ML120810246

From kanterella
Jump to navigation Jump to search
2012 Byron Station Initial License Examination Miscellaneous Correspondence
ML120810246
Person / Time
Site: Byron  Constellation icon.png
Issue date: 01/23/2012
From: Hironori Peterson
Operations Branch III
To: Pacilio M
Exelon Generation Co
Shared Package
ML12079A120 List:
References
Download: ML120810246 (69)


Text

2012 BYRON STATION INITAL LICENSE EXAMINATION MISCELLANEOUS CORRESPONDENCE

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 24.4.3 WARRENVillE ROAD, SUITE 210 LISLE, ILLINOIS 60532*.4352 January 18, 2012 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555

SUBJECT:

BYRON STATION OPERATOR LICENSING EXAMINATION APPROVAL

Dear Mr. Pacilio:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Byron Station.

The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and separately provided a list of approved applicants to Mr. George Pickar, Acting Training Director, Byron Station. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9, Supplement 1, of NUREG-1 021, "Operator Licensing Examination Standards for Power Reactors," during the week of January 30,2012.

The NRC staff will administer the operating tests during the week of January 23, 2012. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 630-829-9707.

Please contact your Chief Examiner, Mr. Michael Bielby, at 630-829-9762, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

M. Pacifio

-2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.

Sin~r~~

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 cc:

Distribution via ListServ'

M. Pacilio

-2 In accordance with 10 CFR 2.390 of the !\\IRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 cc:

Distribution via ListServ' DISTRIBUTION:

Amy Snyder RidsNrrDorlLpl3-2 Resource RidsNrrPMByron Resource RidsNrrDirslrib Resource Cynthia Pederson Jennifer Uhle Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak George Picard, Training Dept.

John McHale, NRR DOCUMENT NAME: G:\\DRSIII\\DRS\\Work in Progress\\-Ltr 01_12 BYRON 2012 Exam Approval JK.docx o Publicly Available 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive To receive a co of this document, indicate in the box "C" = Co w/o attach/encl "E" = Co RIII:DRS OFFICE NAME DATE

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 1,2011 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS:

BYRON STATION

Dear Mr. Pacilio:

We have received your corporate letter RS-10-130. In that letter, you requested an initial operator licensing examination be scheduled at the Byron Station for January 2014 and January 2015.

In response, we have scheduled an initial licensing examination for the weeks of January 27 and February 3,2014, at the Byron Station. Additionally. we have scheduled an initial licensing examination for the week of February 9, 2015, at the Byron Station. On-site validation of these examinations is tentatively scheduled approximately three weeks prior to the examination date. We note that you were previously scheduled for an initial operator licensing exam the weeks of January 14 and 21, 2013. Per your request, the 2012 initial license exam has been moved to the week of January 23, 2012, with an onsite validation date of the week of January 2.2012. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

We understand that your staff will develop the examinations unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately upon discovery of that need. Because your letter indicated that there were more than nine applicants being considered for each of these examinations, the examinations were each scheduled for two weeks. Please inform us if the number of candidates change for any examination as this will impact the examination schedule. Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.

A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the training program.

M. Pacilio

-2 In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).

Sincerely, IRA by D. McNeil forI Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 cc:

Distribution via ListServ

M. Ptlcilio

-2 In accordance with 10 CFR 2.930 of the NRC's "'Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).

Sincerely, IRA by D. McNeil fori Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 cc:

Distribution via ListServ DISTRIBUTION:

Daniel Merzke RidsNrrDorlLpl3-2 Resource RidsNrrPMByron Resource RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\\DRSIII\\DRS\\WORK IN PROGRESS\\OL EXAM CONFIRMATION LETTERS\\BYR 060111 DRS OL.DOCX o Publicly Available 0 Non-Publicly Available 0 Sensitive

[J Non-Sensitive acumenl indicate in the box, 'C" - Conv without al!achmenl/enclosure "E" ~ Coov with attachment/enclosure "N" - No copy Tor OFFICE Rill I

Rill IN I

NAME HPeterson RKWalton:co 06/01/2011 DATE 05/17/2011 OFFICIAL RECORD COpy 1

Exelon Generation Company, LLC www.exeloncorp.com{l ~

Byron Station Nuclear 4450 North German ChUTCh Road Byron,ll61010-9794 March 4, 2011 L TR:

BYRON 2011-0037 File:

1.10.0101 Mr. Dell McNeil Operations Branch - Region III U. S. Nuclear Regulatory Commission 2443 Warrenville Road, SUite 210 Lisle, I L 60532-4352 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455

Subject:

Change to Byron Station Operator Licensing Examination 2012 Dates In conversation with Mr. William Hochstetter, Senior Operations Training Instructor at Byron Station, a request has been made to reschedule the current 2012 Primary and Alternate Byron Station Initial Operator License Examination dates. This request is being made based on nine candidates taking the exam. In conversation with David Reeser, the Lead NRC Examiner for this exam, the operating portion of the exam can be accomplished in one week. This change would also request the NRC Exam Validation be conducted during the week of January 2, 2012.

Current Primary Current Alternate Proposed Proposed Date Date Primary Date Alternate Date January 16, 2012 January 23, 2012 January 23, 2012 January 16, 2012 Please confirm these revisions by contacting Mr. William Hochstetter at 815-406-3111.

Respectfully, T

hyJ. Tulon

. e Vice President yron Station TJTtWFHrrLH/cy k

'cJ. lI£.tt ~..Jl6

'~AR 7 2011

Exelon Exelon Generatlon www.exeloncorp.com Nuclear 4300 Winfield Road Warrenville.IL 60555 RS-l0-130 July 28,2010 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 5Q-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Facility Operating License Nos. DPR-2, (Renewed) DPR-19 and DPR-25 NRC Docket Nos. 50-10. 50-237, and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-l1 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station. Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket Nos. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Facility Operating License Nos. DPR-12, (Renewed) DPR-44, and DPR-56 NRC Rocket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289

//), -,.t:."

fyJ....

Z, it.

C.....J..

(1 L

AUG 2 - 2010

July 28,2010 U. S. Nuclear Regulatory Commission Page 2

Subject:

Exelon Generation Company. LLC (EGC) Response to NRC Regulatory Issue Summary 2010*08, "Preparation and Scheduling of Operator Licensing Examinations"

Reference:

NRC Regulatory Issue Summary 2010-08, "Preparation and Scheduling of Operator Licensing Examinations," dated June 28,2010 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2012 through 2015. and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2012 and 2013. Attachments 1 through 10 provide responses to RIS 2010-08 for the EGC plants identified above. The requested information for each facility is provided on a separate NRC Form 536.

There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-2819. - Completed NRC Form 536 for Braidwood Station

OPERA TOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. 3150-0131 EXPIRES: 1013112011 Estimated burdan par ras~onsa to comply with this voluntary information coIlectlon requast: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

his information col/action Is used to plan budget and resources for operator examinations. Sand comments r;v.ardln§ burde estimate to the Records and FOIA/Pnvacy Services Branch

-5 F 3). U.S.

Nuclear R~ulatory Commission. Washington. DC 20555-000

  • or by, inteme e-mail to in ocollects@nrc80v. and to the Desk Officer. Office of In ormation and Regulatory Affairs. NE 8-10202. (3150-0131), Office of Management snd Budget, WashlOgton, DC 20503.

If a means used to impose an infomnatlo collection does not display a currently valid OMS control number, the NRC may not conduct or sponsor. and a person is not required to respond to, the information collectIon.

n n

s t

FACILITY Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 D

NRC REGION III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 Cy 2013 Cy 2014 Cy 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 0

I t

0 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0

0 0

0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy 2012 CY 2013 CY 2014 Cy2015 NUMBER OF REACTOR OPERATORS 0

8 6

0 NUMBER OF SENIOR REACTOR OPERATORS

  • INSTANT 0

12 6

0 NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 0

0 0

0 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0

0 0

0 PROPOSED DATES PRIMARY DATE N/A 3/25/2013 12/0812014 N/A ALTERNATE DATE N/A 4/8/2013 11512015 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 2012

~-

Cy 2013

.~-

MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0

0 0

0 0

0 12 0

NRC FORM 536 (10-2006)

PRINTED ON RECYClED PAPER Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCL.EAR REGULATORY COMMISSION APPROVED BY OMS: NO 3150-0131 EXPIRES: 10131/2011 (10-2008)

Estimated burden per res~onse to comply with this voluntary Informatio collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

his information collection is used to plan budget and resources for operator examinations. Send comments ':r.-ardlng burde OPERA TOR LICENSING estimate to the Records and FOIAIPrivBcy Services Branch

  • 5 F 3). U.S Nuclear Re~ulatory Commission. Washington. DC 20555-000
  • or brc Internet EXAMINATION DATA e-mail 10 in ocoliectS@nrC'gov. and to the Desk Officer. Olllce of In ormation and Regulatory Affairs. NE B*10202. (3150-0131). Office of Management an Budget. Washington. DC 20503.

If a means used to impose an information collection does not display a currently valid OMB control number. the NRC may not conduct or ~nsor. and a person Is not required to respond to. th information colle on.

n n

d e

s FACILITY Byron Station, Units I and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 NRC REGION III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 2012 CY 2013 CY 2014 Cy 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 1

1 1

I ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0

0 0

0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 CY 2013 Cy 2014 Cy 2015 NUMBER OF REACTOR OPERATORS 2

6 6

0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 6

6 6

6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0

0 1

0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0

0 0

0 PROPOSED DATES PRIMARY DATE Jl23/2012 112112013 1127/2014 111912015 ALTERNATE DATE 1116/2012 112812013 1120/2014 1IZ6/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER Cy 2012

-.'--~-'

Cy 2013 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0

0 12 0

0 0

6 0

NRC FORM 536 (10-<008)

PRINTED ON RECYCLED PAPER Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150-<)131 EXPIRES: 1013112011 110-2(08)

Estimated burden per res~nse to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

is information collection is used to plan budgets and resounces for operator examinations. Send comments r'?1rardin~ burden OPERA TOR LICENSING estimate to the Records and FOIAlPrtvacy Services Branch ~ *5 F 3). U.S.

Nuclear Re?,Ulatory Commission, Washington. DC 20555-<>00,or ~ Internet EXAMINATION DATA e-mail to in ocolleclS@nrc8°V' and to the Desk Officer. Offoce of In ormation and Regulatory Affairs. NE B-10202, (3150-0131). Office of Management and Budget. Washington, DC 20503.

