MONTHYEARML1109503072011-03-25025 March 2011 Request to Utilize an Alternative to the Requirements of 10 CFR 50.55a(g) for the Repair of Control Rod Drive Housing Penetrations for the Remainder of the License Renewal Period of Extended Operation Project stage: Other ML1109502922011-04-0505 April 2011 Acceptance Review Determination Relief Request for Repair of CRD Housing Penetrations Project stage: Acceptance Review ML1116400612011-06-22022 June 2011 Request for Withholding Information from Public Disclosure - Nine Mile Point, Unit No. 1 Request to Utilize Alternative for Repair of Control Rod Drive Housing Penetrations Dated March 4 and 25, 2011 - Areva Proprietary Documents Project stage: Withholding Request Acceptance ML1122200932011-08-11011 August 2011 Request for Additional Information Request for Alternative Relief Request No. 1ISI-004 Project stage: RAI ML11279A0372011-09-29029 September 2011 Request to Utilize an Alternative to the Requirements of 10 CFR 50.55a(g) for the Repair of Control Rod Drive Housing Penetrations - Response to NRC Request for Additional Information Project stage: Response to RAI ML12048A8362012-02-23023 February 2012 Request for Additional Information Relief Request No. 1ISI-004 Project stage: RAI ML12102A1122012-04-0909 April 2012 Request to Utilize an Alternative to the Requirements of 10 CFR 50.55a(g) for the Repair of Control Rod Drive Housing Penetrations - Response to NRC Follow-up Request for Additional Information Project stage: Request ML12152A1732012-05-22022 May 2012 Request to Utilize an Alternative to the Requirements of 10 CFR 50.55a(g) for the Repair of Control Rod Drive Housing Penetrations - Revised Affidavits Justifying Withholding Proprietary Information Project stage: Other ML12160A3492012-06-0707 June 2012 Request to Utilize an Alternative to the Requirements of 10 CFR 50.55a(g) for the Repair of Control Rod Drive Housing Penetrations - Withdrawal of the Portion of the Request Regarding Rotary Peening Project stage: Withdrawal ML12124A2322012-06-12012 June 2012 ME5789-Proprietary Information Determination Letter, Submissions Dated March 4, 25, 2011, and April 9, 2012 Project stage: Other ML12250A8062012-09-13013 September 2012 Request for Additional Information (RAI) Request No. 1lSl-004, Request to Utilize an Alternative for the Repair of Control Rod Drive Housing Penetrations Project stage: RAI ML12312A2552012-10-31031 October 2012 Request to Utilize an Alternative to the Requirements of 10 CFR 50.55a(g) for the Repair of Control Rod Drive Housing Penetrations - Response to NRC Request for Additional Information Project stage: Response to RAI ML12312A2562012-10-31031 October 2012 Calculation 32-9157438-000, NMP-1 LAS Scc/Sicc Evaluation. Project stage: Other ML12313A0912012-11-15015 November 2012 Request for Withholding Information from Public Disclosure License Response Dated October 31, 2012 Project stage: Withholding Request Acceptance ML13058A0762013-03-0404 March 2013 Draft Safety Evaluation for Nine Mile Point Nuclear Station, Unit No. 1 Relief from the Requirements of the ASME Code, Section XI, Request No. 1ISI-004, Revision 1, Repair of Control Rod Drive Housing Penetrations Project stage: Draft Approval ML13084A2442013-03-14014 March 2013 Response to Request for Review of Draft NRC Safety Evaluation, Relief from Requirements of ASME Code, Section XI, Request No. 1ISI-004, Revision 1, Repair of Control Rod Drive Housing Penetrations Project stage: Draft Request ML13052A3732013-03-15015 March 2013 ME5789-Authorization of Relief Request 1ISI-004, Revision 1 (NMP1 Relief Request) Project stage: Acceptance Review 2012-02-23
[Table View] |
|
---|
Category:Letter
MONTHYEARML24268A3382024-10-16016 October 2024 Issuance of Amendment No. 253 Regarding the Modification of TS Surveillance Requirement 4.3.6.a Related to Adoption of TSTF-425, Revision 3 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP2L2890, Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6)2024-10-0404 October 2024 Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6) ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing IR 05000220/20243022024-10-0303 October 2024 Initial Operator Licensing Examination Report 05000220/2024302 ML24190A0012024-09-26026 September 2024 Issuance of Amendment Nos. 252 and 197 Regarding the Revision to Technical Specification Design Features Section to Remove Nine Mile Point Unit 3 Project Designation NMP1L3608, Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-09-20020 September 2024 Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000220/20240052024-08-29029 August 2024 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2024005 and 05000410/2024005) IR 05000220/20240102024-08-22022 August 2024 Age-Related Degradation Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3603, Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan2024-08-20020 August 2024 Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000220/20240022024-08-0505 August 2024 Integrated Inspection Report 05000220/2024002 and 05000410/2024002 ML24215A3002024-08-0202 August 2024 Operator Licensing Examination Approval NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-07-31031 July 2024 Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML24213A1412024-07-31031 July 2024 Requalification Program Inspection NMP2L2883, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations2024-07-24024 July 2024 Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations ML24198A0852024-07-16016 July 2024 Senior Reactor and Reactor Operator Initial License Examinations RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3584, License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2024-06-13013 June 2024 License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling IR 05000220/20244012024-05-30030 May 2024 Security Baseline Inspection Report 05000220/2024401 and 05000410/2024401(Cover Letter Only) ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 NMP1L3591, Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request2024-05-18018 May 2024 Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request NMP1L3589, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-05-16016 May 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable ML24158A2052024-05-15015 May 2024 Annual Radioactive Environmental Operating Report NMP1L3582, 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 22024-05-15015 May 2024 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 2 IR 05000220/20240012024-05-10010 May 2024 Integrated Inspection Report 05000220/2024001 and 05000410/2024001 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds 05000410/LER-2024-001, Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum2024-05-0101 May 2024 Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP1L3581, Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report2024-04-30030 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report NMP2L2877, 2023 Annual Environmental Operating Report2024-04-19019 April 2024 2023 Annual Environmental Operating Report NMP2L2878, Core Operating Limits Report2024-04-16016 April 2024 Core Operating Limits Report ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24092A3352024-04-0101 April 2024 NRC Office of Investigations Case No. 1-2023-002 ML24074A2812024-03-14014 March 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3577, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-03-13013 March 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable IR 05000220/20230062024-02-28028 February 2024 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2, (Reports 05000220/2023006 and 05000410/2023006) IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation 05000410/LER-2023-001, Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater2024-01-30030 January 2024 Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000220/LER-2023-002, Average Power Range Monitors Declared Inoperable Due to Trip of Reactor Recirculation Pump 122023-12-15015 December 2023 Average Power Range Monitors Declared Inoperable Due to Trip of Reactor Recirculation Pump 12 NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station 2024-09-04
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 12, 2012 Mr. Ken Langdon Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P. O. Box 63 Lycoming, NY 13093
SUBJECT:
NINE MILE POINT NUCLEAR STATION, UNIT NO.1 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE: (TAC NO.
ME5789)
Dear Mr. Langdon:
By letters dated March 4, 2011 (Agencywide Documents Access and Management System (ADAMS) Package Accession No. ML110680293), and April 9, 2012 (ADAMS Package Accession No. ML121020213), you submitted affidavits dated February 24,2011, and April 6, 2012, respectively, executed by Gayle F. Elliott, Manager, Licensing, AREVA, NP, Inc. (AREVA NP). Also, by letter dated March 25,2011 (ADAMS Package Accession No. ML110950302),
you submitted an affidavit dated March 17,2011, executed by Sandra M. Sloan, Manager, Regulatory Affairs for New York Plants for AREVA NP. All the affidavits were superseded by your letter dated May 22,2012 (ADAMS Accession No. ML12152A173). The two affidavits dated May 14, 2012, submitted by letter dated May 22,2012, requested that the information contained in the following documents be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390(a)(4):
(1) CENG Letter to NRC, "Nine Mile Point Nuclear Station Unit No.1; Docket No. 50-220 Request to Utilize an Alternative to the Requirements of 10 CFR 50.55a(g) for the Repair of Control Rod Drive Housing Penetrations for the Remainder of the License Renewal Period of Extended Operation," dated March 4, 2011, Attachment 5, "AREVA Document No. 32-9138065-001, NMP-1 CRD Housing IDTB Weld Anomaly Analysis (Proprietary)" (Affidavit dated May 14, 2012).
