Simulation Facility Braidwood Scenario Operating Test No.: 2011 NRC No.: EXAM NRC 11-4 Examiners: ______________________ Applicant: _____________________ SRO

______________________ _____________________ ATC

______________________ _____________________ BOP Initial Conditions: IC-21 Turnover: Unit 1 is operating at 99.5% power, steady state, equilibrium xenon. Online risk is green. 1C CD/CB pump is OOS for bearing replacement. The 1C CD/CB pump is expected back in service in four days. Following completion of turnover, the crew is to perform 1BwOS MS-Q1, UNIT 1 MAIN STEAM DUMP VALVE STROKE SURVEILLANCE.

Event Malf. No. Event Event No. Type* Description Preload IOR ZDI1CD05PC PTL 1C CD/CB Pump OOS IOR ZDI1CD05PCB PTL IOR ZDI1CB113C CLS 1 None N-BOP, US Steam Dump Valve Stroke Surv.

2 IMF RX29D 100 30 I-BOP, US 1FW540 controller fails high in auto 3 IMF RX17 -4.25 C-ATC, US Rod control failure 4 IMF SW01A C-BOP, US 1A SX Pump Trip TS-US 5 IMF RX21A 2500 30 I-ATC, US 1PT-455 fails high TS-US 6 IMF TC14D 0 R-ATC, US #4 Governor valve servo failure closed 7 In caep file below M-ALL 1D Steam Generator Tube Rupture 8 IMF TH11A 0 Loss of RCS pressure control IMF TH03D 450 60 TRGSET 1 "ZLO1IA066(2)==0" IOR ZDI1IA066 (1 0) CLS IOR ZAO1PIRY018 (1 60) 0 30 IMF PN1555 (1 70) ON IMF TH11B 0

  • (N)ormal, (R)eactivity (I)nstrument, (C)omponent, (M)ajor Transient

SCENARIO OVERVIEW Unit 1 is operating at 100% power, steady state, equilibrium xenon. Online risk is green. 1C CD/CB pump is OOS for bearing replacement. The 1C CD/CB pump is expected back in service in four days. Following completion of turnover, the crew is to perform 1BwOS MS-Q1, UNIT 1 MAIN STEAM DUMP VALVE STROKE SURVEILLANCE.

After completing shift turnover and relief, the BOP will perform 1BwOS MS-Q1, UNIT 1 MAIN STEAM DUMP VALVE STROKE SURVEILLANCE.

After completing 1BwOS MS-Q1, 1FW540 Feed Reg Valve Controller 1FK-540 will fail to 100% demand.

The 1FW540 valve will fail open and 1D SG level will rise. The crew will take actions to stabilize the plant by taking manual control of the 1FK-540.

After the 1FK-540 failure is addressed, the rod control summing amplifier will malfunction, resulting in uncontrolled inward rod motion. After checking turbine power stable, the RO will place rod control in Manual to stop the inward rod motion. 1BwOA ROD-1, UNCONTROLLED ROD MOTION, will be implemented. Rods will remain in Manual control for the remainder of the scenario.

After the rod control failure has been addressed, the 1A Essential Service Water pump will trip due to overcurrent. The crew will implement 1BwOA PRI-8, ESSENTIAL SERVICE WATER MALFUNCTION, and start the 1B Essential Service Water pump. Technical Specifications 3.7.8, condition A applies. On-line risk remains yellow. The 1A SX pump will remain unavailable for the rest of the scenario.

After the Essential Service Water malfunction has been addressed, the controlling pressurizer pressure channel will fail high. The ATC will identify the failure and take manual control to restore pressurizer pressure. The US will enter 1BwOA INST 2, OPERATION WITH A FAILED INSTRUMENT CHANNEL-Attachment B. Tech Specs 3.3.1 conditions A, E, and K, 3.3.2 conditions A and D, and 3.3.4 condition A will be entered.

After the pressurizer pressure channel failure has been addressed, the #4 turbine governor valve servo will fail, causing the #4 governor valve to close. Turbine load will lower approximately 70 Mw. The ATC will borate the RCS as necessary and/or move rods in to stabilize RCS temperature. On-line risk remains yellow.

After the governor valve malfunction has been addressed, a 450 gpm Steam Generator Tube Rupture will occur on the 1D SG. The crew will implement 1BwEP-0, REACTOR TRIP OR SAFETY INJECTION.

When SI actuates, a solenoid failure will cause 1IA066 to fail closed, resulting a loss of Instrument Air to containment. IA to containment will remain unavailable for the remainder of the scenario. The crew will transition to 1BwEP-3, STEAM GENERATOR TUBE RUPTURE, based on secondary radiation trends on the 1D SG. After determining RCS pressure control is unavailable, the crew will transition to 1BwCA-3.3, SGTR WITHOUT PRESSURIZER PRESSURE CONTROL.

The scenario is complete when the crew has terminated high head SI in 1BwCA-3.3.

Critical Tasks

1. Isolate feedwater flow into and steam flow from the ruptured SG prior to completing step 4 of 1BwEP-3.

(ERG Critical Task number - E-3--A) (K/A number - 000038EA2.01 importance - 4.1/4.7)

2. Cool down to establish RCS subcooling margin, but prevent entry into 1BwFR-P.1.

(ERG Critical Task number - E-3--B) (K/A number - 000038EA1.36 importance - 4.3/4.5)

3. Terminate high head SI prior to completing step 9 of 1BwCA-3.3.

(ERG Critical Task number - CA-3.3--A) (K/A number - 000038EA1.30 importance - 4.0/3.8)

NRC 11-4 Page 2 of 27

SIMULATOR SETUP GUIDE:

  • Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
  • Establish the conditions of IC-21, 100% power, steady state, equilibrium xenon.
  • Complete items on Simulator Ready for Training Checklist.
  • Verify/remove any Equipment Status Tags and Danger Tags not applicable to the scenario.
  • Place simulator in RUN and allow simulator to run during board walk down and turnover.
  • Start 1B CD/CB pump.
  • Secure 1C CD/CB pump.
  • Place CD/CB Pumps Standby Select C/S in OFF.
  • Place 1C CD/CB Pump in PULL OUT, 1C CD/CB Pump Lube Oil Pump in PULL OUT, and 1CB113C in CLOSED.
  • Place info tags on 1C CD/CB pump, 1C CD/CB Lube Oil pump, and 1CB113C C/Ss.
  • Lower reactor power to 99.5% by reducing turbine load approx. 5 MW.
  • Run caep NRC 11-4 SETUP from disk and verify the following actuate:
  • IOR ZDI1CD05PC PTL
  • IOR ZDI1CD05PCB PTL
  • IOR ZDI1CB113C CLS
  • Verify SER and printer are clear of data.
  • Provide students with turnover sheets, 1BwOS NR-1, critical parameter sheet, Op Aids, Pre-Job Brief Forms, and copy of 1BwOS FW-W1.

NRC 11-4 Page 3 of 27

INSTRUCTOR/SIMULATOR RUN AID GUIDE Event 1: Perform 1BwOS MS-Q1.

When requested, as Equipment Operator report you are standing by at the steam dump isolation valves ready to isolate the steam dumps and condenser spray valves.

Note: valve positions can be monitored from SIM Graphic Display FW1 and MS6 Acknowledge as EO request to locally close 1MS003A-M and 1CB038A-M / 1CB006, then run NRC 11-4 to CLOSE valves EVENT 1 from disk and verify the following:

  • MRF MS09 0
  • MRF MS10 0
  • MRF MS11 0
  • MRF MS12 0
  • MRF MS13 0
  • MRF MS14 0
  • MRF MS15 0
  • MRF MS16 0
  • MRF MS17 0
  • MRF MS18 0
  • MRF MS19 0
  • MRF MS20 0
  • MRF FW001 0
  • MRF FW002 0
  • MRF FW003 0
  • MRF FW004 0
  • MRF FW005 0
  • MRF FW006 0
  • MRF FW007 0
  • MRF FW008 0
  • MRF FW009 0
  • MRF FW010 0
  • MRF FW011 0
  • MRF FW012 0 Report as EO that 1MS003A-M and 1CB038A-M / 1CB006 are locally closed.

Acknowledge as EO request to locally open 1MS003A-M and 1CB038A-M / 1CB006, then run CAEP NRC 09-4 to OPEN valves EVENT 1 from disk and verify the following:

  • MRF MS09 100
  • MRF MS10 100
  • MRF MS11 100
  • MRF MS12 100
  • MRF MS13 100
  • MRF MS14 100
  • MRF MS15 100
  • MRF MS16 100
  • MRF MS17 100
  • MRF MS18 100 NRC 11-4 Page 4 of 27
  • MRF MS19 100
  • MRF MS20 100
  • MRF FW001 100
  • MRF FW002 100
  • MRF FW003 100
  • MRF FW004 100
  • MRF FW005 100
  • MRF FW006 100
  • MRF FW007 100
  • MRF FW008 100
  • MRF FW009 100
  • MRF FW010 100
  • MRF FW011 100
  • MRF FW012 100 Report as EO that 1MS003A-M and 1CB038A-M / 1CB006 are locally open.

Acknowledge as Shift Manager commencement and completion of procedure.

Event 2: 1FW540 controller fails high in auto Insert IMF RX29D 100 30 to fail 1FK-540 high over a 30 second period.

If dispatched as EO to investigate, wait one minute and report no visible damage to 1FW540 Valve. Valve appears to be failing open in auto and responding correctly in manual (if asked for feedback to manual ops).

Acknowledge as Shift Manager the failure, request for maintenance support, and IR request.

Ensure control rods are in automatic prior to inserting the next event.

Event 3: Uncontrolled inward control rod motion.

If control rods are in manual, as SM direct crew to restore automatic rod control.

Insert IMF RX17 -4.25 to cause uncontrolled inward rod motion.

If dispatched as Equipment Operator to rod control cabinets, report no abnormal indications present.

As SM acknowledge the failure, on line risk assessment, request for maintenance support, and IR requests.

If consulted as SM for status of manual or auto rod control, direct crew to perform actions in accordance with 1BwOA ROD-1.

NRC 11-4 Page 5 of 27

INSTRUCTOR/SIMULATOR RUN AID GUIDE Event 4: 1A SX pump trip Insert IMF SW01A for 1A SX pump trip.

If dispatched as EO to investigate 1A SX pump breaker, wait 2 minutes and report phase A overcurrent flag on 1A SX pump breaker cubicle (Bus 141, cubicle 2).

If dispatched as EO to investigate 1A SX pump, wait 3 minutes and report no damage visible at pump and pump is NOT rotating backwards. Report 1B SX pump is running with normal parameters if dispatched to check 1B SX pump.

If contacted as Unit 2 to swap Unit 2 SX pumps for chem. Feed alignment, acknowledge request.

If contacted as Rad Waste operator, report no abnormal aux building sump indications.

As SM, acknowledge the trip of 1A SX pump, LCO 3.7.8 condition A entry, and requests for on line risk assessment, maintenance support, and IR initiation.

Event 5: Pressurizer pressure channel 1PT-455 fails high Insert IMF RX21A 2500 30 As SM, acknowledge the failure, LCO 3.3.1 conditions A, E, & K entry, LCO 3.3.2, condition A & D entry, and LCO 3.3.4 condition A entry, requests for on line risk assessment, maintenance support, and IR initiation.

As SM, if requested support for tripping bistables in AEER, report that AEER bistables are not to be tripped until work analyst and NSO support can be obtained (in approx. 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />) and that the abnormal operating procedure should be continued. AEER bistable tripping will be conducted later.

If lead examiner desires the bistables tripped, participate in brief and perform the following:

  • As assist NSO contact Unit 1 (X-2209)
  • Insert the following:
  • MRF RP20 OPEN (open protection cabinet #1 door)
  • MRF RX032 TRIP (trip PRZ HI PRESS RX TRIP bistable PB455A)
  • MRF RX034 TRIP (trip PRZ LO PRESS RX TRIP bistable PB455C)
  • MRF RX035 TRIP (trip PRZ LO PRESS SI bistable PB455D)
  • MRF RX033 TRIP (trip PRZ ENABLE BLOCK P-11 bistable PB455B)
  • MRF RX013 TRIP (trip OTDT RX TRIP bistable TB411C)
  • MRF RX135 TRIP (trip OTDT RUNBACK bistable TB411D)
  • MRF RP20 CLOSE (close protection cabinet #1 door)

NRC 11-4 Page 6 of 27

INSTRUCTOR/SIMULATOR RUN AID GUIDE Event 6: #4 governor valve servo failure.

Insert IMF TC14D 0 If dispatched as EO to investigate #4 GV failure, wait 2 minutes and report #4 GV is closed and no visible damage present.

Acknowledge as Power Team loss of load due to Governor Valve failure.

Acknowledge as chemistry/rad protection requests for RCS samples.

Acknowledge as SM the GV failure and requests for on line risk assessment, maintenance support, and IR initiation. If asked about isolating EH to #4 gov. valve, concur with isolation to prevent further valve movement.

Acknowledge as Power Team load reduction and estimated duration of derate.

Events 7& 8: 1D Steam Generator Tube Rupture, loss of RCS pressure control Run caep NRC 11-4 EVENTS 7 & 8 from disk and verify the following actuate:

  • IMF TH11A 0
  • IMF TH03D 450 60
  • TRGSET 1 "ZLO1IA066(2) == 0"
  • IOR ZDI1IA066 (1 0) CLS
  • IOR ZAO1PIRY018 (1 60) 0 30
  • IMF PN1555 (1 70) ON
  • IMF TH11B 0 Acknowledge as Shift Manager procedure changes, Emergency Plan evaluations, STA request, and requests for support personnel.

After STA requested, as STA report CSF status: Yellow on inventory when pressurizer level < 17%, yellow on heat sink when ruptured SG level > 88%.

If containment entry requested to attempt to repair 1IA066, acknowledge request but do not make air available to containment.

As Equipment Operator, acknowledge request to fill 1B AF pump day tank.

As Shift Manager, acknowledge request for environs teams when 1D SG PORV open.

NRC 11-4 Page 7 of 27

Scenario NRC 11-4 Event 1 No: No.

Event Perform 1BwOS MS-Q1

==

Description:==

Time Position Applicants Actions or Behavior CUE o From turnover, perform 1BwOS MS-Q1, UNIT 1 MAIN STEAM DUMP VALVE STROKE SURVEILLANCE.

US

  • Direct BOP to perform 1BwOS MS-Q1.

BOP

  • Refer to 1BwOS MS-Q1.
  • Record initial data on step F.1.2.
  • Notify Equipment Operator to locally close 1MS003A thru M and 1CB038A thru M or 1CB006.

o Acknowledge report from EO that requested valves are closed.

  • Perform the following at 1PM02J:
  • Place 1PK-507 controller in MANUAL.
  • Verify the controller demand is 0%.
  • Place steam dump MODE SELECT switch in STM PRESS position.
  • Verify 1MS004A-M CLOSED lamps are illuminated.
  • Raise 1PK-507 controller steam pressure demand to 100%.
  • Verify 1MS004A-M CLOSED lamps are NOT illuminated.
  • Verify 1MS004A-M OPEN lamps are illuminated.
  • Lower 1PK-507 controller steam pressure demand to 0%.
  • Verify 1MS004A-M OPEN lamps are NOT illuminated.
  • Verify 1MS004A-M CLOSED lamps are illuminated.
  • Notify Equipment Operator to locally open 1MS003A thru M and 1CB038A thru M or 1CB006.

o Acknowledge report from EO that requested valves are open.

  • At 1PM05J, verify C7 bypass permissive light is NOT illuminated.
  • Perform the following at 1PM02J:
  • Place steam dump MODE SELECT switch in RESET then TAVE position.
  • Verify all steam dump valves remain closed.
  • Inform US 1BwOS MS-Q1 complete.

ATC o Peer check actions of BOP operator.

o Monitor remainder of MCB.

US

  • Acknowledge report.

o Notify SM 1BwOS MS-Q1 is complete.

EVALUATOR NOTE: After 1BwOS MS-Q1 is complete and with lead examiner concurrence, enter next event.

Comments:

NRC 11-4 Page 8 of 27

Scenario NRC 11-4 Event 2 No: No.

Event 1FW540 controller fails high in auto

==

Description:==

Time Position Applicants Actions or Behavior CUE

  • 1FK-540 controller output failed high.
  • 1D SG level indicators 1LI547/548/549/559 indicate rising level.

BOP

  • Perform the following at 1PM04J:
  • Determine 1D SG level rising.
  • Report failure to US.

Note: the crew may elect to enter 1BwOA PRI-16, RESPONSE TO OVERPOWER CONDITION or perform the following:

o Initiate 5MW power reduction.

CREW

  • Reference BwARs
  • Recognize 1FK-540 output failed high US
  • Direct/Ensure BOP takes manual control of 1FK-540 and returns 1D S/G level to normal.

o Direct BOP/RO to stop load ramp/dilution.

BOP

  • Perform the following at 1PM04J:
  • Place 1FK-540, 1FW540 1D FRV Controller, in manual.
  • Monitor 1D S/G level and return level to normal.
  • Maintain 1D S/G flow by operating 1FK-540 in manual.

US

  • Contact SM to perform risk assessment, initiate IR, and contact maintenance to investigate/correct instrument failure.

Initiate the next event when the lead examiner approves.

Comments:

NRC 11-4 Page 9 of 27

Scenario NRC 11-4 Event 3 No: No.

Event Uncontrolled inward control rod motion

==

Description:==

Time Position Applicants Actions or Behavior CUE

  • RODS IN light lit at 1PM05J.
  • 1SI-412, rod speed indicator, indicates approximately 48 steps per minute.

ATC

  • Report failure to US.
  • Determine turbine power stable at 1PM06J or OWS drop 210.
  • Place rod bank select switch to manual at 1PM05J to attempt to stop uncontrolled rod insertion.

CREW

  • Identify entry conditions for 1BwOA ROD-1, UNCONTROLLED ROD MOTION.

US

  • Notify SM of plant status and procedure entry.
  • Enter/implement 1BwOA ROD-1, UNCONTROLLED ROD MOTION " and direct operator actions of 1BwOA ROD-1 to establish the following conditions:

CREW

  • Check turbine power stable at 1PM06J or OWS drop 210.
  • Check rod control status at 1PM05J:
  • Verify/place rod bank select switch in manual.
  • Verify rods stopped moving.
  • Check for unexplained reactivity addition - none identified.
  • Verify manual rod control status by stepping rods in and out 7 steps each.

o Adjust turbine load, boron concentration or rod position to maintain Tave and Tref within 1° F.

US

  • Determine applicable Tech Spec entries.

o If pressurizer pressure drops below 2209 psig, then LCO 3.4.1 Cond. A applies.

o Contact SM to perform risk assessment, initiate IR, and contact maintenance to investigate/correct rod control malfunction.

EVALUATOR NOTE: After the actions for the rod control malfunction are complete and with lead examiners concurrence, insert the next event.

Comments:

NRC 11-4 Page 10 of 27

Scenario NRC 11-4 Event 4 No: No.

Event 1A essential service water pump trip

==

Description:==

Time Position Applicants Actions or Behavior EVALUATOR NOTE: The crew may start the stand-by SX pump per the annunciator response OR elect to enter 1BwOA PRI-8, ESSENTIAL SERVICE WATER MALFUNCTION, to address the 1A essential service water pump trip. Actions for 1BwOA PRI-8 are in italics below and on the next page.

CUE

  • 1A SX pump trip light - LIT.

BOP

  • Determine 1A SX pump tripped.

o Reference BwARs.

o Place 1A SX pump C/S in PTL BOP

  • Start 1B SX pump at 1PM06J per 1BwAR 1-2-A1, SX PUMP TRIP.
  • Verify 1SX001B OPEN
  • Verify 1SX016B OPEN
  • Verify 1SX027B OPEN
  • Place 1B SX pump control switch to start and hold until the lube oil pressure interlock is met and 1B SX pump starts.

o Verify annunciator SX PUMP DSCH HDR PRESS LOW (1-2-A2) is NOT LIT.

US

  • Determines TS 3.7.8 condition A is applicable.
  • Contact SM to perform risk assessment, initiate IR, and contact maintenance to investigate/correct instrument failure.

o Inform Unit 2 to swap SX pumps for proper Chem Feed alignment.

CREW o Identify entry conditions for 1BwOA PRI-8, ESSENTIAL SERVICE WATER MALFUNCTION.

o Dispatch operators to investigate status of 1A SX pump and breaker.

US o Notify SM of plant status and procedure entry.

o Request evaluation of Emergency Plan conditions.

o Enter/Implement 1BwOA PRI-8, ESSENTIAL SERVICE WATER MALFUNCTION and direct operator actions of 1BwOA PRI-8 to establish the following conditions:

o Direct BOP to start 1B SX pump per BwAR 1-2-A1.

CREW o Check for excessive leakage in aux building:

o Contact RWCR to monitor aux building sumps.

o Annunciator SX PUMP SUCT VLV PIT LEVEL HIGH (1-2-D2) - NOT LIT.

BOP o Check status of SX pumps at 1PM06J:

o Start 1B SX pump if not already started using BwAR.

o Check status of SX system at 1PM06J:

o Annunciator SX PUMP SUCT PRESS LOW (1-2-C1) - NOT LIT.

o Annunciator SX STRN DP HIGH (1-2-C2) - NOT LIT.

o Annunciator SX PUMP DSCH HDR PRESS LOW (1-2-A2) - NOT LIT.

o Annunciator SX PUMP DSCH HDR TEMP HIGH LOW (1-2-B2) - NOT LIT.

o 1A SX pump NOT rotating backwards.

Comments:

NRC 11-4 Page 11 of 27

Scenario NRC 11-4 Event 4 No: No.

Event 1A essential service water pump trip

==

Description:==

Time Position Applicants Actions or Behavior o Check for SX leakage into containment at 1PM06J:

o Annunciator CNMT DRAIN LEAK DETECT FLOW HIGH (1-1-A2) - NOT LIT.

o Check CC outlet temperatures < 105°F at 1PM06J.

o Check RCP cooling at 1PM05J:

o Annunciator RCP THERM BARR CC WTR TEMP HIGH (1-7-E3) - NOT LIT.

o Annunciator RCP BRNG CC WTR TEMP HIGH (1-7-E5) - NOT LIT.

US o Determines TS 3.7.8 condition A is applicable.

o Contact SM to perform risk assessment, initiate IR, and contact maintenance to investigate/correct instrument failure.

EVALUATOR NOTE: After the actions for the 1A SX pump trip are complete and with lead examiners concurrence, insert the next event.

Comments:

NRC 11-4 Page 12 of 27

Scenario NRC 11-4 Event 5 No: No.

Event Pressurizer pressure channel 1PT-455 fails high

==

Description:==

Time Position Applicants Actions or Behavior CUE

  • Annunciator PZR PRESS HIGH RX TRIP STPT ALERT (1-12-A2)
  • PZR pressure indicators 1PI-456, 457, and 458 lowering

ATC

  • Identify 1RY455A is open.
  • Report failure to US.
  • Perform the following at 1PM05J:

o Select an Operable controlling channel per the BwAR OR o Perform the following actions per 1BwOA INST-2

  • Place 1PK-455A, master PZR pressure controller, in manual.
  • Lower demand on 1PK-455A sufficiently to close PZR spray valves and energize PZR heaters prior to reactor trip or SI occurring.
  • Operate 1PK-455 in manual to restore PZR pressure to normal operating band.