If a means used to impose an information collection does not display a currently valid OMS control number. the NRC may not conduct or s~sor. and a person is not required to respond to, the information collecl FACILITY NRC REGION Clinton Power Station Facility Operating License No. NPF-62 III NRC Docket NO. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2012 CY 2013 CY 2014 CY 201S ESTIMATED NUMBER OF I

0 1

LICENSEE-PREPARED 0

EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2012 CY2013 CY 2014 CY 201S NUMBER OF REACTOR 0

6 0

6 OPERATORS NUMBER OF SENIOR REACTOR 0

OPERATORS -INSTANT 4

0 4

NUMBER OF SENIOR REACTOR 0

2 0

2 OPERATORS UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE N/A 08119/13 N/A 08111115 ALTERNATE DATE N/A 08126/13 N/A 08124115 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 20ll CY 2013 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

10 0

0 0

0 0

0 CANDIDATES NRC FORM 536 (1Q-2008)

PRINTED ON RECYCLED PAPER

AHachment4 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 APPROVED 8Y OM8: NO. 3150-0131 EXPlRES; 1013112011

(.0-2OOa)

NRC FORM 53fI U,S, NUCLEAR REGULATORY COMMISSION EstimatllCl burden ~r res~nse to comply with this vOluntary Information coUec:1lon request hOOI.

his InfOrmation ""'ecticn is used to plan budgets and r1IlOun:.I fo, operator examinations. Send cornmanlS t$~ardln~ burden esl,,".lo to the Records and FOIAIPrlv8CY Servlcu Branch I *5 F 3), U.S.

OPERATOR LICENSING NUdeaI' ~ulatory Commission, Washington, DC 20555-000,or b~ Intlmel

&omeil to In OCO!lectI@nrc,8'!l'" and to Ihe o.sk Officer, omce olin orl'll4ltion EXAMINATION DATA and Reuu=ff8lts, NE 9*10202, (315O-()131), Oftke 01 Ma~mont and Budget, W ton, DC 20503.

If

  • means used 10 impose an.1If00000000Uon COllectiOn 0081 not display II currently valid OMB oontrol number, the NRC may not conduct or 'ponsor, and II person Is not required to respond to, Ih.

Inronn.1ion ""'ection.

NRC ReGION F.... ClLITY Dresden Nuclear Power Station, Units :z and 1 III Renewed Facility Operaling License Nos. DPR-I9 and DPR-Z5 NRC Docket Nos. 51)..137 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE Cy 2011 CY2014 CY 2015 CY 2013 PROPOSED NUMBER ESTIMATED NUMBER OF lICENSEE*PREPARED I

0 I

EXAMINATIONS 1

ESnMATED NUMBER OF NRc.PREPAREO 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY21)14 Cy2015 CY2013 CY 201Z PROPOSED NUMBER NUMBER OF REACTOR 4

0 5

4 OPERATORS NUMBER OF SENIOR REACTOR I) 7 7

7 OPERATORS* INSTANT NUMBER OF SENIOR REACTOR

)

)

0 0

OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS* LIMITED PROPOSED DATES 10/14113 N/A PRIMARY DATE 3/2115 816112 10128113 N/A 3123/1S ALTERNATE OATE 81Z01l2 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 20U CY 2013

~-

-~~--

PROPOSED NUMBER SEPTEMBER MARCH JUNE DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 U

0 0

0 0

12 CANDIDATES NRC FOl'lM 534 (10-2008)

PFlINTEO ON REcYCU:O PAI'IIR Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION (10*2008)

OPERA TOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. 3150'()131 EXPIRES: 10131/2011 Estimated burden per res~onse to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

his information COllection is used to plan budgets and resources for operator examinations. Send comments r&l+ardin8 burde estimate to the Records and FOIAIPrivacy Services Branch

  • 5 F 3). U.S.

Nuclear R~ulalOry Commission. Washington, DC 20555'()oOl, or bi: Interne I).mail 10 in OCOliects@nrc'Bov, and to the Desk Officer. Office of In ormetlon and Regulatory Affairs, NE El-10202, (3150'()131). Office of Management and Budget. Washmgton, DC 20503.

If a means used to impose an information collection does not display a currently valid OMB control number. the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

n t

FACILITY NRC REGION LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-ll and NPF-18 NRC Docket Nos. STN 50-373 and STN 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 ESTIMATED NUMBER OF LlCENSEE*PREPARED EXAMINATIONS 1

0 I

0 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0

0 0

0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 Cy2013 CY2014 Cy 2015 NUMBER OF REACTOR OPERATORS 8

0 6

0 NUMBER OF SENIOR REACTOR OPERATORS* INSTANT 5

0 6

0 NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 2

0 2

0 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0

0 0

0 PROPOSED DATES PRIMARY DATE 9/2412012 N/A 10/13/2014 N/A ALTERNATE DATE 10/1/2012 N/A 10/20/2014 N/A

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER Cy 2012 CY 2013

~-

MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0

0 0

0 0

12 0

0 NRC FORM 536 (1()'2008)

PRINTED ON RECYCLED PAPER Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010*08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 315()..Q131 EXPIRES: 10131/2011 (10-2000)

Estimated burden per res~nse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

is information collection is used to plan budgets and resources for operator examInations. Send comments r~ardjn~ burden OPERATOR LICENSING estimate to Ihe Records and FOtAlPrivacy Services Branch

-5 F 3), U.S, Nuclear Re~ulatOry Commission, Washington, DC 20555-000, or blc intemet EXAMINATION DATA e-mail to in Ocollects@nrc.gov, and to the Desk Officer, OfflC8 of In ormation and Regulatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Washington. DC 20503.

If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor. and a person is not required to respond to. the infonnation collection.

FACILITY NRC REGION Limerick Generating Station~ Units 1 and 2 FaciHty Operating License Nos. NPF-39 and NPF-85 1

NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 2011 CY 1013 CY 2014 Cy 2015 ESTIMATED NUMBER OF I

0 1

0 LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF 0

0 0

NRC-PREPARED 0

EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy20n Cy2013 CY 2014 CY 2015 NUMBER OF REACTOR 8

0 8

0 OPERATORS NUMBER OF SENIOR REACTOR 7

OPERATORS -INSTANT 0

6 0

NUMBER OF SENIOR REACTOR 2

0 2

0 OPERATORS -.UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 10/08/2012 N/A 10/06/2014 N/A ALTERNATE DATE 10/1512012 N/A 1011312014 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED

~.--

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 0

14 0

0 CANDIDATES NRC fORM 536 (10-2008)

PRINTED ON RECYCLED PAPER Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVeOBVQMB: NO.3150-0131 EXPIRES: 10/31/2011 (10.2008)

Estimated burden per rlls~on.. 10 comply willi tills vo<unla!'Y Informallon COIlec:tIon request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

his information COIleclllltlia UlIed 10 plan budgel and resources for operalor axamin8lioml. Sand comments ~8Id1F2 burde OPERATOR LICENSING II$timale 10 lila Records and FOIAl?rl\\lllCY Sarlllces Branch

  • 5 F 3). U. S NUClear R~ Coml'lliQion. Wa8hingl0ll. DC 205S1i-OOO
  • or ~ Intern EXAMINATION DATA e-mail 10 I lects@nrc:.~. and to thl 0eIk Offtcer. Off'tee of In ormallo and Reg= Affairs. NE 8-10202. (3150-0131). Offtce of Management an Budget. W ngton! DC 20503.

If a means ilsed to ll'I1pot1 an irlformallo collection do8I not display a currently valkl OMS contrO! number. Iha NRC may not conduct or sponsor, and a parBOil is nol reqUited 10..spond 10. th Information coliectlOll.

et d

e a

n n

n FACILITY Oyster Creek Nuclear Geoer.dng Station Renewed Facility Operating Lkense No. DPR*16 NRC Docket No. 50-Zt9 NRC REGION

(

A. PROPOSED EXAMINAnON PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 CY 1014-CY 2015-ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS I

0 I

0 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0

0 0

0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY lOll CylOI3 CY 2014 CY 2015 NUMBER OF REACTOR OPERATORS 0

6 0

NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 3

0 2

0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2

0 5

0 NUMBER OF SENIOR REACTOR OPERATORS -LIMITED 0

0 0

0 PROPOSED DATES PRIMARY DATE 0511912011 N/A 0610212014 N/A AlTERNATE DATE 0610412012 N/A 06109/2014 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINAnON (GFE) SCHEDULE PROPOSED NUMBER CY 20ll CY 2013 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0

0 0

0 13 0

0 0

NRC FORM 536 (1D-2OGS)

PRINTED ON RECYClEO PAPER Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO 3150'()131 EXPIRES: 10/31/2011 (10-2008)

Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

his,information collection is used to plan budget and resources for operator examinations. Send comments rr.ardln~ burde OPERATOR LICENSING estimate to the Records and FOIAlPrlvacy Services Branch

-5 F 3), U,S Nuclear R:;JlUlatory Commission, WaShington, DC 20555-000,or orr intama EXAMINATION DATA e-mail to In ocoliects@nrc.gov, and to the Desk Officer, Office of In ormallon and Regulatory Affillrs, NE B-10202, (3150.()131). Office of Management an Budget, Washington, DC 20503.

If a means used to impose an informatio collecllon does not display a currently valid OMB control number, the NRC may not conduct or ~nsor, and a person is not required to respond to, the information colle n

s n

t d

FACILITY Peach Bottom Atomic Power Station, Units 1 and 3 Facility Operating License Nos. DPR-12, (Renewed) DPR-44, and DPR-56 NRC Docket Nos. 50-277 and 50-278 NRC REGION I

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 Cy 2014 CY 1015 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 0

1 0

t ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0

0 0

0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 1012 CY 2013 CY 2014 CY 2015 NUMBER OF REACTOR OPERATORS 0

8 0

6 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 0

10 0

6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0

2 0

2 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED

  • SeeLGS
  • See LGS PROPOSED DATES PRIMARY DATE N/A 211112013 N/A 2/9/2015 ALTERNATE DATE N/A 3/25/2013 N/A 3/23/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 1012 CY 2013 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0

0 0

0 0

0 12 0

NRC FORM 536 (10-2008)

PRINTED ON RECYCLED PAPER Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150-0131 EXPIRES: 1013112011 (10*2008)

Estimated burden psr response to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budget and resources for operator examinations, Send comments ro,~arding burden OPERATOR LICENSING estimate to the Records and FOIAlPrivacy Services Branch

-5 F 3). U.S.

Nuclear R~ulalOry Commission. Washington. DC 20555-0001. or br. inteme EXAMINATION DATA e-mail 10 in ocollects@nrc'8ll'" and to the Desk Officer. Office of In ormatio and RegUlatory Affairs. NE 8-10202. (3150*0131). Office of Management and Budget. Washington. DC 20503.

If a means used to impose an information collection does not display a currently valid OMS control number. the NRC may not conduct or sponsor. and a person is not required to respond to. the lnfonmation collection.

n s

t FACILITY Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 NRC REGION A. PROPOSED EXAMINA"nON PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 CY 2014 CY 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 1

I 0

1 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0

0 0

0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 CY2013 CY 2014 CY 20t5 NUMBER OF REACTOR OPERATORS 4

5 0

5 NUMBER OF SENIOR REACTOR OPERATORS* INSTANT 9

5 0

5 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0

1 0

0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0

0 0

0 PROPOSED DATES PRIMARY DATE 3126/2012 9123/2013 N/A 2/9/2015 ALTERNATE DATE 4/23/2012 10/14/2013 N/A 2/2312015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 2012

~.~,.."--

CY 2013 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0

to 0

0 0

0 0

10 NRC FORM 536 (10-2008)

PRINTED ON RECYCLED PAPER 0

Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)

Esllmated burden per res~onse 10 comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

his Information col/action is used to plan budgets and resources for operator examinations. Send comments rr.rding burden OPERA TOR LICENSING eslimatElto the R&eords and FOIAJPnvacy Services Branch

-5 F 3). U.S.

