to OPEN) Formatted
  • ior dihs114024b norm (Test Valve 4B CS overridden to NORM) Formatted
  • dor dihs114024b (Test Valve 4B CS Override deleted)
  • trgset 1 zdihs114024b(2).eq.1 (Sets Event Trigger 1 as the Test Valve 4B CS taken to Formatted OPEN)
  • trg 1 dor lohs114024b2 (Test Valve 4B Red light override deleted on event Trigger 1) Formatted
4. Provide a copy of QCOS 1400-01 (Current Revision) Quarterly Core Spray System Flow Rate Test marked up as follows:
  • D. Prerequisites o D.1.a Unit 1 o D.1 b IST Group B Pump Test CHECKED IST Comprehensive Pump Test MARKED N/A Post Maintenance WOs, MARKED N/A Partial for: B LOOP ONLY and CHECKED Other, MARKED N/A o D.1.c signed as Unit Supervisor, Date=Today, Time= Current o D.2 and D.4 completed by NSO o D.3, D.5, D.6, and D.7 MARKED N/A
  • E and F, all steps CIRCLED AND SLASHED
  • G left unmarked
  • H.1 marked N/A (Continued)

NRC JPM b Rev 1.docNRC JPM b Rev 1NRC JPM b Rev 1.docNRC JPM b Rev 1.docNRC JPM b.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 12SRRS: 3D.105 (when utilized for operator initial or continuing training)

{JPM Number}2012 NRC JPM b - rev Rev 00XX

  • H.2 completed through step H.2.p.(4) Formatted: Bullets and Numbering o The following steps marked N/A:

H.2.a H.2.b H.2.i H.2.l.(2)

H.2.l.(4)

H.2.n.(2)

H.2.n(3)

H.2.p.(4) o Record values for the following steps:

H.2.c 75 psig H.2.f 410 psig H.2.l.(1) 7 psig H.2.n(1) 4550 gpm, (discharge) 265 psig, (Inlet) 7 psig, 258 psid

  • Signed off by NSO

o Remaining steps signed off as NSO.

  • Short Duration Time Clock paperwork with Unit 1 and date today filled in. Time clock start 15 minutes ago filled in.
  • IST Data Sheet attached.
  • Be prepared to provide a blank Short Duration Time Clock form for MO 1-1402-4B open during JPM administration.

Formatted: Bullets and Numbering 3.Do this next {Add steps to describe additional panel setup requirements for this JPM (e.g.,

re-align systems; hang tags, hang postings, etc.}

4.5. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.

5.6. This completes the setup for this JPM.

NRC JPM b Rev 1.docNRC JPM b Rev 1NRC JPM b Rev 1.docNRC JPM b Rev 1.docNRC JPM b.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 12SRRS: 3D.105 (when utilized for operator initial or continuing training)

{JPM Number}2012 NRC JPM b - rev Rev 00XX INITIAL CONDITIONS

{Put the Initial Conditions here. Include current plant status and the role (by position, e.g., Formatted: Bullets and Numbering an extra RO, etc.) in which the examinee will be performing the task. This information should be duplicated on the last page for the student copy.}You are the Unit 1 ANSO.

Unit 1 is at rated power.

QCOS 1400-01 Quarterly Core Spray System Flow Rate Test is in progress on the B Core Spray Loop.

LCO 3.5.1 Condition B has been entered for B Core Spray Loop inoperable.

No other LCOs are in effect.

The operability of the ESS Keep Fill pump to B Core Spray has just been verified.

The visual inspection for leaks on piping, valves and pump is complete and satisfactory.

The Equipment Operator who is supporting this test is at extension 4040.

INITIATING CUE

{Put the initiating cue the evaluator will read to the students here. This should describe the task clearly. This information should be duplicated on the last page for the student copy.}Return the B Core Spray Loop to standby in accordance with QCOS 1400-01, starting at Step H.2.q.

Provide candidate with the marked up copy of QCOS 1400-01, IST Data Sheet and the SDTC in effect.

DO NOT give the candidate the blank SDTC (on pink paper) until the candidate notifies the US that B Core Spray is going to be made inoperable again.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step. Formatted: Bullets and Numbering Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

NRC JPM b Rev 1.docNRC JPM b Rev 1NRC JPM b Rev 1.docNRC JPM b Rev 1.docNRC JPM b.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 12SRRS: 3D.105 (when utilized for operator initial or continuing training)

{JPM Number}2012 NRC JPM b - rev Rev 00XX Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

NRC JPM b Rev 1.docNRC JPM b Rev 1NRC JPM b Rev 1.docNRC JPM b Rev 1.docNRC JPM b.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 12SRRS: 3D.105 (when utilized for operator initial or continuing training)

{JPM Number}2012 NRC JPM b - rev Rev 00XX JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number Formatted NOTE: MO 1-1402-4B (Test Valve) is a throttle valve. Per QAP 0300-02, Step D.7, the control switch should be held in the close direction for at least 25 seconds after the valve indicates closed.

  • H.2.q *Close MO 1-1402-4B.* MO 1-1402-4B control switch ___ ___ ___

held in the CLOSE position until the Green Closed light is ON and the Red Open Light is OFF.

H.2.r Verify MO 1-1402-38B opens MO 1-1402-38B (Minimum Flow ___ ___ ___

as system flow decreases. Valve) verified open H.2.s Notify the Unit Supervisor to Unit Supervisor notified to exit ___ ___ ___

exit the LCO for Core Spray the LCO for Core Spray Loop B Loop B inoperability. inoperability.

Formatted CUE EVALUATOR: Role Play Unit Supervisor as necessary to acknowledge the Formatted report that B Core Spray Loop has been returned to OPERABLE.

H.2.t Verify that the visual Step H.2.t initialed as complete ___ ___ ___

inspection of leaks on piping, base on information provided in valves and pump is complete the turnover.

handswitch taken momentarily to STOP and released to the Normal-After-Trip position

  • H.2.v *Close MO 1-1402-38B.
  • MO 1-1402-38B handswitch ___ ___ ___

taken momentarily to CLOSE and released to the Normal-After-Close position NRC JPM b Rev 1.docNRC JPM b Rev 1NRC JPM b Rev 1.docNRC JPM b Rev 1.docNRC JPM b.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 8 of 12SRRS: 3D.105 (when utilized for operator initial or continuing training)

{JPM Number}2012 NRC JPM b - rev Rev 00XX Comment STEP ELEMENT STANDARD SAT UNSAT Number H.2.w If overpressure condition of CS HDR PRESS 1-1450-1B ___ ___ ___

(1) & (2) >90 psig in discharge piping referenced to determine that exists after 1B Core Spray >90 psig exists in discharge Pump is stopped THEN: piping.

Fully open 1-1402-17B, B EO directed to fully open 1-CORE SPRAY INBD VENT 1402-17B & 18B VALVE Fully open 1-1402-18B, B CORE SPRAY OUTBD VENT VALVE SIMOP ROLE PLAY the supporting EO as necessary to acknowledge the directive to fully open 1-1402-17B & 18B.

THEN: Lower Core Spray pressure by inserting following commands:

  • ior lohs114024b2 off (Test Valve 4B Red light overridden off) Formatted Formatted: Bullets and Numbering
  • ior dihs114024b open (Test Valve 4B Control Switch overridden to OPEN)

Formatted After 20 seconds, stop opening the Test Valve: Formatted

  • ior dihs114024b norm (Test Valve 4B Control Switch overridden to NORM) Formatted: Bullets and Numbering Formatted Then insert the following commands:

Formatted

  • dor dihs114024b (Test Valve 4B Control Switch Override deleted) Formatted: Bullets and Numbering
  • trgset 1 zdihs114024b(2).eq.1 (Sets Event Trigger 1 as the Test Valve 4B CS Formatted taken to OPEN) Formatted
  • trg 1 dor lohs114024b2 (Test Valve 4B Red light override deleted on event Trigger 1)

Formatted SIMOP ROLE PLAY: Contact the ANSO as the supporting EO to report that 1-1402-17B

& 18B are fully open Formatted NRC JPM b Rev 1.docNRC JPM b Rev 1NRC JPM b Rev 1.docNRC JPM b Rev 1.docNRC JPM b.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 9 of 12SRRS: 3D.105 (when utilized for operator initial or continuing training)

{JPM Number}2012 NRC JPM b - rev Rev 00XX Comment STEP ELEMENT STANDARD SAT UNSAT Number H.2.w When overpressure condition CS HDR PRESS 1-1450-1B ___ ___ ___

(3) clears THEN: referenced to determine when (a)& (b) the discharge header is < 90 Close 1-1402-18B psig.

Close 1-1402-17B EO directed to close 1-1402-18B & 17B SIMOP ROLE PLAY the supporting EO as necessary to acknowledge the directive to CUE close 1-1402-18B & 17B. Wait 1 minute and then report that 1-1402-18B & 17B are closed. (No action is necessary)

NOTE The Alternate Path begins here.

  • H.2.x CS HDR PRESS 1-1450-1B CS HDR PRESS 1-1450-1B ___ ___ ___

referenced to *determine that referenced and lowering the discharge header pressure Discharge Header Pressure is NOT being maintained.

  • identified.

H.2.x & If pressure cannot be Unit Supervisor notified to enter ___ ___ ___

x.(1) maintained after performing the LCO for Core Spray Loop B depressurization step above, inoperability.

THEN:

Notify the Unit Supervisor to enter the LCO for Core Spray Loop B inoperability CUE EVALUATOR: Role Play Unit Supervisor as necessary to acknowledge the report to enter LCO for Core Spray B inoperability. Give candidate the clean copy of the SDTC (on pink paper).

  • H.2. *Open MO 1-1402-4B.
  • MO 1-1402-4B control switch ___ ___ ___

x.(2) held in the OPEN position until the Green Closed light is OFF.

NRC JPM b Rev 1.docNRC JPM b Rev 1NRC JPM b Rev 1.docNRC JPM b Rev 1.docNRC JPM b.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 10 of 12SRRS: 3D.105 (when utilized for operator initial or continuing training)

{JPM Number}2012 NRC JPM b - rev Rev 00XX Comment STEP ELEMENT STANDARD SAT UNSAT Number

  • H.2. *Close MO 1-1402-4B.
  • MO 1-1402-4B control switch ___ ___ ___

x.(3) held in the CLOSE position until the Green Closed light is ON and the Red Open Light is OFF Formatted NOTE: With the Test Valve closed, B Core Spray discharge Header Pressure will rise to the Keep Fill Pump discharge pressure, approximately 66 psig, and then stabilize.

CS HDR PRESS 1-1450-1B B Core Spray discharge header ___ ___ ___

referenced to determine that pressure verified to be the discharge header pressure stabilizing at normal pressure is stabilizing at normal pressure H.2. Fill and vent the B Core Spray EO directed to fill and vent the ___ ___ ___

x.(4) Subsystem per QCOP 1400- B Core Spray Subsystem per 01 QCOP 1400-01 SIMOP ROLE PLAY: As the EO to acknowledge this directive.

Inform the candidate that another NSO will enter QCOP 1400-01 to fill and vent B Core Spray.

Formatted EVALUATOR: Inform the candidate that the JPM is complete. Formatted JPM Stop Time:

NRC JPM b Rev 1.docNRC JPM b Rev 1NRC JPM b Rev 1.docNRC JPM b Rev 1.docNRC JPM b.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 11 of 12SRRS: 3D.105 (when utilized for operator initial or continuing training)

{JPM Number}2012 NRC JPM b - rev Rev 00XX JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Type JPM title hereReturn B Core Spray to Standby After Test Formatted JPM Number: Type JPM number here2012 NRC JPM b Revision Number: ##00 Task Number and

Title:

Type Task Number and Title here Formatted SR-1400-P05 Given a reactor plant with a Core Spray loop in a standby lineup, perform the Quarterly Core Spray Pump Flow Rate Test and return the Core Spray loop to standby in accordance with QCOS 1400-01.