CREW o Refer to BwARs

  • Identify entry conditions for 1BwOA INST-2, OPERATION WITH A FAILED INSTRUMENT CHANNEL US
  • Notify SM of plant status and procedure entry
  • Enter/Implement 1BwOA INST-2, OPERATION WITH A FAILED INSTRUMENT CHANNEL, Attachment B PRESSURIZER PRESSURE CHANNEL FAILURE and direct operator actions of 1BwOA INST -2 to establish the following conditions.

o Direct BOP/RO to stop load ramp/dilution ATC

  • Check PZR pressure at 1PM05J:
  • PZR pressure - low on 1PI-456, 457, & 458.

o Manually restore PZR pressure using 1PK-455A.

o Select operable PZR pressure control channel

  • Place PZR pressure control select C/S to CH-457/CH-458.
  • Check PZR spray valves - NORMAL
  • Check PZR heaters - NORMAL Comments:

NRC 11-4 Page 13 of 27

Scenario NRC 11-4 Event 5 No: No.

Event Pressurizer pressure channel 1PT-455 fails high

==

Description:==

Time Position Applicants Actions or Behavior ATC

  • Check PZR pressure control in auto
  • PZR spray valves in auto
  • Place Master PZR pressure controller in auto
  • PZR pressure recorder selected to CH456, CH457, or CH458
  • Loop T recorder selected to 1B, 1C, or 1D
  • Check P11 interlock
  • RCS pressure > 1930 psig - P11 NOT lit US o Perform pre-job brief per HU-AA-1211 for bistable tripping o Complete 1BwOL 3.3.1, Attachment A, INSTRUMENT CONDITION TRACKING LOG US
  • Determine TS 3.3.1 conditions A, E, & K are applicable.
  • Determine TS 3.3.2 conditions A & D are applicable
  • Determine TS 3.3.4 condition A is applicable
  • If PZR pressure drops below 2209 psig. determine TS 3.4.1 condition A is applicable
  • Contact SM to perform risk assessment, initiate IR, and contact maintenance to investigate/correct instrument failure.

o Dequip entry for P-11 The next event is to be inserted following the above actions by the US and Lead Examiner concurrence.

Comments:

NRC 11-4 Page 14 of 27

Scenario NRC 11-4 Event 6 No: No.

Event #4 governor valve servo failure

==

Description:==

Time Position Applicants Actions or Behavior CUE

  • #4 governor valve closed indication at 1PM02J or OWS drop 210.
  • Generator MW lowering at 1PM02J or OWS drop 210.
  • RCS Tave rising at 1PM05J.

CREW

  • Refer to BwARs ATC/
  • Determine turbine load rejection in progress from 1PM02J or OWS drop210.

BOP

  • Reference BwARs.
  • Dispatch operators to investigate #4 GV.

US

  • Notify SM of #4 GV malfunction.

o Direct operators to restore RCS Tave / Delta I.

NOTE: The crew may decide to borate the rods back out based upon Delta I concerns.

ATC o Insert control rods to maintain Tave and Tref approx. equal.

o Initiate RCS boration per BwOP CV-6 at 1PM05J.

o Determine required boric acid volume.

o Determine desired boric acid flow rate.

o Set 1FK-110 BA Flow Control to desired boration rate.

o Set 1FY-0110 BA Blender Predet Counter to desired volume.

o Place MAKE-UP MODE CONT SWITCH to STOP position.

o Place MODE SELECT SWITCH to BORATE position.

o Place MAKE-UP MODE CONT SWITCH to START.

o Verify proper operation of valves and BA transfer pump (1CV110B open, Boric Acid Transfer Pump running, 1CV110A throttles open, proper BA flow indicated on recorder).

OR o Batch addition of Boric Acid:

o Open 1CV110B.

o Open 1CV110A.

o Start the BA Transfer pump.

o When desired amount of BA has been added, stop the BA Transfer Pump.

o Close 1CV110A.

o Close 1CV110B.

o Turn on PZR backup heaters in accordance with BwOP RY-14, PRESSURIZER BACKUP HEATER OPERATION.

US

  • Contact SM to perform risk assessment, initiate IR, and contact maintenance, OAD, SED to investigate/correct component.

Comments:

NRC 11-4 Page 15 of 27

Scenario NRC 11-4 Event 6 No: No.

Event #4 governor valve servo failure

==

Description:==

Time Position Applicants Actions or Behavior o Refer to BwOP FW-26 to evaluate FW venturi fouling.

o Contact Power Team and inform Power Team of load reduction and estimated duration of power derate.

o Review Tech Spec 3.4.1 for applicability o Review RIL per COLR EVALUATOR NOTE: After the actions for the governor valve failure are complete and with lead examiners concurrence, insert the next event.

Comments:

NRC 11-4 Page 16 of 27

Scenario NRC 11-4 Event 7&8 No: No.

Event 1D Steam Generator Tube Rupture/loss of RCS pressure control

==

Description:==

Time Position Applicants Actions or Behavior CUE o Annunciator CHARGING LINE FLOW HIGH LOW (1-9-D3).

  • RM-11 Rad Monitor ALERT/HI RAD Alarms.

o 1PR08J SG Blowdown.

o 1PR27J SJAE/GS.

o 1AR 22/23A & 1AR22/23D, 1A & 1D main steam line.

  • PZR pressure lowering in an uncontrolled manner.

o Level rise/FW flow drop noted on 1B S/G.

CREW Identify entry conditions for 1BwEP-0, REACTOR TRIP OR SAFETY INJECTION.

ATC

  • Initiate a manual SI.

US

  • Notify SM of plant status and procedure entry.

ATC Perform immediate operator actions of 1BwEP-0 at 1PM05J:

  • Rod bottom lights - ALL LIT.
  • Neutron flux - DROPPING.

BOP Perform immediate operator actions of 1BwEP-0 at 1PM02J or Operator Work Station drop 210 (DEH computer terminal located behind Unit 1 desk):

  • All Turbine throttle valves - CLOSED.
  • All Turbine governor valves - CLOSED.

BOP Perform immediate operator actions of 1BwEP-0 at 1PM01J:

  • Verify power to 4KV busses.
  • ESF Buses - BOTH ENERGIZED (141 & 142).

CREW Perform immediate operator actions of 1BwEP-0 at 1PM04J, 1PM05J, & 1PM06J:

  • Check SI actuated at 1PM05J and 1PM06J:
  • SI ACTUATED Bypass Permissive - LIT.
  • SI equipment automatically actuated:
  • 1A and 1B SI pump -RUNNING.

Comments:

NRC 11-4 Page 17 of 27

Scenario NRC 11-4 Event 7&8 No: No.

Event 1D Steam Generator Tube Rupture/loss of RCS pressure control

==

Description:==

Time Position Applicants Actions or Behavior

  • 1SI8801A and B, CV pump cold leg injection valves - OPEN.
  • Manually actuate SI.

EVALUATOR NOTE: Per the OAS page, RCP trip criteria is applicable throughout the performance of 1BwEP-0. The crew may trip RCPs whenever the criteria of RCS pressure <1425 psig AND High head SI flow >100 gpm are recognized.

US

  • Direct BOP to perform Attachment B of 1BwEP-0 EVALUATOR NOTE: US and ATC will continue in 1BwEP-0 while BOP is performing Attachment B:

BOP Verify FW isolated at 1PM04J:

  • FW pumps - TRIPPED.
  • Isolation monitor lights - LIT.
  • FW pumps discharge valves - CLOSED (or going closed) 1FW002A-C.
  • Verify DGs running at 1PM01J:
  • DGs - BOTH RUNNING.
  • 1SX169A/B OPEN.
  • Dispatch operator locally to check operation
  • Verify Generator Trip at 1PM01J:
  • OCB 1-8 and 7-8 open.
  • PMG output breaker open.
  • Secure all HD running pumps.
  • Verify Control Room ventilation aligned for emergency operations at 0PM02J:
  • VC Rad Monitors - LESS THAN HIGH ALARM SETPOINT.
  • Operating VC train equipment - RUNNING.
  • 0B Supply fan
  • 0B Return fan
  • 0B M/U fan
  • 0B Chilled water pump
  • 0B Chiller
  • M/U fan outlet damper - 0VC08Y NOT FULLY CLOSED.
  • 0B VC train M/U filter light - LIT.
  • 0VC09Y - OPEN
  • 0VC313Y - CLOSED
  • Operating VC train Charcoal Absorber aligned for train B.
  • 0VC44Y - CLOSED
  • 0VC05Y - OPEN
  • 0VC06Y - OPEN
  • Control Room pressure greater than +0.125 inches water on 0PDI-VC038.
  • Verify Auxiliary Building ventilation aligned at 0PM02J:

Comments:

NRC 11-4 Page 18 of 27

Scenario NRC 11-4 Event 7&8 No: No.

Event 1D Steam Generator Tube Rupture/loss of RCS pressure control

==

Description:==

Time Position Applicants Actions or Behavior

  • Two inaccessible filter plenums aligned.
  • Plenum A:
  • 0VA03CB - RUNNING
  • 0VA023Y - OPEN
  • 0VA436Y - CLOSED
  • Plenum C:
  • 0VA03CF RUNNING
  • 0VA072Y - OPEN
  • 0VA438Y - CLOSED
  • Verify FHB ventilation aligned at 0PM02J:
  • 0VA04CB - RUNNING
  • 0VA055Y - OPEN
  • 0VA062Y - OPEN
  • 0VA435Y - CLOSED
  • Notify US Attachment B complete ATC/
  • Verify ECCS pumps running at 1PM05J/1PM06J:

BOP

  • Both CV pumps - RUNNING.
  • Both RH pumps - RUNNING.
  • Both SI pumps - RUNNING.

ATC/

  • Verify RCFCs running in Accident Mode at 1PM06J:

BOP

  • Group 2 RCFC Accident Mode lights - ALL LIT.

ATC/

  • Verify Phase A isolation at 1PM06J:

BOP

  • Group 3 Cnmt Isol monitor lights - ALL LIT.

ATC/

  • Verify Cnmt Vent isolation at 1PM06J:

BOP

  • Group 6 Cnmt Vent Isol monitor lights - ALL LIT.

BOP

  • Verify AF system at 1PM06J:
  • AF pumps - BOTH RUNNING.
  • AF isolation valves - OPEN:
  • AF flow control valves - THROTTLED:
  • 1AF005A-H ATC/
  • Verify CC pumps at 1PM06J:

BOP

  • CC pumps - BOTH RUNNING.

Comments:

NRC 11-4 Page 19 of 27

Scenario NRC 11-4 Event 7&8 No: No.

Event 1D Steam Generator Tube Rupture/loss of RCS pressure control

==

Description:==

Time Position Applicants Actions or Behavior ATC/

  • Verify SX pumps at 1PM06J:

BOP

  • SX pumps - 1B RUNNING.

ATC/

  • Check if Main Steamline Isolation required at 1PM04J and1PM06J:

BOP

  • SG pressures - ALL > 640 psig.
  • CNTM pressure - < 8.2 psig.

ATC/

  • Check if CS is required at 1PM06J:

BOP

  • CNMT pressure remained < 20 psig.

BOP/

  • Verify Total AF flow at 1PM04J and 1PM06J:

ATC

  • AF flow > 500 gpm.
  • SG levels maintained between 10% and 50%.
  • Check status of S/G NR levels.

o 1D S/G level rising in an uncontrolled manner.

  • Close 1AF013D & H.

ATC/

  • Verify ECCS valve alignment at 1PM06J:

BOP

  • Group 2 Cold Leg Injection monitor lights required for injection - LIT.
  • Verify ECCS flow at 1PM05J:

o RCS pressure > 1700 psig.

o SI pump discharge flow < 200 gpm.

ATC

  • Check PZR PORVs and spray valves at 1PM05J:
  • PORV isolation valves:
  • 1RY8000A & B - ENERGIZED
  • 1RY455A & 456- C/S in AUTO
  • 1RY8000A & B - OPEN
  • 1RY455B & 1RY455C - CLOSED ATC
  • Maintain RCS temperature control at 1PM05J:
  • Verify RCS average temperature stable at or trending to 557oF.

o Throttle AF flow.

ATC

  • Check status of RCPs at 1PM05J
  • Check RCP trip criteria:

Comments:

NRC 11-4 Page 20 of 27

Scenario NRC 11-4 Event 7&8 No: No.

Event 1D Steam Generator Tube Rupture/loss of RCS pressure control

==

Description:==

Time Position Applicants Actions or Behavior

  • Phase B isolation NOT actuated.
  • RCS pressure > 1425 psig - continue on in 1BwEP-0.

BOP/

  • Check if SG secondary pressure boundaries are intact at 1PM04J:

ATC

  • Check pressure in all SGs:
  • None dropping in an uncontrolled manner.
  • None completely depressurized.

CREW

  • Determine 1B S/G tubes are NOT intact:
  • RM-11 ALERT/HI RAD Alarms:

o 1PR08J SG Blowdown o 1PR27J SJAE/GS o 1AR 22/23D 1D Main Steam Line CREW Transition to 1BwEP-3, STEAM GENERATOR TUBE RUPTURE.

Comments:

NRC 11-4 Page 21 of 27

Scenario NRC 11-4 Event 7&8 No: No.

Event 1D Steam Generator Tube Rupture/loss of RCS pressure control

==

Description:==

Time Position Applicants Actions or Behavior US

  • Notify SM of plant status and procedure entry.
  • Request STA evaluation of status trees.

BOP/

  • Check status of RCPs at 1PM05J:

ATC

  • Check RCP trip criteria at 1PM05J:
  • High head ECCS flow > 100 gpm
  • RCS pressure > 1425 psig - continue on in 1BwEP-3.

BOP/

  • Identify ruptured SG 1D:

ATC 1D Main steam line rad monitor ABNORMAL for plant conditions.

[CT]

  • Isolate ruptured SG at 1PM04J & 1PM06J:

E-3--A

  • Verify 1MS018D in AUTO o Check 1MS018D CLOSED o Verify closed when SG pressure < 1115 psig.

o Notify SM to dispatch Environmental Monitoring Teams.

o Announce condition on plant page.

  • Verify 1SD002C & D CLOSED.
  • Place 1MS001D, Loop 1B MSIV, C/S to CLOSE.
  • Verify 1MS101D, 1D MSIV Bypass Valves - CLOSED.
  • Check PORVs on 1A, 1B, & 1C SGs available for RCS cool down.

BOP/

  • Perform the following at 1PM04J:

ATC

  • Check 1D SG level - Narrow Range > 10%.
  • Check 1D SG pressure > 320 psig.

CREW

  • Initiate RCS cooldown:

[CT]

  • Determine required core exit temperature:

E-3--B

  • Lowest 1D SG pressure at 1PM04J.
  • Average of 10 highest CETCs at 1PM05J.
  • Check P-11 status at 1PM05J:
  • RCS pressure < 1930 psig:
  • Verify P-11 Bypass Permissive light - LIT.
  • Place BOTH Steam Line SI Reset/Block C/S to BLOCK.
  • RCS pressure > 1930 psig:

Comments:

NRC 11-4 Page 22 of 27

Scenario NRC 11-4 Event 7&8 No: No.

Event 1D Steam Generator Tube Rupture/loss of RCS pressure control

==

Description:==

Time Position Applicants Actions or Behavior

  • Continue RCS cooldown and block steamline SI in accordance with above steps when RCS pressure < 1930 psig.
  • Dump steam to condenser at maximum rate:
  • Check C-9 Bypass Permissive - NOT LIT at 1PM05J.
  • Check 1A, 1B, & 1C MSIVs - OPEN at 1PM06J.
  • Perform the following at 1PM04J:
  • Place Steam Dump Mode Selector C/S to STM PRESS.
  • Raise demand on 1PK-507, MS Header Pressure Controller, to initiate RCS cooldown.
  • When P-12 permissive is LIT, bypass P-12 interlock to continue cool down by placing steam dump switches to BYP-INTLK.
  • Dispatch EOs to 1SI8801A/B valves and breakers
  • Check average of 10 highest CETCs:

o CETC < required temperature determined in step 6a - stop RCS cooldown by lowering demand on MS Header Pressure Controller and throttling AF flow.

o CETC > required temperature determined in step 6a - continue with 1BwEP-3 steps 7-13 and stop RCS cooldown when CETC < required temperature.

  • Check 1A, 1B, & 1C SG levels at 1PM04J:
  • Control SG levels between 30% - 50%.
  • Check narrow range levels not increasing in an uncontrolled manner.

ATC Note: RO may note depressurized PORV accumulator and report that PORV unavailable.

  • Check PZR PORVs and isolation valves at 1PM05J:
  • PORV isolation valves:
  • 1RY8000A/B - ENERGIZED
  • 1RY455A/456 - CLOSED
  • PORV isolation valves:
  • 1RY8000A/B - OPEN BOP/
  • Reset SI at 1PM06J:

ATC

  • Depress both SI reset pushbuttons.
  • Verify SI actuated permissive light - NOT LIT.
  • Verify auto SI blocked permissive light - LIT.
  • Reset CNMT isolations at 1PM06J:

Comments:

NRC 11-4 Page 23 of 27

Scenario NRC 11-4 Event 7&8 No: No.

Event 1D Steam Generator Tube Rupture/loss of RCS pressure control

==

Description:==

Time Position Applicants Actions or Behavior

  • Reset phase A isolation.
  • Check Station Air Compressors - one running.
  • Open 1IA065, Instrument Air Outside Isolation Valve.
  • 1IA066, Instrument Air Inside Isolation Valve, will NOT open.
  • Verify all AC buses energized at 1PM01J:
  • All 4KV non-ESF buses energized.
  • All 6.9 KV buses energized.
  • Check if RH pumps should be stopped at 1PM06J:
  • 1SI8812A & B open.
  • RCS pressure > 325 psig.
  • Stop both RH pumps and place in standby.
  • Check average of 10 highest CETCs:

o CETC < required temperature determined in step 6a - stop RCS cooldown by lowering demand on MS Header Pressure Controller and throttling AF flow.

o CETC > required temperature determined in step 6a - continue cooldown and DO NOT proceed further in with 1BwEP-3 until CETC < required temperature.

  • Maintain CETC < required temperature.
  • Check 1D SG pressure at 1PM04J - stable or rising.
  • Check RCS subcooling acceptable per Figure 1BwEP 3-2.

ATC

  • Attempt to depressurize RCS:
  • Determine normal PZR spray at 1PM05J - NOT available (1IA066 will not open)
  • Check PZR PORVs at 1PM05J:
  • 1RY455A is unavailable (air accumulator de-pressurized).
  • Attempt to open 1RY456.
  • Determine 1RY456 will not open.

ATC/

  • Try to establish aux spray:

BOP o Verify at least one SI and one CV pump running.

o Terminate Hi Head ECCS:

  • Reset SI recirc sump isol valves/CV pump miniflow valves.
  • Verify CV pump miniflow valves OPEN - 1CV8110, 1CV8111, 1CV8114, &

1CV8116.

[CT]

  • Close CV pump cold leg injection valves - 1SI8801A & B. (critical tasks may be CA-3.3 performed later in 1BwCA-3.3)

--A

  • Place 1CV182 at 0%.
  • Open 1CV8105 & 1CV8106.

o Determine aux spray unavailable without IA to CNMT.

CREW Transition to 1BwCA-3.3, SGTR WITHOUT PRESSURIZER PRESSURE CONTROL.

Comments:

NRC 11-4 Page 24 of 27

Scenario NRC 11-4 Event 7&8 No: No.

Event 1D Steam Generator Tube Rupture/loss of RCS pressure control

==

Description:==

Time Position Applicants Actions or Behavior NOTE: IF the above critical task was performed, the scenario can be terminated here at the discretion of the lead evaluator.

Comments:

NRC 11-4 Page 25 of 27

Scenario NRC 11-4 Event 7&8 No: No.

Event 1B Steam Generator Tube Rupture/loss of RCS pressure control

==

Description:==

Time Position Applicants Actions or Behavior US

  • Notify SM of plant status and procedure entry.
  • Enter/Implement 1BwCA-3.3 and direct operator actions of 1BwCA-3.3 to establish the following conditions:

EVALUATOR NOTE: If 1D SG level is > 88% in the next step, the crew will proceed to 1BwCA-3.3, step 7. 1BwCA-3.3 step 7 actions begin below.

BOP

  • Check 1D SG NR level:

o Greater than 88%, GO TO Step 7 (CHECK IF ECCS FLOW CAN BE TERMINATED).

o Less than 88% NR, continue with next step.

CREW

  • Determine normal PZR spray unavailable until IA can be restored to CNMT.

CREW o Attempt to restore PZR PORV:

BOP

  • Check intact SG levels - Narrow range levels > 10%:
  • Maintain narrow range levels between 30% and 50%.
  • Check narrow range levels not increasing in an uncontrolled manner.

RO

  • Check PZR level:

o Less than 14%, return to step 1 of 1BwCA-3.3.

o Greater than 14%, continue to next procedure step.

EVALUATOR NOTE: 1BwCA-3.3, step 7 actions are contained in the row below.

CREW o Check if ECCS flow can be terminated: (Step 7)

  • Subcooling - acceptable per Iconics or Attachment A and Fig 1BwCA-3.3-1.
  • Secondary heat sink established.
  • RVLIS Plenum 15% or greater.
  • Ruptured SG 1D rising in an uncontrolled manner or off scale high.

BOP

  • Stop BOTH SI pumps.
  • Stop 1 CV pump.

CREW

  • Terminate high head ECCS:

[CT]

  • CV pump suction aligned to RWST - 1CV112D & E open.

CA-3.3

  • Reset SI recirc sump isol valves/CV pump miniflow valves.

--A

  • Verify CV pump miniflow valves OPEN-1CV8110, 1CV8111, 1CV8114, & 1CV8116.

Comments:

NRC 11-4 Page 26 of 27

Scenario NRC 11-4 Event 7&8 No: No.

Event 1B Steam Generator Tube Rupture/loss of RCS pressure control

==

Description:==

Time Position Applicants Actions or Behavior

  • Close CV pump cold leg injection valves - 1SI8801A & B. (critical tasks may have been performed earlier in 1BwEP-3)

EVALUATOR NOTE: At this point the scenario is terminated.

Comments:

NRC 11-4 Page 27 of 27

Simulation Facility Braidwood Scenario Operating Test No.: 2011 NRC No.: Exam NRC 11-3b Examiners: ______________________ Applicant: ____________________ SRO

______________________ ____________________ ATC

______________________ ____________________ BOP Initial Conditions: IC-21 Turnover: Unit 1 is operating at 100% power, steady state, equilibrium xenon. Online risk is yellow.

Control rods are in manual for troubleshooting by Instrument Maintenance. Auto rod control is not available.

Event Malf. No. Event Event No. Type Description Preload IMF FW44 1B AF pump fails to start IMF RP15D 1B SI pump fails to automatically start MRF RP84 OPEN trgset 1 ZLO52BRKA(2) == 1 IMF CV01B (1 0) 1B CV pump trips when Rx trips trg 1 IMF FW19C 3.5 0 10 Feed line break inside containment when Rx trips IMF RX17 0 Rod control failure requiring rods in manual.

1 None N-BOP, Lower reactive load 2 KV.

US 2 N/A Not included in this version 3 N/A Not included in this version 4 IMF FW17 100 I-BOP, HDT Level Controller Failure in Auto US 5 IRF ED025 OPEN TS-US Loss of DC to inverter 113 6 IMF ED07A C-ATC, Loss of bus 141 BOP TS-US 7 IMF RP09A M Inadvertent FWI (ALL) Feed line break inside containment 8 Preload 1B CV pump trip when Rx trips 9 Preload Loss of heat sink (1B AF pp)

  • (N)ormal, (R)eactivity (I)nstrument, (C)omponent, (M)ajor Transient NRC 11-3b

SCENARIO OVERVIEW Unit 1 is operating at 100% power, steady state, equilibrium xenon. Online risk is yellow. Control rods are in manual for troubleshooting by Instrument Maintenance. Auto rod control is not available.

After completing shift turnover and relief, the BOP will lower Unit 1 reactive load 2 KV in accordance with BwOP MP-23.

