Dec. 01, 2011 Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2011-66879 USER INFORMATION:
GERLACH*ROSE M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:
TO: GERLACH*ROSE M 12/01/2011 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TRM2 - TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 11/24/2011 ADD MANUAL TABLE OF CONTENTS DATE: 11/30/2011 CATEGORY: DOCUMENTS TYPE: TRM2
+vOoJ
Dec. 01, 2011 Page 2 of 2 ID: TEXT 3.7.3.8 ADD: REV: 10 REMOVE: REV:9 CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT B3.7.3.8 REMOVE: REV:1 ADD: REV: 2 CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT LOES ADD: REV: 70 REMOVE: REV:69 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Dat e: 11/30/2011 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 70 11/30/2011
Title:
LIST OF EFFECTIVE SECTIONS TEXT TOC 20 08/23/2011
Title:
TABLE OF CONTENTS TEXT 1.1 0 11/19/2002
Title:
USE AND APPLICATION DEFINITIONS TEXT 2.1 1 02/04/2005,,
Title:
PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2.2 10 '01/13/2011
Title:
PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 , "4 05/23/2008
Title:
APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT 3.1.1 1 11/09/2007
Title:
REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT 3.1.2 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 4 05/14/2009
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 9 04/20/2011
Title:
CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)
LDCN 4712 Report Date: 12/01/11 Page 1 Page I 15 of .155 Report Date: 12/01/11
SSES MANUJAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.3.1 0 11/19/2002
Title:
INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 3 03/31/2011
Title:
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2 11/09/2007
Title:
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 6 07/09/2010
Title:
INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0 11/19/2002
Title:
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 3 01/13/2011
Title:
INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 1 11/09/2007
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1 10/22/2003
Title:
INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 3 05/14/2009
Title:
INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1 12/14/2004
Title:
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1 10/22/2003
Title:
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 0 04/16/2009
Title:
WATER MONITORING INSTRUMENTATION 0
Report Date: 12/01/11 Page 2 Page. 2, of of 15 15 Report Date: 12/01/11
SSES MANUJAL
. Manual Name:
Manual
Title:
TRM2 TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.1 1 04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY 1 04/16/2009 TEXT 3.4.2
Title:
REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3 1 11/09/2007
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS)
TEXT 3.4.4 2 05/14/2009
Title:
REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1 04/26/.2006
Title:
REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS TEXT 3.4.6 0 07/20/2010
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT 3.5.1 1. 02/04/2005
Title:
ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1 11/09/2007
Title:
ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0 11/19/2002
Title:
ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/19/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 1 08/23/2011
Title:
SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0 11/19/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Report Date: 12/01/11 Page3 Page 3 of of 15 15 Report Date: 12/01/11
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.6.4 0 11/19/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0 11/19/2002
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN TEXT 3.7.2 0 11/19/2002
Title:
PLANT SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL TEXT 3.7.3.1 2 04/16/2009
Title:
PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2 3 04/16/2009
Title:
PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3 3 04/16/2009
Title:
PLANT SYSTEMS C02 SYSTEMS TEXT 3.7.3.4 2 04/16/2009
Title:
PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 2 04/16/2009
Title:
PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6 2 04/16/2009
Title:
PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7 1 04/26/2006
Title:
PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 10 11/30/2011
Title:
PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4 1 04/26/2006
Title:
PLANT SYSTEMS SOLID RADWASTE SYSTEM Report Date: 12/01/11 Page,44 Page of of 15 15 , Report Date: 12/01/11
SSES MA.NUAL
. Manual Name:
Manual
Title:
TRM2 TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.1 0 11/19/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0 11/19/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1 04/2.6/2006.
Title:
PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 2 .. 06/27/2008
Title:
PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2 09/05/2008
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 7 12/03/2010
Title:
PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1 08/28/2006
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1 12/14/20,04
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.7.11 1 1.0/02/2009.
Title:
PLANT SYSTEMS TEXT 3.8.1 2 02/04/2005
Title:
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES LDCN 4775 TEXT 3.8.2.1 2 11/09/2007
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT 3.8.2.2 2 12/14/2004
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC Page 5 of 15 Report Date: 12/01/11
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.3 1 04/05/2010
Title:
ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT 3.8.4 1 02/04/2005
Title:
ELECTRICAL POWER 24 VDC ELECTRICAL SUBSYSTEM TEXT 3.8.5 0 11/19/2002
Title:
ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6 0 11/19/2002
Title:
ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 2 10/22/2009
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0 11/19/2002
Title:
REFUELING OPERATIONS DECAY TIME' TEXT 3.9.2 0 11/19/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0 11/19/2002
Title:
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1 04/26/2006
Title:
MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 1 04/09/2007
Title:
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 2 06/15/2010
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.11.1.1 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION Report Date: 12/01/11 Pages Page 6 O~
of 15 15 Report Date: 12/01/11
SSES MANUJAL
. Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.2 1. 04/26/2006 1
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3.11.1.4 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.1.5 2 05/02/2007
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3.11.2.1 3 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.2 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES TEXT 3.11.2.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11.2.4 0 11/19/2002,..
Title:
RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3.11.2.5 3 11/14/2006
Title:
RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.2.6 4 09/16/2009
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3 1. 04/26/2006
Title:
RADIOACTIVE EFFLUENTS TOTAL DOSE TEXT 3.11.4.1 3 04/26/2006
Title:
RADIOACTIVE EFFLUENTS MONITORING PROGRAM Report Date: 12/01/11 Page77 Page of of i~
15 Report Date: 12/01/11
SSES MANUJAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.4.2 2 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0 11/19/2002
Title:
LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3.12.2 4 04/17/2008
Title:
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0. 11/19/2002
Title:
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS TEXT 4.1 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4 1 12/18/2008
Title:
ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM TEXT 4.7 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS TRAINING Report Date: 12/01/11 Page E Page .~ of of 15 15 Report Date: 12/01/11 .
SSES MANUIAL O Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.0 4 05/23/2008
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.1.1 1 11/09/2007
Title:
REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.1.3 3 04/10/2007
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0 11/19/2,002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0 11/19/2002
Title:
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)
TEXT B3.3.1 0 11/19/2002
Title:
INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 2 03/31/2011
Title:
INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 2 11/09/2007
Title:
INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 4 07/09/20,10
Title:
INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT B3.3.5 2 . 11/09/2007
Title:
INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK TEXT B3.3.6 4 01/13/2011
Title:
INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION Report Date: 12/01/11 Page -9
~. of of 15 15 Report Date: 12/01/11
SSES MANUJAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.7 1 11/09/2007
Title:
INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1 10/22/2003
Title:
INSTRUMENTATION BASES TRM RPS INSTRUMENTATION TEXT B3.3.9 3 05/14/2009
Title:
INSTRUMENTATION BASES LPRM UPSCALE ALARM INSTRUMENTATION TEXT B3.3.10 2 08/09/2010
Title:
INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.11 1 10/22/2003
Title:
INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 0 04/16/2009
Title:
WATER MONITORING INSTRUMENTATION TEXT B3.4.1 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 1 04/16/2009
Title:
REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3 1 11/09/2007
Title:
REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS TEXT B3.4.6 0 07/20/2010
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION Report Date: 12/01/11 10 Page 10 of of 15 15 Report Date: 12/01/11
SSES MANUJAL
. Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.5.1 0 11/19/2002
Title:
ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1 11/09/2007.