K/A Number and Importance: K/A:Type System/Evolution #, K/A, and Importance Ratings Formatted here. 209001 A1.02 Rating: 3.2/3.4 Formatted Ability to predict and/or monitor changes in parameters associated with operating the Low Pressure Core Spray System controls including: Core Spray Pressure Formatted Suggested Testing Environment: Type suggested testing environment here (e.g., simulator, classroom, mock-up, etc.) Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): Type procedure reference(s), AND revision number(s) here. Delete blank

'Comments' rows during JPM development, as necessary, to maintain this sheet as a single page.QCOS 1400-01 Rev. 40 Quarterly Core Spray System Flow Rate Test QAP 0300-02, Rev. 69, Conduct of Shift Operations Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 0020 minutes Actual Time Used:

minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

NRC JPM b Rev 1.docNRC JPM b Rev 1NRC JPM b Rev 1.docNRC JPM b Rev 1.docNRC JPM b.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 12 of 12SRRS: 3D.105 (when utilized for operator initial or continuing training)

{JPM Number}2012 NRC JPM b - rev Rev 00XX Evaluators Name: (Print)

Evaluators Signature: Date:

NRC JPM b Rev 1.docNRC JPM b Rev 1NRC JPM b Rev 1.docNRC JPM b Rev 1.docNRC JPM b.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 13 of 12SRRS: 3D.105 (when utilized for operator initial or continuing training)

{JPM Number}2012 NRC JPM b - rev Rev 00XX NRC JPM b Rev 1.docNRC JPM b Rev 1NRC JPM b Rev 1.docNRC JPM b Rev 1.docNRC JPM b.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 14 of 12SRRS: 3D.105 (when utilized for operator initial or continuing training)

{JPM Number}2012 NRC JPM b - rev Rev 00XX INITIAL CONDITIONS You are the Unit 1 ANSO. Formatted: Bullets and Numbering Unit 1 is at rated power.

QCOS 1400-01 Quarterly Core Spray System Flow Rate Test is in progress on the B Core Spray Loop.

LCO 3.5.1 Condition B has been entered for B Core Spray Loop inoperable.

No other LCOs are in effect.

The operability of the ESS Keep Fill pump to B Core Spray has just been verified.

The visual inspection for leaks on piping, valves and pump is complete and satisfactory.

The Equipment Operator who is supporting this test is at extension 4040.

INITIATING CUE Return the B Core Spray Loop to standby in accordance with QCOS 1400-01, starting at Step H.2.q.{Put the Initial Conditions here. Include current plant status and the role (by position, e.g., extra RO, etc.) in which the examinee will be performing the task. This information should be duplicated from the evaluator's page.}

INITIATING CUE

{Put the initiating cue the evaluator will read to the students here. This should describe the task clearly. This information should be duplicated from the evaluator's page.}

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure JPM Title Here Perform the MSIV Closure Timing Test JPM Number: XXYYZZXX2012 NRC JPM c (LS-014-II)

Revision Number: ##13 Date: ## 03// ## 04// 20##12 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date NRC JPM c.docNRC JPM cNRC JPM c.docNRC JPM cNRC JPM c (updated).doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 10910

{JPM Number2012 NRC JPM c} - Rrev XX13 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM c.docC:\Documents and Settings\nrc1\Desktop\Quad Cities 2012 ILT NRC Exam As Administered\JPMs\NRC JPM c.docC:\Documents and Settings\ilt1\Desktop\z 2012 NRC Exam\NRC JPMs\2012 NRC JPMs Working\NRC JPM c.doc\\IBM-1DC324749A3\ilt1\Desktop\z 2012 NRC Exam\NRC JPMs\NRC JPMs Working\NRC JPM c.docC:\Documents and Settings\ilt1\Desktop\z 2012 NRC Exam\NRC JPMs\NRC JPMs Working\NRC JPM c (updated).doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 10910

{JPM Number2012 NRC JPM c} - Rrev XX13 G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM c.docC:\Documents and Settings\nrc1\Desktop\Quad Cities 2012 ILT NRC Exam As Administered\JPMs\NRC JPM c.docC:\Documents and Settings\ilt1\Desktop\z 2012 NRC Exam\NRC JPMs\2012 NRC JPMs Working\NRC JPM c.doc\\IBM-1DC324749A3\ilt1\Desktop\z 2012 NRC Exam\NRC JPMs\NRC JPMs Working\NRC JPM c.docC:\Documents and Settings\ilt1\Desktop\z 2012 NRC Exam\NRC JPMs\NRC JPMs Working\NRC JPM c (updated).doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 10910

{JPM Number2012 NRC JPM c} - Rrev XX13 Revision Record (Summary)

Revision 1300, {Put reason for writing this JPM under Revision 00, for all subsequent revisions annotate the changes that were made.}This JPM was developed new for the 2007 NRC Exam. It was based on bank JPM LS-014-11 Rev.12.

It has been updated to the current template and current procedure revisions for the 2012 NRC Exam.

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM c.docC:\Documents and Settings\nrc1\Desktop\Quad Cities 2012 ILT NRC Exam As Administered\JPMs\NRC JPM c.docC:\Documents and Settings\ilt1\Desktop\z 2012 NRC Exam\NRC JPMs\2012 NRC JPMs Working\NRC JPM c.doc\\IBM-1DC324749A3\ilt1\Desktop\z 2012 NRC Exam\NRC JPMs\NRC JPMs Working\NRC JPM c.docC:\Documents and Settings\ilt1\Desktop\z 2012 NRC Exam\NRC JPMs\NRC JPMs Working\NRC JPM c (updated).doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 10910

{JPM Number2012 NRC JPM c} - Rrev XX13 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC XX Reset the simulator to IC 13420 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2. IC

Description:

The unit is operating < 75% power and < 97% FCL ~ 680 MWe.Do this second {Add steps to describe additional simulator setup steps (e.g., Load Computer Aided Exercise ZZZZ or jcae! ZZZZ)}

3. Manual Actuation: Formatted: Bullets and Numbering Insert rods to ensure <97% FCL Raise recirc speed to return to 74% power.

Reduce power as necessary to ensure plant is less than 75% ( 680 Mwe) and <97% FCL.

Annotate QCOS 0250-04 to indicate that two stopwatches have been obtained and that Unit Supervisor permission has been granted to perform the test.

4. Malfunctions: Formatted: Bullets and Numbering Slow stroke 1-203-2A, valve strokes at >5.2 seconds.
  • imf ms03e 0.3 Formatted Formatted: Bullets and Numbering
5. Remotes:

None.

6. Overrides: Formatted: Bullets and Numbering None.
7. Digital FW screen for FWLC control trend data should be displayed. Formatted: Bullets and Numbering
8. This completes the setup for this JPM.

3.Do this next {Add steps to describe additional panel setup requirements for this JPM (e.g., Formatted: Bullets and Numbering re-align systems; hang tags, hang postings, etc.}

4.When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.

5.This completes the setup for this JPM.

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM c.docC:\Documents and Settings\nrc1\Desktop\Quad Cities 2012 ILT NRC Exam As Administered\JPMs\NRC JPM c.docC:\Documents and Settings\ilt1\Desktop\z 2012 NRC Exam\NRC JPMs\2012 NRC JPMs Working\NRC JPM c.doc\\IBM-1DC324749A3\ilt1\Desktop\z 2012 NRC Exam\NRC JPMs\NRC JPMs Working\NRC JPM c.docC:\Documents and Settings\ilt1\Desktop\z 2012 NRC Exam\NRC JPMs\NRC JPMs Working\NRC JPM c (updated).doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 10910

{JPM Number2012 NRC JPM c} - Rrev XX13 INITIAL CONDITIONS

- The unit is operating on the 95% Flow Control line. Formatted: Bullets and Numbering

- There are no personnel in the MSIV Room.

- The Unit Supervisor has directed the MSIV Closure Timing Test be performed on AO 1-203-1A and AO 1-203-2A due to a previous slow closure time.

{Put the Initial Conditions here. Include current plant status and the role (by position, e.g., an extra RO, etc.) in which the examinee will be performing the task. This information should be duplicated on the last page for the student copy.}

INITIATING CUE Perform the MSIV Closure Timing surveillance on AO 1-203-1A and AO 1-203-2A IAW QCOS 0250-04.

Provide examinee with:

QCOS 0250-04 with steps C.1 and D.1.a, b. & c. filled in.

One Electronic Stopwatches.

{Put the initiating cue the evaluator will read to the students here. This should describe the task clearly. This information should be duplicated on the last page for the student copy.}

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step. Formatted: Bullets and Numbering Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM c.docC:\Documents and Settings\nrc1\Desktop\Quad Cities 2012 ILT NRC Exam As Administered\JPMs\NRC JPM c.docC:\Documents and Settings\ilt1\Desktop\z 2012 NRC Exam\NRC JPMs\2012 NRC JPMs Working\NRC JPM c.doc\\IBM-1DC324749A3\ilt1\Desktop\z 2012 NRC Exam\NRC JPMs\NRC JPMs Working\NRC JPM c.docC:\Documents and Settings\ilt1\Desktop\z 2012 NRC Exam\NRC JPMs\NRC JPMs Working\NRC JPM c (updated).doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 10910

{JPM Number2012 NRC JPM c} - Rrev XX13 candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM c.docC:\Documents and Settings\nrc1\Desktop\Quad Cities 2012 ILT NRC Exam As Administered\JPMs\NRC JPM c.docC:\Documents and Settings\ilt1\Desktop\z 2012 NRC Exam\NRC JPMs\2012 NRC JPMs Working\NRC JPM c.doc\\IBM-1DC324749A3\ilt1\Desktop\z 2012 NRC Exam\NRC JPMs\NRC JPMs Working\NRC JPM c.docC:\Documents and Settings\ilt1\Desktop\z 2012 NRC Exam\NRC JPMs\NRC JPMs Working\NRC JPM c (updated).doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 10910

{JPM Number2012 NRC JPM c} - Rrev XX13 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number D.2.a. Reactor power is <75%. Verifies Reactor power <75%. ___ ___ ___

D.2.b. Flow control line is <97%. Verifies FCL <97%. ___ ___ ___

  • H.1.a. *Determine that MSIV will be Determines that proper criteria ___ ___ ___

tested using hot criteria.

  • for testing is hot criteria.
  • H.2.a. *Activate MSIV Test Mode at Activates MSIV Test Mode. ___ ___ ___

Operator Work Station FWLC Measuring Point Display.

  • H.2.b. Verify reactor level maintained Observe water level ind. stable ___ ___ ___

H.2.c. Verify that sum of individual Verifies that green filled square ___ ___ ___

steam flows being used for at the OWS FWLC measuring total steam flow. point display labeled as Act indicated sum of individual steam flows.

H.3.a. Verify open AO 1-203-1A. Verifies AO 1-203-1A is open. ___ ___ ___

EVALUATOR NOTE: The first stopwatch must be started at same time as control switch actuation, the second stopwatch is started upon illumination of the closed position indicator and both stop watches are stopped upon de-energization of the open position indicator.

Formatted CUE: Direct the candidate to perform timing using the Switch-to-Light method and Formatted you will perform timing by the Light-to-Light method.

(Light-to-Light timing is simulated.)CUE Formatted Formatted Type cues to be provided by evaluator in these areas or delete row as applicable.

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM c.docC:\Documents and Settings\nrc1\Desktop\Quad Cities 2012 ILT NRC Exam As Administered\JPMs\NRC JPM c.docC:\Documents and Settings\ilt1\Desktop\z 2012 NRC Exam\NRC JPMs\2012 NRC JPMs Working\NRC JPM c.doc\\IBM-1DC324749A3\ilt1\Desktop\z 2012 NRC Exam\NRC JPMs\NRC JPMs Working\NRC JPM c.docC:\Documents and Settings\ilt1\Desktop\z 2012 NRC Exam\NRC JPMs\NRC JPMs Working\NRC JPM c (updated).doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 8 of 10910

{JPM Number2012 NRC JPM c} - Rrev XX13 Comment STEP ELEMENT STANDARD SAT UNSAT Number

  • H.3.b.XX *Close and time AO 1-203- AO 1-203-1A Normal Control ___ ___ ___

1A.*Type next element of Switch positioned to close AND task. stop watch actuated to time the valve stroke.Type specific operator action standards in this column including application of fundamentals, as appropriate.