After lowering reactive load, HDT Level Controller, 1LK-HD009A, will fail to 100% demand. The 1HD046A/B valves will full open and HDT level will drop. The BOP will take actions to stabilize the plant by taking manual control of the 1LK-HD009A.

After the HDT Level Controller failure is addressed, a loss of DC to instrument inverter 113 will occur. The crew will follow the annunciator response BwAR 1-4-C5. The crew will determine from field report that the instrument inverter DC input has failed. Technical Specification 3.8.7, condition A applies.

Following completion of inverter 113 actions,, a ground fault will occur on bus 141. 1BwOA ELEC-3 will be entered and the operators will start redundant equipment on bus 142 and investigate the status of bus 141.

Tech Spec 3.8.9 applies.

Following completion of 1BwOA ELEC-3 actions, an inadvertent FWI occurs. When the crew manually trips the reactor, a feed line break on the 1C SG inside containment will occur. SI will actuate. The crew will enter 1BwEP-0 to stabilize the plant. The 1B SI pump fails to auto start and must be manually started due to a failure of its actuation relay. The 1B AF pump will not start (engine will seize) resulting in a transition to 1BwFR-H.1 at step 15 of 1BwEP-0. The 1B CV pump trips when the reactor trips. Bleed and feed will be required due to the status of the CV pumps.

Completion criteria is establishing startup feedwater pump flow to the non-faulted SGs.

Critical Tasks

1. Manually start the 1B SI pump before transition out of 1BwEP-0 (ERG Critical Task number - E-0J) (K/A number 006000A4.01 4.1/3.9)
2. Initiate RCS bleed and feed before attempting to establish main feedwater flow or condensate flow to any SG (ERG Critical Task number - FR-H.1--F) (K/A number 000E05EA1.1 importance 4.1/4.0)

NRC 11-3b Page 2 of 21

SIMULATOR SETUP GUIDE:

  • Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
  • Establish the conditions of IC-21, 100% power, steady state, equilibrium xenon.
  • Complete items on Simulator Ready for Training Checklist.
  • Verify/remove any Equipment Status Tags and Danger Tags not applicable to the scenario.
  • Place simulator in RUN (allow simulator to run during board walk down and turnover).
  • Run caep NRC 11-3 SETUP from disk and verify the following actuate:
  • IMF FW44
  • IMF RP15D
  • MRF RP84 OPEN
  • trgset 1 ZLO52BRKA(2) == 1
  • IMF CV01B (1 0)
  • trg 1 IMF FW19C 3.5 0 10
  • IMF RX17 0
  • Secure 1A VP chiller and 1A VP WO pump.
  • Start 1B VP chiller and 1B VP WO pump.
  • Raise MVARS to 250 MW out.
  • Provide students with turnover sheets, 1BwOS NR-1, and critical parameter sheet.

NRC 11-3b Page 3 of 21

INSTRUCTOR/SIMULATOR RUN AID GUIDE Event 1: Lower reactive load 2 KV.

As TSO (Kerry Koch), call TSO tie line (white phone) and request Braidwood Station to lower switchyard voltage 2 KV.

Acknowledge as Shift Manager commencement and completion of procedure.

If contacted as Unit 2 to coordinate lowering reactive load, report Unit 2 main generator reactive load is 250 MVARS. Following adjustment of reactive load, report Unit 2 main generator reactive load is 200 MVARS.

Report that Unit 2 will log the reactive load change.

If contacted, acknowledge as Transmission System Operation (TSO) (Kerry Koch) completion of reactive load adjustment.

Event 2: Not included in this version Event 3: Not included in this version Event 4: HDT Level Controller Failure.

Insert IMF FW17 100 If dispatched as EO to investigate, wait one minute and report no visible damage to 1HD046A or B Valves.

Report local operation of valves same as MCR indication. (if asked for feedback to manual ops). Report local tank level same as MCR indication.

Event 5: Loss of DC to inverter 113 Insert IRF ED025 OPEN for loss of DC to inverter 113.

When dispatched as Equipment Operator to instrument inverter 113, wait two minutes and report DC input breaker to Inverter 113, B1 is tripped open and Low DC Voltage light P16 is lit.

If requested to close the DC input breaker locally, report breaker will not close.

If dispatched as Equipment Operator /NSO to instrument bus 113, wait one minute and report instrument bus 113 appears normal.

Acknowledge as SM entry into TS 3.8.7 and on line risk status. Acknowledge requests for an IR and System Engineering/Maintenance support.

NRC 11-3b Page 4 of 21

INSTRUCTOR/SIMULATOR RUN AID GUIDE Event 6: Loss of bus 141

  • Insert IMF ED07A If dispatched as EO to bus 141 report acrid smell in Div. 11 ESF switchgear room but no fire.

Acknowledge as SM request for E-plan evaluation, Tech Spec 3.8.9 entry for unit 1, and 3.8.1 for both units request for on line risk assessment. (on line risk will be red)

Acknowledge Tech Spec 3.8.4 entry and exit.

Acknowledge request for U-2 admin NSO to perform 1/2BwOSR 3.8.1.1 If requested as FS/EO to cross-tie 125 VDC bus 111 to 125 VDC bus 211 wait five minutes and insert the following:

  • MRF ED111 CLOSE If dispatched as EO to depress 1A DG emergency stop push button insert the following:
  • MRF EG19 TRIP Event 7: Inadvertent Feed Water Isolation
  • Insert IMF RP09A Event 8: Feed line break in containment / Loss of Heat Sink/CV pump trip Acknowledge as SM procedure changes, E Plan evaluations, and STA request.

After STA requested, as STA report CSF status - Red path on heat sink (until feed flow established). Yellow on heat sink once feed flow established, Yellow on inventory when head voids due to bleed and feed.

If dispatched as EO, report 1B CV pump has phase C overcurrent flag.

If dispatched as EO, report 1B AF pump has large lube oil leak and engine damage.

Acknowledge as U2 NSO request to remove FW isolation fuses insert the following:

  • MRF FW150 REMOVED
  • MRF FW151 REMOVED
  • MRF RP78 REMOVED
  • MRF RP79 REMOVED Acknowledge as EO start startup FW pump aux oil pump and insert the following:
  • MRF FW149 START Acknowledge request as EO to close containment isolation valves.
  • MRF CH11 0 to close 1WO006A
  • MRF CH13 0 to close 1WO020A
  • MRF CV17 0 to close 1CV8100 NRC 11-3b Page 5 of 21

Scenario NRC 11-3b Event 1 No: No.

Event Lower reactive load 2 KV

==

Description:==

Time Position Applicants Actions or Behavior CUE o From TSO request, lower Switchyard voltage 2 KV in accordance with BwOP MP-23, ADJUSTING REACTIVE LOAD.

US Directs BOP to perform BwOP MP-23.

BOP

  • Verify MVAR change will not exceed Generator Capability Curve in 1BwGP 100-3A6.
  • Contact Unit 2 to coordinate MVAR adjustment.
  • Perform the following at 1PM01J:
  • Place voltage adjust C/S to lower. (may be done intermittently)
  • Monitor 1VI-MP006, main generator output VARS.
  • Release voltage adjust C/S when 1VI-MP006 has dropped 50 MVARS.
  • Inform US BwOP MP-23 is complete.

US

  • Acknowledge report.

o Notify SM BwOP MP-23 is complete.

o Notify TSO BwOP MP-23 is complete.

ATC o Peer check actions of BOP operator.

o Monitor remainder of MCB.

EVALUATOR NOTE: After BwOP MP-23 is complete and with lead examiners concurrence, enter next event.

Comments:

NRC11-3b Page 6 of 21

Scenario NRC 11-3b Event 2 No: No.

Event Not included in this version

==

Description:==

Time Position Applicants Actions or Behavior Comments:

NRC11-3b Page 7 of 21

Scenario NRC 11-3b Event 3 No: No.

Event Not included in this version

==

Description:==

Time Position Applicants Actions or Behavior Comments:

NRC11-3b Page 8 of 21

Scenario NRC 11-3b Event 4 No: No.

Event HDT Level Controller Failure

==

Description:==

Time Position Applicants Actions or Behavior CUE

CREW

  • Refer to BwARs
  • Direct/Ensure BOP takes manual control of 1LK-HD009A and returns HDT level to normal.

BOP

  • Perform the following at 1PM03J:
  • Place 1LK-HD009A, HDT Level Controller, in manual.
  • Monitor HDT level and 1HD046A/B positions to return HDT level to normal.
  • Maintain HDT flow by operating 1LK-HD009A in manual.

o Dispatch EO to 1HD046A/B valves.

US o Contact SM to perform risk assessment, initiate IR, and contact maintenance to investigate/correct instrument failure.

Initiate the next event when the lead examiner approves.

Comments:

NRC11-3b Page 9 of 21

Scenario NRC 11-3b Event 5 No: No.

Event Loss of DC to instrument inverter 113

==

Description:==

Time Positio Applicants Actions or Behavior n

CUE

ATC/

  • Determine instrument inverter 113 trouble.

BOP

  • Reference BwAR.

CREW

  • Dispatch operators to investigate status of inverter and instrument bus.

US o Notify SM of plant status.

US

  • Determines TS 3.8.7 condition A is applicable.
  • Contact SM to perform risk assessment, initiate IR, and contact additional personnel to investigate/correct instrument failure.

o Perform what if brief for loss of inverter EVALUATOR NOTE: After the tech spec entry is complete and with lead examiner concurrence, insert the next event.

Comments:

NRC11-3b Page 10 of 21

Scenario NRC 11-3b Event 6 No: No.

Event Loss of bus 141

==

Description:==

Time Position Applicants Actions or Behavior Evaluators Note: The loss of Bus 141 combined with the previous malfunction (loss of DC to inverter 113) will cause a loss of instrument bus 113 and NI channel N43.

Action steps for these subsequent equipment losses are contained in this guide however, this event is intended to demonstrate the crews ability to perform the steps of 1BwOA ELEC-3 only. Therefore after the actions of 1BwOA ELEC-3 are complete the next event can be inserted with lead evaluators concurrence.

CUE

  • Bus 141 bus alive light not lit CREW
  • Determine Bus 141 De-energized.
  • Reference BwARs
  • Identify entry conditions for 1BwOA ELEC-3 "LOSS OF 4KV ESF BUS" US
  • Notify SM of plant status and procedure entry
  • Implement 1BwOA ELEC-3 "LOSS OF 4KV ESF BUS" to establish the following conditions:
  • Determines TS 3.8.9 condition A & B are applicable.
  • Contact SM to perform risk assessment, initiate IR, and contact maintenance to investigate/correct instrument failure.

ATC/

  • Ensure the following B train equipment started/running BOP
  • 1B CV pump o 1B CC pump
  • Isolate bus 141 by placing the following breakers in PTL:

o ACB 1413 FIRST, then:

o ACB 1411, 1412, 1414

  • Bus 141 lockout alarm (1-21-A7) LIT
  • 111 Batt Chrg trouble alarm (1-21-E8) LIT o Dispatch operator to crosstie ESF DC Bus 111 with ESF DC Bus 211 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Comments:

NRC11-3b Page 11 of 21

Scenario NRC 11-3b Event 6 No: No.

Event Loss of bus 141

==

Description:==

Time Position Applicants Actions or Behavior

  • Refer to Tech Specs
  • Perform 1BwOSR 3.8.1.1 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />
  • Unit 2 contacted to perform 2BwOSR 3.8.1.1 w/i 1 hr
  • Review 3.8.1, 3.8.9 o Review 3.8.4
  • Operator dispatched to emergency trip 1A D/G
  • Dispatch operators to locally investigate bus 141 EVALUATOR NOTE: After the crew completes the actions of 1BwOA ELEC-3 and the tech spec call has been made, the scenario can continue by inserting the next event. However, the crew may decide to perform steps below of 1BwOA ELEC-2 for the loss of INST Bus 113.

ATC/ o Determine Instrument Bus 113 deenergized.

BOP o Reference BwARs.

CREW o Identify entry conditions for 1BwOA ELEC-2, LOSS OF INSTRUMENT BUS.

o Dispatch operators to investigate status of inverter and instrument bus.

US o Notify SM of plant status and procedure entry.

o Request evaluation of Emergency Plan conditions.

o Enter/Implement 1BwOA ELEC-2 LOSS OF INSTRUMENT BUS and direct operator actions of 1BwOA ELEC-2 to establish the following conditions:

o Direct BOP/ATC to stop load ramp/dilution.

RO o Check control channels operable at 1PM05J:

o PZR pressure o PZR level o TAVE o Delta T BOP o Check control channels operable at 1PM05J/1PM04J:

o PIMP o SG level o Steam flow o Feed flow Comments:

NRC11-3b Page 12 of 21

Scenario NRC 11-3b Event 6 No: No.

Event Loss of bus 141

==

Description:==

Time Position Applicants Actions or Behavior CREW o Determine Instrument Bus 113 cannot be energized.

US o Refer to 1BwOA ELEC-2, Table D, LOSS OF INSTRUMENT BUS 113 EFFECTS.

o Brief crew on loss of instrument bus 114 effects.

o Direct actions of 1BwOA INST-1 NUCLEAR INSTRUMENTATION MALFUNCTION, Attachment A.

o Dispatch operators to fail air to 1AF005E-H.

o Determine TS 3.8.9, condition B is applicable EVALUATOR NOTE: After the crew recognizes instrument bus 113 cannot be reenergized, the scenario can continue by inserting the next event. However, the crew may decide to perform steps below of 1BwOA INST-1 for the failed NI channel.

When crew requests assistance for tripping bistables, cue will be that no extra NSOs are currently available.

RO/ o Place Rod Bank Select in MANUAL BOP o Check annunciator 1-10-B5 - LIT o Place N43 Rod Stop Bypass switch in BYPASS at 1PM07J o Check Tave - Tref deviation within 1 deg. F.

o Check SG levels normal and stable.

o Defeat N43 Functions at 1PM07J o Place upper section current comparator defeat switch in PR N43 position.

o Place lower section current comparator defeat switch in PR N43 position.

o Place power mismatch bypass switch in PR N43 position.

o Place rod stop bypass switch in PR N43 position.

o Check annunciator 1-10-C3 - LIT o Reset PR N43 rate trip at 1PM07J o Place computer points in TEST, N0047, N0048, U1143 o Remove computer point from scan N0052A o Place N43 input to DEH in test o Remove N43 control power fuses at 1PM07J o Select LOOP delta T recorder to operable channel o Check Tave - Tref within 1 deg. F

1. Place rods in auto EVALUATOR NOTE: After the actions for the bus 141 failure are complete and with lead examiners concurrence, insert the next event.

Comments:

NRC11-3b Page 13 of 21

Scenario NRC 11-3b Event 7 No: No.

Event Inadvertent FWI & Feed line break inside containment

==

Description:==

Time Position Applicants Actions or Behavior CUE

  • FWI monitor lights - ALL lit CREW

US

  • Direct a manual Rx trip
  • Direct operator actions of 1BwEP-0 to establish the following conditions:

ATC Perform immediate operator actions of 1BwEP-0 at 1PM05J:

  • Rod bottom lights - ALL LIT.
  • Neutron flux - DROPPING.

BOP Perform immediate operator actions of 1BwEP-0 at 1PM02J or OWS drop 210:

  • All Turbine throttle valves - CLOSED.
  • All Turbine governor valves - CLOSED.

BOP Perform immediate operator actions of 1BwEP-0 at 1PM01J:

  • Verify power to 4KV busses.
  • Bus 141 deenergized
  • Bus 142 energized CREW (If manual SI not previously performed) Recognize and respond to conditions requiring a Safety Injection in accordance with 1BwEP-0 REACTOR TRIP OR SAFETY INJECTION, Step 4:
  • 1C SG pressure cannot be maintained > 640 psig.
  • Manually actuate SI from 1PM05J and 1PM06J.

The crew may transition to 1BwEP ES-0.1 "REACTOR TRIP RESPONSE" if SI conditions are not met in accordance with 1BwEP-0 "REACTOR TRIP or SI."

Recognition of SI requirements during performance of 1BwEP ES-0.1 will require re-entering 1BwEP-0 at step 1 (Page 17 continues the actions of 1BwEP-0).

Recognition of 1BwFR-H.1 entry requirements during performance of 1BwEP ES-0.1 will require entering 1BwFR-H.1.

1BwFR-H.1 actions start on page 20.

Comments:

NRC11-3b Page 14 of 21

Scenario NRC 11-3b Event 7 No: No.

Event Feed line break inside containment & Loss of heat sink

==

Description:==

Time Position Applicants Actions or Behavior US o Transition to 1BwEP ES-0.1 "REACTOR TRIP RESPONSE" from 1BwEP-0 o Notify SM of plant status and procedure entry.

o Request evaluation of Emergency Plan conditions.

o Request STA evaluation of status trees.

o Enter/Implement 1BwES-0.1 and direct operator actions of 1BwEP-1 to establish the following conditions:

ATC o RCS temperature stable at/trending to 557°F o All rod bottom lights are lit o PZR level > 17%

o Charging and Letdown in Service o PZR Level Trending to Program o PZR pressure > 1829 psig o PZR pressure stable or trending to 2235 psig.

o Check FW status o RCS temp <564 °F o FWI monitor lights lit o Trip Running FW Pumps o Check FW flow to SGs >500 gpm o Check SG levels Comments:

NRC11-3b Page 15 of 21

Scenario NRC 11-3b Event 8&9 No: No.

Event Feed line break inside containment & Loss of heat sink/1B CV pump trip

==

Description:==

Time Position Applicants Actions or Behavior Note: If the crew had previously transitioned to 1BwEP ES- 0.1, Reactor Trip Response, then immediate actions of 1BwEP-0 should be re-performed when SI is actuated or recognized.

EVALUATOR NOTE: US and RO will continue in 1BwEP-0 while BOP is performing Attachment B:

EVALUATOR NOTE: Per the OAS page, RCP trip criteria is applicable throughout the performance of 1BwEP-0. The crew may trip RCPs whenever the criteria of RCS pressure <1425 psig AND High head SI flow >100 gpm are recognized.

BOP

  • Verify FW isolated at 1PM04J:
  • FW pumps - TRIPPED.
  • Isolation monitor lights - LIT.
  • FW pumps discharge valves - CLOSED (or going closed) 1FW002A-C.
  • Verify DGs running at 1PM01J:
  • DGs - BOTH RUNNING.
  • 1SX169A/B OPEN.
  • Dispatch operator locally to check operation
  • Verify Generator Trip at 1PM01J:
  • OCB 1-8 and 7-8 open.
  • PMG output breaker open.
  • Verify Control Room ventilation aligned for emergency operations at 0PM02J:
  • VC Rad Monitors - LESS THAN HIGH ALARM SETPOINT. (train A rad monitors de-energized) o Dispatch EO to secure VL, VW and VV supply fans.
  • Operating VC train equipment - RUNNING.
  • 0B Supply fan
  • 0B Return fan
  • 0B M/U fan
  • 0B Chilled water pump
  • 0B Chiller
  • M/U fan outlet damper - 0VC08Y NOT FULLY CLOSED.

Comments:

NRC11-3b Page 16 of 21

Scenario NRC 11-3b Event 8&9 No: No.

Event Feed line break inside containment & Loss of heat sink/1B CV pump trip

==

Description:==

Time Position Applicants Actions or Behavior

  • 0B VC train M/U filter light - LIT.
  • 0VC09Y - OPEN
  • 0VC313Y - CLOSED
  • Operating VC train Charcoal Absorber aligned for train B.
  • 0VC44Y - CLOSED
  • 0VC05Y - OPEN
  • 0VC06Y - OPEN
  • Control Room pressure greater than +0.125 inches water on 0PDI-VC038.
  • Verify Auxiliary Building ventilation aligned at 0PM02J:
  • Two inaccessible filter plenums aligned.
  • Plenum A:
  • 0VA03CB - RUNNING
  • 0VA023Y - OPEN
  • 0VA436Y - CLOSED
  • Plenum C:
  • 0VA03CF RUNNING
  • 0VA072Y - OPEN
  • 0VA438Y - CLOSED
  • Verify FHB ventilation aligned at 0PM02J:
  • 0VA04CB - RUNNING
  • 0VA055Y - OPEN
  • 0VA062Y - OPEN
  • 0VA435Y - CLOSED
  • Notify US Attachment B complete ATC
  • Verify ECCS pumps running at 1PM05J/1PM06J:
  • CV pumps - NONE RUNNING (1B tripped):
  • 1B RH pump - RUNNING.
  • SI pump - NONE RUNNING

[CT]

  • START 1B SI PP E-0--J
  • RCFCs running in accident mode (0B train ONLY running)
  • RCFC accident mode status light lit
  • CNMT Phase A valves closed (train A valves not all closed)
  • Manually actuate Phase A Comments:

NRC11-3b Page 17 of 21

Scenario NRC 11-3b Event 8&9 No: No.

Event Feed line break inside containment & Loss of heat sink/1B CV pump trip

==

Description:==

Time Position Applicants Actions or Behavior

  • Dispatch EO to close de-energized valves outside containment
  • Verify Cnmt Vent isolation:
  • Group 6 Cnmt Vent Isol monitor lights - ALL LIT.
  • Verify AF system:
  • AF pumps - Neither RUNNING.
  • Attempt manual start of 1B AF pump o Dispatch EO to check 1B AF pump
  • AF flow control valves - 1AF005A-H THROTTLED.
  • Verify CC pumps - 1B RUNNING.
  • Verify SX pumps - 1B RUNNING ATC/
  • Check if Main Steamline Isolation required BOP
  • 1C S/G pressures < 640 psig
  • CNMT pressure > 8.2 psig
  • MSIV & MSIV bypass valves - CLOSED CREW o Determine and Announce containment is adverse when pressure rises above 5 psig.

BOP/

  • Check CS not required ATC
  • CNMT pressure remained < 20 psig BOP/
  • Verify Total AF flow:

ATC

  • AF flow < 500 gpm
  • SG levels < 31%

o May CLOSE 1AF005C & 1AF013G to isolate CST gravity flow to 1C SG FW line break.

CREW Identify entry conditions for 1BwFR-H.1, RESPONSE TO LOSS OF SECONDARY HEAT SINK Comments:

NRC11-3b Page 18 of 21

Scenario NRC 11-3b Event 9 No: No.

Event Feed line break inside containment/loss of heat sink

==

Description:==

Time Position Applicants Actions or Behavior US

  • Notify SM of plant status and procedure entry
  • Request STA evaluation of status trees
  • Enter/Implement 1BwFR-H.1 and direct operator actions of 1BwFR-H.1 to establish the following conditions ATC
  • Check if secondary heat sink is required
  • RCS pressure > faulted SG pressure
  • Check CV pump status
  • CV pumps - NONE RUNNING
  • GO TO step 15 (bleed and feed)

ATC

  • Establish RCS feed path
  • Verify RCS feed path
  • 1B SI pump - RUNNING
  • Group 2 cold leg injection monitor lights required for operating ECCS pumps - LIT ATC
  • Establish RCS bleed path

[CT]

  • PORV isolation valves - 1RY8000A deenergized & open, 1RY8000B energized &

FR-H.1- open

-F

  • Open BOTH PZR PORVs (1RY455A & 1RY456)

ATC

  • Verify adequate RCS bleed path
  • PORV isolation valves - BOTH OPEN ATC /
  • Verify ESF equipment actuations BOP Comments:

NRC11-3b Page 19 of 21

Scenario NRC 11-3b Event 9 No: No.