Title:
ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1 11/09/2007
Title:
ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0 11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0 11/19/2.002
Title:
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 1 04/19/2007
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1 12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0 11/19/2002
Title:
PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2 0 11/19/2002
Title:
PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL TEXT B3.7.3.1 3 06/15/2010
Title:
PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2 04/26/2006
Title:
PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS TEXT B3.7.3.3 0 11/19/2002
Title:
PLANT SYSTEMS BASES C02 SYSTEMS Report Date: 12/01/11 Page ji 11 of of J=~
15 Report Date: 12/01/11
SSES MANTJMJ Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.3.4 1 04/26/2006
Title:
PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5 1 04/26/2006
Title:
PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6 1 04/26/2006
Title:
PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0 11/19/2002
Title:
PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES TEXT B3.7.3.8 2 11/30/2011
Title:
PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3.7.4 0 11/19/2002
Title:
PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.1 0 11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2 0 11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 0 11/19/2002
Title:
PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6 2 06/27/2008
Title:
PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 2 01/31/2008
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 3
Title:
PLANT SYSTEMS BASES SNUBBERS 06/21/2007 4
Page12 o 15 epor Dat: 1201/1 Page 12 of 1:5 Report Date: 12/01/11
SSES MANUJAL
. Manual Name:
Manual
Title:
TRM2 TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.9 1 12/14/2004
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1 12/14/2004
Title:
PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11 2 04/14/2010
Title:
STRUCTURAL INTEGRITY TEXT B3.8.1 2 03/10/2010
Title:
ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1 0 11/19/2002
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT B3.8.2.2 1 09/17/2004
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC TEXT B3.8.3 0 11/19/2002
Title:
ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4 0. 11/19/2002
Title:
ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 0 11/19/2002
Title:
ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 1 02/04/2005
Title:
ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 1 06/15/2009
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT B3.9.1 0 11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME ReportDate: 12/01/11 Page i~.
13 of of 15 15 Report-Date: 12/01/11
SSES MANUJAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.9.2 0 11/19/2002
Title:
REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0 11/19/2002
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0 11/19/2002
Title:
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1 04/10/2007
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0 11/19/2002
Title:
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3.11.1.1 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3.11.1.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3.11.1.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3.11.1.4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3.11.2.1 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES Report. Date: 12/01/11 Page 14 Page 14 of of 15 15 Report Date: 12/01/,11
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.11.2.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.11.2.4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5 4 11/14,/2006
Title:
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11.2.6 1 01/27/2004
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1 3 07/09/2010
Title:
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2 0 .11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0, 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1., 10/04/2007
Title:
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 1 12/03/2010
Title:
LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0 11/19/2002
Title:
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Report Date: 12/01/il Page .15.
Page 15 of of I5~
15 Report Date: 12/01/11
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 70 LIST OF EFFECTIVESECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date TOC TABLE OF CONTENTS 08/11/2011 1.0 USE AND APPLICATION Page TRM / 1.0-1 08/31/1998 Page TRM / 1.0-2 10/04/2002 Page TRM / 1.0-3 08/31/1998 2.0 PLANT PROGRAMS Page 2.0-1 08/31/1998 Pages TRM / 2.0-2 and TRM 2.0-3 01/28/2005 Page TRM / 2.0-4 06/25/2002 Page TRM / 2.0-5 04/12/1999 Page TRM / 2.0-6 04/15/2009 Page TRM / 2.0-7 05/15/2008 Pages TRM / 2.0-8 and TRM / 2.0-9 01/07/2011 Page TRM / 2.0-10 02/02/2010 Page TRM /2.0-11 11/15/2004 Page TRM /2.0-12 04/15/2009 Pages TRM / 2.0-13 and TRM / 2.0-14 11/15/2004 Page TRM / 2.0-15 11/15/2005 3.0 APPLICABILITY Pages TRM / 3.0-1 and TRM / 3.0-2 04/14/2008 Page TRM / 3.0-3 03/15/2002 Page TRM / 3.0-4 11/30/2005 3.1 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-1 10/31/2007 Pages TRM / 3.1-2 through TRM / 3.1-5 08/31/1998 Page TRM / 3.1-6 03/27/2007 Page TRM / 3.1-7 04/15/2009 Page TRM / 3.1-8 03/27/2007 Pages TRM / 3.1-9 and TRM / 3.1-9a 02/18/1999 Page TRM / 3.1-10 02/18/1999 3.2 CORE OPERATING LIMITS REPORT Page TRM / 3.2-1 08/31/1998 Pages TRM / 3.2-2 through TRM / 3.2-54 04/12/2011 3.3 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 07/16/1999 Pages TRM / 3.3-4 and TRM / 3.3-5 10/31/2007 Page TRM / 3.3-6 03/10/2011 Page TRM 3.3-7 10/31/2007 Page 3.3-8 08/31/1998 SUSQUEHANNA - UNIT 2 TRM / LOES-1 EFFECTIVE DATE 11/24/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 