(2) CENG Letter to NRC, "Nine Mile Point Nuclear Station Unit No.1; Docket No. 50-220 Request to Utilize an Alternative to the Requirements of 10 CFR 50.55a(g) for the Repair of Control Rod Drive Housing Penetrations for the Remainder of the License Renewal Period of Extended Operation, " dated March 25, 2011, Attachment 5, "AREVA Document No. 32-9138065-002, NMP-1 CRD Housing IDTB Weld Anomaly Analysis (Proprietary)" (Affidavit dated May 14, 2012).
(3) CENG Letter to NRC, "Nine Mile Point Nuclear Station Unit No.1; Docket No. 50-220 Request to Utilize an Alternative to the Requirements of 10 CFR 50.55a(g) for the Repair of Control Rod Drive Housing Penetrations - Response to NRC Follow-up Request for Additional Information (TAC No. ME5789)," dated April 9, 2012, Attachment 5, "White Paper Regarding Peening (Proprietary)" (Affidavit dated May 14, 2012).
K. Langdon -2 Both the affidavits dated May 14, 2012, stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(b) Use of the information by a competitor would permit the competitor to significantly reduce its expenditures, in time or resources, to design, produce. or market a similar product or service.
(c) The information includes test data or analytical techniques concerning a process.
methodology, or component, the application of which results in a competitive advantage for AREVA NP.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the submitted information marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course. ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review Situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
K. Langdon - 3 Nonproprietary copies of CENG documents listed in paragraphs (1), (2), and (3) above (ADAMS Accession Nos. ML110680289, ML12102A112, and ML110950312, respectively), have been placed in the NRC's Public Document Room and added to the ADAMS Public Electronic Reading Room.
If you have any questions regarding this matter, I may be reached at 301-415-3308.
Sincerely, Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-220 cc:
Gayle F. Elliott, Manager, Product Licensing AREVA NP Inc.
3315 Old Forest Road Lynchburg, VA 24506-0935 Additional Distribution via Listserv
K. Langdon - 3 Nonproprietary copies of CENG documents listed in paragraphs (1), (2), and (3) above (ADAMS Accession Nos. ML110680289, ML12102A112, and ML110950312, respectively), have been placed in the NRC's Public Document Room and added to the ADAMS Public Electronic Reading Room.
If you have any questions regarding this matter, I may be reached at 301-415-3308.
Sincerely, IRAJ Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-220 cc:
Gayle F. Elliott, Manager, Product Licensing AREVA NP Inc.
3315 Old Forest Road Lynchburg, VA 24506-0935 Additional Distribution via Listserv DISTRIBUTION:
PUBLIC LPL1-1 Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDorlLpl1-1 Resource RidsNrrLASLittle Resource RidsNrrDeEvib Resource RidsNrrPMNineMilePoint Resource RidsOgcMailCenter Resource RidsRgn 1MailCenter Resource G. Dentel, Region 1 ADAMS Accession No.: ML12124A232 OFFICE NRRlLPL1-1 \PM INRR/LPL1-1 \LA NRRlEVIB/BC NRRlLPL 1-1/BC NRR/LPL1-1 \PM fs*1'~~~
NAME BVaidya ,;'" SRosenberg GWilson BVaidya IDATE 6/11/12 6/11/12 6/12/12 6/12/12 OFFICIAL RECORD COpy