Event Feed line break inside containment/loss of heat sink

==

Description:==

Time Position Applicants Actions or Behavior CREW

  • Maintain RCS heat removal
  • Reset Cnmt isolations
  • Reset Phase A
  • Restore I/A to Cnmt BOP
  • Check if CS should be stopped
  • CS pumps - NONE RUNNING ATC
  • Verify cold leg recirc capability
  • 1B RH pump - RUNNING
  • 1SI8811B - ENERGIZED BOP/
  • Try to establish AF to at least one SG ATC
  • Check blowdown isolation and sample valves closed
  • 1SD005 A-D & 1SD002A-H
  • Review attachment B
  • Check 1AF004A & B - OPEN
  • Check AF pumps - NONE RUNNING o Dispatch operator to 1B AF pump
  • AF isolation valves - OPEN
  • AF flow control valves - THROTTLED
  • 1AF005A-H
  • Check AF flow - NOT ESTABLISHED ATC /
  • Prepare FW system for restoration BOP
  • CD/CB pumps - at least ONE RUNNING
  • Place FW valves in manual at 0% demand
  • 1FW510 - 540
  • 1FW510A - 540A Comments:

NRC11-3b Page 20 of 21

Scenario NRC 11-3b Event 9 No: No.

Event Feed line break inside containment/loss of heat sink

==

Description:==

Time Position Applicants Actions or Behavior

  • 1FW034A - D ATC /
  • Dispatch operators to remove FW isolation fuses
  • FW isolation fuses removed
  • 1PA27J
  • Establish main FW flow to at least one SG BOP
  • Open 1FW035A/B/D
  • Check FW pumps available
  • CD/CB pumps - at least TWO RUNNING
  • Check startup FW pump prepared for operation
  • Dispatch operator to startup FW pump
  • Bus 159 - ENERGIZED
  • Locally start aux oil pump
  • Open startup FW pump disch valve - 1FW059
  • Open startup FW pump recirc valve - 1FW076 (place C/S in modulate)
  • Verify close main FW pump recirc valves - 1FW012A, B, & C
  • Start startup FW pump US
  • Review Attachment B prior to initiating FW flow ATC /
  • Establish main FW flow to at least one SG BOP
  • Throttle 1FW034A/B to desired flow rate
  • Maintain hotwell level > 7 inches
  • Check SG WR levels rising Note: The scenario may be terminated at this point (final)

Comments:

NRC11-3b Page 21 of 21

Simulation Facility Braidwood Scenario Operating Test No.: 2011 NRC No.: Exam NRC 11-3a Examiners: ______________________ Applicant: ____________________ SRO

______________________ ____________________ ATC

______________________ ____________________ BOP Initial Conditions: IC-21 Turnover: Unit 1 is operating at 100% power, steady state, equilibrium xenon. Online risk is yellow.

Control rods are in manual for troubleshooting by Instrument Maintenance. Auto rod control is not available.

Event Malf. No. Event Event No. Type Description Preload IMF FW44 1B AF pump fails to start IMF RP15D 1B SI pump fails to automatically start MRF RP84 OPEN trgset 1 ZLO52BRKA(2) == 1 IMF CV01B (1 0) 1B CV pump trips when Rx trips trg 1 IMF FW19C 3.5 0 10 Feed line break inside containment when Rx trips IMF RX17 0 Rod control failure requiring rods in manual.

1 None N-BOP, Lower reactive load 2 KV.

US 2 IMF ED15A R-ATC, Grid disturbance requiring turbine load reduction IMF ED15I US 3 IOR ZDI1CV110B CLS C-ATC, 1CV110B valve fails closed requiring ramp with IOR ZLO1CV110B(1) OFF US rods only IOR ZLO1CV110B(2) OFF 4 IMF FW17 100 I-BOP, HDT Level Controller Failure in Auto US 5 IRF ED025 OPEN TS-US Loss of DC to inverter 113 6 IMF ED07A C-ATC, Loss of bus 141 BOP TS-US 7 IMF RP09A M Inadvertent FWI (ALL) Feed line break inside containment 8 Preload 1B CV pump trip when Rx trips 9 Preload Loss of heat sink (1B AF pp)

  • (N)ormal, (R)eactivity (I)nstrument, (C)omponent, (M)ajor Transient NRC 11-3a

SCENARIO OVERVIEW Unit 1 is operating at 100% power, steady state, equilibrium xenon. Online risk is yellow. Control rods are in manual for troubleshooting by Instrument Maintenance. Auto rod control is not available.

After completing shift turnover and relief, the BOP will lower Unit 1 reactive load 2 KV in accordance with BwOP MP-23.

After lowering reactive load, a grid disturbance will cause 345 KV lines 0103 and 0104 to be lost. One minute later, the Transmission System Operations Reliability Coordinator will contact the main control room and direct Unit 1 to initiate an emergency load reduction of 100 MW within 20 minutes to alleviate an overload condition on grid transmission lines. The state estimator alarm is not present.

During the initial boric acid addition, 1CV110B valve will fail closed (blown fuse), forcing the crew to complete the load ramp with control rods only.

After the load ramp is complete, HDT Level Controller, 1LK-HD009A, will fail to 100% demand. The 1HD046A/B valves will full open and HDT level will drop. The BOP will take actions to stabilize the plant by taking manual control of the 1LK-HD009A.

After the HDT Level Controller failure is addressed, a loss of DC to instrument inverter 113 will occur. The crew will follow the annunciator response BwAR 1-4-C5. The crew will determine from field report that the instrument inverter DC input has failed. Technical Specification 3.8.7, condition A applies.

Following completion of inverter 113 actions,, a ground fault will occur on bus 141. 1BwOA ELEC-3 will be entered and the operators will start redundant equipment on bus 142 and investigate the status of bus 141.

Tech Spec 3.8.9 applies.

Following completion of 1BwOA ELEC-3 actions, an inadvertent FWI occurs. When the crew manually trips the reactor, a feed line break on the 1C SG inside containment will occur. SI will actuate. The crew will enter 1BwEP-0 to stabilize the plant. The 1B SI pump fails to auto start and must be manually started due to a failure of its actuation relay. The 1B AF pump will not start (engine will seize) resulting in a transition to 1BwFR-H.1 at step 15 of 1BwEP-0. The 1B CV pump trips when the reactor trips. Bleed and feed will be required due to the status of the CV pumps.

Completion criteria is establishing startup feedwater pump flow to the non-faulted SGs.

Critical Tasks

1. Manually start the 1B SI pump before transition out of 1BwEP-0 (ERG Critical Task number - E-0J) (K/A number 006000A4.01 4.1/3.9)
2. Initiate RCS bleed and feed before attempting to establish main feedwater flow or condensate flow to any SG (ERG Critical Task number - FR-H.1--F) (K/A number 000E05EA1.1 importance 4.1/4.0)

NRC 11-3a Page 2 of 23

SIMULATOR SETUP GUIDE:

  • Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
  • Establish the conditions of IC-21, 100% power, steady state, equilibrium xenon.
  • Complete items on Simulator Ready for Training Checklist.
  • Verify/remove any Equipment Status Tags and Danger Tags not applicable to the scenario.
  • Place simulator in RUN (allow simulator to run during board walk down and turnover).
  • Run caep NRC 11-3 SETUP from disk and verify the following actuate:
  • IMF FW44
  • IMF RP15D
  • MRF RP84 OPEN
  • trgset 1 ZLO52BRKA(2) == 1
  • IMF CV01B (1 0)
  • trg 1 IMF FW19C 3.5 0 10
  • IMF RX17 0
  • Secure 1A VP chiller and 1A VP WO pump.
  • Start 1B VP chiller and 1B VP WO pump.
  • Raise MVARS to 250 MW out.
  • Provide students with turnover sheets, 1BwOS NR-1, and critical parameter sheet.

NRC 11-3a Page 3 of 23

INSTRUCTOR/SIMULATOR RUN AID GUIDE Event 1: Lower reactive load 2 KV.

As TSO (Kerry Koch), call TSO tie line (white phone) and request Braidwood Station to lower switchyard voltage 2 KV.

Acknowledge as Shift Manager commencement and completion of procedure.

If contacted as Unit 2 to coordinate lowering reactive load, report Unit 2 main generator reactive load is 250 MVARS. Following adjustment of reactive load, report Unit 2 main generator reactive load is 200 MVARS.

Report that Unit 2 will log the reactive load change.

If contacted, acknowledge as Transmission System Operation (TSO) (Kerry Koch) completion of reactive load adjustment.

Event 2: Grid disturbance requiring load reduction.

NOTE: Insert Event 3 when first boration is initiated.

Insert the following 2 malfunctions simutaneously:

  • IMF ED15A
  • IMF ED15I One minute after inserting the above malfunctions, contact Unit 1 on the TSO phone as Reliability Coordinator Bruce Larsen and direct Unit 1 to initiate an emergency load reduction of 100 MW within 20 minutes due to an overload condition on grid transmission lines. Inform Unit 1 that Unit 2 has been contacted and Unit 2 is also initiating a 100 MW load drop in response to the grid emergency.

As Nuclear Engineer, inform examinees Beacon Prediction is available for Emergency Offsite Line Drop Ramp in Operator Aid Book. Examinees are to use Beacon Prediction for load drop.

If dispatched as Equipment Operator to the relay house to investigate the breaker trips and/or transmission system status, acknowledge request.

If contacted as TSO for cause of grid conditions, report LaSalle Station had fault in switchyard with local breaker backup failures which resulted in a loss of 345 KV lines 0103 and 0104. The state estimator alarm is not present.

If requested as extra NSO to perform Offsite Power Availability Surveillance, report Unit 2 will perform the surveillance. Wait 15 minutes and report surveillance acceptance criteria are met.

Acknowledge as Shift Manager initiation of load reduction, failures, request for maintenance support, and IR request.

Acknowledge as chemistry/rad protection requests for RCS samples (if required).

Acknowledge as Power Team initiation of ramp.

NRC 11-3a Page 4 of 23

INSTRUCTOR/SIMULATOR RUN AID GUIDE Event 3: 1CV110B valve fails closed.

When the ATC begins the first boration for the unit load reduction, run caep NRC 11-3 EVENT 3 from disk and verify the following actuate:

  • IOR ZDI1CV110B CLS
  • IOR ZLO1CV110B(1) OFF
  • IOR ZLO1CV110B(2) OFF If asked as SM about ramping the unit without boration capability, insist that the unit continue to ramp on rods only, until the valve failure can be fixed. TSO reports no other stations are available to perform the load drop.

As SM, acknowledge the failure and requests for on line risk assessment, maintenance support, and IR initiation.

If dispatched as EO to 1DC12J to investigate, wait 10 minutes and report that a fuse for 1CV110B is blown.

As SM report that system engineering is present to replace the fuse, wait until ramp is complete, replace the fuse by deleting the following:

  • DOR ZLO1CV110B(1) OFF
  • DOR ZLO1CV110B(2) OFF
  • DOR ZDI1CV110B CLS Event 4: HDT Level Controller Failure.

Insert IMF FW17 100 If dispatched as EO to investigate, wait one minute and report no visible damage to 1HD046A or B Valves.

Report local operation of valves same as MCR indication. (if asked for feedback to manual ops). Report local tank level same as MCR indication.

Event 5: Loss of DC to inverter 113 Insert IRF ED025 OPEN for loss of DC to inverter 113.

When dispatched as Equipment Operator to instrument inverter 113, wait two minutes and report DC input breaker to Inverter 113, B1 is tripped open and Low DC Voltage light P16 is lit.

If requested to close the DC input breaker locally, report breaker will not close.

If dispatched as Equipment Operator /NSO to instrument bus 113, wait one minute and report instrument bus 113 appears normal.

Acknowledge as SM entry into TS 3.8.7 and on line risk status. Acknowledge requests for an IR and System Engineering/Maintenance support.

NRC 11-3a Page 5 of 23

INSTRUCTOR/SIMULATOR RUN AID GUIDE Event 6: Loss of bus 141

  • Insert IMF ED07A If dispatched as EO to bus 141 report acrid smell in Div. 11 ESF switchgear room but no fire.

Acknowledge as SM request for E-plan evaluation, Tech Spec 3.8.9 entry for unit 1, and 3.8.1 for both units request for on line risk assessment. (on line risk will be red)

Acknowledge Tech Spec 3.8.4 entry and exit.

Acknowledge request for U-2 admin NSO to perform 1/2BwOSR 3.8.1.1 If requested as FS/EO to cross-tie 125 VDC bus 111 to 125 VDC bus 211 wait five minutes and insert the following:

  • MRF ED111 CLOSE If dispatched as EO to depress 1A DG emergency stop push button insert the following:
  • MRF EG19 TRIP Event 7: Inadvertent Feed Water Isolation
  • Insert IMF RP09A Event 8: Feed line break in containment / Loss of Heat Sink/CV pump trip Acknowledge as SM procedure changes, E Plan evaluations, and STA request.

After STA requested, as STA report CSF status - Red path on heat sink (until feed flow established). Yellow on heat sink once feed flow established, Yellow on inventory when head voids due to bleed and feed.

If dispatched as EO, report 1B CV pump has phase C overcurrent flag.

If dispatched as EO, report 1B AF pump has large lube oil leak and engine damage.

Acknowledge as U2 NSO request to remove FW isolation fuses insert the following:

  • MRF FW150 REMOVED
  • MRF FW151 REMOVED
  • MRF RP78 REMOVED
  • MRF RP79 REMOVED Acknowledge as EO start startup FW pump aux oil pump and insert the following:
  • MRF FW149 START Acknowledge request as EO to close containment isolation valves.
  • MRF CH11 0 to close 1WO006A
  • MRF CH13 0 to close 1WO020A
  • MRF CV17 0 to close 1CV8100 NRC 11-3a Page 6 of 23

Scenario NRC 11-3a Event 1 No: No.

Event Lower reactive load 2 KV

==

Description:==

Time Position Applicants Actions or Behavior CUE o From TSO request, lower Switchyard voltage 2 KV in accordance with BwOP MP-23, ADJUSTING REACTIVE LOAD.

US Directs BOP to perform BwOP MP-23.

BOP

  • Verify MVAR change will not exceed Generator Capability Curve in 1BwGP 100-3A6.
  • Contact Unit 2 to coordinate MVAR adjustment.
  • Perform the following at 1PM01J:
  • Place voltage adjust C/S to lower. (may be done intermittently)
  • Monitor 1VI-MP006, main generator output VARS.
  • Release voltage adjust C/S when 1VI-MP006 has dropped 50 MVARS.
  • Inform US BwOP MP-23 is complete.

US

  • Acknowledge report.

o Notify SM BwOP MP-23 is complete.

o Notify TSO BwOP MP-23 is complete.

ATC o Peer check actions of BOP operator.

o Monitor remainder of MCB.

EVALUATOR NOTE: After BwOP MP-23 is complete and with lead examiners concurrence, enter next event.

Comments:

NRC11-3a Page 7 of 23

Scenario NRC 11-3a Event 2 No: No.

Event Grid disturbance requiring turbine load reduction.

==

Description:==

Time Position Applicants Actions or Behavior CUE

  • Call from TSO Reliability Coordinator directing Unit 1 to initiate an emergency load reduction of 100 MW within 20 minutes due to an overload condition on grid transmission lines.
  • 345 KV bus tie breakers 1-3, 1-8, 9-10, and 9-15 open at 0PM03J.
  • 345 KV lines 0103 and 0104 deenergized at 0PM03J.

US

  • Acknowledge request to lower power 100 MW at 5 MW/min.
  • Implement actions of 1BwGP 100-4, POWER DESCENSION.

o Perform pre-job brief per HU-AA-1211 PRE-JOB, HEIGHTENED LEVEL OF AWARENESS, INFREQUENT PLANT ACTIVITY, AND POST JOB BRIEFINGS for load ramp.

o Initiate 1BwGP 100-4T2, LOAD SWING INSTRUCTION SHEET.

CREW o Review applicable Precautions, and Limitations and Actions.

o Review Tech Spec 3.8.1 EVALUATOR NOTE: Immediately after initial boration is started, insert the next event.

ATC

  • Verify rod position and boron concentration.
  • Initiate boration, if required. (BwOP CV-6)

o Perform boration boundary calculation per 1BwGP 100-4T2.

o Refer to operator aid for ramp.

  • Perform the following at 1PM05J:

o Set 1FK-110 BA Flow Control to desired boration rate.

o Set 1FY-0110 BA Blender Predet Counter to desired volume.

o Place MAKE-UP MODE CONT SWITCH to STOP position.

o Place MODE SELECT SWITCH to BORATE position.

o Place MAKE-UP MODE CONT SWITCH to START.

o Verify proper operation of valves and BA transfer pump (1CV110B open, Boric Acid Transfer Pump running, 1CV110A throttles open, proper BA flow indicated on recorder).

Comments:

NRC11-3a Page 8 of 23

Scenario NRC 11-3a Event 2 No: No.

Event Grid disturbance requiring turbine load reduction.

==

Description:==

Time Position Applicants Actions or Behavior OR o Batch addition of Boric Acid:

o Open 1CV110B.

o Open 1CV110A.

o Start the BA Transfer pump.

o When desired amount of BA has been added, stop the BA Transfer Pump.

o Close 1CV110A.

o Close 1CV110B.

o Turn on PZR backup heaters (BwOP RY-13).

BOP

  • Lower turbine load at 1PM02J or Operator Work Station drop 210 (DEH computer terminal located behind Unit 1 desk).by performing the following:
  • Select SETPOINT.
  • Enter MW value that is 100 MW below current value in REF window into REF DEMAND window.
  • Select ENTER.
  • Enter 3.0 MW/min into the RATE window.
  • Select ENTER.
  • Select EXIT.

o Notify US and RO of pending ramp.

  • Select GO/HOLD.
  • Verify GO/HOLD button illuminates.
  • Verify HOLD illuminated RED.
  • Select GO.
  • Verify GO illuminates RED.

ATC/

  • Monitor reactor power and turbine load lowering:

BOP

  • Monitor NIs, Tave, I, Pzr press/level at 1PM05J.
  • Monitor MWe and DEHC system response at 1PM02J or Operator Work Station drop 210 (DEH computer terminal located behind Unit 1 desk).

o Return Reactor Makeup System to automatic at current boron concentration.

Comments:

NRC11-3a Page 9 of 23

Scenario NRC 11-3a Event 3 No: No.

Event 1CV110B valve fails closed requiring ramp with rods only

==

Description:==

Time Position Applicants Actions or Behavior CUE o Boric acid flow stops o Annunciator BA FLOW DEVIATION (1-9-A6)

ATC

  • Refer to BwAR 1-9-A6 o Identify/report 1CV110B valve failure o Dispatch operator to 1DC12J to inspect fuses US
  • Notify SM of 1CV110B valve failure o Direct BOP to stop load ramp BOP o Stop turbine load ramp o Select GO/HOLD.

o Assist US & RO o Refer to BwARs ATC o MAKE-UP MODE CONT SWITCH to STOP o MODE SELECT SWITCH to AUTO o Close 1CV110A US o Contact SM to perform risk assessment, initiate IR, and contact maintenance to investigate/correct component.

o Recommence ramp using rods only.

o If PZR pressure drops below 2209 psig. LCO 3.4.1 applies.

BOP o Initiate turbine load reduction:

o When ready to begin load reduction, depress GO o Verify load reduction occurring ATC/

  • Monitor reactor power and load reduction BOP
  • Monitor NIs, Tave, I, Pzr press/level
  • Monitor MWe, Turb loading, EHC ATC
  • Maintain Tave/Tref within desired band:
  • At 1PM05J - insert rods manually at desired intervals.

NOTE: After the unit load ramp is complete and with lead examiners concurrence, enter next event Comments:

NRC11-3a Page 10 of 23

Scenario NRC 11-3a Event 4 No: No.

Event HDT Level Controller Failure

==

Description:==

Time Position Applicants Actions or Behavior CUE

CREW

  • Refer to BwARs
  • Direct/Ensure BOP takes manual control of 1LK-HD009A and returns HDT level to normal.

BOP

  • Perform the following at 1PM03J:
  • Place 1LK-HD009A, HDT Level Controller, in manual.
  • Monitor HDT level and 1HD046A/B positions to return HDT level to normal.
  • Maintain HDT flow by operating 1LK-HD009A in manual.

o Dispatch EO to 1HD046A/B valves.

US o Contact SM to perform risk assessment, initiate IR, and contact maintenance to investigate/correct instrument failure.

Initiate the next event when the lead examiner approves.

Comments:

NRC11-3a Page 11 of 23

Scenario NRC 11-3a Event 5 No: No.

Event Loss of DC to instrument inverter 113

==

Description:==

Time Positio Applicants Actions or Behavior n

CUE

ATC/

  • Determine instrument inverter 113 trouble.

BOP

  • Reference BwAR.

CREW

  • Dispatch operators to investigate status of inverter and instrument bus.

US o Notify SM of plant status.

US

  • Determines TS 3.8.7 condition A is applicable.
  • Contact SM to perform risk assessment, initiate IR, and contact additional personnel to investigate/correct instrument failure.

o Perform what if brief for loss of inverter EVALUATOR NOTE: After the tech spec entry is complete and with lead examiner concurrence, insert the next event.

Comments:

NRC11-3a Page 12 of 23

Scenario NRC 11-3a Event 6 No: No.

Event Loss of bus 141

==

Description:==

Time Position Applicants Actions or Behavior Evaluators Note: The loss of Bus 141 combined with the previous malfunction (loss of DC to inverter 113) will cause a loss of instrument bus 113 and NI channel N43.

Action steps for these subsequent equipment losses are contained in this guide however, this event is intended to demonstrate the crews ability to perform the steps of 1BwOA ELEC-3 only. Therefore after the actions of 1BwOA ELEC-3 are complete the next event can be inserted with lead evaluators concurrence.

CUE

  • Bus 141 bus alive light not lit CREW
  • Determine Bus 141 De-energized.
  • Reference BwARs
  • Identify entry conditions for 1BwOA ELEC-3 "LOSS OF 4KV ESF BUS" US
  • Notify SM of plant status and procedure entry
  • Implement 1BwOA ELEC-3 "LOSS OF 4KV ESF BUS" to establish the following conditions:
  • Determines TS 3.8.9 condition A & B are applicable.
  • Contact SM to perform risk assessment, initiate IR, and contact maintenance to investigate/correct instrument failure.

ATC/

  • Ensure the following B train equipment started/running BOP
  • 1B CV pump o 1B CC pump
  • Isolate bus 141 by placing the following breakers in PTL:

o ACB 1413 FIRST, then:

o ACB 1411, 1412, 1414

  • Bus 141 lockout alarm (1-21-A7) LIT
  • 111 Batt Chrg trouble alarm (1-21-E8) LIT o Dispatch operator to crosstie ESF DC Bus 111 with ESF DC Bus 211 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Comments:

NRC11-3a Page 13 of 23

Scenario NRC 11-3a Event 6 No: No.

Event Loss of bus 141

==

Description:==

Time Position Applicants Actions or Behavior

  • Refer to Tech Specs
  • Perform 1BwOSR 3.8.1.1 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />
  • Unit 2 contacted to perform 2BwOSR 3.8.1.1 w/i 1 hr
  • Review 3.8.1, 3.8.9 o Review 3.8.4
  • Operator dispatched to emergency trip 1A D/G
  • Dispatch operators to locally investigate bus 141 EVALUATOR NOTE: After the crew completes the actions of 1BwOA ELEC-3 and the tech spec call has been made, the scenario can continue by inserting the next event. However, the crew may decide to perform steps below of 1BwOA ELEC-2 for the loss of INST Bus 113.

ATC/ o Determine Instrument Bus 113 deenergized.

BOP o Reference BwARs.

CREW o Identify entry conditions for 1BwOA ELEC-2, LOSS OF INSTRUMENT BUS.

o Dispatch operators to investigate status of inverter and instrument bus.