70 LIST OF EFFECTIVESECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Pages TRM / 3.3-9 and TRM / 3.3-9a 06/30/2010 Page TRM / 3.3-10 10/31/2007 Pages TRM / 3.3-11 and TRM / 3.3-11 a 06/30/2010 Page TRM / 3.3-12 03/30/2001 Page TRM / 3.3-13 01/07/2011 Page TRM / 3.3-14 12/14/1998 Pages TRM / 3.3-15 and TRM / 3.3-16 01/07/2011 Page TRM / 3.3-17 06/14/2002 Page TRM / 3.3-18 10/31/2007 Pages TRM / 3.3-19 and TRM / 3.3-20 10/22/2003 Page TRM / 3.3-21 04/15/2009 Page TRM / 3.3-21a 11/15/2004 Pages TRM /3.3-21b through TRM / 3.3-21d 03/27/2007 Page TRM / 3.3-22 12/03/2004 Pages TRM / 3.3-23 and TRM / 3.3-24 05/16/2003 Page TRM / 3.3-25 10/22/2003 Pages TRM / 3.3-26 and TRM / 3.3-27 04/07/2009 3.4 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 03/31/2006 Pages 3.4-2 through 3.4-5 10/23/1998 Pages TRM / 3.4-6 through TRM / 3.4-8 04/01/2009 Page 3.4-9 08/31/1998 Page 3.4-10 10/31/2007 Page 3.4-11 08/31/1998 Page TRM / 3.4-12 04/17/2009 Page TRM / 3.4-13 03/31/2006 Page TRM / 3.4-14 07/15/2010 3.5 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 01/28/2005 Pages 3.5-2 and 3.5-3 08/31/1998 Page TRM / 3.5-4 10/31/2007 Pages 3.5-5 through 3.5-7 08/31/1998 3.6 CONTAINMENT Pages 3.6-1 and 3.6-2 08/31/1998 Pages TRM / 3.6-3 and TRM / 3.6-3a 08/11/2011 Page 3.6-4 08/31/1998 Page TRM / 3.6-5 01/07/2002 Page 3.6-6 08/31/1998 Pages TRM / 3.6-7 through TRM / 3.6-9 12/31/2002 TRM / LOES-2 EFFECTIVE DATE 11/24/2011 SUSQUEHANNA - UNIT SUSQUEHANNA -
UNIT 2 2 TRM / LOES-2 EFFECTIVE DATE 11/24/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 70 LIST OF EFFECTIVESECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.7 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 07/29/1999 Page 3.7-3 08/31/1998 Page TRM / 3.7-4 03/31/2006 Page TRM / 3.7-5 04/07/2009 Pages TRM / 3.7-6 through TRM / 3.7-8 08/02/1999 Pages TRM / 3.7-9 and TRM / 3.7-10 04/07/2009 Page TRM / 3.7-11 01/21/2000 Page TRM / 3.7-12 08/02/1999 Page TRM / 3.7-13 04/07/2009 Page TRM / 3.7-14 08/09/2005 Pages TRM / 3.7-15 and TRM / 3.7-16 08/02/1999 Page TRM / 3.7-17 04/07/2009 Page TRM / 3.7-18 08/02/1999 Page TRM / 3.7-19 04/07/2009 Pages TRM / 3.7-20 through TRM / 3.7-22 08/02/1999 Page TRM / 3.7-23 04/07/2009 Page TRM / 3.7-24 03/31/2006 Pages TRM / 3.7-25, and TRM / 3.7-26 08/02/1999 Page TRM / 3.7-27 11/24/2011 Page TRM / 3.7-28 11/29/2006 Page TRM / 3.7-29 01/13/2010 Page TRM I 3.7-30 11/30/2005 Page TRM / 3.7-31 11/16/2001 Page TRM I 3.7-32 09/16/2010 Page TRM / 3.7-33 10/05/2002 Page TRM I 3.7-34 03/31/2006 Pages TRM / 3.7-35 and TRM / 3.7-36 02/01/1999 Pages 3.7-37 through 3.7-38 08/31/1998 Page TRM / 3.7-39 03/31/2006 Page TRM / 3.7-40 02/14/2005 Page TRM / 3.7-40a 06/20/2008 Page TRM / 3.7-41 09/04/2008 Page TRM / 3.7-42 08/31/1998 Pages TRM / 3.7-43 through TRM / 3.7-45 10/05/2006 Page TRM / 3.7-46 06/07/2007 Page TRM / 3.7-47 11/29/2010 Page TRM / 3.7-48 06/07/2007 Page TRM / 3.7-49 03/09/2001 Page TRM / 3.7-50 08/16/2006 Page TRM / 3.7-51 12/03/2004 Page TRM / 3.7-52 04/15/2003 Page TRM / 3.7-53 07/29/1999 Page TRM / 3.7-54 04/01/2009 Page TRM / 3.7-55 09/25/2009 Page TRM I 3.7-56 04/01/2009 SUSQUEHANNA - UNIT 2 TRM / LOES-3 EFFECTIVE DATE 11/24/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 70 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.8 ELECTRICAL POWER Page TRM / 3.8-1 04/02/2002 Pages TRM / 3.8-2 and TRM / 3.8-3 01/28/2005 Page TRM / 3.8-4 01/31/2005 Pages TRM / 3.8-5 and TRM / 3.8-6 04/02/2002 Pages TRM / 3.8-7 through TRM / 3.8-10 10/31/2007 Page TRM / 3.8-11 08/10/2004 Page TRM / 3.8-12 12/03/2004 Page TRM / 3.8-13 03/25/2010 Page TRM / 3.8-14 08/31/1998 Page TRM /3.8-15 01/28/2005 Pages TRM / 3.8-16 and TRM / 3.8-17 04/02/2002 Page 3.8-18 02/01/1999 Page TRM / 3.8-19 04/02/2002 Page TRM / 3.8-20 02/01/1999 Pages TRM / 3.8-21 through TRM / 3.8-23 06/06/1999 Pages 3.8-24 and 3.8-25 08/31/1998 Page TRM / 3.8-26 05/28/2009 Page TRM / 3.8-27 11/29/2006 Page TRM / 3.8-28 05/28/2009 Page TRM / 3.8-29 10/20/2009 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/1998 3.10 MISCELLANEOUS Page TRM / 3.10-1 03/31/2006 Pages 3.10-2 through 3.10-4 08/30/1998 Pages TRM / 3.10-5 and TRM / 3.10-6 03/27/2007 Page TRM / 3.10-7 06/10/2010 3.11 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 03/31/2006 Pages 3.11-2 through 3.11-3 08/31/1998 Page TRM / 3.11-4 03/31/2006 Page 3.11-5 08/31/1998 Page TRM / 3.11-6 03/31/2006 Pages 3.11-7 through 3.11-9 08/31/1998 Page TRM / 3.11-10 12/03/2004 Pages 3.11-11 and 3.11-12 08/31/1998 Page TRM / 3.11-13 04/12/2007 Page TRM / 3.11-14 12/03/1004 Pages 3.11-15 and 3.11-16 09/01/1998 Page TRM / 3.11-17 03/31/2006 TRM / LOES-4 EFFECTIVE DATE 11/24/2011 SUSQUEHANNA - UNIT SUSQUEHANNA -
UNIT 2 2 TRM / LOES-4 EFFECTIVE DATE 11124/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 70 LIST OF EFFECTIVESECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page 3.11-18 08/31/1998 Page TRM / 3.11-19 08/15/2005 Pages TRM / 3.11-20 and TRM / 3.11-21 03/31/2006 Page TRM / 3.11-22 04/02/2002 Page TRM / 3.11-23 11/14/2006 Page TRM / 3.11-24 05/13/2005 Page TRM / 3.11-25 04/12/2007 Pages TRM / 3.11-26 and TRM / 3.11-27 01/21/2004 Page TRM / 3.11-28 09/08/2009 Page TRM / 3.11-29 12/03/2004 Pages TRM 3.11-30 through TRM / 3.11-32 01/21/2004 Page TRM / 3.11-33 03/31/2006 Page 3.11-34 08/31/1998 Page TRM / 3.11-35 03/31/2006 Pages TRM / 3.11-36 through TRM / 3.11-39 11/30/2005 Pages 3.11-40 through 3.11-44 08/31/1998 Page TRM / 3.11-45 03/31/2006 Page 3.11-46 08/31/1998 Page TRM / 3.11-47 03/31/2006 3.12 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 02/05/1999 Page TRM / 3.12-4 03/14/2008 Page TRM / 3.12-5 02/05/1999 4.0 ADMINISTRATIVE CONTROLS Pages TRM / 4.0-1 through TRM / 4.0-3 08/31/1998 Page TRM / 4.0-4 12/11/2008 Pages TRM / 4.0-5 through TRM / 4.0-8 08/31/1998 SUSQUEHANNA - UNIT 2 TRM / LOES-5 EFFECTIVE DATE 11/24/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 70 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.0 