Formatted CUE: The Switch-to-Light closing time may be slightly greater than the 4.8-second Formatted limit on attachment A due to inconsistencies in Simulator performance. If this occurs, provide the following closing times:

Light-to-Light closing time: 4.1 seconds Switch-to-Light closing time: 4.6 seconds Otherwise, report that the Light-to-Light stroke time is 0.5 seconds less Formatted than the reported Switch-to-Light time. Formatted Formatted H.3.c. Record closure time on Records closure time on step ___ ___ ___ Formatted Attachment A. H.3.b. to nearest 1/10 of a Formatted second.

CUE: If the closing time falls between 4.7 and 4.8 seconds, the candidate may ask if a re-adjustment is desired (To satisfy the last line of Attachment A).

ROLE PLAY as UNIT SUPERVISOR and inform the candidate that a re-adjustment will NOT be performed.

  • H.3.d. *Open AO 1-203-1A.
  • AO 1-203-1A Control switch ___ ___ ___

placed in OPEN. Open Verifies AO 1-203-1A OPEN indicator is illuminated and the indication is ON and CLOSED closed indicator is extinguished.

indication is OFF H.4.a. Verify open AO 1-203-2A. Verifies AO 1-203-2A is open. ___ ___ ___

EVALUATOR NOTE: The first stopwatch must be started at same time as control switch actuation, the second stopwatch is started upon illumination of the closed position indicator and both stop watches are stopped upon de-energization of the open position indicator.

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM c.docC:\Documents and Settings\nrc1\Desktop\Quad Cities 2012 ILT NRC Exam As Administered\JPMs\NRC JPM c.docC:\Documents and Settings\ilt1\Desktop\z 2012 NRC Exam\NRC JPMs\2012 NRC JPMs Working\NRC JPM c.doc\\IBM-1DC324749A3\ilt1\Desktop\z 2012 NRC Exam\NRC JPMs\NRC JPMs Working\NRC JPM c.docC:\Documents and Settings\ilt1\Desktop\z 2012 NRC Exam\NRC JPMs\NRC JPMs Working\NRC JPM c (updated).doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 9 of 10910

{JPM Number2012 NRC JPM c} - Rrev XX13 Comment STEP ELEMENT STANDARD SAT UNSAT Number CUE: Direct the candidate to perform timing using the Switch-to-Light method and you will perform timing by the Light-to-Light method. (Light-to-Light timing is simulated.)

  • H.4.b. *Close and time AO 1-203-2A Normal Control ___ ___ ___

AO 1-203-2A.* Switch positioned to close AND stop watch actuated to time the valve stroke.

Formatted CUE: Report that the Light-to-Light stroke time is 0.5 seconds less than the Formatted reported Switch-to-Light time.

Formatted

  • H.4.c.XX *Record closure time on Records closure time on step ___ ___ ___ Formatted Attachment A and reports to H.4.b. to nearest 1/10 of a Formatted the US that stroke time is out second. Formatted of spec.*Type element of task in this column.

Recognizes that stroke time is out of spec and informs US.Type specific operator action standards in this column including application of fundamentals, as appropriate.

Formatted CUE: If asked whether AO 1-203-2A should be re-opened, asked applicant what he Formatted would recommend then as US, direct that valve be left closed, pending further testing.

EVALUATOR: JPM will end with recognition by candidate that either further testing or valve adjustment is necessary before proceeding.CUE JPM Stop Time:

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM c.docC:\Documents and Settings\nrc1\Desktop\Quad Cities 2012 ILT NRC Exam As Administered\JPMs\NRC JPM c.docC:\Documents and Settings\ilt1\Desktop\z 2012 NRC Exam\NRC JPMs\2012 NRC JPMs Working\NRC JPM c.doc\\IBM-1DC324749A3\ilt1\Desktop\z 2012 NRC Exam\NRC JPMs\NRC JPMs Working\NRC JPM c.docC:\Documents and Settings\ilt1\Desktop\z 2012 NRC Exam\NRC JPMs\NRC JPMs Working\NRC JPM c (updated).doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 10 of 10910

{JPM Number2012 NRC JPM c} - Rrev XX13 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Type JPM title herePerform the MSIV Closure Timing Test Formatted JPM Number: Type JPM number here2012 NRC JPM cRevision Number: ##13 Formatted Formatted Task Number and

Title:

Type Task Number and Title hereSR-0250-P03 Given a reactor plant at power, conduct MSIV closure timing in accordance with QCOS 0250-04 Formatted K/A Number and Importance: Type System/Evolution #, K/A, and Importance Ratings Formatted here.239001 A4.01 Rating: 4.2/4.0 Ability to manually operate and/or monitor in the control room: MSIVs Formatted Suggested Testing Environment: Type suggested testing environment here (e.g., simulator, classroom, mock-up, etc.) Simulator Formatted Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): Type procedure reference(s), AND revision number(s) here. Delete blank

'Comments' rows during JPM development, as necessary, to maintain this sheet as a single page.

QCOS 0250-04 Rev. 23, MSIV Closure Timing Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Formatted Estimated Time to Complete: 0012 minutes Actual Time Used:

minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM c.docC:\Documents and Settings\nrc1\Desktop\Quad Cities 2012 ILT NRC Exam As Administered\JPMs\NRC JPM c.docC:\Documents and Settings\ilt1\Desktop\z 2012 NRC Exam\NRC JPMs\2012 NRC JPMs Working\NRC JPM c.doc\\IBM-1DC324749A3\ilt1\Desktop\z 2012 NRC Exam\NRC JPMs\NRC JPMs Working\NRC JPM c.docC:\Documents and Settings\ilt1\Desktop\z 2012 NRC Exam\NRC JPMs\NRC JPMs Working\NRC JPM c (updated).doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 11 of 10910

{JPM Number2012 NRC JPM c} - Rrev XX13 Evaluators Name: (Print)

Evaluators Signature: Date:

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM c.docC:\Documents and Settings\nrc1\Desktop\Quad Cities 2012 ILT NRC Exam As Administered\JPMs\NRC JPM c.docC:\Documents and Settings\ilt1\Desktop\z 2012 NRC Exam\NRC JPMs\2012 NRC JPMs Working\NRC JPM c.doc\\IBM-1DC324749A3\ilt1\Desktop\z 2012 NRC Exam\NRC JPMs\NRC JPMs Working\NRC JPM c.docC:\Documents and Settings\ilt1\Desktop\z 2012 NRC Exam\NRC JPMs\NRC JPMs Working\NRC JPM c (updated).doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 12 of 10910

{JPM Number} - rev XX INITIAL CONDITIONS

- The unit is operating on the 95% Flow Control line. Formatted: Bullets and Numbering

- There are no personnel in the MSIV Room.

- The Unit Supervisor has directed the MSIV Closure Timing Test be performed on AO 1-203-1A and AO 1-203-2A due to a previous slow closure time.

INITIATING CUE Perform the MSIV Closure Timing surveillance on AO 1-203-1A and AO 1-203-2A IAW QCOS 0250-04.

{Put the Initial Conditions here. Include current plant status and the role (by position, e.g.,

extra RO, etc.) in which the examinee will be performing the task. This information should be duplicated from the evaluator's page.}

INITIATING CUE

{Put the initiating cue the evaluator will read to the students here. This should describe the task clearly. This information should be duplicated from the evaluator's page.}

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Shutdown the RCIC System JPM Number: 2012 NRC JPM d (LS-020-I-A)

Revision Number: 04 Date: 03/04/2012 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date NRC JPM d.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 9

2012 NRC JPM d - Rev 04 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 through 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME/Instructor Date SME/Instructor Date SME/Instructor Date NRC JPM d.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 9

2012 NRC JPM d - Rev 04 Revision Record (Summary)

Revision 00, This JPM is developed IAW guidelines established in NUREG 1021 Rev 8 ES-301 and Appendix C. This JPM meets the criteria of Category B.1 Control Room Systems, for RO/SRO candidates JPM revised to match procedure revision.

Revision 01, This JPM is being revised to reflect procedure, format changes and updated KA.

Revision 02, JPM revised to match procedure revision.

Revision 03, JPM revised to match procedure revision.

Revision 04, This JPM revision updates Bank JPM LS-020-I-F Rev. 3 for the 2012 ILT NRC Exam.

NRC JPM d.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 9

2012 NRC JPM d - Rev 04 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 21 or ANY AT POWER.

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Manual Actuation:

- Start Torus Cooling IAW QCOP 1000-09 and QCOP 1000-04.

- Place the RCIC System on, in the pressure control mode, IAW QCOP 1300-02, step F.6. (use the control switch for the MO 1-1301-53 to achieve approximately 400 gpm at approximately 1100 psig discharge pressure.)

- Ensure RCIC controller is in manual.

Malfunctions: Override the turb trip pushbutton using the following command:

ior dihs11303rtt off Remotes:

None Overrides:

None

3. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
4. This completes the setup for this JPM.

NRC JPM d.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 9

2012 NRC JPM d - Rev 04 INITIAL CONDITIONS The unit SCRAMMED due to a Group I isolation.

- Reactor pressure was being controlled with RCIC in the pressure control mode with the controller in manual.

- The MSIVs have just been re-opened and RCIC is no longer required for pressure control.

- This JPM is not time critical.

INITIATING CUE Shutdown the RCIC system and place the system in a standby condition with the suction from the CCSTs per QCOP 1300-05.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

NRC JPM d.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 9

2012 NRC JPM d - Rev 04 JPM Start Time:

Comment SAT UNSAT Number STEP ELEMENT STANDARD EVALUATOR NOTE: After the candidate has acquired QCOP 1300-05, provide a working copy (Yellow) of QCOP 1300-05.

F.1. Trip Turbine. Depresses TURB TRIP ___ ___ ___

pushbutton.

Role If asked, as Unit Supervisor, acknowledge RCIC fails to trip and state RCIC Play: needs to be shutdown.

EVALUATOR NOTE: Alternate path starts here.

  • F.2. Verify closed MO 1-1301-61, Places the control switch to ___ ___ ___

stm to turb vlv. close and verifies closed light lit.

F.3 Verify closed MO 1-1301-60, Verifies MO 1-1301-60 closes ___ ___ ___

min flow valve. and the closed light is lit.

F.4 Verify RCIC Pump discharge Observes discharge flow flow decreases to zero. indicates zero on FIC 1-1340-1.

EVALUATOR NOTE: For Step F.5, Turbine RPM may be read as slightly above the bottom of the meter scale, which would be 200 RPM. If necessary, cue the candidate that Turbine RPM is 0 (zero).

F.5 Verify RCIC Turbine Speed Observes Turbine Speed ___ ___ ___

decreases to zero. indicates zero on 1-1340-501, Turb Speed.

F.6 Verify closed MO 1-1301-49 Verifies closed light lit. ___ ___ ___

pump discharge valve.

EVALUATOR NOTE: Step F.7 is Not Applicable and can be marked as N/A.

F.8 Close MO 1-1301-62, Turb Clg Places control switch to close ___ ___ ___

Water Vlv. and verifies closed light lit.

NRC JPM d.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 9

2012 NRC JPM d - Rev 04 Comment SAT UNSAT Number STEP ELEMENT STANDARD NOTE: MO 1-1301-53 (Test Valve) is a throttle valve. Per QAP 0300-02, Step D.7, the control switch should be held in the close direction for at least 25 seconds after the valve indicates closed.

F.9 Verify closed MO 1-1301-53 Places control switch to close ___ ___ ___

CCST Test Byp. and releases 25 seconds after full-closed indication is received.

F.10 Verify closed MO 1-2301-15, Places control switch to close ___ ___ ___

HPCI Test RTN vlv. and verifies closed light lit.

  • F.11 Verify FIC 1-1340-1, RCIC Depresses Auto pushbutton on ___ ___ ___

flow controller is in auto and set FIC 1-1340-1 and verifies Auto at 400 gpm. PB light is lit and setpoint is 400 gpm.

