ML113000280
ML113000280 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 10/27/2011 |
From: | NRC Region 4 |
To: | Pacific Gas & Electric Co |
References | |
50-275/11-07, 50-323/11-07, ES-301-1 | |
Download: ML113000280 (34) | |
Text
ES-301 Administrative Topics Outline Form ES-301-1 Facility: Diablo Canyon Date of Examination: 07 / 2011 Examination Level: RO SRO Operating Test Number: L091 Administrative Topic Type Describe activity to be performed (See Note) Code*
Calculate Rod Withdrawal Hold Points Conduct of Operations 2.1.23 Ability to perform specific and integrated plant M, R procedure during all modes of plant operations.
(NRCL091-A1) (4.3)
(from NRCADM051-501B)
Perform Shutdown Margin Calculation Conduct of Operations 2.1.25 Ability to interpret reference materials, such as graphs, M, R curves, tables, etc. (3.9)
(NRCL091-A2) (from LJAC0-04R)
Perform STP I-1A Check on Accumulator Volume Equipment Control 2.2.44 Ability to interpret control room indications to verify the N, R status and operation of a system, and understand how (NRCL091-A3) operator actions and directives affect plant and system conditions. (4.2)
Evaluate Release under Changing Plant Conditions Radiation Control 2.3.11 Ability to control radiation releases. (3.8)
N, R (new)
(NRCL091-A4)
Emergency Procedures/Plan NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.
- Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (< 3 for ROs; < 4 for SROs & RO retakes)
(N)ew or (M)odified from bank (> 1)
(P)revious 2 exams (< 1; randomly selected)
ES 301, Page 22 of 27 Rev 1
ES-301 Administrative Topics Outline Form ES-301-1 Facility: Diablo Canyon Date of Examination: 07 / 2011 Examination Level: RO SRO Operating Test Number: L091 Administrative Topic Type Describe activity to be performed (See Note) Code*
Verify Rod Withdrawal Hold Points Conduct of Operations 2.1.23 Ability to perform specific and integrated plant M, R procedure during all modes of plant operations.
(NRCL091-A5) (4.3)
(from NRCADM051-501B)
Verify Shutdown Margin Calculation Conduct of Operations 2.1.25 Ability to interpret reference materials, such as graphs, M, R curves, tables, etc. (3.9)
(NRCL091-A6) (from LJAC0-04R)
Verify STP I-1A Check on Accumulator Volume Equipment Control 2.2.44 Ability to interpret control room indications to verify the N, R status and operation of a system, and understand how (NRCL091-A7) operator actions and directives affect plant and system conditions. (4.2)
Evaluate Release under Changing Plant Conditions Radiation Control 2.3.11 Ability to control radiation releases. (4.3)
N, R (new)
(NRCL091-A8)
Perform An Off-Site Dose Assessment -
GDT Rupture Emergency Procedures/Plan 2.4.38 Ability to take actions called for in the facility emergency D, R (NRCL091-A9) plan, including supporting or acting as emergency coordinator if required. (4.4)
(from LJAEP-04S)
NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.
- Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (< 3 for ROs; < 4 for SROs & RO retakes)
(N)ew or (M)odified from bank (> 1)
(P)revious 2 exams (< 1; randomly selected)
ES 301, Page 22 of 27 Rev 1
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Diablo Canyon Date of Examination: 07 / 2011 Exam Level: RO SRO-I SRO-U Operating Test Number: L091 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Safety System / JPM Title Type Code*
Function
- a. C1 064.A4.06 / Manually Start Diesel Generator 12 (LJC-085) C, D, EN, L 6
- b. C2 E07.EA1.1 / Respond to Saturated Core Conditions C, N, L 2
- c. S1 06.A4.07 / Respond to Accumulator Low Level (LJC-016) D, S 3
- d. S2 04.A2.05 / Establish steady state conditions after rod misalignment D, S 1 (LJC-022)
- e. S3 08.A2.05 / Respond to loss of CCW to Letdown Heat Exchanger (LJC-126) A, D, S 8
- f. S4 05.A2.03 / Transfer To Cold Leg Recirculation (LJC-027A) A, C, D, S 4P
- g. S5 073.A4.03 / Verify RE-18 is Operable N, S 7
- h. S6 051.AA2.02 / Traveling Screen Problem A, N, S 4S In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. P1 062.A2.05 / Transfer the TSC to Vital Power (LJP-058) D, E, L 6
- j. P2 068.AA1.03 / Close S/G Blowdown valves outside containment (LJP-096) A, D, E, L, R 8
- k. P3 103.A2.03 / Locally verify SI & Containment Isolation phase A valves A, E, L, N, R 5
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (EN)gineered safety feature - / - / > 1 (control room system (L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3/ <3 / < 2 (randomly selected)
(R)CA >1 / >1 / >1 (S)imulator ES-301, Page 23 of 27 Rev 1
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Diablo Canyon Date of Examination: 07 / 2011 Exam Level: RO SRO-I SRO-U Operating Test Number: L091 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Safety System / JPM Title Type Code*
Function
- a. C1 064.A4.06 / Manually Start Diesel Generator 12 (LJC-085) C, D, EN, L 6 b.