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 08/31/1998 Page TRM / B 3.0-4 01/10/2007 Page TRM / B 3.0-5 04/14/2008 Page TRM / B 3.0-6 08/31/1998 Page TRM / B 3.0-7 04/12/2007 Pages TRM / B 3.0-8 through TRM / B 3.0-10 08/31/1998 Pages TRM / B 3.0-11 and TRM / B 3.0-12 03/15/2002 Pages TRM / B 3.0-13 and TRM / B 3.0-14 11/30/2005 Page TRM / B 3.0-15 03/15/2002 B 3.1 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 07/13/1999 Pages TRM / B 3.1-2 and TRM / B 3.1-3 10/31/2007 Page B 3.1-4 08/31/1998 Pages TRM / B 3.1-5 through TRM / B 3.1-7 03/27/2007 Page TRM / B 3.1-8 02/18/1999 B 3.2 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 B 3.3 INSTRUMENTATION BASES Page TRM / B 3.3-1 04/07/2000 Page TRM / B 3.3-2 03/10/2011 Page TRM / B-3.3-2a 10/31/2007 Pages TRM / B 3.3-3 and TRM / B 3.3-3a 10/31/2007 Page TRM / B 3.3-4 06/30/2010 Page TRM / B 3.3-5 05/30/2006 Page TRM / B 3.3-6 06/30/2010 Page TRM / B 3.3-7 10/31/2007 Page TRM / B 3.3-8 06/30/2010 Page TRM / B 3.3-9 10/31/2007 Pages TRM / B 3.3-10 through TRM / B 3.3-13 01/07/2011 Page TRM / B 3.3-14 06/25/2002 Page TRM / B 3.3-14a 10/31/2007 Page TRM / B 3.3-14b 06/14/2002 Pages TRM / B 3.3-15 through TRM / B 3.3-17 10/22/2003 Pages TRM / B 3.3-18 and TRM / B 3.3-19 03/27/2007 Pages TRM / B 3.3-19a and TRM / B 3.3-19b 03/27/2007 Page TRM / B 3.3-19c 04/17/2009 Pages TRM / B 3.3-19d and TRM / B 3.3-19e 03/27/2007 Pages TRM / B 3.3-20 and TRM / B 3.3-21 08/03/2010 Page TRM / B 3.3-22 10/22/2003 25 Page TRM / B 3.3-23 05/16/2003 Pages TRM / B 3.3-24 and TRM / B 3.3-25 04/07/2009 SUSQUEHANNA - UNIT 2 TRM / LOES-6 EFFECTIVE DATE 11/24/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 70 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.4 REA/CTOR COOLANT SYSTEM BASES Page TRM / B 3.4-1 08/31/1998 Pages TRM / B 3.4-2 and TRM / B3.4-3 04/01/2009 Pages TRM / B 3.4-4 and TRM / B 3.4-4a 10/31/2007 Page TRM / B 3.4-5 10/15/1999 Page B 3.4-6 08/31/1998 Page TRM / B 3.4-7 07/15/2010 B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 08/31/1998 Pages TRM / B 3.5-3 and TRM / B 3.5-3a 10/31/2007 Page B 3.5-4 08/31/1998 Page TRM / B 3.5-5 10/31/2007 B 3.6 CONTAINMENT BASES Page TRM / B 3.6-1 07/26/2001 Page TRM / B 3.6-2 02/01/1999 Page B 3.6-3 08/31/1998 Page TRM / B 3.6-4 03/29/2007 Page TRM / B 3.6-5 04/04/2007 Page TRM / B 3.6-6 12/03/2004 Pages TRM / B 3.6-7 through TRM / B 3.6-11 12/31/2002 B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 08/31/1998 Page TRM / B 3.7-3 06/10/2010 Page TRM / B 3.7-3a 12/27/2007 Page TRM / B 3.7-4 03/31/2006 Page TRM / B 3.7-5 08/02/1999 Pages TRM / B 3.7-6 and TRM / B 3.7-6a 03/31/2006 Pages TRM / B 3.7-7 and TRM / B 3.7-7a 08/02/1999 Page TRM / B 3.7-8 08/02/1999 Page TRM / B 3.7-9 03/31/2006 Page TRM / B 3.7-10 08/02/1999 Pages TRM / B 3.7-1Oa through TRM / B 3.7-11a 03/31/2006 Pages TRM / B 3.7-12 through TRM / B 3.7-14 08/02/1999 Page TRM / B 3.7-14a 01/09/2004 Page TRM / B 3.7-14b 11/24/2011 Pages TRM / B 3.7-15 and TRM / B 3.7-16 02/01/1999 Pages B 3.7-17 through B 3.7-20 08/31/1998 Page TRM / B 3.7-21 02/14/2005 Page TRM / B 3.7-21a 06/20/2008 Pages TRM / B 3.7-22 and TRM / B 3.7-23 01/30/2008 Pages TRM / B 3.7-24 through TRM / B 3.7-29 10/05/2006 SUSQUEHANNA - UNIT 2 TRM / LOES-7 EFFECTIVE DATE 11/24/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 70 LIST OF EFFECTIVESECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM / B 3.7-30 06/07/2007 Pages TRM / B 3.7-30a and TRM I B 3.7-30b 10/05/2006 Page TRM / B 3.7-32 03/09/2001 Page TRM / B 3.7-33 04/15/2003 Page TRM / B 3.7-34 12/03/2004 Page TRM / B 3.7-35 07/05/2000 Pages TRM / B 3.7-36 and TRM / B 3.7-37 04/01/2009 Page TRM / B 3.7-38 09/25/2009 Page TRM / B 3.7-39 04/01/2009 Page TRM / B 3.7-40 04/08/2010 B 3.8 ELECTRICAL POWER BASES Page TRM / B 3.8-1 04/02/2002 Pages TRM / B 3.8-2 and TRM / B 3.8-2 01/28/2005 Page TRM / B 3.8-2a 03/01/2010 Page TRM / B 3.8-3 04/02/2002 Page TRM / B 3.8-3a 04/02/2002 Page TRM / B 3.8-4 04/02/2002 Page TRM / B 3.8-4a 08/10/2004 Page TRM / B 3.8-5 08/31/1998 Pages TRM / B 3.8-6 through TRM / B 3.8-16 04/02/2002 Page TRM / B 3.8-17 01/28/2005 Pages TRM / B 3.8-18 through TRM / B 3.8-20 11/29/2006 Pages TRM / B 3.8-21 through TRM / B 3.8-24 05/28/2009 B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 08/31/1998 Pages B 3.9-3 through B 3.9-7 10/23/1998 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 08/31/1998 Pages TRM / B 3.10-2 and TRM / B 3.10-3 03/27/2007 Pages TRM / B 3.10-4 and TRM / B 3.10-5 08/23/1999 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 08/31/1998 Page TRM / B 3.11-10 02/01/1999 Pages TRM/B 3.11-11 and TRM/B 3.11-1 Ia 04/07/2000 Pages TRM/B 3.11-12 and TRM/B 3.11-13 02/01/1999 Page TRM / B 3.11-14 12/03/2004 Page TRM / B 3.11-15 02/01/1999 Pages B 3.11-16 through B 3.11-19 08/31/1998 Page TRM / B 3.11-20 04/02/2002 Page TRM / B 3.11-20a 04/02/2002 SUSQUEHANNA - UNIT 2 TRM / LOES-8 EFFECTIVE DATE 11/24/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 70 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM / B 3.11-21 05/13/2005 Pages TRM / B 3.11-22 and TRM / B 3.11-23 11/14/2006 Page TRM / B 3.11-23a 05/13/2005 Pages TRM / B 3.11-24 and TRM / B 3.11-25 01/21/2004 Pages B 3.11-26 through B 3.11-27 08/31/1998 Pages TRM / B 3.11-28 and TRM / B 3.11-29 11/30/2005 Page TRM / B 3.11-30 06/30/2010 Pages TRM / B 3.11-31 and TRM / B 3.11-32 08/31/1998 Page TRM / B 3.11-33 06/30/2010 Pages TRM / B 3.11-34 and TRM / B 3.11-35 08/31/1998 Page TRM / B 3.11-36 02/12/1999 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 09/19/2007 Page TRM / B 3.12-2 11/29/2010 Page TRM / B 3.12-3 02/05/1999 TRM2 text LOES.doc 11/28/2011 SUSQUEHANNA - UNIT 2 TRM / LOES-9 EFFECTIVE DATE 11/24/2011
Fire Detection Instrumentation PPL Rev. 10 3.7.3.8 3.7.3 Fire Protection 3.7.3.8 Fire Detection Instrumentation TRO 3.7.3.8 The fire detection instrumentation for each fire detection zone shown in Table 3.7.3.8-1 shall be OPERABLE.