US o Notify SM of plant status and procedure entry.

o Request evaluation of Emergency Plan conditions.

o Enter/Implement 1BwOA ELEC-2 LOSS OF INSTRUMENT BUS and direct operator actions of 1BwOA ELEC-2 to establish the following conditions:

o Direct BOP/ATC to stop load ramp/dilution.

RO o Check control channels operable at 1PM05J:

o PZR pressure o PZR level o TAVE o Delta T BOP o Check control channels operable at 1PM05J/1PM04J:

o PIMP o SG level o Steam flow o Feed flow Comments:

NRC11-3a Page 14 of 23

Scenario NRC 11-3a Event 6 No: No.

Event Loss of bus 141

==

Description:==

Time Position Applicants Actions or Behavior CREW o Determine Instrument Bus 113 cannot be energized.

US o Refer to 1BwOA ELEC-2, Table D, LOSS OF INSTRUMENT BUS 113 EFFECTS.

o Brief crew on loss of instrument bus 114 effects.

o Direct actions of 1BwOA INST-1 NUCLEAR INSTRUMENTATION MALFUNCTION, Attachment A.

o Dispatch operators to fail air to 1AF005E-H.

o Determine TS 3.8.9, condition B is applicable EVALUATOR NOTE: After the crew recognizes instrument bus 113 cannot be reenergized, the scenario can continue by inserting the next event. However, the crew may decide to perform steps below of 1BwOA INST-1 for the failed NI channel.

When crew requests assistance for tripping bistables, cue will be that no extra NSOs are currently available.

RO/ o Place Rod Bank Select in MANUAL BOP o Check annunciator 1-10-B5 - LIT o Place N43 Rod Stop Bypass switch in BYPASS at 1PM07J o Check Tave - Tref deviation within 1 deg. F.

o Check SG levels normal and stable.

o Defeat N43 Functions at 1PM07J o Place upper section current comparator defeat switch in PR N43 position.

o Place lower section current comparator defeat switch in PR N43 position.

o Place power mismatch bypass switch in PR N43 position.

o Place rod stop bypass switch in PR N43 position.

o Check annunciator 1-10-C3 - LIT o Reset PR N43 rate trip at 1PM07J o Place computer points in TEST, N0047, N0048, U1143 o Remove computer point from scan N0052A o Place N43 input to DEH in test o Remove N43 control power fuses at 1PM07J o Select LOOP delta T recorder to operable channel o Check Tave - Tref within 1 deg. F

1. Place rods in auto EVALUATOR NOTE: After the actions for the bus 141 failure are complete and with lead examiners concurrence, insert the next event.

Comments:

NRC11-3a Page 15 of 23

Scenario NRC 11-3a Event 7 No: No.

Event Inadvertent FWI & Feed line break inside containment

==

Description:==

Time Position Applicants Actions or Behavior CUE

  • FWI monitor lights - ALL lit CREW

US

  • Direct a manual Rx trip
  • Direct operator actions of 1BwEP-0 to establish the following conditions:

ATC Perform immediate operator actions of 1BwEP-0 at 1PM05J:

  • Rod bottom lights - ALL LIT.
  • Neutron flux - DROPPING.

BOP Perform immediate operator actions of 1BwEP-0 at 1PM02J or OWS drop 210:

  • All Turbine throttle valves - CLOSED.
  • All Turbine governor valves - CLOSED.

BOP Perform immediate operator actions of 1BwEP-0 at 1PM01J:

  • Verify power to 4KV busses.
  • Bus 141 deenergized
  • Bus 142 energized CREW (If manual SI not previously performed) Recognize and respond to conditions requiring a Safety Injection in accordance with 1BwEP-0 REACTOR TRIP OR SAFETY INJECTION, Step 4:
  • 1C SG pressure cannot be maintained > 640 psig.
  • Manually actuate SI from 1PM05J and 1PM06J.

The crew may transition to 1BwEP ES-0.1 "REACTOR TRIP RESPONSE" if SI conditions are not met in accordance with 1BwEP-0 "REACTOR TRIP or SI."

Recognition of SI requirements during performance of 1BwEP ES-0.1 will require re-entering 1BwEP-0 at step 1 (Page 17 continues the actions of 1BwEP-0).

Recognition of 1BwFR-H.1 entry requirements during performance of 1BwEP ES-0.1 will require entering 1BwFR-H.1.

1BwFR-H.1 actions start on page 20.

Comments:

NRC11-3a Page 16 of 23

Scenario NRC 11-3a Event 7 No: No.

Event Feed line break inside containment & Loss of heat sink

==

Description:==

Time Position Applicants Actions or Behavior US o Transition to 1BwEP ES-0.1 "REACTOR TRIP RESPONSE" from 1BwEP-0 o Notify SM of plant status and procedure entry.

o Request evaluation of Emergency Plan conditions.

o Request STA evaluation of status trees.

o Enter/Implement 1BwES-0.1 and direct operator actions of 1BwEP-1 to establish the following conditions:

ATC o RCS temperature stable at/trending to 557°F o All rod bottom lights are lit o PZR level > 17%

o Charging and Letdown in Service o PZR Level Trending to Program o PZR pressure > 1829 psig o PZR pressure stable or trending to 2235 psig.

o Check FW status o RCS temp <564 °F o FWI monitor lights lit o Trip Running FW Pumps o Check FW flow to SGs >500 gpm o Check SG levels Comments:

NRC11-3a Page 17 of 23

Scenario NRC 11-3a Event 8&9 No: No.

Event Feed line break inside containment & Loss of heat sink/1B CV pump trip

==

Description:==

Time Position Applicants Actions or Behavior Note: If the crew had previously transitioned to 1BwEP ES- 0.1, Reactor Trip Response, then immediate actions of 1BwEP-0 should be re-performed when SI is actuated or recognized.

EVALUATOR NOTE: US and RO will continue in 1BwEP-0 while BOP is performing Attachment B:

EVALUATOR NOTE: Per the OAS page, RCP trip criteria is applicable throughout the performance of 1BwEP-0. The crew may trip RCPs whenever the criteria of RCS pressure <1425 psig AND High head SI flow >100 gpm are recognized.

BOP

  • Verify FW isolated at 1PM04J:
  • FW pumps - TRIPPED.
  • Isolation monitor lights - LIT.
  • FW pumps discharge valves - CLOSED (or going closed) 1FW002A-C.
  • Verify DGs running at 1PM01J:
  • DGs - BOTH RUNNING.
  • 1SX169A/B OPEN.
  • Dispatch operator locally to check operation
  • Verify Generator Trip at 1PM01J:
  • OCB 1-8 and 7-8 open.
  • PMG output breaker open.
  • Verify Control Room ventilation aligned for emergency operations at 0PM02J:
  • VC Rad Monitors - LESS THAN HIGH ALARM SETPOINT. (train A rad monitors de-energized) o Dispatch EO to secure VL, VW and VV supply fans.
  • Operating VC train equipment - RUNNING.
  • 0B Supply fan
  • 0B Return fan
  • 0B M/U fan
  • 0B Chilled water pump
  • 0B Chiller
  • M/U fan outlet damper - 0VC08Y NOT FULLY CLOSED.

Comments:

NRC11-3a Page 18 of 23

Scenario NRC 11-3a Event 8&9 No: No.

Event Feed line break inside containment & Loss of heat sink/1B CV pump trip

==

Description:==

Time Position Applicants Actions or Behavior

  • 0B VC train M/U filter light - LIT.
  • 0VC09Y - OPEN
  • 0VC313Y - CLOSED
  • Operating VC train Charcoal Absorber aligned for train B.
  • 0VC44Y - CLOSED
  • 0VC05Y - OPEN
  • 0VC06Y - OPEN
  • Control Room pressure greater than +0.125 inches water on 0PDI-VC038.
  • Verify Auxiliary Building ventilation aligned at 0PM02J:
  • Two inaccessible filter plenums aligned.
  • Plenum A:
  • 0VA03CB - RUNNING
  • 0VA023Y - OPEN
  • 0VA436Y - CLOSED
  • Plenum C:
  • 0VA03CF RUNNING
  • 0VA072Y - OPEN
  • 0VA438Y - CLOSED
  • Verify FHB ventilation aligned at 0PM02J:
  • 0VA04CB - RUNNING
  • 0VA055Y - OPEN
  • 0VA062Y - OPEN
  • 0VA435Y - CLOSED
  • Notify US Attachment B complete ATC
  • Verify ECCS pumps running at 1PM05J/1PM06J:
  • CV pumps - NONE RUNNING (1B tripped):
  • 1B RH pump - RUNNING.
  • SI pump - NONE RUNNING

[CT]

  • START 1B SI PP E-0--J
  • RCFCs running in accident mode (0B train ONLY running)
  • RCFC accident mode status light lit
  • CNMT Phase A valves closed (train A valves not all closed)
  • Manually actuate Phase A Comments:

NRC11-3a Page 19 of 23

Scenario NRC 11-3a Event 8&9 No: No.

Event Feed line break inside containment & Loss of heat sink/1B CV pump trip

==

Description:==

Time Position Applicants Actions or Behavior

  • Dispatch EO to close de-energized valves outside containment
  • Verify Cnmt Vent isolation:
  • Group 6 Cnmt Vent Isol monitor lights - ALL LIT.
  • Verify AF system:
  • AF pumps - Neither RUNNING.
  • Attempt manual start of 1B AF pump o Dispatch EO to check 1B AF pump
  • AF flow control valves - 1AF005A-H THROTTLED.
  • Verify CC pumps - 1B RUNNING.
  • Verify SX pumps - 1B RUNNING ATC/
  • Check if Main Steamline Isolation required BOP
  • 1C S/G pressures < 640 psig
  • CNMT pressure > 8.2 psig
  • MSIV & MSIV bypass valves - CLOSED CREW o Determine and Announce containment is adverse when pressure rises above 5 psig.

BOP/

  • Check CS not required ATC
  • CNMT pressure remained < 20 psig BOP/
  • Verify Total AF flow:

ATC

  • AF flow < 500 gpm
  • SG levels < 31%

o May CLOSE 1AF005C & 1AF013G to isolate CST gravity flow to 1C SG FW line break.

CREW Identify entry conditions for 1BwFR-H.1, RESPONSE TO LOSS OF SECONDARY HEAT SINK Comments:

NRC11-3a Page 20 of 23

Scenario NRC 11-3a Event 9 No: No.

Event Feed line break inside containment/loss of heat sink

==

Description:==

Time Position Applicants Actions or Behavior US

  • Notify SM of plant status and procedure entry
  • Request STA evaluation of status trees
  • Enter/Implement 1BwFR-H.1 and direct operator actions of 1BwFR-H.1 to establish the following conditions ATC
  • Check if secondary heat sink is required
  • RCS pressure > faulted SG pressure
  • Check CV pump status
  • CV pumps - NONE RUNNING
  • GO TO step 15 (bleed and feed)

ATC

  • Establish RCS feed path
  • Verify RCS feed path
  • 1B SI pump - RUNNING
  • Group 2 cold leg injection monitor lights required for operating ECCS pumps - LIT ATC
  • Establish RCS bleed path

[CT]

  • PORV isolation valves - 1RY8000A deenergized & open, 1RY8000B energized &

FR-H.1- open

-F

  • Open BOTH PZR PORVs (1RY455A & 1RY456)

ATC

  • Verify adequate RCS bleed path
  • PORV isolation valves - BOTH OPEN ATC /
  • Verify ESF equipment actuations BOP Comments:

NRC11-3a Page 21 of 23

Scenario NRC 11-3a Event 9 No: No.

Event Feed line break inside containment/loss of heat sink

==

Description:==

Time Position Applicants Actions or Behavior CREW

  • Maintain RCS heat removal
  • Reset Cnmt isolations
  • Reset Phase A
  • Restore I/A to Cnmt BOP
  • Check if CS should be stopped
  • CS pumps - NONE RUNNING ATC
  • Verify cold leg recirc capability
  • 1B RH pump - RUNNING
  • 1SI8811B - ENERGIZED BOP/
  • Try to establish AF to at least one SG ATC
  • Check blowdown isolation and sample valves closed
  • 1SD005 A-D & 1SD002A-H
  • Review attachment B
  • Check 1AF004A & B - OPEN
  • Check AF pumps - NONE RUNNING o Dispatch operator to 1B AF pump
  • AF isolation valves - OPEN
  • AF flow control valves - THROTTLED
  • 1AF005A-H
  • Check AF flow - NOT ESTABLISHED ATC /
  • Prepare FW system for restoration BOP
  • CD/CB pumps - at least ONE RUNNING
  • Place FW valves in manual at 0% demand
  • 1FW510 - 540
  • 1FW510A - 540A Comments:

NRC11-3a Page 22 of 23

Scenario NRC 11-3a Event 9 No: No.

Event Feed line break inside containment/loss of heat sink

==

Description:==

Time Position Applicants Actions or Behavior

  • 1FW034A - D ATC /
  • Dispatch operators to remove FW isolation fuses
  • FW isolation fuses removed
  • 1PA27J
  • Establish main FW flow to at least one SG BOP
  • Open 1FW035A/B/D
  • Check FW pumps available
  • CD/CB pumps - at least TWO RUNNING
  • Check startup FW pump prepared for operation
  • Dispatch operator to startup FW pump
  • Bus 159 - ENERGIZED
  • Locally start aux oil pump
  • Open startup FW pump disch valve - 1FW059
  • Open startup FW pump recirc valve - 1FW076 (place C/S in modulate)
  • Verify close main FW pump recirc valves - 1FW012A, B, & C
  • Start startup FW pump US
  • Review Attachment B prior to initiating FW flow ATC /
  • Establish main FW flow to at least one SG BOP
  • Throttle 1FW034A/B to desired flow rate
  • Maintain hotwell level > 7 inches
  • Check SG WR levels rising Note: The scenario may be terminated at this point (final)

Comments:

NRC11-3a Page 23 of 23

Simulation Facility Braidwood Scenario Operating Test No.:2011 NRC No.: Exam NRC 11-2 Examiners: Applicant:

______________________ ____________________ SRO

______________________ ____________________ ATC

______________________ ____________________ BOP Initial Conditions: IC-21 Turnover: Unit 1 is operating at 100% power, steady state, equilibrium xenon. Online risk is yellow. 1B SX pump is OOS for change out of the aux lube oil pump for the past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. LCOAR 1BwOL 3.7.8 has been initiated. Expected back in service next shift. Following completion of turnover, the crew is to perform 1BwOS FW-W1, UNIT 1 TURBINE DRIVEN MAIN FEEDWATER PUMP STOP VALVE SURVEILLANCE. Power Team has requested Unit 1 lower power to 1125 MW at 3 MW/min due to grid demand following completion of 1BwOS FW-W1. Heavy rains have been experienced at the Braidwood site over the past few days and are forecasted to continue.

Event Malf. No. Event Event No. Type* Description Preload IOR ZDI1SX01PB PTL 1B SX pump OOS IOR ZLO1SX01PBC OFF 1B SX aux lube oil pump OOS IMF MS01C 100 1MS001C fails to close from MSI switches trgset 1 "ZDI1MS001C(1) ==

1" trg 1 "DMF MS01C" 1 None N-BOP, US 1BwOS FW-W1 2 None R-ATC, US Lower power at 3 Mw/Min 3 IMF CV01B C-ATC, US 1B CV pump trip (Tech Spec)

TS, US 4 IMF RX10A 0 15 I-ATC, US Turbine impulse pressure channel 1PT-505 TS-US fails Low (Tech Spec) 5 IMF FW35C C-BOP, US 1C HD Pump Trip (standby pump available) 6 IMF RX05 0 30 I-BOP, US Steam line pressure detector 1PT-507 fails low 7 MRF ED042D OPEN M-ALL Dual unit loss of Offsite AC power MRF ED042E OPEN (unit 1 loss of all AC power)

MRF ED042H OPEN IOR ZLO1HSDG0201 OFF IMF ED15C IMF ED15G IMF ED15J IMF EG08A 8 Preload 1C MSIV Fails to Close From MSI Switches

  • (N)ormal, (R)eactivity (I)nstrument, (C)omponent, (M)ajor Transient

SCENARIO OVERVIEW Unit 1 is operating at 100% power, steady state, equilibrium xenon. 1B SX pump is OOS for change out of the aux lube oil pump for the past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. LCOAR 1BwOL 3.7.8 has been initiated. Expected back in service next shift. Following completion of turnover, the crew is to perform 1BwOS FW-W1, UNIT 1 TURBINE DRIVEN MAIN FEEDWATER PUMP STOP VALVE SURVEILLANCE. Power Team has requested Unit 1 lower power to 1125 MW at 3 MW/min due to grid demand following completion of 1BwOS FW-W1. Heavy rains have been experienced at the Braidwood site over the past few days and are forecasted to continue.

After completing shift turnover and relief, the crew will perform 1BwOS FW-W1, UNIT 1 TURBINE DRIVEN MAIN FEEDWATER PUMP STOP VALVE SURVEILLANCE.

After completing 1BwOS FW-W1, the crew will lower power to 1125 MW at 3 MW/min due to grid demand. The crew will commence a power reduction at 3 MW/min.

After a measurable change in power, 1B CV pump will trip. The crew will implement 1BwOA PRI-15, LOSS OF NORMAL CHARGING. The crew will start the 1A CV pump to restore normal charging.

Technical Specifications 3.5.2 condition A and TRM 3.1.d, condition A apply.

After the 1B CV pump trip is addressed, First Stage Turbine Impulse Pressure channel 1PT-505 will fail low. The ATC will diagnose the failure of 1PT-505 and take manual control of rods after verifying turbine load stable. 1BwOA INST-2, OPERATION WITH A FAILED INSTRUMENT CHANNEL, Attachment D, will be entered. TS 3.3.1 conditions A and P will be entered. The ATC will return rod control to automatic after verifying Tave and Tref are within 1°F.

After the 1PT-505 failure is addressed, the 1C Heater Drain pump will trip due to overcurrent. The crew will implement 1BwOA SEC-1, SECONDARY PUMP TRIP, and start the 1B Heater Drain pump. Technical Specifications do not apply. On-line risk remains yellow. The 1C Heater Drain pump will remain unavailable for the rest of the scenario.

After the 1C Heater Drain pump has been addressed, steam line pressure detector 1PT-507 will fail low over a 30 second period. Both main feedwater pumps speed will lower, reducing feedwater flow and causing all steam generator levels to begin lowering. The crew will take actions to stabilize the plant by taking manual control of the main feedwater pumps. 1BwOA INST-2, OPERATION WITH A FAILED INSTRUMENT CHANNEL, Attachment J, will be implemented. 1PT-507 will remain unavailable for the remainder of the scenario. On-line risk remains yellow.

After the 1PT-507 failure is addressed, a loss of all offsite power will occur for both Units. When the 1A DG engine attempts to start, the engine will seize. A loss of DC control power to the 1B DG will prevent it from starting, resulting in a loss of all AC power to Unit 1. Transition will be made to 1BwCA-0.0, LOSS OF ALL AC POWER. The 1C MSIV will fail to close from either MSI switch and will have to be closed from the C/S. A limited crosstie to Unit 2 will be required due to the failure of 2B DG to energize bus 142. The crew must restore power to Unit 1 within 10 minutes. After power is restored to Bus 141, SX will be cross-tied between units per 1BwCA-0.0, Attachment C.

The scenario is complete when the crew has restored CV pump flow in 1BwCA-0.0, step 23e.

Critical Tasks

1. Restore power to Bus 141 within 10 minutes of loss of all AC power.

(UFSAR 15.0.8/Table 15.0-7) (K/A number - 000055EA2.03 importance 3.9/4.7)

2. Isolate RCP seal injection before a CV pump is started in 1BwCA-0.0.

(ERG Critical Task number - ECA-0.0--H) (K/A number - 003000A4.01 importance - 3.3/3.2)

NRC 11-2 Page 2 of 24

SIMULATOR SETUP GUIDE:

  • Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
  • Establish the conditions of IC-21, 100% power, steady state, equilibrium xenon.
  • Complete items on Simulator Ready for Training Checklist.
  • Verify/remove any Equipment Status Tags and Danger Tags not applicable to the scenario.
  • Place simulator in RUN and allow simulator to run during board walk down and turnover.
  • Run caep DEMO NRC 11-2 SETUP from disk and verify the following actuate:
  • IOR ZDI1SX01PB PTL
  • IOR ZLO1SX01PBC OFF
  • IMF MS01C 100
  • trgset 1 "ZDI1MS001C(1) == 1"
  • trg 1 "DMF MS01C"
  • Place info tags on 1B SX pump and 1SX001B.
  • Update PARAGON to reflect 1B SX pump OOS.
  • Post Yellow safety status sign.
  • VERIFY/START 1B CV Pump, SECURE and place in standby 1A CV Pump.
  • VERIFY 1C HD Pump is RUNNING.
  • Provide students with turnover sheets, 1BwOS NR-1, 1BwOS FW-W1 and critical parameters sheet.

NRC 11-2 Page 3 of 24

INSTRUCTOR/SIMULATOR RUN AID GUIDE Event 1: Perform 1BwOS FW-W1, UNIT 1 TURBINE DRIVEN MAIN FEEDWATER PUMP STOP VALVE SURVEILLANCE.

If dispatched as Equipment Operator to observe main feedwater pump stop valve operation, report stop valves respond normally as they are tested.

Acknowledge as SM commencement and completion of surveillance.

Event 2: Lower power at 3 MW/min Acknowledge as chemistry/rad protection requests for RCS samples (if required).

Acknowledge as Power Team initiation of ramp.

Event 3: 1B CV pump trip Insert IMF CV01B for 1B CV pump.

If dispatched as Equipment Operator to 1B CV pump and/or pump breaker, wait three minutes and report 1B CV pump appears normal and/or report phase A overcurrent flag at breaker cubicle.

Acknowledge as Shift Manager the failure, LCOAR entry, on line risk assessment, EAL evaluation, request for maintenance support, and IR request.

Event 4: Turbine Impulse Pressure channel 1PT-505 failed low.

Insert IMF RX10A 0 15 As SM, acknowledge the failure, 1BwOA INST-2 entry, request for E Plan evaluation, LCO 3.3.1 conditions A

& P entry, and requests for on line risk assessment, maintenance support, and IR initiation.

As SM, if requested support for tripping bistables in AEER, report that AEER bistables are not to be tripped until work analyst and NSO support can be obtained (in approx. 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />) and that the abnormal operating procedure should be continued. AEER bistable tripping will be conducted later.

NRC 11-2 Page 4 of 24

INSTRUCTOR/SIMULATOR RUN AID GUIDE Event 5: 1C Heater Drain Pump Trip.

Insert IMF FW35C to trip 1C HD Pump.

As SM acknowledge the failure, on line risk assessment, request for maintenance support, IR request, evaluation for reactivity screening, request for personnel notifications, and evaluation for restoration of full power operation.

If dispatched as Equipment Operator, report 1C HD pump is seized and report ground overcurrent flag at breaker cubicle.

If dispatched as Equipment Operator, report you will complete pump vent alignment per BwOP HD-2 for tripped pump.

If dispatched as Equipment Operator, report standby pump start was successful and you will complete BwOP HD-1 for started pump.

Event 6: Steam line pressure detector 1PT-507 fails low.

Insert IMF RX05 0 30 for 1PT-507 failed low.

If dispatched as EO to investigate 1PT-507, wait two minutes report no visible damage to 1PT-507.

Acknowledge as SM 1PT-507 failure, on line risk assessment, request for maintenance support, and IR requests.

Event 7: Dual unit loss of offsite power.

Run caep NRC 11-2 EVENT 7 from disk and verify the following actuate:

  • MRF ED042H OPEN
  • MRF ED042E OPEN
  • MRF ED042D OPEN
  • IOR ZLO1HSDG0201 OFF
  • IMF ED15C
  • IMF ED15G
  • IMF ED15J
  • IMF EG08A Record time loss of all AC power occurred: ______:______:______.