- c. S1 06.A4.07 / Respond to Accumulator Low Level (LJC-016) D, S 3
- d. S2 04.A2.05 / Establish steady state conditions after rod misalignment D, S 1 (LJC-022)
- e. S3 08.A2.05 / Respond to loss of CCW to Letdown Heat Exchanger (LJC-126) A, D, S 8
- f. S4 05.A2.03 / Transfer To Cold Leg Recirculation (LJC-027A) A, C, D, S 4P
- g. S5 073.A4.03 / Verify RE-18 is Operable N, S 7
- h. S6 051.AA2.02 / Traveling Screen Problem A, N, S 4S In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. P1 062.A2.05 / Transfer the TSC to Vital Power (LJP-058) D, E, L 6
- j. P2 068.AA1.03 / Close S/G Blowdown valves outside containment (LJP-096) A, D, E, L, R 8
- k. P3 103.A2.03 / Locally verify SI & Containment Isolation phase A valves A, E, L, N, R 5
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (EN)gineered safety feature - / - / > 1 (control room system (L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3/ <3 / < 2 (randomly selected)
(R)CA >1 / >1 / >1 (S)imulator ES-301, Page 23 of 27 Rev 0
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Diablo Canyon Date of Examination: 07 / 2011 Exam Level: RO SRO-I SRO-U Operating Test Number: L091 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Safety System / JPM Title Type Code*
Function
- a. C1 064.A4.06 / Manually Start Diesel Generator 12 (LJC-085) C, D, EN, L 6 b.
c.
d.
e.
f.
- g. S5 073.A4.03 / Verify RE-18 is Operable N, S 7
- h. S6 051.AA2.02 / Traveling Screen Problem A, N, S 4S In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) i.
- j. P2 068.AA1.03 / Close S/G Blowdown valves outside containment (LJP-096) A, D, E, L, R 8
- k. P3 103.A2.03 / Locally verify SI & Containment Isolation phase A valves A, E, L, N, R 5
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (EN)gineered safety feature - / - / > 1 (control room system (L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3/ <3 / < 2 (randomly selected)
(R)CA >1 / >1 / >1 (S)imulator ES-301, Page 23 of 27 Rev 0
ES-301 Transient and Event Checklist Form ES-301-5 Group 1 (U1, R1, R2)
Facility: Diablo Canyon Date of Exam: 07/2011 Operating Test Number: L091 A E Scenarios P V 1 5 3 4 P E T M L N CREW CREW CREW CREW O I I T POSITION POSITION POSITION POSITION T N C A I A T S A B S A B S A B S A B L M N Y R T O R T O R T O R T O U T P O C P O C P O C P O C P M(*)
E R I U RX 0 1 1 0 RO NOR 3 5 2 1 1 1 SRO-I I/C 1,2,3,5 2,3,4,6 8 4 4 2 SRO-U MAJ 4,6 7 3 2 2 1 TS 1,3 3,4 4 0 2 2 RX 2 1 1 1 0 RO NOR 3 5 2 1 1 1 SRO-I I/C 1,2,3 4,8 5 4 4 2 SRO-U MAJ 4,6 7 3 2 2 1 TS 0 0 2 2 RX 1 1 1 1 0 RO NOR 3 5 2 1 1 1 SRO-I I/C 1,3,5 3,4 5 4 4 2 SRO-U MAJ 4,6 7 3 2 2 1 TS 0 0 2 2 RX 1 1 0 RO NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
ES-301, Page 26 of 27 Rev 0
ES-301 Transient and Event Checklist Form ES-301-5 Group 2 (I2, I3, R5)
Facility: Diablo Canyon Date of Exam: 07/2011 Operating Test Number: L091 A E Scenarios P V 1 2 3 4 P E T M L N CREW CREW CREW CREW O I I T POSITION POSITION POSITION POSITION T N C A I A T S A B S A B S A B S A B L M N Y R T O R T O R T O R T O U T P O C P O C P O C P O C P M(*)