APPLICABILITY: Whenever equipment protected by the fire detection instrument is required to be OPERABLE.
ACTIONS
- 1. Separate condition entry is allowed for each instrument.
CONDITION REQUIRED ACTION COMPLETION TIME A. The number of OPERABLE A.1 Establish an hourly fire watch 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> fire detection instruments patrol less than the Minimum Instruments Operable AND requirement of Table 3.7.3.8-1 A.2.1 Inspect the accessible Once per hour zone(s) with inoperable instrument(s)
OR A.2.2 Inspect the affected area Once per hour surrounding any inaccessible zones SUSQUEHANNA - UNIT 2 TRM / 3.7-26 EFFECTIVE DATE 08/02/1999
Fire Detection Instrumentation PPL Rev. 10 3.7.3.8 TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY
NOTE -----------------------------------------------------------
When a detector is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and required Actions may be delayed for up to 15 minutes to allow for the individual detector trip to clear.
TRS 3.7.3.8.1 Perform CHANNEL FUNCTIONAL TEST on 12 months accessible fire detection instruments.
TRS 3.7.3.8.2 Verify that the supervised circuits supervision 12 months associated with the detector alarms of each of the fire detection instruments listed in Table 3.7.3.8-1 are OPERABLE.
TRS 3.7.3.8.3 Perform CHANNEL FUNCTIONAL TEST on Prior to startup inaccessible fire detection instruments, from each COLD SHUTDOWN exceeding 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> unless performed in the previous 12 months TRS 3.7.3.8.4 Perform CHANNEL FUNCTIONAL TEST on heat 12 months detectors fixed-temperature, non-restorable line type fire detection instrument.
SUSQUEHANNA - UNIT 2 TRM / 3.7-27 EFFECTIVE DATE 11/24/2011
Fire Detection Instrumentation PPL Rev. 10 3.7.3.8 TABLE 3.7.3.8-1 FIRE DETECTION INSTRUMENTATION INSTRUMEtNT LOCATION IINSTRUMENT OPERABLE FIRE fHEAT IONIZATION {PHOTO ELECTRIC ZONE LROOM OR AREA ELEV. TOTAL MIN. TOTAL MIN. TOTAL MIN._
- a. Control Building . ..
0-21A Common Equipment Room Elevator 656'-0" NA NA NA NA Lobby ____
0-22A Above Ceiling/Filter Area 687'-8" NA NA 10 5 NA NA 0-22A Elevator Lobby 679-0' NA NA 1 1 NA NA Chem Lab 0F1 35 High Temp. Alarm 68T-1 0' 2 1 NA NA NA NA Chem Lab DS-021 687'-10" 2 1 NA NA NA NA Chem Lab 0F1 38 High Temp. Alarm 687'-10" 2 1 NA NA NA NA Chem Lab DS-022 687'-10' 2 1 NA NA NA NA 0-22A Chem Lab 0F1 41 High Temp. Alarm 687-10" 2 1 NA NA NA NA Chem Lab DS-023 687-1 0" 2 1 NA NA NA NA Chem Lab 0F1 44 High Temp. Alarm 68T-10" 2 1 NA NA NA NA Chem Lab DS-024 68T-10" 2 1 NA NA NA NA 0-23 Egress Corridor to South Stairwell 686'-6" NA NA 1 1 NA NA 0-24A UPS Panel Room U-2 698'-0" 4 2 2 1 NA NA 0-24B Corridor 698'-0" NA NA 3 2 NA NA 0-24B Corridor Elevator Lobby 698'-0' NA NA 1 1 NA NA 0-24D Ul Lower Relay Room 698'-0" 4 2 4 2 NA NA 0-24E Computer Room 698'-0" NA NA 6 3 NA NA 0-24E Computer Room (Above Ceiling) 698'-0" 12 6 4 2 NA NA Computer Room 1U720 697'-0" NA NA 4 2 NA NA PGCC Underfloor 1U722 697'-0" NA NA 4 2 NA NA 0-24E I1U724 697'-0" NA NA 4 2 NA NA 1U726 697'-0" NA NA 4 2 NA NA 21-721 697'-0" NA NA 4 2 NA NA 21-723 697'-0" NA NA 4 2 NA NA 21-725 697'-D" NA NA 4 2 NA NA 2U727 697'-0" NA NA 4 2 NA NA 0-24F Computer Maintenance Rm and Office 698'-0" NA NA 2 1 NA NA 0-24G U2 Lower Relay Room 6981-0" 4 2 4 2 NA NA U-2 Lower Relay Room 2U704 69T-0" 11 6 6 3 NA NA PGCC Halon Panel 2U705 697-0' 11 6 6 3 NA NA 0-24G Division 11 2U706 69T-0' 11 6 6 3 NA NA 2U731 697-0" 10 5 6. 3 NA NA 2U732 697-0" 11 6 6 3 NA NA SUSQUEHANNA - UNIT 2 TRM / 3.7-28 EFFECTIVE DATE 11/29/2006
Fire Detection Instrumentation PPL Rev. 10 3.7.3.8 TABLE 3.7.3.8-1 FIRE DETECTION INSTRUMENTATION
- c..~.:v~~~.NSTRUMENT I LOCATION INSTRUMENT OPERABLE FIEHEAT IONIZATION PHOTO ELECTRIC ZONE ROOM OR AREA. ELEV. TAL MIN. TOTAýL MIN. TOTAL' MIN.