Record time AC power restored to Bus 141: ______:______:______.

Calculate time to restore AC power: ______:______:______.

After STA requested, as STA report CSF status - Yellow on inventory if pressurizer level < 17%.

NRC 11-2 Page 5 of 24

INSTRUCTOR/SIMULATOR RUN AID GUIDE Event 7: Dual unit loss of offsite power (continued)

When requested as EO to start the U1 D/Gs, report that 1A D/G is seized, 1B DG does not have control power, and 1BwOA ELEC-3 was ineffective.

Acknowledge as EO request to depress U1 DG emergency stop push buttons and insert the following:

  • MRF EG19 TRIP
  • MRF EG20 TRIP As Unit 2 operator, report ONLY Bus 241 is energized from 2A DG, acknowledge request to perform 2BwCA-0.3, and acknowledge request to monitor crosstie current as loads are started.

4 min. 19 sec. after request 2BwCA-0.3, insert the following to align Unit 2 4KV ESF buses to Unit 1:

  • MRF ED006 CLOSE to close ACB 2414.

Acknowledge as EO request to monitor 1B AF pump and request to maintain 1B AF pump day tank level.

Acknowledge as EO request to isolate RCP seals, wait three minutes and insert the following to isolate the RCS seal injection filters. Report RCP seal isolation to MCR.

  • MRF CV41 0 to close 1CV8384A
  • MRF CV42 0 to close 1CV8384B (should already be closed)

If asked as Unit 2 for 2SX016A and 2SX027A status, report 2SX016A and 2SX027A are open/energized.

Acknowledge request as EO to close 1SX016B and 2SX016B. Perform the following to close 1SX016B.

  • Open Monitor window and Input: SWV1SX016B=0 Wait three minutes and report 1SX016B and 2SX016B are closed.

If dispatched as EO to check 1SX005 position locally, wait two minutes and report 1SX005 is open.

If asked as Unit 2 for 2SX005 status, report 2SX005 is closed.

Acknowledge request as EO to throttle SX to the CC HXs. Insert the following to close 0SX007 and 1SX007.

  • MRF SW01 0
  • MRF SW02 0 Wait two minutes and report 0SX007 is closed, 1SX007 is closed and 2SX007 is 20% open.

NRC 11-2 Page 6 of 24

INSTRUCTOR/SIMULATOR RUN AID GUIDE Event 7: Dual unit loss of offsite power (continued)

If requested as Unit 2 to open 2SX005, Insert the following to open 2SX005.

  • MRF SW07 100 Wait one minute and report 2SX005 is open.

If asked as Unit 2 for 2SX033 and 2SX034 status, report 2SX033 and 2SX034 are open.

If dispatched as EO to throttle 0SX007 to 10% open, Insert the following to throttle 0SX007.

  • MRF SW01 10 Wait 30 sec and report 0SX007 is 10% open.

Acknowledge request as Unit 2 to monitor 2A SX pump amps and discharge pressure.

If asked as Unit 2 for crosstie loading capability, report adequate capacity exists prior to starting Unit 1 loads.

Acknowledge as EO request to isolate CC surge tank auto makeup and insert the following to isolate CC surge tank makeup:

  • MRF CC51 0 to close 1CC185
  • MRF CC52 0 to close 1CC184 Acknowledge as EO request to drain CC surge tank to normal level and insert the following as needed to initiate CC surge tank drain:
  • MRF CC15 100 to open 1CC2020B
  • MRF CC16 100 to open 1CC2020A NRC 11-2 Page 7 of 24

Scenario NRC 11-2 Event 1 No: No.

Event 1BwOS FW-W1

==

Description:==

Time Position Applicants Actions or Behavior CUE

  • From turnover perform 1BwOS FW-W1, UNIT 1 TURBINE DRIVEN MAIN FEEDWATER PUMP STOP VALVE SURVEILLANCE.

US

  • Direct BOP to perform 1BwOS FW-W1.

BOP

  • Refer to 1BwOS FW-W1.
  • Update data sheet D-2 as each test is performed.
  • Test 1B main FW pump at 1PM04J:
  • Depress left LP stop valve TEST pushbutton.
  • Observe left LP stop valve OPEN lamp goes out.
  • Observe left LP stop valve TEST button illuminates.
  • Observe left LP stop valve OPEN lamp illuminates.
  • Depress high pressure stop valve TEST pushbutton.
  • Observe high pressure stop valve OPEN lamp goes out.
  • Observe high pressure stop valve CLOSED and TEST buttons illuminate.
  • Observe high pressure stop valve CLOSED button goes out.
  • Test 1C main FW pump at 1PM04J:
  • Depress left LP stop valve TEST pushbutton.
  • Observe left LP stop valve OPEN lamp goes out.
  • Observe left LP stop valve TEST button illuminates.
  • Observe left LP stop valve OPEN lamp illuminates.
  • Depress high pressure stop valve TEST pushbutton.
  • Observe high pressure stop valve OPEN lamp goes out.
  • Observe high pressure stop valve CLOSED and TEST buttons illuminate.
  • Observe high pressure stop valve CLOSED button goes out.
  • Inform US 1BwOS FW-W1 complete.

US

  • Acknowledge report.

o Notify SM 1BwOS FW-W1 complete.

EVALUATOR NOTE: After 1BwOS FW-W1 is complete and with lead examiners concurrence, insert the next event.

Comments:

NRC 11-2 Page 8 of 24

Scenario NRC 11-2 Event 2 No: No.

Event Lower power to 1125 MW at 3 MW/min

==

Description:==

Time Position Applicants Actions or Behavior US

  • Implement actions of 1BwGP 100-4, POWER DESCENSION or BwOP EH-15 DEHC OPERATIONS.

o Perform pre-job brief per HU-AA-1211 PRE-JOB, HEIGHTENED LEVEL OF AWARENESS, INFREQUENT PLANT ACTIVITY, AND POST JOB BRIEFINGS for load ramp.

CREW o Review Precautions, and Limitations and Actions, if not already performed during pre-job brief.

ATC

  • Verify rod position and boron concentration.
  • Initiate boration, if required. (BwOP CV-6)

o Refer to operator aid REMA for reactivity guidlines.

o Auto addition of Boric Acid:

  • Perform the following at 1PM05J:
  • Set 1FK-110 BA Flow Control to desired boration rate.
  • Set 1FY-0110 BA Blender Predet Counter to desired volume.
  • Place MAKE-UP MODE CONT SWITCH to STOP position.
  • Place MODE SELECT SWITCH to BORATE position.
  • Place MAKE-UP MODE CONT SWITCH to START.
  • Verify proper operation of valves and BA transfer pump (1CV110B open, Boric Acid Transfer Pump running, 1CV110A throttles open, proper BA flow indicated on recorder).

o Turn on PZR backup heaters in accordance with BwOP RY-13, PRESSURIZER BACKUP HEATER OPERATION.

OR o Batch addition of Boric Acid:

  • Open 1CV110B.
  • Open 1CV110A.
  • Start the BA Transfer pump.
  • When desired amount of BA has been added, stop the BA Transfer Pump.
  • Close 1CV110A.
  • Close 1CV110B.

o Turn on PZR backup heaters (BwOP RY-13).

Comments:

NRC 11-2 Page 9 of 24

Scenario NRC 11-2 Event 2 No: No.

Event Lower power to 1125 MW at 3 MW/min

==

Description:==

Time Position Applicants Actions or Behavior BOP

  • Lower turbine load at 1PM02J or OWS drop 210 by performing the following::
  • Select SETPOINT.
  • Enter desired MW into REF DEMAND window
  • Select ENTER.
  • Enter 3 MW/min into the RATE window.
  • Select ENTER.
  • Select EXIT.

o Notify US and RO of pending ramp.

  • Select GO/HOLD.
  • Verify GO/HOLD button illuminates.
  • Verify HOLD illuminated RED.
  • Select GO.
  • Verify GO illuminates RED.

ATC/

  • Monitor reactor power and turbine load lowering:

BOP

  • Monitor NIs, Tave, I, Pzr press/level at 1PM05J.
  • Monitor MWe and DEHC system response at 1PM02J or OWS drop 210.
  • During boration, monitor the following at 1PM05J and HMI:

o Monitor VCT level.

o Verify RCS boron concentration rising.

o Monitor BA predet counter.

o Verify boration auto stops at preset value.

o Return Reactor Makeup System to automatic at current boron concentration.

After measurable change in power and lead examiner concurrence, insert the next event.

Comments:

NRC 11-2 Page 10 of 24

Scenario NRC 11-2 Event 3 No: No.

Event 1B CV pump trip.

==

Description:==

Time Position Applicants Actions or Behavior CUE

  • PZR level lowering.
  • Trip/yellow disagreement light on 1B CV pump C/S.

ATC

  • Identify 1B CV pump has tripped at 1PM05J.
  • Report failure to US.

o May isolate letdown per BwAR by closing 1CV8149A/B/C CREW

  • Reference BwARs as time permits.

o Identify entry conditions for 1BwOA PRI-15, LOSS OF NORMAL CHARGING.

  • Dispatch operator to investigate cause of 1B CV pump trip.

o Place unit ramp on hold.

NOTE: The crew may elect to start the stand-by CV pump using Immediate Actions of BwAR 1-9-A3 OR by entering 1BwOA PRI-15. The required actions for each method are described below.

ATC IF crew chooses to use BwAR 1-9-A3 to start 1A CV pump, required actions begin here.

o Determine NO indications of gas binding of tripped pump.

o NO fluctuation of pump amps prior to trip.

o NO fluctuation of pump discharge flow prior to trip.

o NO fluctuation of charging flow prior to trip.

  • Verify suction source 1CV112B and 1CV112C OPEN
  • Verify recirc path 1CV8111 and 1CV8114 OPEN
  • Place 1A CV pump C/S to start.

US IF crew chooses to enter 1BwOA PRI-15 to start 1A CV pump, required actions begin here.

  • Notify Shift Manager of plant status and procedure entry.

o Implement 1BwOA PRI-15, LOSS OF NORMAL CHARGING, and direct operator actions of 1BwOA PRI-15 to establish the following conditions:

o Direct BOP/ATC to stop load ramp/dilution.

Comments:

NRC 11-2 Page 11 of 24

Scenario NRC 11-2 Event 3 No: No.

Event 1B CV pump trip.

==

Description:==

Time Position Applicants Actions or Behavior o Enter Tech Spec 3.4.1 if PZR pressure < 2209 psig.

ATC Perform the following at 1PM05J:

  • Check CV pump status:
  • Identify NEITHER CV pump is running
  • Place 1B CV pump C/S in PULL OUT.
  • Isolate normal letdown:
  • Place 1CV8149A, B, & C, letdown orifice isolation valves, C/Ss to CLOSE.
  • Place 1CV459 & 1CV460, letdown isolation valves, C/Ss to CLOSE.
  • Check VCT status:
  • Check 1CV112B & 1CV112C, VCT suction valves, OPEN.
  • Maintain VCT level greater than 20%.
  • Operate RMCS in automatic or manual to maintain VCT level > 20%.

ATC/ Perform the following at 1PM05J:

BOP o Acknowledge RM-11 alarm caused by isolating flow to 1PR06J, Gross Failed Fuel Monitor.

  • Check for gas binding of previously running CV pump by verifying the following trends NOT fluctuating prior to pump trip (may use PPC trends):
  • RCP #1 seal leak off flows.
  • CV pump flow.
  • CV pump discharge pressure.
  • CV pump amps.
  • Restore normal charging flow:
  • Check 1CV8111 & 1CV8114, 1B CV pump miniflow isolation valves - OPEN.
  • Check RCS pressure approximately 2235 psig.
  • Place 1A CV pump C/S to start.
  • Check CV System Alignment:
  • Verify 1CV8146, charging to RC 1B loop isolation valve - OPEN.
  • Verify 1CV8324A, charging to regen HX 1A isolation valve - OPEN.
  • Verify 1CV8105 AND 1CV8106, charging line CNMT isolation valves - OPEN.
  • Check charging flow established (Charging flow may be at minimum for RCP seal injection due to letdown isolation).
  • Determine normal letdown is isolated.

o Monitor RMCS during automatic VCT makeup:

Comments:

NRC 11-2 Page 12 of 24

Scenario NRC 11-2 Event 3 No: No.

Event 1B CV pump trip.

==

Description:==

Time Position Applicants Actions or Behavior

CREW

  • Identify entry conditions for 1BwOA ESP-2, REESTABLISHING CV LETDOWN DURING ABNORMAL CONDITIONS.

US o Notify Shift Manager of plant status and procedure entry.

  • Implement 1BwOA ESP-2, REESTABLISHING CV LETDOWN DURING ABNORMAL CONDITIONS, and direct operator actions of 1BwOA ESP-2 to establish the following conditions:

BOP Perform the following at 1PM05J:

  • Check letdown Isolated:
  • Verify 1CV8149A, B, & C, letdown orifice isolation valves - CLOSED.
  • Verify 1CV459 & 1CV460, letdown isolation valves - CLOSED.

BOP Perform the following at 1PM05J:

  • Check letdown flow path:
  • Verify 1CV8401A, letdown to letdown HX 1A isolation valve, - OPEN.
  • Verify 1CV8324A, charging to regen HX 1A isolation valve - OPEN.
  • Verify 1CV8389A, letdown to regen HX 1A isolation valve - OPEN.
  • Verify 1CV8152 & 1CV8160, letdown line CNMT isolation valves - OPEN.
  • Verify BTRS mode select switch OFF.
  • Align letdown controllers:
  • Place 1PK-131, letdown line pressure controller, in MANUAL and raise demand to 40%.
  • Place 1CC130A, letdown HX outlet temperature controller, in MANUAL and raise demand to 60%.
  • Verify charging flow established:
  • Verify 1CV8105 AND 1CV8106, charging line CNMT isolation valves - OPEN
  • Adjust 1CV182, charging header backpressure control valve, to establish 8-13 gpm RCP seal injection flow.
  • Establish letdown flow:
  • Place 1CV459 & 1CV460, letdown isolation valves, C/Ss to OPEN.
  • Place 1CV8149A, B, & C, letdown orifice isolation valves, C/Ss to OPEN as necessary to establish 120 gpm letdown flow.

Comments:

NRC 11-2 Page 13 of 24

Scenario NRC 11-2 Event 3 No: No.

Event 1B CV pump trip.

==

Description:==

Time Position Applicants Actions or Behavior

  • Lower demand on 1PK-131, letdown line pressure controller, to raise letdown pressure to approximately 360 psig on 1PI-131.
  • Operate 1FK-121 in manual to restore PZR level to normal operating band and maintain 8-13 gpm RCP seal injection flow.
  • Lower demand on 1CC130A, to control letdown temperature between 90° to 115°F on 1TI-130.
  • Place 1PK-131, letdown line pressure controller, in AUTO.
  • Place 1CC130A, letdown HX outlet temperature controller, in AUTO.
  • At the RM-11, verify 1PR06J cursor is GREEN.

US Note: these actions are applicable for both methods of starting 1A CV pump.

  • Contact SM to perform risk assessment, initiate IR, and contact maintenance to investigate/correct instrument failure.
  • Determine TS 3.5.2, condition A is applicable.
  • Determine TRM 3.1.d, condition A is applicable.

EVALUATOR NOTE: After the actions for charging pump trip are complete and with lead examiner concurrence, enter next event.

Comments:

NRC 11-2 Page 14 of 24

Scenario NRC 11-2 Event 4 No: No.

Event Turbine Impulse Pressure Channel 1PT-505 failed low

==

Description:==

Time Position Applicants Actions or Behavior CUE

  • 1PI-505, First Stage Pressure, indication lowering.
  • 1TR-0412, Auct Tave/Tref recorder, Tref indication lowering
  • 1SI-412, Rod Speed, indicates 72 step per minute ATC/
  • Report failure to US o Place rod control in manual o Refer to BwAR 1-14-D1 as time permits BOP o Verifies turbine load not lowering CREW
  • Identify entry conditions for 1BwOA INST-2, OPERATION WITH A FAILED INSTRUMENT CHANNEL US
  • Notify SM of plant status and procedure entry
  • Implement 1BwOA INST-2 "OPERATION WITH A FAILED INSTRUMENT CHANNEL", Attachment D "TURBINE IMPULSE PRESSURE CHANNEL FAILURE" and direct operator actions of 1BwOA INST -2 to establish the following conditions.
  • Direct RO to place rod control in manual o If Pzr Pressure drops below 2209 psig, enter LCO 3.4.1 until pressure is > 2209 psig.

ATC/

  • Restore steam dumps BOP
  • C-7 NOT lit
  • Place steam dump mode select switch to STM PRESS mode
  • Place 1PK-507 in auto o Check Reactor Power <100%

ATC/

  • Place 1PS505Z, Turbine Impulse Pressure Defeat Switch, to DEFEAT P-505 US/ATC
  • Check if rod control can be placed in auto o C5 NOT lit o Tave/Tref stable and within 1°F (check T0494 < 1°F).

Comments:

NRC 11-2 Page 15 of 24

Scenario NRC 11-2 Event 4 No: No.

Event Turbine Impulse Pressure Channel 1PT-505 failed low

==

Description:==

Time Position Applicants Actions or Behavior o If control rods need to be adjusted to restore Tave - Tref within 1°F, perform the following:

o Conduct reactivity brief for restoring control rods per OP-AP-300-1004, Reactivity Change Determination Form o Obtain SM concurrence for reactivity change o Adjust Tave - Tref within 1°F using control rods

  • Place Rod control in auto ATC/
  • Check P13 interlock BOP
  • Turbine power > 10% - P13 NOT lit US
  • Determine TS 3.3.1 conditions A and P are applicable.
  • Contact SM to perform risk assessment, initiate IR, perform reactivity screening and contact personnel to investigate/correct instrument failure.

The next event is to be inserted following the above actions by the US and Lead Examiner concurrence.

Comments:

NRC 11-2 Page 16 of 24

Scenario NRC 11-2 Event 5 No: No.

Event 1C Heater Drain Pump Trip

==

Description:==

Time Position Applicants Actions or Behavior CUE

  • HDT level indicator 1LI-HD009 rising at 1PM03J.
  • 1C HD Pump flow indication 1FI-HD006 drops at 1PM03J.
  • 1A HD Pump flow indication 1FI-HD004 rises at 1PM03J.

ATC/

  • Recognize 1C HD pump has tripped.

BOP

  • Report pump trip to US.
  • Reference BwARs.

o Dispatch operators to investigate.

CREW

  • Identify entry conditions for 1BwOA SEC-1, SECONDARY PUMP TRIP.

US

  • Acknowledge 1C HD pump trip.
  • Contact Shift Manager to perform risk assessment, initiate IR, and contact maintenance to investigate/correct failure.
  • Implement 1BwOA SEC-1, SECONDARY PUMP TRIP Attachment C, HD PUMP TRIP, and direct operator actions of 1BwOA SEC-1 to establish the following conditions:

BOP

  • Start the 1B HD Pump (may have been done per BwAR actions).
  • Recognize two pumps running again.
  • Monitor HD tank level at 1PM03J.
  • Restore Plant Conditions
  • 1HD117 in auto and closed.
  • Running HD pumps parameters acceptable
  • 1-10-E8 NOT lit.
  • 1-10-D7 NOT lit.

ATC/

  • Dispatch EO to perform BwOP HD-1 on standby pump that was started and BwOP BOP HD-2 on tripped pump.

EVALUATOR NOTE: After the actions for the HD Pump trip are complete and with lead examiners concurrence, insert the next event.

Comments:

NRC 11-2 Page 17 of 24

Scenario NRC 11-2 Event 6 No: No.

Event Steam line pressure detector 1PT-507 fails low.

==

Description:==

Time Position Applicants Actions or Behavior CUE

  • Annunciators S/G 1A/B/C/D LEVEL DEVIATION HIGH/LOW (1-15-A9/B9/C9/D9)
  • BOTH main feedwater pump speed/flow - LOWERING.
  • Refer to BwARs
  • Determine 1PT-507 failing low at 1PM04J.
  • Identify entry conditions for 1BwOA INST-2, OPERATION WITH A FAILED INSTRUMENT CHANNEL.

o Dispatch operators to investigate 1PT-507 failure.

US

  • Notify SM of plant status and procedure entry
  • Implement 1BwOA INST-2 "OPERATION WITH A FAILED INSTRUMENT CHANNEL", Attachment J "FW PUMP SPEED CONTROL MALFUNCTION" and direct operator actions of 1BwOA INST -2 to establish the following conditions.

o Direct BOP/RO to stop load ramp/dilution BOP Perform the following at 1PM04J:

  • Place 1SK-509A, Master FW pump speed controller in manual.
  • Raise FW pump speed sufficiently to restore SG levels and FW header DP to normal.
  • Maintain SG levels by operating 1SK-509A in manual.

o Aligns steam dumps back to Tave mode.

Note to evaluator: The crew may ask for Shift Manager direction regarding Steam Dump mode of operation. The procedures for 1PT-505 failure and 1PT-507 failure conflict for which mode steam dumps are left in. Since the steam dumps will not work in Tave on the load reject controller nor will they work in Stm Press mode, they may be returned to Tave mode since they will still work on the plant trip controller.

ATC Perform the following at 1PM05J:

  • Monitor reactor power response to SG under and overfeeding transient.

Comments:

NRC 11-2 Page 18 of 24

Scenario NRC 11-2 Event 6 No: No.

Event Steam line pressure detector 1PT-507 fails low.

==

Description:==

Time Position Applicants Actions or Behavior US

  • Contact SM to perform risk assessment, initiate IR, and contact maintenance to investigate/correct instrument failure.

o If PZR pressure dropped below 2209 psig during transient, LCO 3.4.1 applies.

EVALUATOR NOTE: After the actions for the 1PT-507 failure are complete and with lead examiners concurrence, insert the next event.

Comments:

NRC 11-2 Page 19 of 24

Scenario NRC 11-2 Event 7 No: No.

Event Dual unit loss of offsite power. (U-1 loss of all AC power)

==

Description:==

Time Position Applicants Actions or Behavior CUE

  • BOTH 4KV ESF bus alive lights NOT LIT.

CREW

  • Determine Loss of All AC Power has occurred.

US

  • Enter/Implement 1BwCA-0.0, "LOSS OF ALL AC POWER", and direct operator actions of 1BwCA-0.0 to establish the following conditions:
  • Direct operator actions of 1BwCA-0.0.
  • Notifies SM of plant status and procedure entry.
  • Record time loss of all AC power occurred. ______:______:______

ATC Perform immediate operator actions of 1BwCA-0.0:

  • Manually trip reactor at 1PM05J or 1PM06J.
  • Neutron flux - DROPPING BOP Perform immediate operator actions of 1BwCA-0.0:
  • Manually Isolate Steamlines at 1PM05J or 1PM06J:
  • Actuate main steamline isolation.
  • Verify all MSIVs and MSIV Bypass valves - CLOSED. (1MS001C will NOT be Closed) o Actuate main steamline isolation from alternate MSI Switch.
  • Close 1MS001C with C/S at 1PM06J BOP
  • Verify AF flow at 1PM06J:
  • AF flow >500 gpm (1B AF train only)

RO

  • Verify RCS isolated at 1PM05J:
  • 1CV8149A, B & C closed.
  • 1CV459 and 1CV460 closed.

Comments:

NRC 11-2 Page 20 of 24

Scenario NRC 11-2 Event 7 No: No.

Event Dual unit loss of offsite power. (U-1 loss of all AC power)

==

Description:==

Time Position Applicants Actions or Behavior

  • 1CV8153A & B closed.

BOP

  • Try to restore power to any/both Unit 1 4KV ESF buses at 1PM01J:
  • DGs - NONE RUNNING.
  • Attempt Manual Start of 1A/B DG
  • Manually Actuate SI from 1PM05J and 1PM06J.