F.12 Depress INITIATION signal Depress INITIATION SEAL-IN ___ ___ ___

seal-in and reset. AND RESET pushbutton.

F.13 Reset Turbine trip. Depresses Turb Reset ___ ___ ___

pushbutton.

CUE Inform the candidate that 30 minutes has elapsed since the RCIC Turbine was shutdown.

F.14 Stop TURB VAC PMP. Places the control switch to ___ ___ ___

STOP and verifies green stop light lit.

F.15 Verify BAROMETRIC CNDSR Verifies BAROMETRIC CNDSR ___ ___ ___

COND PMP stops. COND PMP stops and verifies green stop light lit.

F.16 Verify all RCIC annunciators are Observes that there are no ___ ___ ___

cleared. RCIC annunciators in alarm on the 901-4 panel.

EVALUATOR NOTE: The candidate should inform you that this task is complete. If the candidate proceeds with QCOP 1300-01 and QCOP 1000-09, inform him that another operator will be performing these tasks.

JPM Stop Time:

NRC JPM d.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 9

2012 NRC JPM d - Rev 04 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Shutdown the RCIC System JPM Number: 2012 NRC JPM d Revision Number: 04 Task Number and

Title:

SR-1300-P03 (Freq: LIC=I) (ILT-MP) Given an operating reactor plant, perform the periodic RCIC pump operability test in accordance with QCOS 1300-01.

K/A Number and Importance: K/A: 217000 A4.03 Rating: 3.4/3.3 Ability to manually operate and/or monitor in the Control Room: System Valves.

Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QCOP 1300-05, Rev. 13, RCIC SYSTEM SHUTDOWN QCOP 1300-01, Rev. 40, RCIC SYSTEM PREPARATION FOR STANDBY OPERATION Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 10 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

NRC JPM d.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 8 of 9

INITIAL CONDITIONS The unit SCRAMMED due to a Group I isolation.

- Reactor pressure was being controlled with RCIC in the pressure control mode with the controller in manual.

- The MSIVs have just been re-opened and RCIC is no longer required for pressure control.

- This JPM is not time critical.

INITIATING CUE Shutdown the RCIC system and place the system in a standby condition with the suction from the CCSTs per QCOP 1300-05.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Vent Containment Irrespective of Release Rates with APCV.

(Failure of Torus Valve to Open, Requiring Venting Through the Drywell)

JPM Number: 2011 NRC JPM e (LS-053-I-A)

Revision Number: 04 Date: 03/04/2012 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date NRC JPM e.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 10

2011 NRC JPM e - Rev 04 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 through 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME/Instructor Date SME/Instructor Date SME/Instructor Date NRC JPM e.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 10

2011 NRC JPM e - Rev 04 Revision Record (Summary)

Revision 00, New JPM.

Revision 01, Revision 02, JPM revised to reflect procedure and K/A revisions.

Revision 03, K/A revised.

Revision 04, Updated the 2011 ILT Cert Exam version for the 2012 ILT NRC Exam.

NRC JPM e.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 10

2011 NRC JPM e - Rev 04 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 21.

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Manual Actuation:

Start CAMs 901-55 & 56.

Start B SBGT.

Malfunctions: None Remotes: None Overrides: Fail AO 1-1601-60 control switch to open. ior dihs1160160 close

3. Be prepared to provide a blank copy of QCOP 1600-13 (Current Revision) POST ACCIDENT VENTING OF THE PRIMARY CONTAINMENT.
4. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
5. This completes the setup for this JPM.

NRC JPM e.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 10

2011 NRC JPM e - Rev 04 INITIAL CONDITIONS Note: The Simulator setup may not match the Initial Conditions provided.

A transient has occurred on Unit One resulting in fuel damage and hydrogen generation.

The US has entered QGA 200-5 and has determined that containment venting is required to reduce hydrogen concentration inside the containment.

Torus and Drywell hydrogen concentrations are at 7%.

Torus oxygen concentration is at 6%.

Drywell Pressure is 38 psig.

Torus pressure is 37 psig.

Torus level is 15 ft.

A plant assembly has been ordered. The plant is evacuated and all personnel are accounted for.

Sufficient Radwaste and Turbine Building Exhaust Fans are operating for adequate dilution.

One train of SBGT is operating.

QGAs state that it is "OK to exceed release rate limits."

RPS buses are energized.

This JPM is not time critical.

INITIATING CUE As the Reactor Operator, vent the Primary Containment in accordance with QCOP 1600-13 to control Primary Containment Hydrogen Concentration Less than 6%.

(Evaluator provide a blank copy of QCOP 1600-13 if the candidate chooses to use the QCOP or Flowchart rather than the Hard Card.)

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

NRC JPM e.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 10

2011 NRC JPM e - Rev 04 JPM Start Time:

Comment SAT UNSAT Number STEP ELEMENT STANDARD NOTE: Operator may choose to use procedure, flowchart, or hard card.

C.2. Verify RPS available to N/As Prerequisite per Initial ___ ___ ___

operate valves. Conditions.

F.1. Operate fans to provide Signs off as complete per initial ___ ___ ___

(Hard Card dilution flow. conditions.

1.a)

F.2.a-f. Verify closed primary Verifies CLOSED lights lit for ___ ___ ___

(Hard Card containment valves. the following valves:

1.b) AO 1-1601-23 AO 1-1601-24 AO 1-1601-60 AO 1-1601-61 AO 1-1601-62 AO 1-1601-63 F.4.a. Evacuate the Reactor Announces to evacuate the ___ ___ ___

(Hard Card Building AND Turbine Reactor Building AND Turbine 1.c) Building. Building or signs off as CM per Initial Conditions.

  • F.4.b. Select APCV. Positions Master Vent Mode ___ ___ ___

(Hard Card Switch to the APCV position.

1.d)

F.4.c. Verify closed, Vent to Rx Verifies AO 1-1699-7 closed ___ ___ ___

(Hard Card Bldg. vlv. light lit.

1.e)

EVALUATOR: The following 2 steps will bypass the 2.5 psig Group II isolation signal to allow opening containment vent valves.

  • F.4.d. Override Gp II signal for Vent Positions AO 1-1601-24 CIS ___ ___ ___

(Hard Card to Reactor Building exhaust OVERRIDE switch to 1.f) valve and verify Alarm 901-5 OVERRIDE AND holds for 1 E-4 is received. second. Verifies 901-5 E-4 alarm on NRC JPM e.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 10

2011 NRC JPM e - Rev 04 Comment SAT UNSAT Number STEP ELEMENT STANDARD

  • F.4.e. Override Gp II signal for DW SIMULTANEOUSLY positions ___ ___ ___

(Hard Card & Torus Vent vlvs. and verify AO 1-1601-23 CIS OVERRIDE 1.g) Alarms 901-5 E-3 and F3 are and AO 1-1601-60 CIS received. OVERRIDE switches to OVERRIDE AND holds for 1 second. Verifies 901-5 E-3 and F3 alarms on.

  • F.4.f. Open Vent to Reactor Positions AO 1-1601-24 CS to ___ ___ ___

(Hard Card Building Exhaust system open.

1.h) valve.

EVALUATOR NOTE: Alternate Path starts here.

F.4.g Operator opens the AO 1- Positions AO 1-1601-60 control ___ ___ ___

(Hard Card 1601-60. switch to open.

2.a)

F.4.h Operator recognizes inability Operator recognizes inability to ___ ___ ___

(Hard Card to vent the containment vent the containment through the 3.) through the Torus, and need Torus, and need to vent the to vent the Drywell. Drywell.

EVALUATOR NOTE: Role play as Unit Supervisor upon notification of failure and restate need to vent the containment. The operator may dispatch an EO and/or maintenance to investigate. Role play as necessary to investigate the valve failure.

CUE: If dispatched by the candidate, report as the EO or Maintenance that the solenoid for the AO 1-1601-60 has failed.

F.4.h.(1). Operator verifies closed the Operator verifies closed the ___ ___ ___

(Hard Card Torus 18-inch Vent vlv. Torus 18-inch Vent vlv AO-1601-3.a) 60.

  • F.4.h.(2). Opens AO 1-1601-23 DW Positions AO 1-1601-23 DW 18 ___ ___ ___

(Hard Card 18 vent valve. vent valve control switch to 3.b) OPEN.

  • F.4.h.(3). Opens AO 1-1699-6 to Positions AO 1-1699-6 CS to ___ ___ ___

(Hard Card achieve desired containment Open, then Close to reduce 3.c) response , then closes valve. hydrogen concentration.

NRC JPM e.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 10

2011 NRC JPM e - Rev 04 Comment SAT UNSAT Number STEP ELEMENT STANDARD EVALUATOR NOTE: Closure of the AO 1-1699-6 valve is not included as a Critical Step.

Venting is based on H2/O2 concentration in the containment and not based on containment pressure (QGA 200-5 #33).

F.4.h.(3)(a). Monitor Release rate. Monitors 1/2-1740-19, Chimney ___ ___ ___

(Hard Card Gas Activity Recorder (912-4) for 3.d) proper documentation of the release.

EVALUATOR: 1/2-1740-202, Mn Chimney Gas Activity Recorder (912-1) may be checked and monitored per procedural step not included on Hard Card.

EVALUATOR: Provide cue to operators for Gas monitors 1/2-1740-19 and 1/2-1740-202 that gas activity recorders are reading slightly higher.

If asked, for the hydrogen concentration, the operator should check monitor hydrogen on the 901-55 and 901-56 panels on Gas recorders 1-2406A/B. Provide cue to the operator that hydrogen concentration is lowering.

F.4.h.(3)(b). Log Vent information. Communicates that logging ___ ___ ___

(Hard Card start/stop times is required.

3.e)

CUE: Logging will be performed by another NSO.

EVALUATOR: The candidate should inform you that the task is complete.

JPM Stop Time:

NRC JPM e.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 8 of 10

2011 NRC JPM e - Rev 04 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Vent Containment Irrespective of Release Rates with APCV. (Failure of Torus Valve to Open, Requiring Venting Through the Drywell)

JPM Number: 2011 Cert JPM e Revision Number: 03 Task Number and

Title:

SR-0001-P38 (Freq: LIC=A) Given a reactor plant, vent and purge the primary containment irrespective of off-site release rates when drywell OR torus hydrogen reaches 6% or unknown OR drywell OR torus oxygen reaches 5% or unknown in accordance with QGA 200-5. (BWROG PC-11.2)

K/A Number and Importance: K/A: 223001 A2.04 Rating: 3.7/3.8 Ability to (a) predict the impacts of the following on the Primary Containment System and Auxiliaries; and (b) based on those predictions, use procedures to correct, control or mitigate the consequences of those abnormal conditions or operations: High Containment/Drywell hydrogen concentration.

Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QCOP 1600-13, Rev. 24, POST ACCIDENT VENTING OF THE PRIMARY CONTAINMENT Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 10 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

NRC JPM e.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 9 of 10

INITIAL CONDITIONS Note: The Simulator setup may not match the Initial Conditions provided.

A transient has occurred on Unit One resulting in fuel damage and hydrogen generation.

The US has entered QGA 200-5 and has determined that containment venting is required to reduce hydrogen concentration inside the containment.

Torus and Drywell hydrogen concentrations are at 7%.

Torus oxygen concentration is at 6%.

Drywell Pressure is 38 psig.

Torus pressure is 37 psig.

Torus level is 15 ft.

A plant assembly has been ordered. The plant is evacuated and all personnel are accounted for.

Sufficient Radwaste and Turbine Building Exhaust Fans are operating for adequate dilution.

One train of SBGT is operating.

QGAs state that it is "OK to exceed release rate limits."

RPS buses are energized.

This JPM is not time critical.

INITIATING CUE As the Reactor Operator, vent the Primary Containment in accordance with QCOP 1600-13 to control Primary Containment Hydrogen Concentration Less than 6%.