0-24J South Cable Chase 698'-0" 1 1 NA NA NA NA 0-24L Center Cable Chase 698'-0" 1 1 NA NA NA NA 0-24M North Cable Chase 698'-0" 1 1 NA NA NA NA 0-25A U-2 Lower Cable Spreading Room 714'-0" 20 10 6 3 NA NA 0-25B South Cable Chase 714'-0" 1 1 NA NA NA NA 0-25C Center Cable Chase 714'-0" 1 1 NA NA NA NA 0-25D North Cable Chase 714'-" 1 1 NA NA NA NA 0-25E U-1 Lower Cable Spreading Room 714'-0" 26 13 5 3 NA NA 0-25E U-1 Lower Cable Spreading Room 714-0' NA NA 1 1 NA NA Elevator Lobby 0-26A Copy Room 729'-1" NA NA 1 1 NA NA 0-26B South Cable Chase 729'-1" NA NA 1 1 NA NA 0-26C Center Cable Chase 729'-1" NA NA 1 1 NA NA 0-26D North Cable Chase 729'-1" NA NA 1 1 NA NA 0-26E Locker Room 729'-1" NA NA 1 1 NA NA 0-26F Vestibule Elevator Lobby 729'-1" NA NA 1 1 NA NA 0-26F Vestibule (Under Floor) 728'-1" NA NA 1 1 NA NA 0-26G Shift Office 729'-1" NA NA 1 1 NA NA 0-26G Shift Office (Under Floor) 728'-1" NA NA 2 1 NA NA 0-26H Control Room (Under Floor Unit 1) 728'-1" NA NA 15 8 NA NA 0-26H Control Room (Under Floor Unit 2) 728'-1" NA NA 12 6 NA NA 0-26H Control Room 729'-1" NA NA 10 5 NA NA 0-26H Control Room (Above Ceiling) 729'-1" NA NA 9 5 NA NA 0-261 Operational Support Center 729'-1" NA NA 1 1 NA NA 0-261 Operational Support Center 728-1' NA NA 2 1 NA NA (Under Floor) 0-26J Vestibule 729'-1" NA NA 1 1 NA NA 0-26J Vestibule (Under Floor) 728'-1" NA NA 1 1 NA NA 0-26K Technical Support Center 741--1" NA NA NA NA 10 5 0-26K Technical Support Center Elevator Lobby 741'-1" NA NA 1 1 NA NA 0-26K Technical Support Center 741'-1" NA NA 5 3 NA NA (Above Ceiling)
[0-26L Conference Room 741'-1" NA NA NA NA 6 3 0-26L Conference Room (Above Ceiling) 741'-1" NA NA 2 1 NA NA 0-26M U-1 TSC Soffit 729'-1" NA NA 2 1 NA NA 0-26M U-1 TSC Soffit 741'-1" NA NA 2 1 NA NA 0-26N U-1 Control Room Soffit 741'-1" NA NA 2 1 NA NA 0-26P U-2 Control Room Soffit 741'-1" NA NA 2 1 NA NA 0-26R U-2 TSC Soffit 729"-1" NA NA 2 1 NA NA 0-26R U-2 TSC Soffit 741'-1" NA NA 2 1 NA NA SUSQUEHANNA - UNIT 2 TRM / 3.7-29 EFFECTIVE DATE 01/13/2010
Fire Detection Instrumentation PPL Rev. 10 3.7.3.8 TABLE 3.7.3.8-1 FIRE DETECTION INSTRUMENTATION INSTRUMENT LOCATION INSTRUMENT OPERABLE FIRE HEAT_ IONIZATION PHOTO ELECTRIC ZONE JROOM OR AREA ELEV, TOA J. TTL MN OA IN.
0-26S South Cable Chase 741'-1" 1 1 NA NA NA NA 0-26T Center Cable Chase 741'-1" 1 1 NA NA NA NA 0-26V North Cable Chase 741'-1" 1 1 NA NA NA NA 0-27A U-2 Upper Relay Room 754-0" 4 2 3 2 NA NA U-2 Upper Relay Room 2U700 753'-0" 11 6 6 3 NA NA PGCC Halon Panel 2U701 753'-0" 11 6 6 3 NA NA 0-27A Division I 2U702 753'-0" 11 6 6 3 NA NA 2U703 753'-0" 11 6 6 3 NA NA 2U730 753'-0" 11 6 6 3 NA NA 0-27B U-2 Upper Cable Spreading Room 753'-0" 24 12 5 3 NA NA 0-27C U-1 Upper Cable Spreading Room 753'-0" 23 12 7 4 NA NA 0-27C U-1 Upper Cable Spreading Room 754!-0" NA NA 1 1 NA NA Elevator Lobby 0-27D Electrician's Office 754'-0" 2 1 1 1 NA NA 0-27E U-1 Upper Relay Room 754'-0" 4 2 2 1 NA NA 0-27F South Cable Chase 754'-0" 1 1 NA NA NA NA 0-27G Center Cable Chase 754'-0" 1 1 NA NA NA NA 0-27H North Cable Chase 754'-0" 1 1 NA NA NA NA 0-28A-1 Equipment Room 771'-0" NA NA 1 1 NA NA 0-28A-11 Equipment Room 771'-0" NA NA 3 2 NA NA 0-281-I Equipment Room 771'-0" NA NA 1 1 NA NA 0-28B-11 Equipment Room 771'-0" NA NA 2 1 NA NA 0-28B-11 Equipment Room Elevator Lobby 771'-0" NA NA 1 1 NA NA 0-28C Battery Room 771'-0" NA NA 1 1 NA NA 0-28D Battery Room 771'-0" NA NA 1 1 NA NA 0-28E Battery Room 771'-0" NA NA 1 1 NA NA 0-28F Battery Room 771'-0" NA NA I 1 NA NA 0-28G Battery Room 771'-0" NA NA 1 1 NA NA 0-28H Repair Shop 771'-0" NA NA 2 1 NA NA 0-281 Battery Room 771'-0" NA NA 1 1 NA NA 0-28J Battery Room 771'-0" NA NA 1 1 NA NA 0-28K Battery Room 771 '-0" NA NA 1 1 NA NA 0-28L Battery Room 771'-0" NA NA 1 1 NA NA 0-28M Battery Room 771'-0" NA NA 1 1 NA NA SUSQUEHANNA - UNIT 2 TRM / 3.7-30 EFFECTIVE DATE 11/30/2005