Nuclear R~ulatory CommiSsion. Washington. DC 20555-000

  • or blc internet EXAMINATION DATA e-mail to in ocollects@nrc.~v. and to the Desk Officer. OffICe of In ormaticn and Regulatory Affairs. NE

-10202. (3150-0131). Office of Management and Budget. Washtngton. DC 20503.

If a means used to Impose an Informatton collection does not display a currently valid OMS control number, the NRC may not conduct or sponsor. and a person Is not required 10 respond to. the information coIlaction.

FACILI1l' NRC REGION Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 I

NRC Docket No. 50-289 A, PROPOSED EXAMINA'nON PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 CY 2014 Cy 2015 ESTIMATED NUMBER OF 1

1 I

LICENSEE-PREPARED I

EXAMINATIONS ESTIMATED NUMBER OF 0

0 0

NRC-PREPARED 0

EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 CY2013 CY 2014 Cy2015 NUMBER OF REACTOR 4

5 4

6 OPERATORS NUMBER OF SENIOR REACTOR 5

5 5

6 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE 02/6/2012 6110/2013 6/16/2014 6/t5/2015 AlTERNA TE DATE 02113/2012 6/17/2013 6/2312014 6122/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 10 0

0 0

9 0

I) 0 CANDIDATES NRC FORM 536 (10-2008)

PRINTED ON RECYCLED PAPER

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 February 19, 2010 Mr. Charles G. Pardee Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION III EXELON STATIONS

Dear Mr. Pardee:

In a letter dated August 13, 2009 (RS-09-109), your staff responded to Regulatory Issue Summary (RIS) 2009-11, and requested we schedule initial license operator examinations for the Exelon Nuclear Plants. In a separate letter dated March 19, 2009 (U-603882),

Clinton Power Station requested an examination be administered in October or November 2010 that was not included in your RIS response letter. That examination has been added to your examination schedule. In a separate letter dated November 18,2009 (U-603924),

Clinton Power Station requested we not schedule the examination requested in December 2011 per your letter, but retain an August 2011 examination scheduled from your response to the 2008 RIS for examination scheduling. In a separate letter dated January 6, 2010 (Byron 2010-0003), Byron Station requested we change the dates of their examinations proposed for 2011, 2012, and 2013 to other dates. We were unable to accommodate the April 2013 examination requested for Quad Cities Nuclear Power Station. It is currently listed as "To Be Determined" as we are currently negotiating a mutually acceptable examination date with Quad Cities training department personnel. This letter confirms scheduling of the requested examinations at the Region III Exelon power plants and incorporates the changes requested by Clinton Power Station and Byron Station. We have tentatively scheduled the requested examinations to occur as follows:

Station 2010 2011 2012 I

2013 2014 Braidwood NIR 06/20 NIR 03/25 NIR Byron 9/27 NIR 01/16 01114 01/27 Clinton 11/1 8122 NIR 8/19 N/R Dresden 03/08 03/07 3/05 3/04 NIR LaSalle 09/13 NIR 09/24 NIR NIR Quad Cities NIR 5/30 3/26 TBD NIR N/R - None Requested TSD - To Se Deterrmned On-site validation of the examinations is tentatively scheduled to occur approximately three weeks before each scheduled examination. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you and the affected station's training department immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

i

C. Pardee

-2 We understand that your staff will develop the proposed examinations unless we discover it is necessary for the NRC to develop an examination. If an examination anticipates greater than nine anticipated applicants for the examination, the examination is scheduled for two weeks.

Otherwise, the examination is scheduled for one week. Please inform us if the number of candidates declines below ten for any examination as this will impact the examination schedule.

Please inform us at your earliest opportunity if you discover a need to change any of the dates of the scheduled examinations.

A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.

In accordance with 10 CFR 2.390 ofthe NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).

Sincerely, IRA!

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 Docket No. 50-461 license No. NPF-62 Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc:

Distribution via listServ

C. Pardee We understand that your staff will develop the proposed examinations unless we discover it is necessary for the NRC to develop an examination. If an examination anticipates greater than nine anticipated applicants for the examination, the examination is scheduled for two weeks.

Otherwise, the examination is scheduled for one week. Please inform us if the number of candidates declines below ten for any examination as this will impact the examination schedule.

Please inform us at your earliest opportunity if you discover a need to change any of the dates of the scheduled examinations.

A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).

Sincerely, IRA!

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF~72; NPF-77 Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 Docket No. 50-461 License No. NPF-62 Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc:

Distribution via ListServ DISTRIBUTION:

See next page DOCUMENT NAME: G:\\DRS\\Work in Progress\\Exelon 021910 DRS OL.doc To receive a co oftbis document, indicate in the box "e" = Co w/o attach/encl "E" RIII:DRS RIII:DRS JKweiser:co DMcNeil HPeterson 01/25110 02117/10 02/19/10 OFFICIAL RECORD COPY

Letter to Mr. Charles G. Pardee from Mr. Hironori Peterson, dated February 19,2010.

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION III EXELON STATIONS DISTRIBUTION:

RidsNrrDorlLpl3-2 Resource Susan Bagley RidsNrrPMBraidwood Resource RidsNrrPMByron Resource RidsNrrPMClinton Resource RidsNrrPMDresden Resource RidsNrrPMLaSalle RidsNrrPMQuad Cities RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker DRPIII DRSIII Carole Ariano Linda Linn Patricia Buckley Tammy Tomczak

Exelon Nuclear N

ear 4300 Winfield Road Warrcnvllle, Il60555 RS-09-109 August 13, 2009 U, S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station. Units 1 and 2 - 1'1 :;"'0 J)

Facility Operating License Nos. NPF-37 and NPF-66 NRC Dock§t Nos. STN 50-454 and STN 5Q-45g Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. gO-461 Dresden Nuclear Power Station. Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docl<DA.Jf'(

Umerld. GeMndaa Statio... u.tta *ud 2 Facility Operatbll LIeea.. NOlo NPF-39 aad NPF-85 NRC Docket Not. 50-352 ud 5G-353

!lR;REOIQH I

y A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy201' CY llU-CY 20U CY 1813 ESTIMATED NUMBER OF UCENSEE..f'REPARED EXAMINATIONS 1

1 ESTIMATED NUMBER OF NRC-PREPARED EXl\\MINATIONS 0

B. INmAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CV 2O**

Cyl0U Cy28U CylOU NUMBER OF REACTOR OPERATORS 0

11 0

NUMIER OF SENIOR REACTOR OPERATORS

  • INSTANT 7

0 5

0 NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 5

I 2

0 NUMBER OF SENIOR REACTOR OPERATORS* UMITED I

0 8

0 PROPOSED DATES PRIMARY DATE 10l04ll010 N/A 1010112012 N/A ALlERNATE DATE 10/1812010 N/A 091241.Z012 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 1111 CY 2011 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0

8 0

0 0

Hi It 0

Response to RIS 2009-11 Page 2 of 2 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO,3150-0131 EXPIRES: 10/31/2011 (10*2008)

Estimated burden par ras~onse to comply with this Yoluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

his information collection is used to plan budgets and resources for operator examinations. Send comments re~ardln~ burden OPERA TOR LICENSING estimale to Ihe Records and FOIAJPrlvacy Services Branch

  • 5 F 3), U.S.

Nuclear Ra~ulatOry Commission, Washington. DC 20555-000

  • or bllntemet EXAMINATION DATA e*mall to in ocollect9@nrc.~v, and to the Desk Officer, Office of In ormation and Regulatory Affairs, NE B*l0202, (3150*0131), Office of Management and Budget. Washington, DC 20503, If a means used to impose an information collection does not display a currently valid OMS control number, tha NRC may no! conduct o~onsor, and a person is not required to respond to, the information coli on.

fACILITY NRC REGION Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 I

NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINA1"ION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 CY 2012 Cy 2013 ESTIMATED NUMBER OF 1

0 0

0 LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF 0

0 0

NRC-PREPARED 0

EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 Cy 2011 CY2012 Cy2013 NUMBER OF REACTOR OPERATORS 0

0 0

0 NUMBER OF SENIOR REACTOR 0

OPERATORS INSTANT 0

0 0

NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 8

0 0

0 OPERATORS LIMITED PROPOSED DATES PRIMARY DATE 06/14/2010 N/A N/A N/A ALTERNATE DATE 06/07/2010 N/A N/A N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 0

0 0

0 CANDIDATES NRC FORM 536 (10-2006)

PRimED ON RECYCLEO PAPER Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB; NO. 3150..(l131 EXPIRES: 101:l112011 (10*2008, Estimated burden per res~onse to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

his information collection is used to plan budget end resources for operalor examinations. Send comments refrding burden OPERATOR LICENSING estimate to Ihe Records and FOIA/Privacy Services Branch

  • 5 F 3). U.S.

Nuclear R:;?UlatOry CommisSion. Washington. DC 20555-000

  • or ~ interne EXAMINATION DATA e-mail to in oCOliects@nrc.gov. and to the Desk Officer. Office of In ormation and RegUiato~ Affairs. NE 8-10202. (3150..(l131). Office of Management an Budget. Wash nglon, DC 20503.

If a means used 10 impose an informatio collection does not display a currently valid OMS control number. the NRC may nol conduct or sFc0nsor. and a person Is not required to respond to. Ihe information collect on.

d n

s t

FACILITY Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 NRC REGION 1

A. PROPOSED EXAMINATION PREPARArlON SCHEDULE PROPOSED NUMBER Cy 2010 Cy 2011 Cy 2012 CY 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 1

1 I

0 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0

0 0

0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY2011 Cy20n CY2013 NUMBER OF REACTOR OPERATORS 6

6 6

0 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 7

7 8

0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2

1 2

0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0

0 0

0 PROPOSED DATES PRIMARY DATE 05/1712010 07111/2011 05128/1012 N/A ALTERNATE DATE 05/24/2010 0711812011 06/0412012 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANOlDATES 13 0

0 0

14 0

0 0

NRC FORM 536 (1G.2008)

PRINTEO ON RECYCLED PAPER Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION (l()-Z008)

OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMS: NO. 3150'{)131 EXPIRES: 1013112011 Estimated burden per res~onse 10 comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

his information collection iso used to plan budget and resources for operator eJ(aminations. Send comments 'flding burde estimate 10 the Records and FOIAlPrivacy Services Branch

-5 F 3), U.S Nuclear Ra~UlalOry Commission. Washington, DC 20555-000,or blt interne e-mail 10 in OCOliects@nrc'gov. and to Ihe Desk OffICer, Office of In ormation and Regulat~ Affairs, NE B-10202, (3150'{)131), Office of Managament an Budget, Wash nglon, DC 20503.