Exelon Nuclear Job Performance Measure Energize Bus 13-1 via the Crosstie with the 1/2 EDG failure JPM Number: 2012 NRC JPM f Revision Number: 00 Date: 03/04/2012 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date NRC JPM f.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 9

2012 NRC JPM f - Rev 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 through 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM f.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 9

2012 NRC JPM f - Rev 00 Revision Record (Summary)

Revision 00, This JPM was developed for the 2012 ILT NRC exam. It modifies existing bank JPM LS-062-I-A by converting from a loss of Bus 14-1 / U1 EDG to a loss of Bus 13-1 / 1/2 EDG.

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM f.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 9

2012 NRC JPM f - Rev 00 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 08.
2. Go to RUN
3. Run the CAEP file. 2012 NRC Day 1 JPMs.cae
4. Setup Commands:

Override Bus 13 to Bus 13-1 synch switch to off: ior diss165001327 off Prevent the 1/2 EDG from auto starting: imf dg04b Prevent the 1/2 EDG from manual starting: imf dg03b Prevent an auto scram on B RPS: imf rp02b Prevent an auto scram on B RPS: imf rp02d On Manual Trigger 30, Unit 2 xtie from Bus 23-1 to Bus 13-1: irf ed56r(30) close (This command establishes the Remote Function on Event Trigger 30, which allows snapping into an IC for repeat administration, rather than reloading the CAEP File for each session.)

5. Perform Manual Actions:

Open Bus 13-1 to 18 breaker Crosstie Bus 19 to Bus 18 o Close breaker at 18 o Close breaker at 19 Restore RPS A o irf rp29r reset Recover from RPS A loss per the following steps from QCOA 7000-01:

o Reset A 1/2 scram.

o Reset Group 1.

Give each Inboard MSIV an OPEN signal.

o Reset Group 2 and 3 Isolations.

o Restore RWCU with approximately 80 gpm reject flow.

o For Drywell Pneumatics, verify open AO-4720 and AO-4721 and AC running.

o Reset Drywell the Rad Monitor.

o Reset ARMs.

o Restore Control Room ventilation (as necessary).

o Reset 1st-Hit alarms.

o Reinitialize digital displays at panel 901-3.

Trip Bus 13-1 (overcurrent), then clear o imf ed03d o dmf ed03d o irf ed31r reset o irf ed29r reset

6. Clear SBO Alarms.

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM f.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 9

2012 NRC JPM f - Rev 00 INITIAL CONDITIONS

- Unit 1 was operating at full power.

- Unit 2 is operating at 150 MWe in a split configuration (load is split between the UAT and RAT).

- Bus 23-1 is energized from its normal power supply.

- Bus 19 was carrying Bus 18, appropriate Tech Specs have been entered.

- A transient occurred resulting in a LOCA and drywell pressure of 5 psig.

- The Bus 13 to Bus 13-1 tie breaker has tripped.

- Bus 13-1 is de-energized.

- The 1/2 Emergency Diesel Generator failed to auto-start.

- NO immediate Operator actions have been taken.

- Hardcard use has been authorized by the Unit Supervisor.

- This JPM is NOT time critical.

INITIATING CUE Energize Bus 13-1.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM f.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 9

2012 NRC JPM f - Rev 00 JPM Start Time:

Comment SAT UNSAT STEP ELEMENT STANDARD Number EVALUATOR NOTE: If the candidate locates QCOA 6600-02 or QCOP 6500-08, provide a (Yellow) working copy of the procedure selected.

C.1.a Operator recognizes that Operator recognizes that 901-8 ___ ___ ___

901-8 C-4 is not up and C-4 is not up and places the 1/2 starts the 1/2 EDG by EDG control switch to START placing the control switch on the 901-8 panel.

to START.

EVALUATOR NOTE: Operator should recognize failure of auto EDG to start and take immediate operator actions per QCOA 6600-2 to place the control switch to START.

C.1.b. Operator verifies voltage Operator verifies voltage and ___ ___ ___

and frequency not frequency not developed, the developed, the output output breaker is also open and breaker is also open and NO Live Bus light lit.

NO Live Bus light lit.

EVALUATOR NOTE: If Operator dispatches an EO to investigate failure of the diesel, acknowledge and reply: EO has been dispatched.

D.2 Operator attempts Operator attempts restoration of ___ ___ ___

restoration of Bus 13-1 Bus 13-1 from 23-1 with QCOP from 23-1 with QCOP 6500-08.

6500-08.

EVALUATOR NOTE: Alternate Path starts here.

Operator should recognize need to use QCOP 6500-08 (hard-card). If asked from US, re-state as the US the need to Energize Bus 13-1.

Operator selects hard card, Obtains hardcard for BUS 13-1 ___ ___ ___

Attachment B of QCOP TO BUS 23-1 TIE OPERATION 6500-08. (BUS 13-1 DEAD) from the 901-74 panel.

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM f.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 9

2012 NRC JPM f - Rev 00 Comment SAT UNSAT STEP ELEMENT STANDARD Number

  • Hardcard Places control switches in Places the following control ___ ___ ___

step 1 pull to lock to isolate Bus switches in PTL.

13-1. - Bus 13-1 & Bus 61 Tie breaker Bus 13-1 & Bus 61 Tie - 1/2 Diesel Gen to Bus 13-1 breaker GCB

- Buses 13 and 13-1 Tie GCB 1/2 Diesel Gen to Bus

- 1A CS 13-1 GCB

- 1A RHR Buses 13 and 13-1 Tie - 1B RHR GCB 1A CS, 1A RHR, 1B RHR CUE: Role Play Unit 2 operator as necessary to acknowledge the following directive.

  • Hardcard Directs the Unit 2 NSO or Directs the Unit 2 RO to perform ___ ___ ___

step 2 ANSO to operate the the following two steps on the synchronization switch and 902-8 panel:

close bus 23-1 & 13-1 tie 1. Place SYNCH switch to ON breaker. for BUS 23-1 & 13-1 TIE GCB.

2. Close BUS 23-1 & 13-1 TIE GCB.

SIMOP: Coordinate with the Evaluator as necessary to perform the Unit 2 actions.

Use Manual Trigger 30 to insert command irf ed56r close .

Report to candidate that the bus 23-1 to 13-1 crosstie breaker on U-2 is closed in.

  • Hardcard Places the synchronization Places the synchronization ___ ___ ___

step 3.a. switch ON for the crosstie. switch on the 901-8 panel to ON for BUS 13-1 & 23-1 TIE GCB

  • Hardcard Close bus 13-1 & 23-1 tie Closes and holds (for ___ ___ ___

step 3.b. breaker. approximately 10 seconds) the 13-1 & BUS 23-1 TIE GCB on the 901-8 panel. Reports BUS 13-1

& 23-1 TIE GCB closed and 13-1 is LIVE.

EVALUATOR NOTE: Candidate should inform you that the task is complete.

JPM Stop Time:

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM f.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 9

2012 NRC JPM f - Rev 00 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Energize Bus 13-1 via the Crosstie with the 1/2 EDG failure JPM Number: 2012 NRC JPM f Revision Number: 00 Task Number and

Title:

SR-6500-P04 (Freq: LIC=B) Given a loss of normal power to an emergency bus (13-1 or 14-

1) with a failure of the associated emergency diesel to start, supply power to the emergency bus using the crosstie from Unit 2 and restore 480vac busses in accordance with QOA 6500-03, QCOP 6500-08, QOA 6700-04 and QOA 6700-01. (Determine expected bus loading currents in accordance with QCOP 6500-28) (SOER 83-6 r4)

K/A Number and Importance: K/A: 262001 A4.04 Rating: 3.6/3.7 Ability to manually operate and/or monitor in the control room: Synchronizing and paralleling of different A-C supplies.

Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QCOP 6500-08, Rev. 24 QCOA 6600-02, Rev. 19 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 10 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM f.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 8 of 9

INITIAL CONDITIONS

- Unit 1 was operating at full power.

- Unit 2 is operating at 150 MWe in a split configuration (load is split between the UAT and RAT).

- Bus 23-1 is energized from its normal power supply.

- Bus 19 was carrying Bus 18, appropriate Tech Specs have been entered.

- A transient occurred resulting in a LOCA and drywell pressure of 5 psig.

- The Bus 13 to Bus 13-1 tie breaker has tripped.

- Bus 13-1 is de-energized.

- The 1/2 Emergency Diesel Generator failed to auto-start.

- NO immediate Operator actions have been taken.

- Hardcard use has been authorized by the Unit Supervisor.

- This JPM is NOT time critical.

INITIATING CUE Energize Bus 13-1.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Start-Up the RHRSW System With Reduced Pump Capacity JPM Number: 2012 NRC JPM g (LS-001-II-F)

Revision Number: 10 Date: 03/04/2012 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date NRC JPM g.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 10

2012 NRC JPM g - Rev 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 through 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM g.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 10

2012 NRC JPM g - Rev 10 Revision Record (Summary)

Revision 05, This JPM is developed IAW guidelines established in NUREG 1021 Rev 8 ES-301 and Appendix C. This JPM meets the criteria of Category B.1 "Control Room Systems," for RO/SRO candidates.

JPM revised to match procedure revision.

Revision 06, JPM revised to match procedure revision.

Revision 07, JPM revised to reflect procedure, format and KA changes.

Revision 08, JPM revised to match procedure.

Revision 09, JPM revised to reflect procedure number change, updated formatting and K/A.

Revision 10, JPM updated for the 2012 ILT NRC Exam.

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM g.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 10

2012 NRC JPM g - Rev 10 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC any NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

(The following commands are contained in CAEP file: 2012 NRC DAY 3 JPMs.cae)

2. Insert commands for setup:

Malfunctions:

imf sw05d 80 (RHR Service Water Pump 1D Reduced Capacity) imf sw05c 80 (RHR Service Water Pump 1C Reduced Capacity)

Set triggers 5 and 6 to be true when the RHR Bldg SW Flow Select Switch is taken to Rev.

trgset 5 zdihs110014b(2) trgset 6 zdihs110014b(2)

Assign Event Triggers 5 & 6 to delete malfunction SW05D and SW05C :

trg 5 dmf sw05d trg 6 dmf sw05c Remotes:

None Overrides:

None

3. Verify the 1B RHR HX Service Cooler Flow Select switch is in the NORM position.
4. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
5. This completes the setup for this JPM.

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM g.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 10

2012 NRC JPM g - Rev 10 INITIAL CONDITIONS

- The next shift will be performing a HPCI run for engineering.

- RHRSW is not on yet, US orders both RHRSW loops started.

- No RHRSW loops have been drained and no discharge valves have been adjusted.

- An EO has already performed pre-start checks for both RHRSW pumps and everyone is clear of the area.

- This JPM is NOT time critical.

INITIATING CUE Start-up the A and B RHR Service Water Loops in preparation for HPCI run using the A and C RHR Service Water pumps per QCOP 1000-04.

Provide candidate procedure copy.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM g.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 10

2012 NRC JPM g - Rev 10 JPM Start Time:

Comment SAT UNSAT STEP ELEMENT STANDARD Number F.1.b.(1) Verify RHR HX A SERVICE Verifies RHR HX A SERVICE ___ ___ ___

WATER FLOW is in either WATER FLOW is in either NORMAL FLOW OR NORMAL FLOW OR REVERSE REVERSE FLOW lineup. FLOW lineup.

  • F.1.b.(2) Throttle open RHR HX SW Throttles MO 1-1001-5A to at ___ ___ ___

DISCH VLV. least 40% open.

EVALUATOR NOTE: The candidate should make a plant announcement when starting 1A RHRSW pump.

  • F.1.b.(3) Start A RHRSW Pump on A RHRSW pump on A loop ___ ___ ___

A loop. started.

  • F.1.b.(4) Throttles RHR HX SW MO 1-1001-5A throttled to a ___ ___ ___

DISCH VLV as necessary. pump discharge pressure < 350 psig and < 3600 gpm.

F.1.b.(5) Checks process liquid rad Verifies no increase in SW rads ___ ___ ___

monitor on recorder 1-1705-12 on 901-2 Panel F.2.b.(1) Verify RHR HX B service Verifies RHR HX B SERVICE ___ ___ ___

water flow is in either WATER FLOW is in either NORMAL OR REVERSE NORMAL FLOW OR REVERSE FLOW lineup. FLOW lineup.