Fire Detection Instrumentation PPL Rev. 10 3.7.3.8 TABLE 3.7.3.8-1 FIRE DETECTION INSTRUMENTATION INSTRUMENT LOCATION :INSTRUMENT OPERABLE FIRE H EAT IONIZATION PHOTO ELECTRIC ZOEROOM OR AREA ELEV. TAL MIN. TOTAL MIN. TTL NN 0-28N Battery Room 771'-0" NA NA 1 1 NA NA 0-28P South Cable Chase 771'-0" 1 1 NA NA NA NA 0-28Q Center Cable Chase 771'-0" 1 1 NA NA NA NA 0-28R North Cable Chase 771'-0" 1 1 NA NA NA NA 0-28T Battery Room 771'-0" NA NA 1 1 NA NA 0-29A Elevator Vestibule 783'-0" NA NA 1 1 NA NA 0-29B H&V Equipment Room 783'-0" NA NA 10 5 NA NA 0-30A HVAC Equipment Room 806'-0" NA NA 19 10 NA NA 0-30A Freight Elevator Lobby 806'-0" NA NA 1 1 NA NA 0-30A CREOASS 0F125A High Temp. Alarm 806'-0" 7 4 NA NA NA NA 0-30A CREOASS DS-091 806-0" 7 4 NA NA NA NA 0-30A CREOASS 0F125B High Temp. Alarm 806'-0" 7 4 NA NA NA NA 0-30A CREOASS DS-092 806-0" 7 4 NA NA NA NA 0-30A SGTS - OF1 69A High Temp. Alarm 806'-0" 1 1 NA NA NA NA 0-30A SGTS - DS-093 806'-0" 1 1 NA NA NA NA 0-30A SGTS - OF1 69B High Temp. Alarm 806'-0" 1 1 NA NA NA NA 0-30A SGTS - DS-094 806'-0" 1 1 NA NA NA NA b.- ~Reqctorauifdingz -
2-1A Core Spray Pump Room 645'-0" NA NA 8 4 NA NA 2-1 B Core Spray Pump Room 645'-0" NA NA 6 3 NA NA 2-1 B Elevator Lobby 645-0" NA NA 1 1 NA NA 2-1C HPCI Pump Room 645'-0" 2 1 NA NA 7 4 2-1D RCIC Pump Room 645'-0" 2 1 NA NA 5 3 2-1E RHR Pump Room 645'-0" NA NA NA NA 13 7 2-1F RHR Pump Room 645'-0" NA NA NA NA 15 8 2-1G Sump Room 645'-0" NA NA 2 1 NA NA 2-11 Stairwell 202 645'-818' NA NA 2 1 NA NA 2-2A Access Area and Remote Shutdown 670'-U" NA NA 5 3 NA NA Panel Room 2-2A Elevator Lobby 670-0" NA NA 1 1 NA NA 2-2B Core Spray Pump Room 670'-0" NA NA 11 6 NA NA 2-3A Access Area 683'-0" NA NA 4 2 NA NA 2-3A Access Area Elevator Lobby 683'-0" NA NA 1 1 NA NA 2-3B-N Equipment Removal Area - North 683'-0" NA NA 13 7 NA NA 2-3B-S Equipment Removal Area - South 683-0" NA NA 1 1 NA NA 2-3B-W Equipment Removal Area - Wraparound 683'-0" NA NA 2 1 NA NA 2-3C-N Equipment Access Area - North 683-0" NA NA NA NA 4 2 SUSQUEHANNA - UNIT 2 TRM / 3.7-31 EFFECTIVE DATE 11/16/2001
Fire Detection Instrumentation PPL Rev. 10 3.7.3.8 TABLE 3.7.3.8-1 FIRE DETECTION INSTRUMENTATION INST RUMENT LOCATION INSTRUMENT OPE*RABLE FIRE HEAT IONIZATION PHOTO ELECTRIC ZONE ROOM OR AREA ELV.* TOTAL MIN. TOTAL MIN. TOTAL jMN 2-3C-S Equipment Access Area - South 683-0" NA NA NA NA 4 2 2-3C-W Equipment Access Area - Wraparound 683'-0" NA NA NA NA 5 3 2-4A-N Containment Access Area - North 719'-0" NA NA 11 6 3 2 2-4A-S Containment Access Area - South 719-0" NA NA 10 5 NA NA 2-4A-S Containment Access Area Elevator 7190" NA NA 1 1 NA NA Lobby 2-4A-W Containment Access Area -Wraparound 719'-0" NA NA 5 3 NA NA 2-4B Pipe Penetration Room 719'-1" NA NA 1 1 NA NA 2-4C Switchgear Room 719'-1" NA NA 2 1 NA NA 2-4D Switchgear Room 719'-1" NA NA 2 1 NA NA 2-4G Main Steam Pipeway 719'-1" NA NA NA NA 4"" 2 2-4G Exhaust Fan Room (Note: these 799'-1" NA NA NA NA 2 1 detectors also cover el. 749'-1")
2-5A-N Standby Control Systems Area 749-(Y" NA NA 16 8 7 4 2-5A-S General Access Area - South 749'-0" NA NA 5 3 2 1 2-5A-S General Access Area Elevator Lobby 749'-0" NA NA 1 1 NA NA 2-5A-W Access Corridor - Wraparound 749'-0" NA NA 3 2 2 1 2-5B Valve Access Area 761'-10" NA NA NA NA 4 2 2-5C RWCU Backwash Tank 749-1" NA NA NA NA 1 1 2-5D RWCU Pumps & Heat Exchangers 749'-1" NA NA NA NA 8 4 2-5E Penetration Room 749'-1" NA NA NA NA 2 1 2-5F Load Center Room 749'-1" NA NA 2 1 NA NA 2-5G Load Center Room 749'-1" NA NA 2 1 NA NA 2-5H Instrument Repair Room 749'-1" NA NA 2 1 NA NA 2-6A Access Area 779'-1" NA NA 11 6 NA NA 2-6B Load Center Room 779'-1" NA NA 4 2 NA NA 2-6C Electrical Equipment Room 779'-1" NA NA 2 1 NA NA 2-6D H&V Equipment Room 779'-1" NA NA 12 6 NA NA 2-6E Hatch and Laydown Area 779'-1" NA NA 2 1 NA NA 2-7A H&V Fan & Filter Rooms 799'-1" NA NA 14 7 NA NA 2-7A HVAC Filter 2F257A High Temp. Alarm 799'-" 7 4 NA NA NA NA 2-7A HVAC Filter 2F257A DS-281 799'-0" 7 4 NA NA NA NA 2-7A HVAC Filter 2F257B High Temp. Alarm 799'-0" 7 4 NA NA NA NA 2-7A HVAC Filter 2F257B DS-282 799-0" 7 4 NA NA NA NA 2-7A HVAC Filter 2F217A High Temp. Alarm 799'-0" 5 3 NA NA NA NA 2-7A HVAC Filter 2F217A DS-283 799-0" 5 3 NA NA NA NA 2-7A HVAC Filter 2F217B High Temp. Alarm 799'-0" 5 3 NA NA NA NA Inaccessible SUSQUEHANNA - UNIT 2 TRM / 3.7-32 EFFECTIVE DATE 09/16/2010
Fire Detection Instrumentation PPL Rev. 10 3.7.3.8 TABLE 3.7.3.8-1 FIRE DETECTION INSTRUMENTATION INTUETLOCATION [INSTRUMENT OPERABLE ELEV.~ T TOTAL MIN.