If a means used to impose an Informatio collection does nol display a currently valid OMS control number, the NRC may not conduct or ~onsor. and a person is nol required 10 respond to, the Information colle on.

n d

n s

t FACILITY Peach Bottom Atom Power Station. Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and OrR-56 NRC Docket Nos. 50-277 and 50-278 NRC REGION I

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 Cy 2012 CY 2013 ESTIMATED NUMBER OF LlCENSEE*PREPARED EXAMINAnONS 0

1 0

I ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0

0 0

0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY201l CY2012 CY2013 NUMBER OF REACTOR OPERATORS 0

6 0

8 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 0

8 0

10 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0

3 0

2 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0

0 0

PROPOSED DATES PRIMARY DATE 01131/2011 N/A 02/11/2013 ALTERNATE DATE 03/21/2011 N/A 02/04/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0

0 0

0 0

18 0

NRC FORM 536 (1()-2008)

PRINTED ON RECYCLED PAPER

  • See Attachment 6 (Limerick Generating Station) for Limited SRO numbers and exam dates Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION

~lo.2006' OPERA TOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. 3150-0131 EXPIRES: 1013112011 Estimaled burden per res~onse 10 comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

his information collection is used \\0 plan budget and resources 'or operator examinations. Send comments refrdlng burde estimate \\0 the Records and FOIA/Prlvacy Services Branch

  • 5 F 3). U.S.

Nuclear R::Ilulatory Commission, Washington. DC 20555-000, or ~inteme e-mail to in ocolleclS@nrc.gov. and to the Desk Offlcar, Office of In rmatlon and Regulatory Affairs, NE B-1 0202, (3150-0131). Office of Management and Budget. Washington, DC 20503.

If a means used to impose an informatio Gollactlon does nol display a currently valid OMS control number, Ihe NRC may not conduct or sponsor. and a person is not required to respond to, the Information collection.

n l

n s

FACllln' Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Faellity Operating License Nos. OPR-29 and OPR-30 NRC Docket Nos. 50-254 and 50-265 NRC REGION III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 Cy 2011 Cy 2012 Cy 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 0

1 1

1 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0

0 0

0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CylOlt CY 2012 CY2013 NUMBER OF REACTOR OPERATORS 0

6 4

3 NUMBER OF SENIOR REACTOR OPERATORS

  • INSTANT 0

11 10 10 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0

0 1

1 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0

0 0

0 PROPOSED DATES PRIMARY DATE N/A 05/30/2011 03/1212012 04115/2013 ALTERNATE DATE N/A 06113/2011 0312612012 04/29/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER Cy 2010 CY 2011 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0

0 0

14 0

0 0

0 NRC FORM 536 (10.2008)

PRINTED ON RECYCLED PAPER 0

Response to RIS 2009-11 Page 1 of 1 NRC FORM 53.

U.S, NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO.3150.()131 EXPIReS: 1013112011 (1Q.2O(8) esUrnltu burden per r.~e to comply with thll volunttry informatton CCIIec:IIon nlquell: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

Infol'rnallan c:oIecIlon II used budgets end I'IfJOUl'COtI I'ot operator examination.. Send comrnenlll burden OPERATOR LICENSING eallmatt to the R_de and FOIAIPrivacy Sarvtc:MJ!~nc 3). U.S.

Nudaar R::tlatory Commllllon. WaahlngI/?n, OC ~u~. or ~1nWne1 EXAMINATION DATA

........n to In coll~nrc~. and 10 the Delk Olllotr. 0IIIce 011 Ilion and ReQUI::r,:r1il'86 NE lOW. (3150.0131). Omo. ~ MI/I~I and SUdQat. W on, C 20503.

If I,""M uJld to Irnpoll an fi:llmallon coIlt<:tIon dOn nol dlapla)' I cutnlnUy valid OMS conlrd numbar, lila NRC may nol conduct o~nlOr. and I pereon I. not required to re.pond 10. the information col FACIUTY NRCREOION Three MOe Island Nuclear Statio., Unit 1 I

FaeWty Operadrac LIcense no. DrR-50 NRC Doeket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 1010 cy 2011 Cy20Jl cy 2013 ESTIMATED NUMBER OF 1

I.ICENSEE-PREPARED 1

0 I

EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED I) 0 0

I)

EXAMINATIONS B. INmAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CylOll CY2011 Cy2013 NUMBER OF REACTOR 1

10 0

OPERATORS NUMBER OF SENIOR REACTOR 1

OPERATORS -INSTANT to 0

8 NUMBER OF SENIOR REACTOR 0

I 0

1 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

t OPERATORS* LIMITED PROPOSED DATES PRIMARY OATE 01/2111010 091121201.

N/A 09/0912013 AI.TERNATE DATE 011l1ll1010 09'191l011 N/A 09116/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy 1010 Cy 2011 PROPOSED

.....~-

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF

%1 0

0 0

II 0

0 0

CANDIDATES HAC FORM 538 (1Q.2008)

PRlHTEO 011 REC'I'CU!D PAPER

October 7, 200B Mr. Charles G. Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville IL 60555

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION III EXELON STATIONS

Dear Mr. Pardee:

In a letter dated July 22, 2008, (RS-OB-092) your staff responded to Regulatory Issue Summary 2008-16 and requested we schedule initial license operator examinations for the Exelon Nuclear Plants. In a separate letter dated July 11,2008, (KKM-08-001) the Quad Cities Nuclear Power Station Training Manager requested a change to the start date of the Station's 2009 examination. This letter confirms scheduling of the requested examinations at the Region III power plants and the change requested for the Quad Cities Nuclear Power Station 2009 examination. We have tentatively scheduled the requested examinations to occur as follows:

I I

I I

I Station 2009 2010 2011 2012 Braidwood 10105 NIR 6/20 NIR Byron N/R 9/27 9/12 9/10 Clinton 8/24 NIR 8/22 N/R Dresden 03/09 03/08 3107 3/05 LaSalle NIR 09/13 NIR 9/17 Quad Cities 11/30 NIR 5/30 3/26 N/R - None Requested On-site validation of the examinations is tentatively scheduled to occur approximately three weeks before each scheduled examination. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you and the affected station'S training department immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

We understand that your staff will develop the proposed examinations unless we discover it is necessary for the NRC to develop an examination. Because the examinations have greater than nine anticipated applicants, each examination is scheduled for two weeks. Please inform us if the number of candidates declines below ten for any examination as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover a need to change any of the dates of the scheduled examinations.

C. Pardee

-2 A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely, IRA!

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF*72; NPF-77 cc:

Site Vice President - Braidwood Station Plant Manager* Braidwood Station Regulatory Assurance Manager - Braidwood Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General J. Klinger, State Liaison Officer, Illinois Emergency Management Agency Chairman, Illinois Commerce Commission Site Training Director - Braidwood Station

C. Pardee

-2 A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely, IRA!

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 cc:

Site Vice President - Braidwood Station Plant Manager - Braidwood Station Regulatory Assurance Manager - Braidwood Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General J. Klinger, State Liaison Officer, Illinois Emergency Management Agency Chairman, Illinois Commerce Commission Site Training Director - Braidwood Station See Attached Distributions DOCUMENT NAME: G:\\DRS\\WORK IN PROGRESS\\EXELON 100708 DRS OL.DOC o Publicly Available 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive To receive a COPl oftbis document, indicate in tbe box "e" = Copy wlo attach/encl "En = Copy with attach/encl liN" = No copy OFFICE RIII:DRS I

RIII:DRS I

RIII:DRS I

I NAME JKweiser:co DMcNeil HPeterson DATE 10/02/08 10/02/08 10/07/08 OFFICIAL RECORD COpy

C. Pardee

-3 Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 cc:

Site Vice President - Byron Station Plant Manager - Byron Station Regulatory Assurance Manager - Byron Station P. Schmidt, State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission Site Training Director - Byron Station B. Quigley, Byron Station Docket No. 50-461 License No. NPF-62 cc:

Site Vice President - Clinton Power Station Plant Manager - Clinton Power Station Regulatory Assurance Manager - Clinton Power Station Manager Licensing - Clinton, Dresden and Quad Cities Site Training Director - Clinton Power Station Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 cc:

Site Vice President - Dresden Nuclear Power Station Plant Manager - Dresden Nuclear Power Station Regulatory Assurance Manager - Dresden Nuclear Power Station Site Training Director - Dresden Nuclear Power Station Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 cc:

Site Vice President - LaSalle County Station Plant Manager - LaSalle County Station Regulatory Assurance Manager - LaSalle County Station Site Training Director - LaSalle County Station Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc:

Site Vice President - Quad Cities Nuclear Power Station Plant Manager - Quad Cities Nuclear Power Station Regulatory Assurance Manager Quad Cities Nuclear Power Station Vice President - Law and Regulatory Affairs D. Tubbs, Manager of Nuclear Associate General Counsel M. Rasmusson, State Liaison Officer, State of Iowa Chief Radiological Emergency Preparedness Section, Dept. of Homeland Security Site Training Director - Quad Cities Nuclear Power Station

Letter to Charles G. Pardee from Hironori Peterson dated October 7,2008

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION III EXELON STATIONS DISTRIBUTION:

Russell Gibbs Tamara Bloomer Meghan Thorpe-Kavanaugh Joel Wiebe Stephen Sands Christopher Gratton RidsNrrDirslrib Resource Mark Satorius Kenneth OBrien Jared Heck Roland Lickus Carole Ariano Linda Linn Patricia Buckley DRPIII DRSIII Patricia Buckley Tammy Tomczak

Janet Kweiser From:

Carmen Olteanu Sent:

Tuesday, October 21, 2008 11 :22 AM To:

Russell Gibbs; Tamara Bloomer; Meghan Thorpe-Kavanaugh; Joel Wiebe; Stephen Sands; Christopher Gratton; RidsNrrDirslrib Resource; Mark Satorius; Kenneth OBrien; Jared Heck; Carole Ariano; Linda Linn; Patricia Buckley; DRPIII; DRSIII; Patricia Buckley; Tammy Tomczak

Subject:

Exelon Letter Re Confirmation of Initial Exam Attachments:

Exelon 100708 DRS OL.doc The subject document has been completed and has been submitted to ope to be declared in ADAMS. A Word copy of the document has been attached and the document has been assigned Accession

  1. ML082880559.

1

AmerGen~

Exelon An ExeJon Company www,cxeloncorp.(orn Nuclear AmerCcn Energy Company, LLC 43()O Wtnfield Road Exelon Cent!yatlon Warrenville, IL 60555 4300 Winfield Road Warrenville, IL 60555 RS-08-092 July 22, 2008 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-~5 "

NRC Docket Nos. 50-237 and 50-249 laSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 I r

July 22, 2008 U. S. Nuclear Regulatory Commission Page 2 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289

Subject:

Response to NRC Regulatory Issue Summary 2008-16, "Preparation and Scheduling of Operator Licensing Examinations"

Reference:

NRC Regulatory Issue Summary 2008-16, "Preparation and Scheduling of Operator Licensing Examinations," dated June 27,2008 The referenced Regulatory Issue Summary requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2009 through 2012, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2009 and 2010.