  • F.2.b.(2) Throttle open RHR HX SW MO 1-1001-5B throttled open to ___ ___ ___

DISCH VLV. at least 40%.

EVALUATOR NOTE: The candidate should make a plant announcement when starting 1C RHRSW pump.

  • F.2.b.(3) Start C RHRSW Pump on Start C RHRSW Pump on 'B' ___ ___ ___

'B' loop. loop.

SIMOP CUE: As EO, call the control room and report that C pump discharge pressure on local PI 1-1001-77C is 295 psig. It seems higher than normal.

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM g.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 10

2012 NRC JPM g - Rev 10 Comment SAT UNSAT STEP ELEMENT STANDARD Number EVALUATOR NOTE: The following step may not be performed if the candidate has correctly diagnosed the problem.

F.2.b.(4) Throttles RHR HX SW MO 1-1001-5B throttled to a ___ ___ ___

DISCH VLV as necessary. pump discharge pressure < 350 psig and < 3600 gpm.

Recognizes B RHR HX Recognizes B RHR HX outlet ___ ___ ___

outlet pressure is low. pressure is low and Informs US.

ROLE PLAY: As US, I understand that B RHRSW HX outlet pressure is low.

EVALUATOR NOTE: Operator should recognize the following conditions associated with the B RHRSW system:

High pump discharge pressure coupled with low heat exchanger outlet pressure and realize that the heat exchanger is fouled and needs to be reversed per step F.3.

If asked, concur with candidate as US to reverse flow.

This starts the alternate path of the JPM.

F.3.a. Verify A and B RHR Loop Checks status of A and B RHR ___ ___ ___

pumps are off. Loop pumps.

  • F.3.b or Verify B Loop RHR SW Secures running RHRSW pump ___ ___ ___

F.2.e.(1)&(2) pumps off. and closes MO 1-1001-5B EVALUATOR NOTE: The candidate may conclude the RHRSW pump is degraded and start the other RHRSW pump. In this case, report similar parameters.

  • F.3.d. Reverses flow through Places 1B RHR HX SW flow ___ ___ ___

RHRSW Heat Exchanger. select switch to rev.

F.3.d. Verify open MO-1-1001- Verifies open MO-1-1001-186B ___ ___ ___

(1)(2) 186B and MO-1-1001-187B and MO-1-1001-187B.

F.3.d. Verify closed MO-1-1001-4B Verifies closed MO-1-1001-4B ___ ___ ___

(3)(4) and MO-1-1001-185B and MO-1-1001-185B SIM OP: Verify trigger 5 and trigger 6 went true to delete malfunctions for RHRSW pumps (dmf sw05d, dmf sw05c).

CUE: The candidate should inform you that the RHRSW Hx flow has been reversed. Inform candidate Restart RHRSW flow using the same pump on the B Loop.

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM g.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 10

2012 NRC JPM g - Rev 10 Comment SAT UNSAT STEP ELEMENT STANDARD Number F.2.b.(1). Verify RHR HX B service Verifies the RHR HX B Service ___ ___ ___

water flow is in either Water in REVERSE FLOW NORMAL OR REVERSE lineup.

FLOW lineup.

  • F.2.b.(2) Throttle open RHR HX SW MO 1-1001-5B throttled open to ___ ___ ___

DISCH VLV. at least 40%.

EVALUATOR NOTE: The candidate should make a plant announcement when starting 1C RHRSW pump.

  • F.2.b.(3) Start RHRSW Pump on 'B' 1C RHRSW Pump on 'B' loop ___ ___ ___

loop. started.

  • F.2.b.(4) Throttles RHR HX SW MO 1-1001-5B throttled to a ___ ___ ___

DISCH VLV as necessary. pump discharge pressure < 350 psig and < 3600 gpm.

F.2.b.(5) Checks process liquid rad Verifies no increase in SW ___ ___ ___

monitor. Rads on recorder 1-1705-12 on 901-2 Panel EVALUATOR: The candidate should inform you that the task is complete.

JPM Stop Time:

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM g.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 8 of 10

2012 NRC JPM g - Rev 10 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Start-Up the RHRSW System With Reduced Pump Capacity JPM Number: LS-001-II-F Revision Number: 09 Task Number and

Title:

SR-1000-P01 (Freq: LIC=A) (ILT-MP) Given a reactor plant, start the RHRSW system and RHR system in torus cooling in accordance with QCOP 1000-4 and QCOP 1000-9 or QCOP 1000-30. (Important PRA Operator Action - starting torus cooling in conjunction with other actions has a RAW of 4320) (recovery of torus cooling after failure terminates 19 of top 100 core damage sequences)

K/A Number and Importance: K/A: 400000 2.1.32 Rating: 3.8/4.0 Ability to explain and apply system limits and precautions.

Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QCOP 1000-04, Rev. 20, RHR SERVICE WATER SYSTEM OPERATION Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 24 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM g.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 9 of 10

INITIAL CONDITIONS

- The next shift will be performing a HPCI run for engineering.

- RHRSW is not on yet, US orders both RHRSW loops started.

- No RHRSW loops have been drained and no discharge valves have been adjusted.

- An EO has already performed pre-start checks for both RHRSW pumps and everyone is clear of the area.

- This JPM is NOT time critical.

INITIATING CUE Start-up the A and B RHR Service Water Loops in preparation for HPCI run using the A and C RHR Service Water pumps per QCOP 1000-04.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Unisolate and Start the Reactor Building Ventilation System JPM Number: 2012 NRC JPM h (LS-077-I)

Revision Number: 01 Date: 03/04/2012 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date NRC JPM h.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 10

2012 NRC JPM h - Rev 01 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 through 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM h.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 10

2012 NRC JPM h - Rev 01 Revision Record (Summary)

Revision 00, This JPM is developed IAW guidelines established in NUREG 1021 Rev 9 ES-301 and Appendix C. This JPM meets the criteria of Category B.2 "Control Room Systems," for RO/SRO candidates.

This is a new JPM that was developed for the 2009 NRC Initial License exam.

Revision 01, Updated for the 2012 ILT NRC Exam.

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM h.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 10

2012 NRC JPM h - Rev 01 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any IC.

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Isolate the Reactor Building Ventilation system by inserting and deleting the Malfunction for Reactor Building Vent Radiation Monitor: RM02K, PROCESS RADIATION MONITORING FAILURE REAC BLDG VENT CH A:

imf RM02K 100 dmf RM02K Reset the Rx Building Vent Channel A Rad Monitor and reset annunciators 901-3 A-3 and 901-3 G-3 Place all tripped U-1 and U-2 Reactor Building fan control switches in PTL.

3. Verify the following setup conditions:

Outside air temperature approximately 80 F on Panel 912-5, TI 1-5703-12B.

4. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
5. This completes the setup for this JPM.
6. Provide a copy of QCOP 5750-02 with the following steps signed off/N/Ad:

Prerequisite C.1, C.1.a - N/Ad Prerequisite C.2, C.3 - Signed off F.1.a - N/Ad F.1.b - N/Ad F.2 - N/Ad F.3, 4, 5 - N/Ad G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM h.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 10

2012 NRC JPM h - Rev 01 INITIAL CONDITIONS You are the Unit 1 ANSO.

IMs have just completed a planned surveillance on the Reactor Building and Fuel Pool Radiation Monitors.

Outside air temperature is approximately 80 F.

The heating Boiler is NOT in operation.

Proper operation of the Unit-1 Differential Pressure Controller has been verified.

All Reactor Building Supply and Exhaust Fans that tripped on the isolation have been placed in Pull-to-Lock (PTL).

Radiation Protection and Chemistry have been notified that Reactor Building Ventilation will be started.

INITIATING CUE Restore the Unit-1 Reactor Building Ventilation System per QCOP 5750-02. Restart all Unit 1 Reactor Building Ventilation fans that have been placed in Pull-To-Lock.

Another operator will restart the Unit-2 Reactor Building Ventilation fans as necessary.

Inform the Unit supervisor when the Unit-1 Reactor Building ventilation has been returned to a normal operating lineup.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM h.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 10

2012 NRC JPM h - Rev 01 JPM Start Time:

Comment SAT UNSAT STEP ELEMENT STANDARD Number EVALUATOR NOTE: Provide the candidate with the prepared copy of QCOP 5750-02.

EVALUATOR NOTE: Step F.1a and F.1.b are not applicable because, per the Turnover, the U-1 DPC was verified in operation and the heating boiler is not operating.

F.1.c If recovering from a manual or Group II isolation signal is reset. ___ ___ ___

(1) automatic RB Vent isolation, Verifies the following THEN: annunciators are NOT in alarm:

Verify all isolation signals are 901-3 G-3 reset.

901-3 A-3 901-5 A-8 901-5 B-5 F.1.c Verify RB Vent ( Supply and On Panel 912-5, control switch ___ ___ ___

(2) Exhaust fans) control switch positions for all tripped Reactor targets are GREEN or are in Building Vent Fans are GREEN PTL. or are in PTL.

EVALUATOR NOTE: The candidate may chose to open both Units Isolation Dampers.

However since the task is to restore Unit 1 ventilation, critical steps apply to Unit 1 components only.

F.1.c Momentarily place U1 and U2 At the 912-1 Panel: ___ ___ ___

(3) RX BLDG INLT ISOL DMPRS Momentarily places the 1-5741-control switch to CLOSE. 196A HS to CLOSE AND 2-5741-196A HS to CLOSE.

F.1.c Momentarily place U1 and U2 A the 912-1 panel: ___ ___ ___

(4) RX BLDG OUTLT ISOL Momentarily places the 1-5741-DMPRS control switch to 250A HS to CLOSE AND CLOSE. 2-5741-250A HS to CLOSE.

CUE: The RB Vent Isolation can also be reset at a local panel. If the candidate tries to contact an EO to perform this task, Role Play as necessary. All EOs are busy at this time.

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM h.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 10

2012 NRC JPM h - Rev 01 Comment SAT UNSAT STEP ELEMENT STANDARD Number

  • F.1.c Reset the RB Vent Isolation. At the 912-1 panel: ___ ___ ___

(5) Presses the U1 and U2 ISOL DAMPER RESET pushbuttons.

  • F.1.c Open the RB Isolation Momentarily places the ___ ___ ___

(6) Dampers. following control switches at the 912-1 panel to OPEN:

1-5741-196A HS 1-5741-250A HS 2-5741-196A HS 2-5741-250A HS F.1.d Verify OPEN indication for the Verifies the red OPEN lights are ___ ___ ___

U1 and U2 RB isolation lit for the following dampers:

dampers on 912-1 panel. AO 1-5741A AO 1-5741B AO 1-5742A AO 1-5742B AO 2-5741A AO 2-5741B AO 2-5742A AO 2-5742B EVALUATOR: Per the NOTE preceding these next two steps, the exhaust and supply fans` are to be started simultaneously to minimize dP swings.

  • F.1.e Start one RB EXH FAN, then Simultaneously places the ___ ___ ___

one RB SUPPLY FAN. Control Switches for a U1 Reactor Building Exhaust Fan and a Reactor Building Supply Fan to the ON position and holds for at least 5 seconds until current indication stabilizes.

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM h.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 10

2012 NRC JPM h - Rev 01 Comment SAT UNSAT STEP ELEMENT STANDARD Number

  • F.1.f Start a second RB EXH FAN, Simultaneously places the ___ ___ ___

then a second RB SUPPLY Control Switches for a U1 FAN. Reactor Building Exhaust Fan and a Reactor Building Supply Fan to the ON position and holds for at least 5 seconds until current indication stabilizes.

F.1.g Verify RX Building dP RX Building dP verified to be ___ ___ ___

-0.1 to -0.25 H2O. -0.1 to -0.25 H2O, 912-5 dPI 1-5740-22, RX BLDG TO ATMOS DP.

EVALUATOR NOTE: Rx Bldg D/P may be less than -.25# H2O. This condition will be corrected when U2 RB vents are returned to Normal by another operator. If necessary, inform the candidate that the U2 NSO will correct it when U2 RB vents are started.