BOP/

  • Prepare for Unit 2 crosstie:

US

  • Dispatch operator to depress emergency stop push buttons on both U1 DGs.
  • Reset SI at 1PM06J.

US

  • Check status of Unit 2 ESF buses at 1PM01J:
  • Bus 241 - ENERGIZED from 2A DG.
  • Notify Unit 2 to implement 2BwCA-0.3, RESPONSE TO OPPOSITE UNIT LOSS OF ALL AC POWER.
  • Bus 242 - DEENERGIZED
  • GO TO 1BwCA-0.0, Step 14 (limited crosstie).

BOP/

  • Energize bus 141 using limited Unit 2 crosstie (DG 2A) at 1PM01J:

US

  • Bus 241 energized from 2A DG.
  • Check Bus 141 - NOT FAULTED:
  • ACB 1413 (DG feed) in PULL OUT.
  • ACB 1411 (Non-ESF bus tie) in PULL OUT.
  • ACB 1412 (SAT feed) in PULL OUT.
  • ACB 1414 (Reserve feed) in PULL OUT.
  • Verify Bus 141 alarms NOT LIT:

ATC/

  • Energize bus 141 using limited Unit 2 crosstie (DG 2A) at 1PM01J: (Contd)

BOP

  • Place ESF loads in PULL OUT: (may have been performed per BwAP 340-1 prudent operator actions)
  • BOTH CENT CHG pumps
  • BOTH RH pumps
  • BOTH SI pumps
  • 1A AF pump Comments:

NRC 11-2 Page 21 of 24

Scenario NRC 11-2 Event 7 No: No.

Event Dual unit loss of offsite power. (U-1 loss of all AC power)

==

Description:==

Time Position Applicants Actions or Behavior

  • BOTH CS pumps
  • ALL CC pumps (1A, 1B, and 0)
  • BOTH SX pumps
  • BOTH MCR chillers
  • Check ACB 2414 closed (reserve feed light lit.).
  • Synch and Close Bus 141/241 reserve feeder breaker:
  • Close ACB 1414
  • Check Bus 141 energized.

[CT]

  • Check Bus 131X energized.

UFSAR 15.0.8/

Table

  • Record time AC power restored: ______:______:______

15.0-7

  • Time power restored - time power lost = ______:______:______ (<10 minutes)
  • Check VC Train 0A fans - RUNNING:
  • Start 0A supply fan, 0A return fan, & 0A makeup fan.
  • Notify TSO to implement an emergency AC restoration program.
  • GO TO step 16.

ATC/

  • Check AF pump status at 1PM06J:

BOP

  • 1B AF pump - RUNNING.
  • Check SG levels at 1PM05J:
  • Maintain NR levels between 10% (31%) and 50%.

o Throttle 1AF005E/F/G/H

  • Dispatch operator to monitor 1B AF pump.

ATC/

  • Isolate RCP seals:

BOP

  • Dispatch operator to locally close 1CV8384A & B.

[CT]

  • Close 1CC9438 at 1PM06J.

ECA-

  • Close 1CV8100 at 1PM05J.

0.0--H ATC/

  • Verify Equipment loaded on bus 141 at 1PM06J:

BOP

Comments:

NRC 11-2 Page 22 of 24

Scenario NRC 11-2 Event 7 No: No.

Event Dual unit loss of offsite power. (U-1 loss of all AC power)

==

Description:==

Time Position Applicants Actions or Behavior NOTE: All critical tasks are complete at this point. The scenario may be terminated here at the lead evaluators discretion.

US

  • Restore Unit 1 SX cooling:
  • Enter/Implement 1BwCA-0.0, "LOSS OF ALL AC POWER", ATTACHMENT C, STATION BLACKOUT - ALTERNATE SX COOLING, and direct operator actions of 1BwCA-0.0 ATTACHMENT C to establish the following conditions:

ATC/

  • Prepare RCFC train for SX crosstie:

BOP

  • Contact Unit 2 to verify 2SX016A & 2SX027A - OPEN
  • Dispatch operators to locally close 1SX016B AND 2SX016B.
  • Prepare CC HX for SX crosstie:
  • Unit 0 CC HX - in service to Unit 1
  • 1SX005 previously open at 1PM06J or open locally.
  • Contact Unit 2 to verify 2SX005 closed.
  • Close 1SX004 at 1PM06J.
  • Dispatch operators to throttle CC HX SX flow:
  • Close 0SX007.
  • 2SX007 - 20% open.
  • Crosstie unit SX systems:
  • Close 1SX016A & 1SX027A at 1PM06J.
  • Verify 1SX005 previously open at 1PM06J or open locally.
  • Contact Unit 2 to open 2SX005.
  • Verify open 1SX033 & 1SX034 at 1PM06J.
  • Contact Unit 2 to verify open 2SX033 & 2SX034.
  • Establish minimum SX cooling for Unit 1 CC system:
  • Dispatch operator to throttle 0SX007 - 10% open.
  • Local operator to adjust 0SX007 & 2SX007 to maintain the following:
  • 2A SX pump amps < 191 AMPS
  • 2A SX pump discharge pressure > 90 PSIG
  • Unit 1 & Unit 2 CC HX outlet temperatures < 105°F.

GO TO main body, step 20b.

ATC/

  • Start 0A VC chilled water pump at 0PM02J.

BOP

  • Start 0A VC chiller at 0PM02J.
  • Dispatch operators to start 1A & 1B DG per 1BwOA ELEC-3.
  • Restore CC system at 1PM06J:
  • 1CC9438 - CLOSED
  • Start 1A CC pump.
  • Prepare to restore CV pump at 1PM05J:

Comments:

NRC 11-2 Page 23 of 24

Scenario NRC 11-2 Event 7 No: No.

Event Dual unit loss of offsite power. (U-1 loss of all AC power)

==

Description:==

Time Position Applicants Actions or Behavior

  • Open 1CV112D
  • Close 1CV112B
  • Close 1CV8106
  • Reset SI recirc sump and CV pump miniflow isolation valves.
  • Verify/open 1CV8111 & 1CV8114
  • 1SI8801A & B - CLOSED
  • Check seal injection filter isolated:
  • 1CV8384A & B CLOSED
  • Start 1A CV pump at 1PM05J.

o Open 1SI8801A at 1PM05J as needed to maintain PZR level > 25% (41%).

NOTE: Scenario is terminated at this point (Final)

Comments:

NRC 11-2 Page 24 of 24

Simulation Facility Braidwood Scenario Operating Test No.: NRC 2011 No.: Exam NRC 11-1 Examiners: ______________________ Applicant: ____________________ SRO

______________________ ____________________ ATC

______________________ ____________________ BOP Initial Conditions: IC-18 Turnover: Unit 1 is at 75% power, steady state, equilibrium xenon, MOL. Online risk is green. 1B CW PP is OOS for intake bay inspection. Following completion of turnover, the shift manager requests the BOP to swap GC pumps per BwOP GC-5, in preparation for an OOS on 1GC01PA next shift. TSO has requested Unit 1 prepare to raise turbine load to full power at maximum allowable rate due to grid demand.

Event Malf. No. Event Event No. Type* Description Preload IOR ZDI1CW01PB 1B CW PP OOS PTL MRF ED093B OPEN 1CW001B OOS IMF RP02A Reactor trip breaker A fails to open IMF RP02B Reactor trip breaker B fails to open IMF RD09 Auto Rod Speed Failure (8 steps/min)

IRF RP49 OUT prevents 1A CV train valves from auto positioning on SI signal TRGSET 1 PZR PORV 1RY456 fails open THPPRZR .GT. 2315 IMF TH11B (1 0) 100 IOR ZDI1RY8000B 1RY8000B fails open AUTO 1 None N-BOP, US Swap stator cooling pumps.

2 None R-ATC, US Raise power at 0.4 Mw/Min 3 IMF FW16 1500 30 I-BOP, US 1PT-508 FW Htr Dsch Press fails high 4 IMF TH11A 5 C-ATC, 1RY455A partially opens TRGSET 2 TS-US 1RY8000A block valve breaker trips ZLO 1RY8000A(2)==0 MRF ED058C (2 5)

OPEN 5 IMF CV16 100 10 I-RO, US VCT level channel 1LT-112 failure.

6 IMF ED11D TS-US Loss of instrument bus 114 (Tech Spec)

IRF ED019 OPEN 7 IMF ED07C Bus 143 Deenergized 8 Preload M-All ATWS 9 Preload PZR PORV 1RY456 fails open

  • (N)ormal, (R)eactivity (I)nstrument, (C)omponent, (M)ajor Transient

SCENARIO OVERVIEW Unit 1 is at 75% power, steady state, equilibrium xenon, MOL. Online risk is green. 1B CW PP is OOS for intake bay inspection. Following completion of turnover, the shift manager requests the BOP to swap GC pumps per BwOP GC-5, in preparation for an OOS on 1GC01PA next shift. TSO has requested Unit 1 prepare to raise turbine load to full power at maximum allowable rate (0.4 MW/min initially) due to grid demand.

After completing shift turnover and relief, the BOP will swap stator cooling pumps per BwOP GC-5.

After swapping stator cooling pumps, Power Team will request Unit raise turbine load to full power at maximum allowable rate due to grid demand. The crew will commence a power ascension at 0.4 mw/min.

After a measurable change in power, feedwater line pressure detector 1PT-508 will fail high over a 30 second period. Both main feedwater pumps speed will lower, reducing feedwater flow and causing all steam generator levels to begin lowering. The crew will take actions to stabilize the plant by taking manual control of the main feedwater pumps. 1BwOA INST-2, OPERATION WITH A FAILED INSTRUMENT CHANNEL, Attachment J, will be implemented. 1PT-508 will remain unavailable for the remainder of the scenario.

After the 1PT-508 failure is addressed, PZR PORV 1RY455A will open to the intermediate position, resulting in a slow RCS pressure drop. The ATC will isolate the PZR PORV by closing 1RY8000A, PORV block valve. Once 1RY8000A is closed, its breaker will trip open, removing power from 1RY8000A.

1RY455A will remain unavailable for the remainder of the scenario. Tech spec 3.4.11, conditions B and C apply. If pressure drops below 2209 psig, Tech Spec 3.4.1 will apply.

After the PZR PORV failure is addressed, VCT level transmitter 1LT-112 will fail high, causing letdown to divert to the HUT. The RO will take manual control and close the letdown divert valve. Tech Spec 3.3.9 does not apply in Mode 1. The instrument failure will prevent RMCS for operating in automatic mode. 1LT-112 will remain unavailable for the remainder of the scenario.

After the VCT level channel has been addressed, a loss of instrument bus 114 will occur. The crew will enter 1BwOA ELEC-2, LOSS OF INSTRUMENT BUS, and determine that instrument bus 114 is damaged and cannot be energized from the CVT. Tech Spec 3.8.9 will apply.

After the instrument bus 114 failure is addressed, bus 143 is lost causing the loss of 1A and 1C CW pumps. Condenser vacuum is lost and a manual reactor trip or an automatic turbine trip - reactor trip signal is generated. The turbine trips but the reactor does not trip, placing the plant in an ATWS condition.

1BwEP-0 is entered with a transition to 1BwFR S-1. A failure of rod control to automatically insert rods at >

48 steps/minute forces the Unit NSO to manually insert control rods. The RWST will be used as the borated water source since the BA transfer pump has lost power. RCS pressure rises and PZR PORV 1RY456 opens to reduce pressure.

Although RCS pressure starts dropping, PZR PORV 1RY456 remains open creating a loss of reactor coolant. 1BwFR-S.1 is completed and 1BwEP-0 is reentered with a failure of high head injection valves (1SI8801A/B) and charging line Cnmt isolation valves (1CV8105/6) to automatically reposition. The crew will take action to manually open 1SI8801A/B and close 1CV8105/6.

Completion criteria is transition to 1BwEP ES-1.2.

Critical Tasks

1. Insert negative reactivity into the core by initiating RCCA insertion at greater than or equal to 48 steps per minute prior to completion of step 1 of 1BwFR-S.1.

(ERG Critical Task number - FR-S.1--C) (K/A number - 000029EA1.09 importance - 4.0/3.6)

2. Establish high head injection flow before transition out of 1BwEP-0.

(ERG Critical Task number - E-0--I) (K/A number - APE008AA2.10, importance - 3.6/3.6)

NRC 11-1 Page 2 of 25

SIMULATOR SETUP GUIDE:

  • Verify/perform TQ-BR-201-0113, BRAIDWOOD TRAINING DEPARTMENT SIMULATOR EXAMINATION SECURITY ACTIONS CHECKLIST.
  • Establish the conditions of IC-18, 75% power, steady state, equilibrium xenon.
  • Complete items on Simulator Ready for Training Checklist.
  • Verify/remove any Equipment Status Tags and Danger Tags not applicable to the scenario.
  • Place simulator in RUN (allow simulator to run during board walk down and turnover).
  • Turn ON two sets of pressurizer back-up heaters and stabilize RCS pressure.
  • Shut down the 1B CW pump and allow enough time for 1CW001B to fully close.
  • Run caep NRC 11-1 SETUP from disk and verify the following actuate:
  • IOR ZDI1CW01PB PTL
  • MRF ED093B OPEN
  • IMF RP02A
  • IMF RP02B
  • IMF RD09 8
  • IRF RP49 OUT
  • TRGSET 1 THPPRZR .GT. 2315
  • IMF TH11B (1 0) 100
  • IOR ZDI1RY8000B AUTO
  • Place 1B CW pump C/S in PTL.
  • Place info tags on 1B CW pump C/S.
  • Provide students with turnover sheets, 1BwOS NR-1, critical parameter sheet, and beacon load follow sheets.
  • Replace procedures requiring new drafts for PPC mod in simulator procedure books.

NRC 11-1 Page 3 of 25

INSTRUCTOR/SIMULATOR RUN AID GUIDE Event 1: Swap stator cooling pumps.

If dispatched as EO to observe stator cooling pump swap, report 1B stator cooling pump is ready for start, the pump has stable operating parameters once running, and no signs of leakage at the stator water skid.

If dispatched as EO to acknowledge stator panel alarm, insert the following:

  • MRF TP15 ACK to acknowledge 1PL01J.

Acknowledge as SM commencement and completion of procedure.

Event 2: Raise power at 0.4 MW/min As Power Team, contact the MCR by phone and request Unit 1 raise power to 100% at maximum allowable rate due to grid demand.

Acknowledge as chemistry/rad protection requests for RCS samples (if required).

Acknowledge as Power Team initiation of ramp.

Give cue as SM that Control Rods should be returned to Auto whenever not being manually stepped to minimize on line risk.

Event 3: Feed line pressure detector 1PT-508 fails high.

Insert IMF FW16 1500 30 for 1PT-508 failed high.

If dispatched as EO to investigate 1PT-508, wait two minutes report no visible damage to 1PT-508.

Acknowledge as SM 1PT-508 failure, on line risk assessment, request for maintenance support, and IR requests.

If ramp is suspended, acknowledge as Power Team suspension of ramp.

If asked for direction from SM for ramping unit, direct crew to re-initiate the ramp when actions for 1PT-508 failure are complete.

NRC 11-1 Page 4 of 25

INSTRUCTOR/SIMULATOR RUN AID GUIDE Event 4: 1RY455A partially opens/1RY8000A block valve breaker trips.

Run caep NRC 11-1 EVENT 4 from disk and verify the following actuate:

  • IMF TH11A 5
  • TRGSET 2 ZLO1RY8000A(2) = = 0
  • MRF ED058C (2 5) OPEN If dispatched as Equipment Operator, report 1RY8000A breaker (131X2B A5 front and rear) is tripped. If breaker reclosure is requested, the breaker will not close.

Acknowledge as Shift Manager the failure(s), LCOAR entry, on line risk assessment, EAL evaluation, request for maintenance support, and IR request.

If ramp is suspended, acknowledge as Power Team suspension of ramp.

If asked for direction from SM for ramping unit, direct crew to re-initiate the ramp when actions for 1PT-508 failure are complete.

Event 5: VCT level channel 1LT-112 failure.

Insert IMF CV16 100 10 to fail VCT level transmitter 1LT-112 high over a 10 second period.

If dispatched as EO to investigate 1LT-112, wait 2 minutes and report no visible damage to 1LT-112.

As SM, acknowledge failure of 1LT-112, dequip entry, and requests for on line risk assessment, maintenance support, and IR initiation.

Event 6: Loss of instrument bus 114 Run caep NRC 11-1 EVENT 6 from disk and verify the following actuate:

  • IMF ED11D
  • IRF ED019 OPEN When dispatched as EO/NSO to instrument bus 114, wait one minute and report instrument bus 114 has faint acrid smell coming from bus panel, there are burn marks on bus panel door but no active fire exists.

When dispatched as Equipment Operator to instrument inverter 114, wait two minutes and report inverter 114 output breaker is tripped open. Inverter 114 otherwise appears normal.

If dispatched as Equipment Operator to fail open 1AF005E-H, perform the following:

IMF FW45E 100 IMF FW45F 100 IMF FW45G 100 IMF FW45H 100 Report to NSO that 1AF005E-H are failed open.

Acknowledge as Shift Manager the failure, LCOAR entry, on line risk assessment, EAL evaluation, request for maintenance support, and IR request.

NRC 11-1 Page 5 of 25

INSTRUCTOR/SIMULATOR RUN AID GUIDE Event 7: Bus 143 Deenergized Insert IMF ED07C If dispatched as EO to bus 143 report acrid smell in Div. 11 ESF switchgear room but no fire.

Event 8: ATWS If dispatched as EO to locally trip Unit 1 reactor, wait until 1BwFR-S.1 step 7 (CHECK IF REACTOR SUBCRITICAL) is complete, then delete the following malfunctions to locally open Unit 1 reactor trip breakers:

  • DMF RP02A
  • DMF RP02B If reactor trip breakers do not open when above malfunctions deleted, insert the following remote functions to open the reactor trip breakers:
  • IRF RP01 TRIP
  • IRF RP02 TRIP If dispatched as EO/FS to verify dilution paths isolated, wait 15 minutes and report the following: 1CV8441, 1CV8435, & 1CV8453 are locked closed. 1AB8629A is closed.

Event 9: PZR PORV 1RY456 fails open (preload)

If dispatched as EO to locally close 1RY8000B at the breaker, wait 5 minutes and report 1RY8000B is not responding to local control.

Acknowledge as SM procedure changes, E Plan evaluations, and STA request.

NRC 11-1 Page 6 of 25

Scenario NRC 11-1 Event 1 No: No.

Event Swap stator cooling pumps

==

Description:==

Time Position Applicants Actions or Behavior CUE o From turnover, swap stator cooling pumps per BwOP GC-5, SWITCHING STANDBY AND OPERATING GC PUMPS.

US Directs BOP to perform BwOP GC-5.

o Peer check actions of BOP operator.

BOP

  • Refer to BwOP GC-5.
  • Allow both pumps to run in parallel for 5 minutes (per step D.1).

Note: When examinee indicates that a 5 minute parallel run is required, evaluator may time compress parallel run and give cue that 5 minutes has elapsed o Notify EO to perform leak check at skid and acknowledge local alarm.

  • Inform US BwOP GC-5 complete.

US

  • Acknowledge report.

o Notify SM BwOP GC-5 is complete.

ATC o Peer check actions of BOP operator.

o Monitor remainder of MCB.

NOTE: After BwOP GC-5 is complete and with lead examiners concurrence, enter next event.

Comments:

NRC 11-1 Page 7 of 25

Scenario NRC 11-1 Event 2 No: No.

Event Raise power at 0.4 MW/min

==

Description:==

Time Position Applicants Actions or Behavior CUE o Call from Power Team to raise power to 100% at maximum allowable rate.

US

  • Acknowledge request to raise power to 100% at maximum allowable rate.
  • Implement actions of 1BwGP 100-3.

o Perform pre-job brief per HU-AA-1211 PRE-JOB, HEIGHTENED LEVEL OF AWARENESS, INFREQUENT PLANT ACTIVITY, AND POST JOB BRIEFINGS for load ramp.

US

  • Direct raising load to 100% at 0.4 MW/min.

o Initiate load swing instruction sheet, 1BwGP 100-4T2.

CREW o Review applicable Precautions, and Limitations and Actions. (may have been done in PJB prior to starting demo)

ATC o Verify rod position and boron concentration.

  • Initiate dilution, if required (BwOP CV-5).

o Determine required PW volume from REMA form.

  • Determine required PW flow rate.
  • Perform the following at 1PM05J:

o Add PW in auto dilute mode o Set 1FK-111 PW/Total Flow Cont POT to the desired PW flow rate.

o Set 1FY-0111 PW Control Predet Counter to desired PW volume.

o Place MAKE-UP CONT SWITCH to STOP position.

o Set MODE SELECT to DIL/ALT DIL position.

o Place MAKE-UP CONT Switch to START.

o Verify proper operation of valves and PW makeup pump (1CV111B open, 1CV111A throttled, 1CV110B open (ALT DIL only), PW pump running, PW flow on recorder).

OR RO o Batch addition of PW:

o Open 1CV111B.

o Open 1CV110B.

o Open 1CV111A.

o When desired amount of primary water added:

Comments:

NRC 11-1 Page 8 of 25

Scenario NRC 11-1 Event 2 No: No.

Event Raise power at 0.4 MW/min

==

Description:==

Time Position Applicants Actions or Behavior o Close 1CV111A.

o Verify/Close 1CV111B.

o Verify/Close 1CV110B.

BOP

  • Raise turbine load at 1PM02J or OWS drop 210 by performing the following:
  • Select SETPOINT.
  • Enter desired MW into REF DEMAND window.
  • Select ENTER.
  • Enter 0.4 MW/min into the RATE window.
  • Select ENTER.
  • Select EXIT.

o Notify US and RO of pending ramp.

  • Select GO/HOLD.
  • Verify GO/HOLD button illuminates.
  • Verify HOLD illuminated RED.
  • Select GO.
  • Verify GO illuminates RED.

ATC/

  • Monitor reactor power and load ascension:

BOP

  • Monitor NIs, Tave, I, Pzr press/level at 1PM05J or HMI.
  • Monitor MW and DEHC system response at 1PM02J or OWS drop 210.
  • During dilution, monitor the following at 1PM05J and HMI:
  • RCS Tave rising/RCS boron concentration lowering.

o PW/Total flow predet counter responding correctly.

o Verify dilution auto stops at preset value.

o Return Reactor Makeup System to automatic.

o Perform periodic control rod steps to maintain Tave and Delta I within boundaries.

After measurable change in power and lead examiner approves, initiate the next event.

Comments:

NRC 11-1 Page 9 of 25

Scenario NRC 11-1 Event 3 No: No.

Event FW Htr Dsch Press 1PT-508 fails high.

==

Description:==

Time Position Applicants Actions or Behavior CUE o Control rods inward motion o Annunciators (1-15-A9 thru D9) "S/G 1_ LEVEL DEVIATION HIGH LOW" o Steam flow / FW flow mismatch on all SGs o 1B MFP speed lowering o 1C MFP speed lowering o Master, 1B and 1C MFP speed controllers demand lowering o 1PI-508 meter indication rising.

o 1PI-509 meter indication rising.

CREW

  • Refer to BwARs
  • Determine 1PT-508 failing high at 1PM04J.
  • Identify entry conditions for 1BwOA INST-2, OPERATION WITH A FAILED INSTRUMENT CHANNEL.

o Dispatch operators to investigate 1PT-508 failure.