Attachments 1 through 10 provide responses for the Exelon Generation Company, LLC and AmerGen Energy Company, LLC plants identified above. The requested information for each facility is provided on a separate NRC Form 536.

In calendar year 2009, six candidates are expected to take the dual-site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment 8. The schedule for the indicated examination is as follows: the written examination and a portion of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual-site examination that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on for PBAPS. Attachment 6 for lGS references Attachment 8 where appropriate.

There are no regulatory commitments contalned within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-2819.

Respectfully,

~Yv1~L-Darin M. Benyak Director - Licensing and Regulatory Affairs

July 22, 2008 U. S. Nuclear Regulatory Commission Page 3 - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station - Completed NRC Form 536 for Quad Cities Nuclear Power Station 0 - Completed NRC Form 536 for Three Mile Island Nuclear Station - Unit 1

Response to RIS 2008-16 Page 1 of 1 NRC FORM SJ6 II.S NUCLF.AR REGlLATORY COMMISSION (11-2005)

OPERATOR LICENSING EXAMINATION DATA FACILITY Braidwood Station, Units 1 and 2 APPROVED BY OMB: NO. J150*11131 EXPIRES: IIlVJlf.'IXJ8 E~timated burden pt'r re"pon:-.e to c~'mply with thl!'. voluntary mfonnation culle..:lkln requeM: I txmr. thiS i.nfilrm,,"lk1n collection I.;; u~ tu.plan budgets

~~~~~~~~~t~/R~~~d~~:;J¥&~~i~~~~~~~~tfr~~ff~'~~r~r~~.

Nud~~ar Re@ulaIUI)'Commic;.'M)n. Washing.ton, DC 205.5S~(XXH. ilr b" Inlernet

~*mall tn IRtoCtlllerl.~@nrc.~lV. and 10 the: De\\k Ot'lict":r. Oflil'e IJf In ormaUon Jnd Regulatory Affairs. NE 8-1020.2 ** 3150-0131). OtTtce of Mana~ement and Bttdg.et. Wa~htngtlln. DC ~503, If 3 me:ans u:..ed 10 impose an intimnaliun r.=ollection du~s rlot dl:oplay 3 l'urrently valid OMB wntnlJ number. [he NRC may nof conduct ur sptm!'(lf, ;uld a per:0.4.111 i!i nul required HI re~pClnd lO, the Inl~)rrnatilln nJlte~t"-m.

NRC REGION III Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY 2010 CY gQ.11 CY 2012 ESTIMATED NUMBER OF LICENSEE* PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY 2010 CY 2011 CY2012 NUMBER OF REACTOR 1

0 7

0 OPERATORS NUMBER OF SENIOR REACfOR 12 0

12 0

OPERATORS*INSTANT NUMBER OF SENIOR REACTOR 1

0 2

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACfOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 10/05/2009 N/A 6/2012011 N/A ALTERNATE DATE 10/19/2009 N/A 7/1112011 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY2009 CY2010 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 21 0

0 0

CANDIDATES

Response to RIS 2008-16 Page 1 of 1 NRCFORM~J6 u.s NUCLEAR REGULATORY COMMISSION IlI-ltlO5)

OPERATOR LICENSING EXAMINATION DATA FACILITY Byron Station, Units 1 and 2 APPROVED BY OMS: NO. 315CHll.'Il EXrtRES: OW} 11:!lO8 csrimated burden per rt'sJX)n.~ t~} t.'nmpJy with tni!> voluntary IfithrmarKm wiled"," l'Nl~<I: I hour. TIl" Inlormal"," ;;ull<<.1iun ;, u..ed til plan budgel.

!~~~~:;f~t~re:~~d~~~~9t~:::~~..;~~n;:r'::~f~j~~rr:s.

Nud~;u ~e uLuu Cummi!;.s..u!, Wa"hinglon. DC 20555.0'l()l';~rrI:l):=

    • cJ 15().I)lJ I). Oftke,,' MaIlJgemem and means used tn Itnpo.se an mihrmatlllA collect",. le' nllt dl"l'lay 3 ~urrentl)' valid OMS ~"ntnll number,,he NRC may

~=~()~~~.aoo a pt(l")fl b. t\\(lt requlred ttl resplOd tn. [he NRC REGION III Facility Operating License Nos. NPF*37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CY2011 CY2012 ESTIMATED NUMBER OF LlCENSEE*PREPARED 0

1 1

1 EXAMINATIONS ESTIMATED NUMBER OP NRC*PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY2010 CY2011 CY2012 NUMBER OF REACTOR 0

9 0

7 OPERATORS NUMBER OP SENIOR REACTOR 0

8 12 6

OPERATORS*INSTANT NUMBER OF SENIOR REACTOR 0

1 1

2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE NlA 9/27/2010 9/1212011 9/10/2012 ALTERNATE DATE NlA 10/04/2010 9/26/2011 9/24/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY2009 CY2010 Nl.:'MBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

17 0

0 0

12 0

0 CANDIDATES

Response to RIS 2008-16 Page 1 of 1 lIiRC FORM SJ6 u.s )oIUCLEAR RE(;ULATORY COMMISSION APPROVED ElY OMS: NO,.1150-0131 EXPIRES: O1ll31r.!CIOl!

,11-10051 E.... imalt'd burden ~r fe.;pm"C 10 (limply wtth this v()luntJry tnkmnatinn l.:oUel"IoO rt!qucSi. 1 hmJr. Thi~ l,nllmnall('"{'i.dlectt.Jfll.>; u...ed to ptan budgets OPERATOR LICENSING

~~~~~~~t~/R~rrJ~:JF1)1~:~~C;es::;~~~:~*~ef~r.~i~~r8~g.

~~~,lit)~~'~:~t;~~;:;,is~~:".;;~~~:~k~ni~;;'SC:~~~;{i~lo~~=

EXAMINATION DATA

'IJld Regula,,,,), AJr"i", Nitl)S-IOZ02. (31 SO*OI3I), onk. "I' M"""l'emeOl.wd Budge~. Wa.,bmgtnn. DC 10503, If a mtun!\\ u.'te<l It) nnpo!rle an jntormatiml cllll<cc.,. <1<,., no! display a cum:ntly "hd OMS ",,,_ml number. tbe NRC may 110t l;uoOUC1 Uf spl1flS.of. and a perstm is not required to respond rn.,he Informat,on,,"oltet.tion, FACILITY NRC REGION Clinton Power Station, Unit 1 III Facility Operating License No. NPF-62 NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CY 2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY~

CY2010 CY 2011 CY2012 NUMBER OF REACTOR 6

0 6

0 OPERATORS NUMBER OF SENIOR REACTOR 6

0 3

0 OPERATORS*INSTANT NUMBER OF SENIOR REACTOR 2

0 3

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 8/24/2009 N/A 8/22/2011 N/A ALTERNATE DATE 8/17/2009 N/A 8/29/2011 N/A C. PROPOSED GENERIC FUNDAMENTAlS EXAMINATION (GFE) SCHEDULE PROPOSED cr2009 cr2010 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 0

0 0

0 0

9 0

0 NUMBER OF CANDIDATES

Response to RIS 2008-16 Page 1 of 1 IIIR(:.'ORM 536 1I.s NUCLEAR REGIILA TORY COMMISSION APPROVED BY OMB: NO. JI~(}f)131 EXPIRES,08/JII:ml!

!Jl.lOOSl EMlmatcd burdefl per rc~pon~ h) j.'ompfy with tbi!> v{l~ntOlry intllnnatil)R l'olle(ho(J (eque~; 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This iottHl1taUOn ",',Jilet:tKm 1:- u~d 10 plan budgel~

OPERATOR LICENSING

~~~~~:;:~t~/R~!;d~~:J}~~~1~;;e~~~~7r~~he~i~~i~~~~~.

EXAMINATION DATA

~~~

f~1i;~;r~~:;rJ~h)~~~~

and Reg!

t315()'111311. om". "rMaoa~'emelll and Burl,et. Wa,.n.tnt?ton" lX' 1OS03. If J: means u-.ed (l' impn~.m mrormallttn

(:nUa..1ion dues "('It dl!'lplil)' \\1 (;urrently valid OMU I.'olltn)( nomber.lhe NRC may But cnndoct flf 'pOnN.lf. 3nd 3 person 1.\\ nnt required to respnnd ~{}. the info-rmation \\.'\\Ii1eclion.

FACIUTV NRC REGION Dresden Nuclear Power Station, Units 2 and 3 III Renewed Facility Operating Ucense Nos. DPR~19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CY 2011 CY2012 ESTIMATED NUMBER Of' LICENSEE-PREPARED 1

1 1

1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY2010 CY 2011 CY2012 NUMBER OF REAcroR 6

4 4

4 OPERATORS NUMBER OF SENIOR REACTOR 4

10 8

8 OPERATORS*INSTANT NUMBER OF SENIOR REACTOR 0

1 1

1 OPERATORS-UPGRADE NUMBER OF SENIOR REAcroR 0

0 0

0 OPERATORS* LIM ITED PROPOSED DATES PRIMARY DATE 3/09/2009 3/0812010 3/07/2011 3/05/2012 ALTERNATE DATE 410612009 4/05/2010 4/0412011 4/0212012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED cy2009 cy2010 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 0

0 12 NUMBER OF 0

0 0

14 0

CANDIDATES

Response to RIS 2008-16 Page 1 of 1 NRe fOR,\\t 536 U.S Nl'CLEAR REGULATORY COMMISSION IR*ll1051 OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. 3 I 51)*UD1 EXPIRES: OIl/311~(KIR c,'i.lim.lted burden pt"f re~p.lO!'oC to t,.'umply with thi.. voluntary im()rmatKm (ollet:!iun (eq~: I hUlir. Thl~ i,nti'lrm.JI.on..:dlectlnn is used (n.phm budf!,cts

~~~~~~~~)t:;~t~re:.~~~:JFdJ~;~~;~~~~n;:r~~:~fi:~'~r)~~~.

Olmmt~SJnn. Wa~hl1lglnn. OC~~:'~~~~~:tr~~)~~~~~

I). Ollk. "r MaNj;emenl and 8udgd. Wa...hn1gu.U1. DC :ztJS03. If a me3n.~ usn! lu impJ~ an illflJrmatKlIl

~Hllet:uon does nut di!.play a t'urrentl~ vaiid OMB contAlI number. the NRC' may no' rooou\\;t ur spiln,;nr. and a person is not requimi to re;~p()nd 10. the infPrm31 itm t'uiicI.1tO'n.