F.1.h Place the standby Supply and Places / verifies green targets ___ ___ ___

Exhaust Fan control switches for the remaining U-1 Supply to AUTO-AFTER-OFF. (green and Exhaust fans.

target)

CUE: If the candidate starts to restore Unit-2 fans, remind the candidate that another operator will restart the Unit-2 fans as necessary.

EVALUATOR: The candidate should inform you that the task is complete.

JPM Stop Time:

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM h.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 8 of 10

2012 NRC JPM h - Rev 01 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Unisolate and Start the Reactor Building Ventilation System JPM Number: 2012 NRC JPM h Revision Number: 01 Task Number and

Title:

SR-5750-P03 Given an operating reactor plant following a reactor building ventilation isolation, unisolate and start the reactor building ventilation system IAW QCOP 5750-02.

K/A Number and Importance: K/A: 288000 A4.01 Rating: 3.1/2.9 Ability to manually operate and/or monitor in the control room: Start and stop fans Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QCOP 5750-02, Rev. 20, Reactor Building Ventilation System Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 00 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM h.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 9 of 10

INITIAL CONDITIONS You are the Unit 1 ANSO.

IMs have just completed a planned surveillance on the Reactor Building and Fuel Pool Radiation Monitors.

Outside air temperature is approximately 80 F.

The heating Boiler is NOT in operation.

Proper operation of the Unit-1 Differential Pressure Controller has been verified.

All Reactor Building Supply and Exhaust Fans that tripped on the isolation have been placed in Pull-to-Lock (PTL).

Radiation Protection and Chemistry have been notified that Reactor Building Ventilation will be started.

INITIATING CUE Restore the Unit-1 Reactor Building Ventilation System per QCOP 5750-02. Restart all Unit 1 Reactor Building Ventilation fans that have been placed in Pull-To-Lock.

Another operator will restart the Unit-2 Reactor Building Ventilation fans as necessary.

Inform the Unit supervisor when the Unit-1 Reactor Building ventilation has been returned to a normal operating lineup.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Inject Water Into the RPV Using the Condensate System Crosstie JPM Number: 2012 NRC JPM i (LP-001-II)

Revision Number: 07 Date: 03/04/2012 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date NRC JPM i.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 8

2012 NRC JPM i - Rev 07 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 through 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM i.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 8

2012 NRC JPM i - Rev 07 Revision Record (Summary)

Revision 00, This JPM is developed IAW guidelines established in NUREG 1021 Rev 8 ES-301 and Appendix C. This JPM meets the criteria of Category B.1 "Control Room Systems," for RO/SRO candidates.

JPM revised to match procedure changes.

Revision 01, JPM revised to match procedure changes.

Revision 02, JPM revised to update estimated times.

Revision 03, JPM revised to match procedure changes.

Revision 04, JPM revised to update estimated times.

Revision 05, JPM revised to update procedure reference.

Revision 06, JPM revised to update procedure reference.

Revision 07, JPM updated for the 2012 ILT NRC Exam.

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM i.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 8

2012 NRC JPM i - Rev 07 INITIAL CONDITIONS

- Problems have developed on Unit 2(1) which require the Alternate Injection Systems to be lined-up in order to restore reactor water level.

- The Unit Supervisor has directed you to inject water from the Unit 1(2) Condensate system into the Unit 2(1) reactor using the Condensate system crosstie in accordance with QCOP 3300-12 as directed by QGA 100.

- The Unit 1(2) Condensate pumps are operating normally.

- The Unit 1 and 2 NSOs are aware of the situation and are standing by to monitor parameters in the Control Room.

- There are no Condensate Demin backwashes in progress on either unit.

- You have obtained an S-key and are ready to perform the task.

- This JPM is not time critical.

INITIATING CUE Line-up the Condensate System crosstie and begin restoring Unit 2(1) reactor level IAW QCOP 3300-12.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM i.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 8

2012 NRC JPM i - Rev 07 JPM Start Time:

Comment SAT UNSAT STEP ELEMENT STANDARD Number EVALUATOR NOTE: Provide the candidate with a copy of QCOP 3300-12.

EVALUATOR NOTE: Per OP-AA-103-105, if the candidate elects to manually close the outlet valves, the breakers should first be opened. Given the importance of restoring vessel level it is not considered vital that this is done (however, it should be discussed with the candidate at the conclusion of the walkthroughs). If the candidate does open the breakers, cue him that all outlet valve breakers are open.

  • F.2.a.(1) Close U-2(1) Demin outlet At U-2(1) cond demin panels ___ ___ ___

or valves E on all demins (2252(1)-11 & 116) depresses

  • F.2.a.(2) A through H cond demin OR outlet vlv close pushbuttons or Manually close MO 1(2)- locates all outlet MOs, 3302 cond F/D vessel vlv for depresses declutch lever, and all demins. rotates handwheel clockwise.

(MO 2(1)-3302A through H)

CUE: Point to the Demin Outlet Valve (E) indicating lights and state, Closed lights are lit. (Or, if manually closed, state, The handwheel will not rotate any further, threads are visible on the stem.)

F.2.b. Verify closed 2(1)-3303 cond At U-2(1) cond demin panel ___ ___ ___

demin bypass valve. verifies green light lit (MO 2(1)-

3303) or locally, at the bypass valve, verifies green light lit, (near MO 2(1)-3303) or contacts CR to verify closed.

CUE: Point to light and state, The light is lit or CR reports U-2(1) demin byp vlv is closed.

  • F.2.c. Open 1-5599-68 U-1 cond Locates and rotates the 1-5599- ___ ___ ___

hdr to 1/2 backwash hdr sv. 68 vlv handwheel counter-clockwise. (South of U-1 PC TK)

CUE: Point to the handwheel and state, The valve handwheel will not rotate any further.

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM i.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 8

2012 NRC JPM i - Rev 07 Comment SAT UNSAT STEP ELEMENT STANDARD Number F.2.d. Verify MO 2(1)-3205A & MO Contacts CR to verify MO 2(1)- ___ ___ ___

2(1)-3205B U-2(1) Rx FW 3205A AND B are open.

inlet vlvs open.

CUE: Report as NSO that, The U-2(1) feedwater inlet valves are open.

F.2.e. Verify MO 2(1)-3201A, MO Contacts CR to verify MO 2(1)- ___ ___ ___

2(1)-3201B or MO 2(1)- 3201A, B, OR C are open.

3201C U-2(1) RFP disch valve open.

CUE: Report back as NSO that, The A & B RFP disch valves are open.

F.2.f. Verify 2(1)-640-19A, 2(1)- Contacts CR to verify all 3 ___ ___ ___

640-19B, 2(1)-640-20 FWRVs are in manual and FWRVs in manual and closed.

closed.

CUE: Report back as NSO that, All FWRVs are in manual and closed.

  • F.2.g. Throttle open 2-5599-68 U- Locates, unlocks, and rotates ___ ___ ___

2 cond hdr to 1/2 backwash the U-2 2-5599-68 valve hdr sv. handwheel counterclockwise (20 East of U-1 cond demin panel) and informs CR that line-up is complete, they may begin injection.

CUE: Point to the 2-5599-68 handwheel and state, The valve handwheel will not rotate any further. (After contacting the CR) the CR has opened the low flow reg valve and U-2(1) Rx level is inc.

EVALUATOR NOTE: The candidate should inform you that the task is complete.

JPM Stop Time:

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM i.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 8

2012 NRC JPM i - Rev 07 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

inject Water Into the RPV Using the Condensate System Crosstie JPM Number: 2012 NRC JPM i Revision Number: 07 Task Number and

Title:

SRN-3300-P07 (Freq: LIC=B NF=B) Given a reactor plant in a QGA condition, locally crosstie the unit condensate systems to inject into the RPV in accordance with QCOP 3300-12.

K/A Number and Importance: K/A: 295031 EA1.11 Rating: 4.1/4.1 Ability to operate and/or monitor the following as they apply to REACTOR LOW WATER LEVEL: Condensate.

Suggested Testing Environment: Plant Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QCOP 3300-12, Rev. 11, Injection Into the Reactor Using the Condensate System Crosstie OP-AA-103-105, Rev. 01, Limitorque Motor Operated Valve Operations Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 17 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM i.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 8

INITIAL CONDITIONS

- Problems have developed on Unit 2(1) which require the Alternate Injection Systems to be lined-up in order to restore reactor water level.

- The Unit Supervisor has directed you to inject water from the Unit 1(2) Condensate system into the Unit 2(1) reactor using the Condensate system crosstie in accordance with QCOP 3300-12 as directed by QGA 100.

- The Unit 1(2) Condensate pumps are operating normally.

- The Unit 1 and 2 NSOs are aware of the situation and are standing by to monitor parameters in the Control Room.

- There are no Condensate Demin backwashes in progress on either unit.

- You have obtained an S-key and are ready to perform the task.

- This JPM is not time critical.

INITIATING CUE Line-up the Condensate System crosstie and begin restoring Unit 2(1) reactor level IAW QCOP 3300-12.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Energize the B RPS Bus with Normal Power JPM Number: 2012 NRC JPM j (LP-008-I)

Revision Number: 18 Date: 03/04/2012 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date NRC JPM j.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 10

2012 NRC JPM j - Rev 18 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 through 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME/Instructor Date SME/Instructor Date SME/Instructor Date NRC JPM j.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 10

2012 NRC JPM j - Rev 18 Revision Record (Summary)

Revision 13, JPM revised to match procedure changes.

Revision 14, JPM revised to match procedure changes.

Revision 15, JPM revised to match procedure changes.

Revision 16, JPM revised to match procedure revision.

Revision 17, Fixed typos on pages 4, 6, 7, and 10. Revised K/A importance values and revised procedure revision number.

Revision 18, Updated for 2012 ILT NRC Exam.

NRC JPM j.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 10

2012 NRC JPM j - Rev 18 INITIAL CONDITIONS

- Unit 1(2) is operating steady state at 30% power in Mode 1.

- RPS B is currently being powered from its reserve power supply due to repairs on the B MG set.

- The B RPS MG set has been repaired and returned to service, but is NOT running.

- The Unit Supervisor and Unit NSO have been notified of the B RPS transfer.

- No surveillances are in progress which would result in a half scram.

- All MSIV DC power indicating lights on the 901(2)-61 & 62 panels have been verified illuminated.

- The SRM shorting links have been verified installed.

- EMs verified the DC solenoid currents are between 45 - 70 mA DC at the 901(2)-3 panel.

- Relays 1(2)-0595-107A and 1(2)-0595-107B have been verified energized.

- The Main feed breaker to the B MG set at MCC 19-2(29-2) compartment D4 has been closed.

- The key is already in the lock due to being on reserve feed.

- The 1(2) A and B RWCU demins have been placed on HOLD per QCOP 1200-03.

- OPRM Jumpers have been installed on RPS A.

- This JPM is not time critical.

INITIATING CUE Place the Unit ____ B RPS bus on its normal power supply, and verify proper operation per QOP 7000-01.

Provide examinee with:

QOP 7000-01 Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

NRC JPM j.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 10

2012 NRC JPM j - Rev 18 UNSAT requires written comments on respective step.

  • Denotes critical steps.

Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

NRC JPM j.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 10

2012 NRC JPM j - Rev 18 JPM Start Time:

Comment SAT UNSAT Number STEP ELEMENT STANDARD EVALUATOR: Note the position of the VOLTAGE SELECTOR switch on the B RPS Bus Control Panel in order to provide the appropriate cues. If it is selected to the BUS position, then the voltmeter will be indicating 120 volts due to the bus being on reserve power. If it is selected to the GEN position, then the voltmeter will be indicating 0 volts UNTIL the MG set is started and the AUX RESET pushbutton is depressed. The MG set will trip on undervoltage if the Auxiliary Reset P.B. is pushed prior to the MG set attaining full speed (about 35 seconds).

  • F.1.b.(1) Close Motor Starter control Positions B MG set CS to ___ ___ ___

switch. close.

CUE: Point to MG set red running light and state: This light is lit.

F.1.b.(3) Place Voltage Transfer Positions Voltage Transfer ___ ___ ___

Switch in GEN position. Switch in GEN position.