US

  • Notify SM of plant status and procedure entry
  • Implement 1BwOA INST-2 "OPERATION WITH A FAILED INSTRUMENT CHANNEL", Attachment J "FW PUMP SPEED CONTROL MALFUNCTION" and direct operator actions of 1BwOA INST -2 to establish the following conditions.

o Direct BOP/RO to stop load ramp/dilution BOP

  • Perform the following at 1PM04J:
  • Place 1SK-509A, Master FW pump speed controller in manual.
  • Raise FW pump speed sufficiently to restore SG levels and FW header DP to normal per 1BwGP 100-3A9.
  • Maintain SG levels by operating 1SK-509A in manual.

ATC

  • Perform the following:
  • Monitor reactor power response to SG under and overfeeding transient.

US

  • Contact SM to perform risk assessment, initiate IR, and contact maintenance to investigate/correct instrument failure.

Comments:

NRC 11-1 Page 10 of 25

Scenario NRC 11-1 Event 4 No: No.

Event 1RY455A partially opens/1RY8000A block valve breaker trips

==

Description:==

Time Position Applicants Actions or Behavior CUE

  • 1RY455A open and closed lights lit.
  • PZR pressure dropping on 1PI-455 - 458.

ATC

  • Perform the following at 1PM05J:
  • Recognize 1RY455A PORV has opened prior to reaching lift setpoint.

o Place 1RY455A, PZR PORV, C/S to CLOSE.

o Determine 1RY455A will not close.

  • Place 1RY8000A, PZR PORV block valve, C/S to close.

o Report failure to US.

o Recognize/reports DNB LCO 3.4.1 pressure exceeded (<2209 psig) if applicable.

o Recognize loss of indication of 1RY8000A breaker following valve closure.

o Report when DNBR LCO can be exited, if applicable.

o Dispatch operator to investigate 1RY8000A breaker.

BOP o Perform the following:

o Dispatch operators to 1RY8000A breaker.

o Assist US by making notifications.

o Refer to BwARs.

US

  • Acknowledge PORV failure and concur with actions to close PORV and/or PORV block valve.
  • Determine LCO 3.4.11 Condition B and C are applicable.

o TRM 3.4.d does not apply.

o Acknowledge DNB LCO status (if applicable).

  • Contact SM to perform risk assessment, initiate IR, and contact maintenance to investigate/correct instrument failure.

EVALUATOR NOTE: After the actions for PZR PORV failure are complete and with lead examiners concurrence, enter next event.

Comments:

NRC 11-1 Page 11 of 25

Scenario NRC 11-1 Event 5 No: No.

Event VCT level channel 1LT-112 failure

==

Description:==

Time Position Applicants Actions or Behavior CUE

  • 1CV112A, Letdown to VCT or HUT Divert Valve - HUT light lit at 1PM05J.
  • VCT level recorder 1LT-0185 indication lowering at 1PM05J.

ATC/

BOP

  • Reference BwAR.

o Dispatch operators to investigate 1LT-112.

US

  • Notify SM of plant status.

ATC

  • Take manual control of VCT level at 1PM05J:

o Place 1CV112A in manual and lower demand to close 1CV112.

o Place 1CV112A control switch in VCT.

o Determine RMCS auto makeup - NOT AVAILABLE.

o Place RMCS in manual at 1PM05J:

o Place RMCS mode C/S to MAN.

o Place RMCS makeup C/S to START.

o Place RMCS to OFF to enable 37% low level alarm.

US o Determines TS 3.3.9 is NOT applicable.

  • Contact SM to perform risk assessment, initiate IR, and contact maintenance to investigate/correct instrument failure.

EVALUATOR NOTE: After the actions for the VCT level channel malfunction are complete and with lead examiners concurrence, insert the next event.

Comments:

NRC 11-1 Page 12 of 25

Scenario NRC 11-1 Event 6 No: No.

Event

Description:

Loss of instrument bus 114 Time Position Applicants Actions or Behavior CUE

  • PR N44 deenergized.

ATC/

  • Determine instrument inverter 114 deenergized.

BOP

  • Reference BwARs.

CREW

  • Identify entry conditions for 1BwOA ELEC-2, LOSS OF INSTRUMENT BUS.

o Dispatch operators to investigate status of inverter and instrument bus.

US

  • Notify SM of plant status and procedure entry.
  • Enter/Implement 1BwOA ELEC-2 LOSS OF INSTRUMENT BUS and direct operator actions of 1BwOA ELEC-2 to establish the following conditions:

o Direct BOP/ATC to stop load ramp/dilution.

RO

  • Check control channels operable at 1PM05J:
  • PZR pressure
  • PZR level
  • TAVE
  • Check control channels operable at 1PM05J/1PM04J:
  • PIMP
  • Steam flow
  • Dispatch operator to check instrument bus 114 and inverter 114:
  • Instrument bus 114 is damaged.

o Instrument inverter 114 is NOT damaged.

CREW

  • Determine Instrument Bus 114 cannot be energized.

US

  • Implement 1BwOA ELEC-2, Attachment D, INSTRUMENT BUS 114 ACTIONS.

Comments:

NRC 11-1 Page 13 of 25

Scenario NRC 11-1 Event 6 No: No.

Event

Description:

Loss of instrument bus 114 Time Position Applicants Actions or Behavior US

  • Refer to 1BwOA ELEC-2, Table D, LOSS OF INSTRUMENT BUS 114 EFFECTS.
  • Brief crew on loss of instrument bus 114 effects.
  • Direct actions of 1BwOA INST-1 NUCLEAR INSTRUMENTATION MALFUNCTION, Attachment A.
  • Dispatch operators to fail air to 1AF005E-H.
  • Determine TS 3.8.9, condition B is applicable EVALUATOR NOTE: After the crew recognizes instrument bus 114 cannot be reenergized and the tech spec call has been made, the scenario can continue by inserting the next event. If desired by evaluator the crew can perform steps below of 1BwOA INST-1. When crew requests assistance for tripping bistables, cue will be that no extra NSOs are currently available.

RO/ o Place Rod Bank Select in MANUAL BOP o Check annunciator 1-10-B5 - LIT o Place N44 Rod Stop Bypass switch in BYPASS at 1PM07J o Check Tave - Tref deviation within 1 deg. F.

o Check SG levels normal and stable.

o Defeat N44 Functions at 1PM07J o Place upper section current comparator defeat switch in PR N44 position.

o Place lower section current comparator defeat switch in PR N44 position.

o Place power mismatch bypass switch in PR N44 position.

o Place rod stop bypass switch in PR N44 position.

o Check annunciator 1-10-C3 - LIT o Reset PR N44 rate trip at 1PM07J o Place computer points in TEST, N0047, N0048, U1143 o Remove computer point from scan N0052A o Place N44 input to DEH in test o Remove N44 control power fuses at 1PM07J o Select LOOP delta T recorder to operable channel o Check Tave - Tref within 1 deg. F o Place rods in auto Comments:

NRC 11-1 Page 14 of 25

Scenario NRC 11-1 Event 7 No: No.

Event Bus 143 De-energized

==

Description:==

Time Position Applicants Actions or Behavior CUE

  • All CW pumps tripped
  • Condenser pressure rising.

ATC/

  • Identify/report loss of bus 143 BOP
  • Identify report loss of all CW pumps
  • Identify report condenser pressure rising US
  • Notify SM of plant status
  • Notify SM of plant status and procedure entry
  • Rod bottom lights - NONE LIT
  • Neutron flux - NOT DROPPING
  • Manually trip the reactor
  • 1PM05J
  • 1PM06J
  • PR channels > 5%

US

  • Notify SM of plant status and procedure entry
  • Enter/Implement 1BwFR-S.1 and direct operator actions of 1BwFR-S.1 Comments:

NRC 11-1 Page 15 of 25

Scenario NRC 11-5 Event 8 No: No.

Event ATWS

==

Description:==

Time Position Applicants Actions or Behavior ATC Perform immediate operator actions of 1BwFR-S.1:

  • Rod bottom lights - NONE LIT
  • Neutron flux - NOT DECREASING
  • Manually trip the reactor
  • 1PM05J
  • 1PM06J

[CT]

  • Manually insert control rods at greater than or equal to 48 steps per minute prior to FR-S.1- completion of step 1 of 1BwFR-S.1.

-C BOP Perform immediate operator actions of 1BwFR-S.1:

  • All Turbine throttle valves - CLOSED
  • All Turbine governor valves - CLOSED BOP
  • Check AF pumps running
  • AF pump run lights status (May be LIT or NOT LIT) o Manually start the 1A AF pump if it did not yet have an auto start signal.

o Manually start the 1B AF pump (loss of bus 114 prevents auto start)

RO/

  • Initiate emergency boration of the RCS BOP
  • CV pumps - ONE RUNNING
  • Open 1CV8104 o Attempt start boric acid transfer pump (no power to pump)
  • Open 1CV112D or 1CV112E
  • Close 1CV112B or 1CV112C
  • Check PZR pressure < 2335 psig BOP
  • Verify CNMT vent isolation
  • Group 6 CNMT vent isolation monitor lights - LIT Comments:

NRC 11-1 Page 16 of 25

Scenario NRC 11-5 Event 8 No: No.

Event ATWS

==

Description:==

Time Position Applicants Actions or Behavior ATC

  • Check If The Following Trips Have Occurred
  • Dispatch operator to locally trip reactor
  • All Turbine throttle valves - CLOSED
  • All Turbine governor valves - CLOSED ATC
  • Check if reactor is subcritical o PR channels > 5% (continue in 1BwFR S-1) o PR channels < 5% (transition to 1BwEP-0)
  • IR channels startup rate - NEGATIVE NOTE: The reactor will be locally tripped sometime after the previous step (step 7 of 1BwFR-S.1).

NOTE: If Reactor power is >5% at this point the remaining steps below will be completed in 1BwFR S-1.

ATC/

  • At least one SG level > 10% (31%)
  • SG levels maintained between 10% (31%) and 50%
  • 1SD002A-H - CLOSED
  • Verify dilution paths isolated
  • 1CV111A & B - CLOSED
  • BTRS mode selector switch - OFF
  • Dispatch operator to locally verify dilution paths isolated
  • Stop reactivity insertion from RCS cooldown
  • Check RCS temperature -NOT DROPPING IN AN UNCONTROLLED MANNER
  • Check SG pressures - NOT DROPPING IN AN UNCONTROLLED MANNER OR COMPLETELY DEPRESSURIZED.

ATC/

  • Verify reactor subcritical
  • PR channels < 5%
  • IR channels - NEGATIVE SUR

NRC 11-1 Page 17 of 25

Scenario NRC 11-1 Event 9 No: No.

Event

Description:

PZR PORV 1RY456 fails open Time Position Applicants Actions or Behavior BOP Perform immediate operator actions of 1BwEP-0 at 1PM02J or OWS drop 210:

  • All Turbine throttle valves - CLOSED.
  • All Turbine governor valves - CLOSED.

BOP Perform immediate operator actions of 1BwEP-0 at 1PM01J:

  • Verify power to 4KV busses.
  • ESF Buses - BOTH ENERGIZED (141 & 142).

CREW (If manual SI not previously performed) Recognize and respond to conditions requiring a Safety Injection in accordance with 1BwEP-0 REACTOR TRIP OR SAFETY INJECTION, Step 4:

  • PZR pressure cannot be maintained > 1829 psig.
  • Manually actuate SI from 1PM05J and 1PM06J.

CREW

  • Check SI Status at 1PM05J:

o SI First OUT annunciator - LIT.

o SI ACTUATED Permissive Light - LIT.

o SI Equipment - AUTOMATICALLY ACTUATED.

o BOTH SI pumps - RUNNING.

o CV pump to cold leg isolation valves 1SI8801A/B - CLOSED.

US

  • Direct BOP to perform Attachment B of 1BwEP-0 EVALUATOR NOTE: US and RO will continue in 1BwEP-0 while BOP is performing Attachment B:

EVALUATOR NOTE: The examinees may elect to re-align train A high head injection valves and B train ECCS equipment before directed in 1BwEP-0. OP-AA-101-111, ROLES AND RESPONSIBILITIES OF ON SHIFT PERSONNEL, step 4.6.2.5, directs operators to manually initiate safety systems automatic actions when operating parameters exceed the systems automatic initiation setpoints and the initiation does not occur.

EVALUATOR NOTE: Per the OAS page, RCP trip criteria is applicable throughout the performance of 1BwEP-0. The crew may trip RCPs whenever the criteria of RCS pressure <1425 psig AND High head SI flow >100 gpm are recognized.

BOP

  • Verify FW isolated at 1PM04J:
  • FW pumps - TRIPPED.
  • Isolation monitor lights - LIT.

Comments:

NRC 11-1 Page 18 of 25

Scenario NRC 11-1 Event 9 No: No.

Event

Description:

PZR PORV 1RY456 fails open Time Position Applicants Actions or Behavior

  • FW pumps discharge valves - CLOSED (or going closed) 1FW002A-C.
  • Verify DGs running at 1PM01J:
  • DGs - BOTH RUNNING.
  • 1SX169A/B OPEN.
  • Dispatch operator locally to check operation
  • Verify Generator Trip at 1PM01J:
  • OCB 1-8 and 7-8 open.
  • PMG output breaker open.
  • Verify Control Room ventilation aligned for emergency operations at 0PM02J:
  • VC Rad Monitors - LESS THAN HIGH ALARM SETPOINT.
  • Operating VC train equipment - RUNNING.
  • 0B Supply fan
  • 0B Return fan
  • 0B M/U fan
  • 0B Chilled water pump
  • 0B Chiller
  • M/U fan outlet damper - 0VC08Y NOT FULLY CLOSED.
  • 0B VC train M/U filter light - LIT.
  • 0VC09Y - OPEN
  • 0VC313Y - CLOSED
  • Operating VC train Charcoal Absorber aligned for train B.
  • 0VC44Y - CLOSED
  • 0VC05Y - OPEN
  • 0VC06Y - OPEN
  • Control Room pressure greater than +0.125 inches water on 0PDI-VC038.
  • Verify Auxiliary Building ventilation aligned at 0PM02J:
  • Two inaccessible filter plenums aligned.
  • Plenum A:
  • 0VA03CB - RUNNING
  • 0VA023Y - OPEN
  • 0VA436Y - CLOSED
  • Plenum C:
  • 0VA03CE RUNNING
  • 0VA067Y - OPEN
  • 0VA052Y - CLOSED
  • Verify FHB ventilation aligned at 0PM02J:
  • 0VA04CB - RUNNING Comments:

NRC 11-1 Page 19 of 25

Scenario NRC 11-1 Event 9 No: No.

Event

Description:

PZR PORV 1RY456 fails open Time Position Applicants Actions or Behavior

  • 0VA055Y - OPEN
  • 0VA062Y - OPEN
  • 0VA435Y - CLOSED
  • Notify US Attachment B complete ATC
  • Verify ECCS pumps running at 1PM05J/1PM06J:
  • BOTH CV pumps - RUNNING.
  • Manually start 1B CV pump.
  • 1A CV pump - RUNNING.
  • Check RH pumps - RUNNING.
  • Manually start 1B RH pump.
  • 1A RH pump - RUNNING.
  • Check SI pumps - RUNNING.
  • Manually start 1B SI pump.
  • 1A SI pump - RUNNING.

ATC/

  • Verify RCFCs running in Accident Mode:

BOP

  • 1A & 1C RCFC Accident Mode lights - LIT at 1PM06J.
  • 1B & 1D RCFC Accident Mode lights - NOT LIT at 1PM06J.
  • Stop 1B & 1D high speed RCFCs at 1PM06J.
  • Close 1SX112B and 1SX114B, CNMT chiller 1B SX inlet & outlet valves at 0PM02J.
  • Verify/open 1SX147B, CNMT chiller 1B SX bypass valve at 0PM02J.
  • Verify/open 1SX016B and 1SX027B, RCFC 1B & 1D SX inlet & outlet isolation valves at 1PM06J.
  • Start 1D & 1D low speed RCFCs at 1PM06J.

ATC/

  • Verify Phase A isolation:

BOP

  • Group 3 CNMT isolation monitor lights - NOT ALL LIT at 1PM06J.
  • Manually actuate CNMT isolation phase A at 1PM05J and/or 1PM06J.
  • Manually close CNMT isolation phase A valves.

o 1CV8112, 1CV8160, 1RY8028 & 1RY8033 at 1PM05J.

o 1WO006B, 1WO020B, & 1WO056A at 1PM06J.

o 1PR001B, 1FP010, 1PS229A & 1PS229B at 1PM11J.

o 1RE9160B, 1RE9170 & 1RF027 at 1PM11J.

ATC/

  • Verify Cnmt Vent isolation at 1PM06J:

BOP

  • Group 6 Cnmt Vent Isol monitor lights - ALL LIT.

Comments:

NRC 11-1 Page 20 of 25

Scenario NRC 11-1 Event 9 No: No.

Event

Description:

PZR PORV 1RY456 fails open Time Position Applicants Actions or Behavior ATC/

  • Verify AF system at 1PM06J:

BOP

  • 1B AF pump - NOT RUNNING.
  • Manually start 1B AF pump.
  • 1A AF pump - RUNNING.
  • AF isolation valves - OPEN.
  • AF flow control valves - THROTTLED
  • 1AF005E-H failed open due to loss of instrument bus 114.

o Dispatch operator to locally control 1AF005E-H.

o Throttle 1AF013E-H from 1PM06J ATC/

  • Verify CC pumps at 1PM06J:

BOP

  • BOTH CC pump - RUNNING.
  • Manually start 1B CC pump.

ATC/

  • Verify SX pumps at 1PM06J:

BOP

  • BOTH SX pumps - RUNNING.
  • Manually start 1B SX pump.

ATC/

  • Check if Main Steamline Isolation required at 1PM06J:

BOP

  • All SG pressure > 640 psig.
  • Containment pressure < 8.2 psig ATC/
  • Check if CS is required at 1PM06J:

BOP

  • CNMT pressure has not risen > 20 psig.

BOP/ ATC

  • Verify Total AF flow at 1PM06J:
  • AF flow > 500 gpm.
  • S/G NR levels - NOT rising in an uncontrolled manner.

ATC/ BOP Note: the following task may have been performed earlier per note on page 18

  • Verify ECCS valve alignment at 1PM06J:

[CT]

  • Group 2 Cold Leg Injection monitor lights required for injection - NOT ALL LIT.

E-0--I

  • Manually OPEN 1SI8801A/B
  • Manually CLOSE 1CV8105/06
  • Verify ECCS flow at 1PM05J:

Comments:

NRC 11-1 Page 21 of 25

Scenario NRC 11-1 Event 9 No: No.

Event

Description:

PZR PORV 1RY456 fails open Time Position Applicants Actions or Behavior

  • RCS pressure > 1700 psig.

ATC

  • Check PZR PORVs and SPRAY VALVES at 1PM05J:
  • 1RY8000B can NOT be CLOSED CREW Transition to 1BwEP-1, LOSS OF REACTOR OR SECONDARY COOLANT.

Comments:

NRC 11-1 Page 22 of 25

Scenario NRC 11-1 Event 9 No: No.

Event PZR PORV 1RY456 fails open

==

Description:==

Time Position Applicants Actions or Behavior US

  • Notify SM of plant status and procedure entry.
  • Request STA evaluation of status trees.
  • Enter/Implement 1BwEP-1 and direct operator actions of 1BwEP-1 to establish the following conditions:

ATC NOTE: this step may have been performed earlier per OAS summary page of 1BwEP-0.

  • Check status of RCPs at 1PM05J:
  • All RCPs - ALL RUNNING.
  • Hi Head SI flow > 100 gpm
  • RCS Pressure < 1425 psig
  • Check if SG secondary pressure boundaries are intact at 1PM04J:

BOP

  • Check pressure in all SGs:
  • None dropping in an uncontrolled manner.
  • None completely depressurized.

ATC/

  • Check intact SG levels at 1PM04J:

BOP

  • SG levels maintained between 10% (31%) and 50%.
  • S/G NR levels - NOT rising in an uncontrolled manner.

ATC/

  • Check secondary radiation normal BOP
  • Reset Phase A.
  • OPEN 1SD005A-D at 1PM11J
  • Contact Chemistry for SG sampling.
  • Check Secondary trends at RM-11 or PPC:
  • 1PR08J SG Blowdown.
  • 1PR27J SJAE/GS.

ATC

  • Check PZR PORVs and isolation valves at 1PM05J:
  • PORV isolation valves - 1RY8000B Energized but not responding.
  • PORV isolation valves - 1RY8000A previously CLOSED Comments:

NRC 11-1 Page 23 of 25

Scenario NRC 11-1 Event 9 No: No.

Event PZR PORV 1RY456 fails open

==

Description:==

NOTE: If subcooling is NOT ACCEPTABLE in the following step, the crew will continue in 1BwEP-1 (see steps on following page).

If subcooling IS ACCEPTABLE see steps below.

ATC/

  • Check if ECCS flow should be reduced at 1PM05J:

BOP

  • RCS subcooling - ACCEPTABLE.

ATC/

  • Check for secondary heat sink BOP
  • SG levels > 10% in one SG or
  • AF flow > 500 gpm ATC/
  • Check RCS pressure stable of rising BOP
  • Check PZR level > 14%

CREW Transition to 1BwEP ES-1.1 SI TERMINATION US

  • Notify SM of plant status and procedure entry.
  • Enter/Implement 1BwEP ES-1.1 and direct operator actions of 1BwEP ES-1.1 to establish the following conditions:

ATC/

  • Depress both SI reset pushbuttons at 1PM06J o Verify SI Actuated permissive light is DARK.

o Verify Auto SI Blocked permissive light is LIT ATC/

  • Reset Containment Phase A BOP
  • Depress both Phase A reset pushbuttons at 1PM06J ATC/
  • Restore instrument air to containment.

BOP o Check any station air compressor running

  • Open 1IA065 and 1IA066 at 1PM11J ATC/
  • Stop one CV pump BOP ATC/
  • Check RCS pressure - dropping BOP CREW Transition to 1BwEP ES-1.2, POST LOCA COOLDOWN AND DEPRESSURIZATION.

NOTE: Scenario is terminated at this point Comments:

NRC 11-1 Page 24 of 25

Scenario NRC 11-1 Event 9 No: No.

Event PZR PORV 1RY456 fails open

==

Description:==

ATC/

  • Check if ECCS flow should be reduced at 1PM05J:

BOP

  • RCS subcooling - NOT acceptable.

ATC/

  • Check if CS should be stopped BOP
  • CS pumps - NONE RUNNING ATC/
  • Check if RH pumps should be stopped at 1PM06J:

BOP

  • RCS pressure > 325 psig o If RCS pressure is STABLE, perform the following
  • Check RH pumps suction aligned to RWST
  • STOP BOTH RH pumps ATC/
  • Check for Faulted SG Indications BOP
  • SG Pressures - ALL STABLE
  • Check if DGs should be stopped
  • 4KV busses - Energized from offsite power (EXCEPT BUS 143 which is FAULTED)
  • Stop DG 1A & 1B at 1PM01J ATC/
  • Evaluate Plant Status BOP
  • RH Trains - BOTH AVAILABLE
  • Aux Bldg Rads - ALL NORMAL
  • Check trends at RM-11 or PPC:

US

  • Place H2 Monitors in service o Contact U-2 for assist NSO to place U-1 H2 monitors in service.

o Contact SM for consulting with TSC BOP

  • Shutdown 0A VC chiller at 0PM02J ATC/
  • Energize Source Range Detectors BOP
  • Place Boron Dilution Alert Switches in NRMAL at 1PM05J
  • Place Scaler Timer Power Switch to ON at 1PM07J ATC/
  • Check if RCS cooldown and depressuization is required BOP
  • RCS pressure > 325 psig CREW Transition to 1BwEP ES-1.2, POST LOCA COOLDOWN AND DEPRESSURIZATION.

NOTE: Scenario is terminated at this point Comments:

NRC 11-1 Page 25 of 25