~'ACILITY LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 NRC REGION III I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED "'1JMBER CY2009 CY2010 CY2011 CY2012 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 0

1 0

1 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0

0 0

0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY2010 CY2011 CY2012 NUMBER OF REACTOR OPERATORS 0

4 0

4 NUMBER OF SENIOR RBAcroR OPERATORS-INSTANT 0

8 0

8 NUMBER OF SENIOR REACfOR OPERATORS-UPGRADE 0

2 0

2 NUMBER OF SENIOR REAcroR OPERATORS*LIMITED 0

0 0

0 PROPOSED DATES PRIMARY DATE NlA 9/14/2010 NlA 9/1812012 ALTERNATE DATE NlA 9/21/2010 NlA 9/25/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY2009 Cy 2010 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBE'R.

ESTIMATED NUMBER OF CANDIDATES 0

12 0

0 0

0 0

0

Response to RIS 2008-16 Page 1 of 1 NRC fORM 536 u.s NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 31511-11131 EXPIRES: fl1V31/::00H 18*20051 E:,.Ilmated burden ~r ~nse tHCtlmply wIth this vulurt(;.try infmmatkln

\\:oUC\\,'Hon request: I hour. This inh)!InaUOn t'oJlct:tton t~ used tH plan nudgets OPERATOR LICENSING

~~:at~~~;ft:rftR~~~~:Jfrn~i~~~~:,~:~n:~t;fi:1i~~1r~.

Nrn.'itar Rei:j:utalnry C(}mmi,~ion. Wa:.hingwn. DC '::;0:55S M(X)(lI, nr hi intemec EXAMINATION DATA e~m:;.H1 h') intocnllel'b@nrc fjv. JOO 10 rht: De\\k O(f1t~r~ Offtee' of h1 Ilfmattun and Regulatory Affau':\\. NE B-lO::!U~1 t.t t~nI3l). Ofike of M.:lIlJb~~ru.uJd Budge~. Wn.."hmgtno. OC ~S03. It'.t meat;J~ used W tmpOI\\l! an Infurmauon

",IIa:I..,. ~ *.,1 displ.y a cUlTel1ll~ v.ltd OMB "lIlIO,1 number, the NRC may not t..**ond~t or ~msor. and ;) person I,," not requlrrd 10 re~;nd in. the intb(Olauun CllJlet.1ion.

~'ACILITY NRC REGION Limerick Generating Station, Units 1 and 2 I

Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CYgQ1Q CY 2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

EXAMINAnONS ESTlMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY2010 CY 2011 CY 2012 NUMBER OF REACTOR 0

6 0

4 OPERATORS NUMBER OF SENIOR REACTOR 0

10 0

6 OPERATORS*INSTANT

!j:AcrOR 0

2 0

3 OPERATORS*UPGRADE SENIOR REACTOR 0

0 0

OPERATORS*LlMITED PROPOSED DATES PRIMARY DATE 10104/2010 NlA 1010812012 ALTERNATE DATE 10/18/2010 NIA 10/15/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY2009 CY2010 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH I

JUNE SEPTEMBER DECEMBER ESTIMATED 0

16 0

0 0

0 0

0 NUMBER OF CA.'1DIDATES

  • See Attachment 8 (Peach Bottom AtomiC Power Station) for LSRO numbers and exam dates

Response to RIS 2008-16 Page 1 of 1 lIjRC FORM S,U u.s NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 31'0-1l1J1 EXPIRES:O!l/:lII!1lUII lH*2OIISI E~jmi.ile'd burde'n ~r re'pollllt 10 ~'Omply with Ihi~ v\\lluiltru)' mhm'llalMIl colJet.'tionrequest: I hnur.llllS mlH~m"'lu'Hullectilm IS u<;tdto_planbud~IS OPERATOR LICENSING

~~~e.u~~[~*~he*Vl~~~d~~~'~~~~~;~~;Sr;:~k~Br~~~fT~~II'!!~~.

.nd 'n 'he ~~,~ii.~:~;:i',~lo~':!,:=

EXAMINATION DATA 10202.,)ISO-OIJ I). Office,,(M.".""'1lI and eta Wa"hmgton. IX: ~0503. If a me.n~ uloCd tn impose.11'1 tnfnrmaHon

""lleti... dt"" ",,' display a <U""lIIly v.lid OMB _"lIInli number.,,,. NRC may not cnndLK.1 or ~ptlnsHf. i10d a penon is !kit r~ut(ed to re-~nd h). the mti,onatltlti cnllet'tiun, FACILITY NRCREGJON Oyster Creek Nuclear Generating Station I

Facility Operating License No. DPR-16 NRC Docket No. 50-219 A. PROPOSED EXA1VHNATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CY 2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

1 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2009 CY2010 CY 2011 CY2012 NUMBER OF REACTOR 6

6 6

0 OPERATORS NUMBER OF SENIOR REACTOR 10 8

10 0

OPERATORS*INSTANT NUMBER OF SENIOR REACfOR 0

2 2

0 OPERATORS*UPGRADE NUMBER OF SENIOR REACfOR 0

0 0

0 OPERATORS* LIM ITED PROPOSED DATES PRIMARY DATE 5/04/2009 5/17/2010 5/1612011 NlA ALTERNATE DATE 5/11/2009 5/24/2010 5/23/2011 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY2009 CYgQ1Q NUMBER ~

JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 14 0

0 NUMBER OF 16 0

0 0

0 CANDIDATES

Response to RIS 2008-16 Page 1 of 1 NRC FORM SJ(>

U.S NUCLEAR REGULATORY CO,"IMISSION III-100s1 OPERATOR LICENSING EXAMINATION DATA FACILITY APPROVED BY OMB: NO. 3150*0131 EXPIRES:Il!!l311.100H E~Jn'Wfed burdtn per rc!\\pno.'iC It) \\."umply with thf!'> :."olunt;:u-y inltlfmattUn culiet.tivtl request: 1 ht~ur. Thi~ infll~ruHm l'111!<<\\II,lU IS used lo,plan budgets.

~~~~
;ft~/~:r:erd.~~:J~~l~!:~~~~7:~~f.f.~'~f~~N.

Nu.:~ar Rt~Ulatt)ryO)mmiS'lon. Washington. DC ::!U555~OJ1.t.r bl internet:

e-mad tn in flt.*HUti.1~@ntcrl)l\\'. and to the De~k Ofr.cer. OtfK."'e of in mnatioo and R<gul3l",1' Affair" N B*IO~o::.IJ150*0131I, Office of M.Ilag *...,nt iU1d Budget, W..,hlngwn, DC.10503. If a mean.. used to Imp""'. m~"",.",.

,.'oUe.t1ion does opt di;o;.play.l currently valid OMS \\.'Ofllrllj number, the NRC mt.l)'

~ll (<indoct nf..por~~or. and iI pef~m i.~ nol r~quired to re~p()nd to,lhe mtbnnation l~IIIt\\.'IJ()n.

NRC Rt:GION Peach Bottom Atomic Power Station, Units 2 and 3 I

Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CY2011 CYgQ1g ESTIMATED NUMBER OF LICENSEE-PREPARED 1 and 1 LSRO 1

0 1

EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY2010 r<y 2011 CYgQ1g NUMBER OF REACTOR 2

6 0

6 OPERATORS NUMBER OF SENIOR REACTOR 9

10 0

10 OPERATORS-INSTANT NUMBER OF SENIOR REAcroR 1

2 0

2 OPERATORS*UPGRADE NUMBER OF SENIOR REAcroR 6

0 0

0 OPERATORS*LIMITED PROPOSED DAYES 12107/2009 PRIMARY DATE 810312009 - LSAO 1210612010 N/A 12103/2012 1211412009 ALTERNATE DATE 12113/2010 NIA 12110/2012 8/10/2009 - LSAO C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2009 CY2010 NUMBER MARCH JUNE SEPTEMBEA DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 0

0 16 NUMBER OF 0

0 0

0 0

CANDIDATES

-Response to RIS 2008*16 Page 1 of 1 NRC FORM S.l6 li,s NUCLEAR REGIJLATORY <:OMMJSSION APPROVED BY OMB: NO..1150*0131 EXPIRES: 1lfV:lII!OO8 tK*ZOOS)

Estimated m.rMn per re'pitiliC In,,"omp1r wuh Ih;~ vnhmrary infmmafk)ll tullet:tion request: I huue Thl:-" mfu~.ulHn l;llUe\\:til.lU i~ ustd tH pLin budgets OPERATOR LICENSING

~~~~~:;ihetW~~f,i:I~~~~i~~*tS::~k~m:~~~f.f.~i~~~~s.

NudtUf Re~ul:uof"\\l C'tlmmi~~f()n. Wa.....-hlllgrun. DC )}SS~~fO)1. tlr bK internet EXAMINATION DATA e~mail In In ill'tllle'*f~(;'lf\\.*'lr'" and in the De\\k Offkfr. Off~'e of In \\rmal~m and R.~"I:ilory Aff..", NE D*lmIl2, (,) 150.(1131). Otli<< III MIIll3~.ment,nd Budget. Wa"hlngton. DC ;!O:iO,J.)( a m(!31'l'i u:-.ed to impost' an InthrmalKm

,,'ollt'I.'tion dile:, not du.piay a Lum:ntJy valKl OMS c\\)luml number. [he NRC may

~II condut:t of "pno.'Il1t*.and ii pcrs.oR ilii Jlt~. required 10 rc:o-.p.md 10, the mfilfl11;Jtttlfl cnlb.'1ion.

FACILITY Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 NRC REGION I

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CY 2011 CY2012 ESTIMATED NUMBER OF LICENSEE*PREPARED EXAMINATIONS 1

0 1

1 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0

0 0

0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY2010 CY2011 CY2012 NUMBER OF REACI'OR OPERATORS 6

0 6

4 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 10 0

10 10 NUMBER OF SENIOR REACfOR OPERATORS-UPGRADE 0

0 1

1 NUMBER OF SENIOR REACTOR OPERATORS*LIMITED 0

0 0

0 PROPOSED DATES PRIMARY DATE 11/30/2009 N/A 5/2912011 3/1212012 ALTERNATE DATE 12107/2009 NlA 611212011 312612012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CV2009 cv2010 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0

0 0

16 a

0 a

14

Response to RIS 2008-16 0 Page 1 of 1 NRC FORM S.16 u.s NUCLEAR REGULA TORY COMMISSION 18*2005)

OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. )150*0131 EXPIRES: OIV311~1~18 E...timatcd f;lurden per rt'~pon~ hI comply with this V()luOfaty Inf()rmation

~olleclion requc!\\.!:: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Thl:o> informallon l'oll~tton j!: uf.ted to plan budgels

~:1~~~~~c~~t<;~~~t~~FO:~~~~:s,::~~~~m:r~*~ff~i~1r)~r~s.