CUE: Point to GEN on the voltage transfer switch and state: The control switch is in this position.

  • F.1.b.(4) Wait 60 seconds after 60 seconds after starting the B ___ ___ ___

starting RPS MG Set, then MG Set, depress aux. Reset PB press Auxiliary Reset Button & holds 10 seconds.

and hold until the voltage builds up (approximately 10 seconds).

CUE: After they indicate expected voltage, then point to 120 on the voltmeter and state voltage indicates here.

F.1.b.(5)(a) Verify the POWER IN Verifies 1B-1 (2B-1) EPA ___ ___ ___

indicator on EPA 1B-1 (2B-1) Power In light lit.

is lit.

CUE: Point to Power In light and state: This light is lit.

  • F.1.b.(5)(b) Close circuit breaker Positions 1B-1 (2B-1) EPA ___ ___ ___

1B-1 (2B-1). breaker to close.

NRC JPM j.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 10

2012 NRC JPM j - Rev 18 Comment SAT UNSAT Number STEP ELEMENT STANDARD F.1.b.(5)(c) Verify power out indicator lit Verifies 1B-1 (2B-1) EPA ___ ___ ___

on EPA 1B-1 (2B-1). Power Out light lit.

CUE: Point to Power Out light and state: This light is lit.

F.1.b.(6)(a) Verify POWER IN indicator Verifies 1B-2 (2B-2) EPA ___ ___ ___

on EPA 1B-2 (2B-2) is lit. Power In light lit.

CUE: Point to Power In light and state: This light is lit.

  • F.1.b.(6)(b) Close circuit breaker 1B-2 Positions 1B-2 (2B-2) EPA ___ ___ ___

(2B-2). breaker to close.

F.1.b.(6)(c) Verify power out indicator lit Verifies 1B-2 (2B-2) Power ___ ___ ___

on EPA 1B-2 (2B-2). Out light lit.

CUE: Point to Power Out light and state: This light is lit.

EVALUATOR: The candidate may elect to call the control room to inform them that the B RPS bus is about to be deenergized, if so, provide the necessary cues.

  • F.1.b.(7) Open the reserve feed At RPS B panel opens reserve ___ ___ ___

circuit breaker at the RPS feed breaker. (Key already in panel. lock.)

CUE: Breaker is open.

EVALUATOR: The candidate should wait at least 5 seconds before closing the normal Feed Breaker to prevent an Unknown mode failure of the MSL Rad Monitor. If he/she does not, this should be a remediation item and noted on this JPM.

  • F.1.b.(9) Close the normal feed circuit At RPS B panel closes the ___ ___ ___

breaker. normal feed breaker.

CUE: Breaker is closed.

F.1.b.(10) Verify the RPS generator and Positions VOLTAGE ___ ___ ___

bus voltages are normal, 114 SELECTOR switch to BUS &

to 121 VAC. GEN positions & verifies both between 114 and 121 volts.

NRC JPM j.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 10

2012 NRC JPM j - Rev 18 Comment SAT UNSAT Number STEP ELEMENT STANDARD CUE: If asked, point to 120 volts on the volt meter.

F.1.b.(11) Lock the reserve feed Positions key to move bolt over ___ ___ ___

breaker in the OFF position. reserve feed breaker and removes key.

F.1.b.(12) Return key to Shift Key returned to SM cabinet. ___ ___ ___

Managers key cabinet.

CUE: You have received a call from the Control Room stating the NSO will perform Step F.1.c.

EVALUATOR: The candidate should inform you that the task is complete.

JPM Stop Time:

NRC JPM j.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 8 of 10

2012 NRC JPM j - Rev 18 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Energize the B RPS Bus with Normal Power JPM Number: 2012 NRC JPM j Revision Number: 18 Task Number and

Title:

SN-0500-P04 (Freq: LIC=I NF=I) Given an operating reactor plant following an inadvertent trip of an RPS MG set, place the RPS bus on reserve power, restart the MG set and transfer the RPS bus from reserve power to the MG set in accordance with QOP 7000-01. (Note: QOP 7000-01 prerequisites are met) (Per 2006 3rd Quarter LORT CRC, this task has been selected to be testable to Reactor Operators.)

K/A Number and Importance: K/A: 212000 A2.02 Rating: 3.7/3.9 Ability to (a) predict the impacts of the following on the REACTOR PROTECTION SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions on operations: RPS Bus power supply failure Suggested Testing Environment: Plant Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QOP 7000-1, Rev. 46, REACTOR PROTECTION SYSTEM MG SETS Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 13.5 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

NRC JPM j.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 9 of 10

INITIAL CONDITIONS

- Unit 1(2) is operating steady state at 30% power in Mode 1.

- RPS B is currently being powered from its reserve power supply due to repairs on the B MG set.

- The B RPS MG set has been repaired and returned to service, but is NOT running.

- The Unit Supervisor and Unit NSO have been notified of the B RPS transfer.

- No surveillances are in progress which would result in a half scram.

- All MSIV DC power indicating lights on the 901(2)-61 & 62 panels have been verified illuminated.

- The SRM shorting links have been verified installed.

- EMs verified the DC solenoid currents are between 45 - 70 mA DC at the 901(2)-3 panel.

- Relays 1(2)-0595-107A and 1(2)-0595-107B have been verified energized.

- The Main feed breaker to the B MG set at MCC 19-2(29-2) compartment D4 has been closed.

- The key is already in the lock due to being on reserve feed.

- The 1(2) A and B RWCU demins have been placed on HOLD per QCOP 1200-03.

- OPRM Jumpers have been installed on RPS A.

- This JPM is not time critical.

INITIATING CUE Place the Unit ____ B RPS bus on its normal power supply, and verify proper operation per QOP 7000-01.

Exelon Nuclear Job Performance Measure Place the U-1 Diesel Generator Cooling Water Pump on Alternate Feed JPM Number: 2012 NRC JPM k (LP-005-I)

Revision Number: 14 Date: 03/04/2012 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date NRC JPM k.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 8

2012 NRC JPM k - Rev 14 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 through 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM k.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 8

2012 NRC JPM k - Rev 14 Revision Record (Summary)

Revision 07, This JPM is developed IAW guidelines established in NUREG 1021 Rev 8 ES-301 and Appendix C. This JPM meets the criteria of Category B.1 "Control Room Systems," for RO/SRO candidates.

JPM revised to match procedure changes.

Revision 08, JPM revised to reflect procedure changes.

Revision 09, JPM revised to update cues.

Revision 10, JPM revised to update procedure rev number referenced. No change to content.

Revision 11, JPM revised by adding an evaluator note before step D.3.a OR D.4.a and correcting grammar mistakes.

Revision 12, JPM revised to update time and fix grammatical errors.

Revision 13, JPM/procedure step numbering changed.

Revision 14, JPM updated for 2012 ILT NRC Exam and restricted to Unit 1 only due to physical constraints encountered during administration on Unit 2.

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM k.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 8

2012 NRC JPM k - Rev 14 INITIAL CONDITIONS

- You are an extra EO.

- The U-1 diesel generator is running due to a loss of normal power to Bus 14-1.

- The diesel generator cooling water pump is running, however, an EO has found that the DGCWP cubicle coolers are NOT running.

- The 2B Fuel Pool Cooling Water Pump is NOT running.

- The 2A Fuel Pool Cooling Water Pump is running.

- An EO is standing by in the DGCWP vault.

- This JPM is not time critical.

INITIATING CUE Place the U-1 Diesel Generator Cooling Water Pump on its alternate feed in order to provide power to the cubicle coolers.

Provide examinee with:

Copy of QCOA 6600-11.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM k.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 8

2012 NRC JPM k - Rev 14 JPM Start Time:

Comment SAT UNSAT STEP ELEMENT STANDARD Number CUE: Provide a copy of QCOA 6600-11.

  • D.1.b. Select the DGCWP Positions selector switch to the ___ ___ ___

position. DGCWP position inside 2252-99 panel (behind bus 29).

CUE: Point to DGCWP position and state, The switch is here.

CUE: If asked, an ECCS initiation signal is not present.

EVALUATOR: The amber light on the 99 panel will not illuminate until the FPCWP bkr is closed in the following 2 steps.

D.1.d. Check 2B FPCWP bkr Looks at 2B FPCWP bkr ___ ___ ___

position. window to determine bkr position.

CUE: Point to FPCWP bkr indicator and state, The bkr indicates open.

  • D.1.d.(1) Obtain local pushbutton Obtains a local PB controller ___ ___ ___

control. from behind bus 29 & insert into 2B FPCWP receptacle on bus 29 Cubicle 1A.

CUE: (Do not allow the yellow seal on the door to the pigtail pushbutton to be broken)

Point to FPCWP breaker receptacle and state, The local controller is in the receptacle.

  • D.1.d.(2) Close the FPCWP breaker. Depresses closed PB on local ___ ___ ___

cont.

CUE: Point to closed PB and state, The PB has been depressed.

EVALUATOR: If the candidate looks at the FPCWP breaker and asks for position indication, then point to the indicator window and state, The breaker indicates closed.

If asked, the amber light on the 99 panel is now lit. The DGCWP and coolers will NOT swap feeds until the DGCWP is tripped.

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM k.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 8

2012 NRC JPM k - Rev 14 Comment SAT UNSAT STEP ELEMENT STANDARD Number D.1.e. Verify amber light is lit. Verifies amber light on 2252-99 ___ ___ ___

panel behind bus 29.

CUE: Point to amber light and state, The amber light is lit.

  • D.1.f. Trip DGCWP normal feed. Positions DGCWP CS ( at ___ ___ ___

2251-37 panel in DG room) to trip.

CUE: Point to the green light on the 37 panel and state, The green light is lit.

D.1.g. Verify amber lights lit. Verifies amber lights lit on 2251- ___ ___ ___

98 (in DG room).

CUE: Point to amber lights on the 98 panel and state, All 3 amber lights are lit.

D.1.h. Verify DGCWP is operating. Verifies from local operator or ___ ___ ___

room indications, or from control room, pump is on.

CUE: Role play as local operator, point to indicators to show flow and state, DGCWP is running.

D.1.i. Verify cubicle coolers are Verifies from local operator A ___ ___ ___

operating. and B coolers are running.

CUE: Role play as local operator and state, Diesel Generator 1 Cubicle Coolers A and B are operating.

EVALUATOR: The candidate should inform you that the task is complete.

JPM Stop Time:

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM k.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 8

2012 NRC JPM k - Rev 14 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Place the U-1 Diesel Generator Cooling Water Pump on Alternate Feed JPM Number: 2012 NRC JPM k Revision Number: 14 Task Number and

Title:

SRN-6600-P05 (Freq: LIC=B NF=B) Given a reactor plant in an accident condition and loss of the normal power supply to the Unit 1 (Unit 2) DG cooling water pump, locally transfer the Unit 1 (Unit 2) DG cooling water pump to the alternate supply and start the pump in accordance with QCOA 6600-11.

K/A Number and Importance: K/A: 264000 2.1.30 Rating: 4.4/4.0 Ability to locate and operate components, including local controls.

Suggested Testing Environment: Plant Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QCOA 6600-11, Rev. 10, Loss of Normal Power Feed to the Diesel Generator 1(2) Cooling Water Pump and Cubicle Coolers A and B Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 23 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

G:\DRSIII\License Examinations\2012\Quad Cities\AS GIVEN EXAM\JPMs\NRC JPM k.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 8

INITIAL CONDITIONS

- You are an extra EO.

- The U-1 diesel generator is running due to a loss of normal power to Bus 14-1(24-1).

- The diesel generator cooling water pump is running, however, an EO has found that the DGCWP cubicle coolers are NOT running.

- The 2B Fuel Pool Cooling Water Pump is NOT running.

- The 2A Fuel Pool Cooling Water Pump is running.

- An EO is standing by in the DGCWP vault.

- This JPM is not time critical.

INITIATING CUE Place the U-1 Diesel Generator Cooling Water Pump on its alternate feed in order to provide power to the cubicle coolers.

SRRS: 3D.105 (when utilized for operator initial or continuing training)