ZOEROOM TOTA IONREIA PHOTOLETI 2-7A HVAC Filter 2F217B DS-284 799'-0" 5 3 NA NA NA NA 0-6G Surge Tank Vault 779'-4" NA NA 2 1 NA NA 0-8A Refueling Floor 818'-1" NA NA NA NA 60 30 0-8A Refueling Floor Elevators 8181-1' NA NA 2 1 NA NA Cý u. . .E. .. . . .
0-51 Pump Room 685'-6" NA NA 6 3 NA NA 0-52 Pump Room 685'-6" NA NA 6 3 NA NA 0-51 PumpcRoom 685-6".A NA 6 3 NA NA 0-51 Pump Room 685'-6" NA NA 6 3 NA NA 0-52 Pump Room 685'-6" NA NA 6 3 NA NA
- i ,:- tei elGnrator Building A TINFRA:.RED PHOTO-EiLCTRiC-0-41A Diesel Generator "A" Bay 660'-0"& 22 11 2 1 15 8 677'-0" 710'-9" N/A N/A N/A N/A 8 4 660'-U'& 23 12 2 1 15 8 0-41 B Diesel Generator "B" Bay 677'-0" 710'-9" N/A N/A N/A N/A 9 5 0-41C Diesel Generator "C" Bay 660'-U"& 22 11 2 1 15 8 677'-0" 710'-9" N/A N/A N/A N/A 8 4 0-41D Diesel Generator "D"Bay 660'-0"& 22 11 2 1 15 8 677'-0" 7109" N/A N/A N/A N/A 8 4
- e. Wiesel QenerarorE Bui/ding IONIZATION 0-41 E Diesel Generator Rooms 656'-6" & 1 1 NA NA 21 11 675'-6"!& NA NA 6 3 3 2 708'-0" NA NA 4 2 NA NA Outside Area nsformer (0X103PHOTO)10E CNTRIA 0-00 Startup Transformer (0X103) DS-014 NA 10 5 NA NA NA NA 0-00 Startup Transformer (0X104) DS-015 NA 12 6 NA NA NA NA 0-00 ESS Transformer - DS-016 0X201 NA 6 3 NA NA NA NA OX 213 NA 6 3 NA NA NA NA 0-00 ESS Transformer - DS-017 0X203 NA 6 3 NA NA NA NA 0X211 NA 6 3 NA NA NA NA SUSQUEHANNA - UNIT 2 TRM / 3.7-33 EFFECTIVE DATE 10/05/2002
Fire Detection Instrumentation PPL Rev. 2 B 3.7.3.8 B 3.7.3.8 Fire Detection Instrumentation BASES TRO OPERABILITY of the fire detection instrumentation ensures that adequate warning capability is available for the prompt detection of fires. This capability is required in order to detect and locate fires in their early stages. Prompt detection of fires will reduce the potential for damage to safety-related equipment and is an integral element in the overall facility fire protection program.
The basis for the detection instrumentation included within the scope of this TRO includes both Safety Related and Safe Shutdown System protection. Fire Detection Instrumentation associated with building elevators are listed as separate line items in Table 3.7.3.8-1 due to their specific function and their layout being in a vertical string.
ACTIONS The Actions are defined to ensure proper corrective measures and compensatory actions are taken in response to the inoperable systems or components.
In the event that a portion of the fire detection instrumentation is inoperable, establishing hourly firewatch patrols in the affected areas is required to provide detection capability until the inoperable instrumentation is restored to OPERABILITY.
Inaccessible Fire Detection Instrumentation can affect the compensatory actions for inoperable Fire Rated Assemblies (Ref. TRO 3.7.3.7 and B 3.7.3.7).
Hourly Firewatch Patrols shall be completed once each clock hour.
Individual zones on the hourly firewatch patrol shall be toured at intervals (i.e., zone A and back to zone A) of sixty minutes with a margin of fifteen minutes.
A continuous Firewatch must remain in the specified area at all times and must patrol the required fire zones in the specified area at least once per fifteen minutes with a margin of five minutes. The specified area can be as small as one fire zone or as large as a firewatch can reasonably patrol within the fifteen minute time period. The specified area is limited to two floors of the Control Structure or Reactor Buildings. The floors must be adjacent or serviced by an operable elevator.
(continued)
SUSQUEHANNA - UNIT 2 TRM / B 3.7-14 EFFECTIVE DATE 8/02/1999
Fire Detection Instrumentation PPL Rev. 2 B 3.7.3.8 B 3.7.3.8 Fire Detection Instrumentation BASES ACTIONS Areas exist within the plant where the posting of a firewatch does not (continued) provide acceptable radiological ALARA practices. For these inaccessible areas, alternate measures should be taken to assure an adequate level of fire protection is maintained.
TRS The TRSs are defined to be performed at the specified Frequency to ensure that the Fire Detection Instrumentation is maintained OPERABLE.
The Surveillances are modified by a Note to indicate that when a detector is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 15 minutes for each detector. Upon completion of each detector test, or expiration of the 15 minute allowance, the detector must reset and alarm must clear, or the applicable Condition entered and Required Action taken. This note is based on the assumption of time to perform a detector test. Under normal conditions, it is expected that the detector would reset and alarm clear within minutes after detector test initiation. It is recognized that while the detector being tested is in the tripped condition, other alarms originating on the string of detectors being tested will be masked.
TRS 3.7.3.8.1 /TRS 3.7.3.8.2 The surveillance frequency of 12 months is based on NFPA 72-1996, National Fire Alarm Code.
TRS 3.7.3.8.3 Fire Detection Instrumentation that is inaccessible during unit operation is defined as those fire detection instruments that are located within high radiation areas or where access is limited due to operating conditions, AND remote testing capability (i.e., smoke tubes) does not exist. Inaccessible Fire Detection Instruments need only be tested when the Unit is in cold shutdown for longer than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, unless it has been tested in the previous 12 months. Inaccessible Fire Detection Instrumentation must then be surveilled during the cold shutdown prior to startup. Inaccessible Fire Detection Instrumentation remains OPERABLE during Unit operation even though the surveillance frequency for accessible Fire Detection Instrumentation may have been exceeded.
(continued)
SUSQUEHANNA - UNIT 2 TRM / B 3.7-14a EFFECTIVE DATE 01/09/2004
Fire Detection Instrumentation PPL Rev. 2 B 3.7.3.8 B 3.7.3.8 Fire Detection Instrumentation BASES TRS TRS 3.7.3.8.4 (continued)
Fire Detection Instruments that are Fixed-Temperature, non-restorable line type shall be surveilled by measuring the loop resistance from the control panel to the detector and back to the panel. Changes from the acceptance criteria shall be investigated. The acceptance criterion is identified at time of Fire Detection Instrument installation.
REFERENCES 1. FPRR Section 4.12 SUSQUEHANNA - UNIT 2 TRM / B 3.7-14b EFFECTIVE DATE 11/24/2011