~~~I~l}~~i~~:ile~,~@~~.,s;~~:~;':t~~~~~k~if~~;,~~~~;;.rI~~)~~~~~

.*nd Regula!o,)! Affairs. NESB.1020l. ()150*f)1 311. Oftke ()f Managemen! and Budget. Washington. DC 10503. If a mean~ used In impollC an IOtilflT13t1on (olle,,;tion doe~ not dl...play a cUIT('ntly VJhd OMB l'nntml numtlcr. the NRC may

~t (onduC1 or s.p()n.~or. and a per"4m i\\ not reqUired ttl re~lnd 10. the mtimnalion culJ~ikHl.

FACILITY Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. OPR-50 NRC Docket No. 50-289 NRC REGION I

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 1

0 1

0 ESTIMATED NUMBER OF NRC* PREPARED EXAMINATIONS 0

0 0

0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2oo9 CY2010 CY 2011 CY2012 NUMBER OF REACTOR OPERATORS 8

0 8

0 NUMBER OF SENIOR REACTOR OPERATORS*[NSTANT 6

0 7

0 NUMBER OF SENIOR REACTOR OPERATORS*UPGRADE 0

0 2

0 NUMBER OF SENIOR REACTOR OPERATORS*LIMITED 0

0 0

0 PROPOSED DATES PRIMARY DATE 5/25/2009 N/A 5/30/2011 N/A ALTERNATE DATE 6/01/2009 N/A 6/06/2011 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 2009 CY2010 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0

0 0

0 15 0

0 0

AmerGenSM Exel~n www.exeloncorp.com An Exelon Company AmerCen Energy Company. lLC 4300 Winfield Road Warrenville.IL 60555 RS-07-116 August 13,2007 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Nuclear Exelon Generation 4300 Winfield Road Warrenville.ll 60555 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. SIN 50-456 and SIN 50-457 Byron Station, Units 1 and 2 Facility Operating license Nos. NPF-37 and NPF-66 NRC Docket Nos. SIN 50-454 and SIN 50-455 Clinton Power Station, Unit 1 Facility Operating license No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 5Q-2a7 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating license Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating license Nos. NPF-39 and NPF*85 NRC Docket Nos. 50-352 and 50-35a Oyster Creek Generating Station Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating license Nos. DPR-44 and DPR-56 NRC Docket Nos. 59-2n and 50-278

August 13, 2007 U. S. Nuclear Regulatory Commission Page 2 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289

Subject:

Response to NRC Regulatory Issue Summary 2007-17 "Preparation and Scheduling of Operator Licensing Examinations"

Reference:

NRC Regulatory Issue Summary 2007-17, "Preparation and Scheduling of Operator Licensing Examinations," dated July 12,2007 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates to be tested in operator licensing examinations and the Generic Fundamentals Examinations (GFEs) for calendar years 2008 through 2011. Attachments 1 through 10 provide responses to RIS 2007-17 for the Exelon Generation Company, LLC (EGC) and AmerGen Energy Company, LLC (AmerGen) plants identified above. The requested information for each facility is provided on a separate NRC Form 536.

In calendar year 2009, 6 candidates are expected to take the dual Site Limited Senior Reactor Operator (LSRO) initial*license examination as indicated on Attachment 8. The schedule for the indicated examination is as follows: the written examination and part of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual site examination that involves both LGS and PBAPS, rather than repeating the.same information on both attachments, the examination scheduling information is provided on Attachment 8 for PBAPS. Attachment 6 for LGS references Attachment 8 where necessary.

The operator licensing examination information for each facility is provided on a separate NRC Form 536. There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Michelle Yun at (630) 657-2818.

Respectfully,

"~~~L-Darin M. Benyak Director - Licensing and Regulatory Affairs

August 13, 2007 U. S. Nuclear Regulatory Commission Page 3

.... Completed NRC Form 536 for Braidwood Station... Completed NRC Form 536 for Byron Station... Completed NRC Form 536 for Clinton Power Station... Completed NRC Form 536 for Dresden Nuclear Power Station... Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Oyster Creek Generating Station... Completed NRC Form 536 for Peach Bottom Atomic Power Station... Completed NRC Form* 536 for Quad Cities Nuclear Power Station 0... Completed NRC Form 536 for Three Mile Island Nuclear Station... Unit 1

Response to RIS 2007-17 Page 1 of 1 NRC FORM SJ6 u.s NUCLEAR RJ!:GULATORV COMMISSION (8-1005)

OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. 3IS(~(lI31 EXPIRES: Q!II31121XlII

. Estimaled btlrden per resp"n"e to mmply with Ihis "'Iullr....y inlor_ion

~oJlection request: I hUUf, ~nus mJhrmllCltlR ("ollectitln is u~ to Ian budgetli und resuu estima[eh III aIId BOOSe!, W..h,"~(on. DC 20S03.lf. me_ used \\0 impose an inrurmatio.

",ned0>0 due<...>t dioplay

  • c'Urrenlly valid OMB ~()nlrol number. Ille NRC may

~~i)~=~;~ ~~It~n:~~, and a person l~ not requi'ed to re.,nd In. t~

FACILITY Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 NRC REGION III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2008 CY2009 CY201Q CY2011 ESTIMATED NUMBER OF UCENSBE-PREPARED EXAMINATIONS 0

1 0

1 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0

0 0

0

. B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2008 CY~

CY2010 CY2011 NUMBER OF REACTOR OPERATORS 0

1 0

6 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 0

13 0

12 NUMBER OF SENIOR REACTOR OPERATORS*UPGRADE 0

1 0

2 NUMBER OF SENIOR REACTOR OPERATORS*LlMITED 0

0 0

0 PROPOSED DATES PRIMARY DATE 10/5/09 4/4/2011 ALTERNATE DATE 10/19/09 5/1612011 C. PROPOSED GENERIC FUNDAMENTALS EXAl\\fiNATION (GFE) SCHEDULE PROPOSED NUMBER CY~

CV2QQfl MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0

14 0

0 0

0 0

18

Response to RIS 2007-17 Page 1 of 1 SRC FORM5J6 u.s NUCLEAR REGULATORY COMMISSION IS-%IIM)

OPERATOR LICENSING EXAMINATION DATA FACILITY Byron Station, Units 1 and 2 APPROVED BV 0"'18: NO, 3151),0131 EXPIRES: OIV) II:!IXll!

E::tim.ued hurden per ('tsport,,;,e to t.!mnply with Ihis vuluntary inRlrmation l.'vlkx.1iun request: I ht\\ur. This in!\\trrnattun..~)llectiun is. u.<iCd 1H p13n budgets and resuun.'e!i ttlr opeC;H;()( examimuiutls. Send....omment,. ~rn~ burden

.>Iim.1e II) tile Re\\:,lt(!., and FOIAIPriva.:y So..... " Brancb

  • S F 3). V.S, DC 2055,*1)(101. tl, by i.temel

. on....,,1' Mana!!"me......,

u~ (0 UnptlSC an infimnati;n mIJect.lO' du** Olll d;,pJay

  • cumlll/)! valid OM8 <ollll\\,loumber. lhe NRC may

~~O';':;,';~W;;:"~I:ti':i.and *pe...... is 1M required II),,,,,,,,Id to. the NRC REGION III Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50*454 and STN 50*455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2008 CY2009 CY 221J2 CY2211 ESTIMATED NUMBER OF LlCENSEE*PREP,ARED 0

0 1

1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 1

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2008 CY2009 CY 2010 CY2011 NUMBER OF REACTOR 8

0 8

5 OPERATORS NUMBER OF SENIOR REACTOR 5

0 6

7 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 1

0 1

0 OPERATORS*UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 511912008 6120/2010 8/7/2011 ALTERNATE DATE 512612008 06127/2010 811412011 C. PROPOSED GENERIC FUNDMtENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2008 CY~

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

0 0

0 14 0

0 0

CANDIDATES

Response to RIS 2007-17 Page 1 of 1 NRC FORM 536

(;.s NU<:LEAR REG liLA TORY COMMISSION (II-ZtJlI5)

OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. JISIl~llJI EXPIRES: O!!f.llllOOH E)Jimart"d blJrd~n per re~ptlnse to cumply with chis voluntary inthrmation Cllllel'ttnn request: I hour. This infurmatlon (ollection IS used lu plan budget~

~~~~~~~~*it~/Re~f:d~~~~~~:~~::.;~:\\n:r~~~~i~r~r3~s.

Nuc~ar Rt=~ulatory CUmmi!i.Skln. Washingcon. OC 20SSS....b:)I. ()rb~ inle~

e*maillu in (X-\\.lllet:ts@nocESlV. and to lhe Desk Ofticer. Offk:e of In ormatKlR and Regulal,,!), Affai.., N B-f()202, (31")..()IJIl, Office of Management and Budget. Washington. DC 20503. Ifa rne'olIK used to impose an infumt3lion cul1<<1Km dues not di:\\J)lay acurrently. valid OM8 ~nt'Kml number. the NRC may nor conduct or :oopnnsnr. and a person is not required lu respond It). the inf(.rmation c()ltectiun.

FACILITY Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 NRC REGION III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2008 CY2009 CY2010 CY2011 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 0

1 0

1 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0

0 0

0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2008 CY2009 CY2010 CY2011 NUMBER OF REACTOR OPERATORS 0

6 0

6 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 0

3 0

3 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0

3 0

3 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0

0 0

0 PROPOSED DATES PRIMARY DATE 8/24/2009 8/22/2011 ALTERNATE DATE 8117/2009 8/29/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER cv2008 CY2009 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0

9 0

0 0

0 0

0

Response to RIS 2007-17 Page 1 of 1 NRC FORJ\\I 536 U,S :-IUCLEAR REGULA'fORY COMMISSION APPROVED BY OMB: SO. 3 I S!)'!lI)I EXPIRES:11ItI31110JII (SoZfllISI E"'im~ed burden per respo05e to (omply with this. voluntary mt\\Jrmarinn

~(}flet'lIt)n ~st; I hour. This mlhrmatlOft (olttt1Km L'i u.~ ttl plan budgets OPERATOR LICENSING

~~=;~~:ef~~~~:JfU.~~:c:esr:t~i~";!.~~r:fT~i~~s, NociearR EXAMINATION DATA and 503. If a meruts used to ilTlflO1il! 3n inthrmation

,\\"""-10,.

"U""lIIly v:llid OMB <"ntn>l number, t/le NRC may t!~t)=~~ ~~)it;~:.* and il pewm i.Ii not reqQi~d to re~)nd tu. the FACILITY Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR*25 NRC Docket Nos. 50-237 and 50-249 NRC REGION III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY~

CY~

CY2Q1Q CY2Qll FSTIMATEDNUMBEROF LICENSEE* PREPARED EXAMINATIONS 1

1 1

1 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0

0 0

0 B. INITIAL OPERATOR LICENSE EXAMINATIONS i

PROPOSED NUMBER CY200a CY~

CY gQ.1Q CY2011 NUMBER OF REACfOR OPERATORS 5

5 4

4 NUMBER OF SENIOR REACfOR OPERATORS*INSTANT 7

5 10 a

NUMBER OF SENIOR REACfOR OPERATORS* UPGRADE 0

0 1

0 NUMBER OF SENIOR REACfOR OPERATORS*LIMITED 0

0 0

0 i

PROPOSED DATES PRIMARY DATE 31312008 319/2009 21a12010 31712011 ALTERNATE DATE 417/2008 41612009 31&'2010 41412011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER Cy200a CY~

MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0

0 12 0

0 0

14 0

Response to RIS 2007-17 Page 1 of 1 NRC FORM 536 u.s NUCLEAR REGllLATORY COMMISSION (8*lOO5)

OPERATOR LICENSING EXAMINATION DATA APPIIOVED BY OMB: NO. JI~(J.0131 EXPIRES: OIIIJ 111(_111 Ell!imaled burden per "SPill'" III c<,mpl¥ with.hi, "ulullt.'y inlbrmation

~i~!~.!f.i

and M!ihUn."eS for {lperuh)f examination
.. Send t.'ommeniN

imille 10 lhe 11"''''''00 FOIAiI'rW"".

u.s.

Internd rmation It. Off"", of MUl108emern.ne!

a mcan.'\\ u:o;ed to impt)st an information

<um"'"~ "alid OMB."rnn}I.......ber. lhe NRC may not cnodut.1 or ~pu~'iOr. aoo a petr,on IS nol required to te"P.nd to, Ihe infhrrtulfion,\\\\Uet'ffOn.

FACILITY laSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF*18 NRC Docket Nos. 50-373 and 50-374 NRCRECION III A. PROPOSED EXAMINATION PREPARATION SCHEDULE*

PROPOSED NUMBER CY~

CY~

CY2Q1Q CY2011 ESTlMATBD NUMBER OF LICENSEE-PREPARED EXAMINATIONS 1

0 1

0 ESTIMATBD NUMBER OF NRC*PREPARED EXAMINATIONS 0

0 0

0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2oo8 CY2009 CY2Q1Q CY 2011 NUMBER OF REACTOR OPERATORS 4

0 4

0 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 6

0 8

0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0

0 2

0 NUMBER OF SENIOR REACTOR OPERATORS-UMITED 0

0 0

0 PROPOSED DATES PRIMARY DATE 811812008 9/1412010 ALTERNATE DATE 8125/2008 9121/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY~

cv2oo9 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0

0 0

0 0

12 0

0

Response to RIS 2007-17 Page 1 of 1 NRC FORM 536 u.s NUCLEAR REGULATORY COMMISSION (II-ZOIl5' OPERATOR LICENSING EXAMINATION DATA FACIUTY APPROVED BY OMB: NO. JI"MlIJI EXPIRES: OHf.llnOOR E.qimated burden ~ respun..;e t,o n)mply with this Vt)lumary inttwmutillft

,,:oJIeClklR~: ~ hour. Tbts information \\.'(JllectJun i~ u~ to plan budgets

~~~~~~;~/R;[;~:J~~~i:C~~~":~~"~if§1~3,

~~~r:l)Ri~(~,~~f@:i.i~~h~:~~:gto:~~~~~~~:frl:l):~":

(JISO-lIIJH. OftkeoCMamlgement and

l1Vo uSed to Impose an infortn:ltion urrently. volid OMB "!)mM.umber.the NRC may intfJrmatlcm l't)IIet.'tion.

!l person i:!; ~lt required to resptmd to. the NRC REGION Limerick Generating Station, Units 1 and 2 I

Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2008 CY~

CY2010 CY2011 PSTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 1

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER I

CY2008 CY~

CY2010 CY2Qll NUMBER OF REACTOR 3

0 9

0 OPERATORS NUMBER OF SENIOR REACTOR 11 0

9 0

OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 2

0 1

0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 10/20/2008 10/04/2010 NlA ALTERNATE DATE 10/27/2008 10/1812010 NlA C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PJtOPOSED cv~

CV2QQ2 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPI'EI\\iIBER DECEMBER ESTIMATED 0

0 18 0

0 NUMBER OF 0

0 0

CANDIDATES

  • See Attachment 8 (Peach Bottom AtomiC Power Station) for LSRO numbers and exam dates

Response to RIS 2007-17 Page 1 of 1 NRC FORM S3Ii u.s NUCLEAR REGULATORY COMMISSION (8-%005.

OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO, 3130-0131 EXPIIlES: 01V3l/:!OOl!

ElIOlirnurtd burden ~r re:;pmse to cnmply with this, vUNntl'U)' inli.lrmarimt

,~~~~~'-

and "ur<:es for

.~~~~~,

1~::.r,~A):~i:

or M~n.8emt" and Budget. WOShlUgtOfl. DC :l()SO), If a mellll.~ "roe<! 10 impt'se an inlOl'moIio.

,""U<'<.1ioo <1<"" *.,1 di.play a curre",1y valid OMB "mln" number. the NRC may no~ conduc' or l\\pon~)f. and i penon i!lii not reoquired tu resp)nd tu. lhe mkmnatKln \\'uUa1iln.

FACILITY Oyster Creek Generating Station Facility Operating License No. DPR-16 NRC Docket No. 50-219 NItCREGION I

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CYgQOO CY~

CY 2010 CY2011 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINAnONS 1

1 1

1 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0

0 0

0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2oo8 CY~

CY2010 CY 2011 NUMBER OF REACfOR OPERATORS 5

6 6

4 NUMBER OF SENIOR REACI'OR OPERATORS-INSTANT 9

10 10 10 NUMBER OF SENIOR REACfOR OPERATORS-UPGRADE 0

0 0

2 NUMBER OF SENIOR REACI'OR OPERATORS-LIMITED 0

0 0

0 PROPOSED DATES PRIMARY DATE 417/2008 6115/2009 6114/2010 3/1412011 ALTERNATE DATE 4/1412008 612212009 6121/2010 3/21/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY~

cv2009 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 16 0

0 0

16 0

0 16

Response to RIS 2007-17 Page 1 of 1 NRCroRM~

II.S NUCLEAR REGULATORY (:OMMISSION CII*lCMl5l OPERATOR LICENSING EXAMINATION DATA APPROVED 8Y OMS: NO. 31;so.1)m EXPIRES: OtV3l/:!IXlft Estimafed bl.ln:kn ~f resp()n~ to \\:ump'Y with thl, vnJul1ttl.f'y mft}~ion li~~~.r~

01 :SO-Cl1311, OIr,,'e of Managoment and 800/101. Washington. DC ~n:S03. If a me,ul....... 10 impuse an infof1lllllK,.

<1.11i<1ion dt,.. 001 ~i"l'lay. cumontly.....Iid OMS CllntR}1 number. the NRC may om (..'tloout.1 or sponsor. ;uxI a peo;Oft is IlUI reqlllred '0 respnnd to. the il1ftn'matit)1l CtlJlet.:lion.

FACILITY Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-2n and 50-278 NRC REGION I

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY~

CY2009 CY221Q CY2011 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 1

1 and 1 LSRO 1

0 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0

0 0

0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2008 CY2009 CY 2010 CY 2011 NUMBER OF REACTOR OPERATORS 4

0 4

0 NUMBER OF SENIOR REACTOR OPERATORS*INSTANT 9

7 10 0

NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2

2 2

0 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0

6 0

0 PROPOSED DATES PRIMARY DATE 1218/2008 12/7/2009 7/27/2009 -LSRO 1216/2010 ALTERNATE DATE 12115/2008 1211412009 12113/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER Cy2Q08 CY2QQi MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0

0 7

0 0

0 14 0

Response to RIS 2007-17 Page 1 of 1 NRC FORMS36 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.0131 EXPIRES: OlII3l1::1XlII (11-%0115)

E..;timated burden ~ re~~ to t.*t.)mply with this voluntary inlhrmat ion collet:tion request: I huur, Thl$ ~rUhrmatk)n t.'-1lltdiun is u~

OPERATOR LICENSING EXAMINATION DATA

md

. If. moa... ulied to Imp""".n imh'mali""

cllllet:tiun

. ROt display. currtmly valid OMS "nmroll1llmher. lhe NRC may

!XJI,,,nd""l or,;po"'. and a pet'" "nul..qun.! til respond 10. the inftmnatitm cnllec:tif.m.

FACILITY NRC REGION Quad Cities Nuclear Power Station, Units 1 and 2 III Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY"""""....

CY2009 CY2010 I CY2Q11 ESTIMATED NUMBER OF LICENSEB-PREPARED 0

1 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2008 CY2009 CY2010 CY2011 NUMBER Of REACTOR 0

4 6

0 OPERATORS NUMBER OF SENIOR REACfOR 0

11 8

0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0

1 1

0 OPERATORS-UPGRADE NUMBER OfSENIOR REACfOR 0

0 0

0 OPERATORS-LIMfJ'ED PROPOSED DATES PRIMARY DATE 10/1612009 10/1812010 ALTERNATE DATE 10/23/2009 1012512010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY2008 CygQQi NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 0

0 15 0

0 NUMBER OF 0

16 0

CANDIDATES

Response to AIS 2007-17 0 Page 1 of 1 NRC FORM 5311 U.S NUCLEAR REGULATORY COMMISSION 18-_5.

OPERATOR LICENSING EXAMINATION DATA fACILITY APPROVED BY OMS: NO. 31SCMIIJ I EXPIRES: tllll3ll1tlOll E;timated burden pcr..e,pnn,.,. to "limply wilb thi' voluntary iol\\>tmalio.

cullt.:tio. reque:iI: I bour, TIIi' inf(\\rmat.... col!<t1K>n i. used III Ian bud el~

amJ resources fur operatur "nd R.gulUllll)' Affair..

and BIldgeI, W""hongtOll. DC :!!lSU3, If al!le*** used to imp"'"..,o'\\>rmal;on (UI1<<1'" d"". "lit <li,p'oy.outtonlly valid OMB ""11m' numoo.,he NRC may JlOf l"O"KJiJ!.'t or t;p\\l'fL~ur. and a. perAlln j" not ~u)red ttl r~pof¥l to, the lnfufmatioD tO'k'l1';on.

NRC REGION Three Mile Island Nuclear Station, Unit 1 I

Facility Operating License No. DPR-50 NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CYgQrul CY2009 CY2010 CY2011 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY20QB CY2oo9 CY2010 CY~

NUMBER OF REACTOR 0

10 0

8 OPERATORS NUMBER OF SENIOR REACTOR 0

6 0

8 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0

1 0

1 OPERATORS*UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS*LIMITED PROPOSED DATES PRIMARY DATE 5/2512009 5130/2011 ALTERNATE DATE 61112009 61612011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2008 CY~

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 0

0 0

0 0

NUMBER OF 16 0

0 CANDIDATES