E R I U RX 1 1 1 1 0 RO NOR 3 1 1 1 1 SRO-I I/C 1,2,3,5 3 2,5 7 4 4 2 SRO-U MAJ 4,6 5,7 6,8 6 2 2 1 TS 1,3 2 0 2 2 RX 2 1 1 1 0 RO NOR 3 1 1 1 1 SRO-I I/C 1,2,3 2,3,4 2,3,5 9 4 4 2 SRO-U MAJ 4,6 5,7 6,8 6 2 2 1 TS 2,3 2,3 4 0 2 2 RX 1 1 1 1 0 RO NOR 3 4 2 1 1 1 SRO-I I/C 1,3,5 2,3,4,6 7 8 4 4 2 SRO-U MAJ 4,6 5,7 6,8 6 2 2 1 TS 0 0 2 2 RX 1 1 0 RO NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
ES-301, Page 26 of 27 Rev 0
ES-301 Transient and Event Checklist Form ES-301-5 Group 3 (I4, I5, R6)
Facility: Diablo Canyon Date of Exam: 07/2011 Operating Test Number: L091 A E Scenarios P V 1 2 3 4 P E T M L N CREW CREW CREW CREW O I I T POSITION POSITION POSITION POSITION T N C A I A T S A B S A B S A B S A B L M N Y R T O R T O R T O R T O U T P O C P O C P O C P O C P M(*)
E R I U RX 1 1 1 1 0 RO NOR 3 1 1 1 1 SRO-I I/C 1,2,3,5 2,3,6,8 2,5 10 4 4 2 SRO-U MAJ 4,6 7 6,8 5 2 2 1 TS 1,3 2 0 2 2 RX 2 1 1 1 0 RO NOR 3 1 1 1 1 SRO-I 2,3,4,5,6, I/C 1,2,3 8
2,3,5 12 4 4 2 SRO-U MAJ 4,6 7 6,8 5 2 2 1 TS 2,4,5 2,3 5 0 2 2 RX 1 1 1 1 0 RO NOR 3 4 2 1 1 1 SRO-I I/C 1,3,5 2,4 7 6 4 4 2 SRO-U MAJ 4,6 7 6,8 5 2 2 1 TS 0 0 2 2 RX 1 1 0 RO NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
ES-301, Page 26 of 27 Rev 0
ES-301 Transient and Event Checklist Form ES-301-5 Group 4 (I1, I7, R3)
Facility: Diablo Canyon Date of Exam: 07/2011 Operating Test Number: L091 A E Scenarios P V 1 2 5 4 P E T M L N CREW CREW CREW CREW O I I T POSITION POSITION POSITION POSITION T N C A I A T S A B S A B S A B S A B L M N Y R T O R T O R T O R T O U T P O C P O C P O C P O C P M(*)
E R I U RX 1 1 1 1 0 RO NOR 3 5 2 1 1 1 SRO-I I/C 1,2,3,5 2,3,4,6 2,3,4,6 12 4 4 2 SRO-U MAJ 4,6 5,7 7 5 2 2 1 TS 1,3 3,4 4 0 2 2 RX 2 1 1 1 0 RO NOR 3 5 2 1 1 1 SRO-I I/C 1,2,3 2,3,4 4,8 8 4 4 2 SRO-U MAJ 4,6 5,7 7 5 2 2 1 TS 2,3 2 0 2 2 RX 1 1 1 1 0 RO NOR 3 5 2 1 1 1 SRO-I I/C 1,3,5 3 3,4 6 4 4 2 SRO-U MAJ 4,6 5,7 7 5 2 2 1 TS 0 0 2 2 RX 1 1 0 RO NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
ES-301, Page 26 of 27 Rev 0
ES-301 Transient and Event Checklist Form ES-301-5 Group 5 (I6, R7, R8)
Facility: Diablo Canyon Date of Exam: 07/2011 Operating Test Number: L091 A E Scenarios P V 1 2 3 4 P E T M L N CREW CREW CREW CREW O I I T POSITION POSITION POSITION POSITION T N C A I A T S A B S A B S A B S A B L M N Y R T O R T O R T O R T O U T P O C P O C P O C P O C P M(*)
E R I U RX SUR 1 1 1 1 0 RO NOR SUR 2* 1 1 1 1 SRO-I I/C SUR 2,3,4,6 *3,4,5,6,8 2,3,5 12 4 4 2 SRO-U MAJ SUR 5,7 7 6,8 5 2 2 1 TS SUR 2,4,5 2,3 5 0 2 2 RX 1 1 1 1 0 RO NOR 2* 1 1 1 1 SRO-I I/C *3,6,8 2,5 5 4 4 2 SRO-U MAJ 7 6,8 3 2 2 1 TS 0 0 2 2 RX 1 1 1 1 0 RO NOR 4 1 1 1 1 SRO-I I/C 3 2,4 7 4 4 4 2 SRO-U MAJ 5,7 7 6,8 5 2 2 1 TS 0 0 2 2 RX 1 1 0 RO NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
ES-301, Page 26 of 27 Rev 0
ES-301 Transient and Event Checklist Form ES-301-5 Group 6 (I10, I11, R9)
Facility: Diablo Canyon Date of Exam: 07/2011 Operating Test Number: L091 A E Scenarios P V 1 2 3 4 P E T M L N CREW CREW CREW CREW O I I T POSITION POSITION POSITION POSITION T N C A I A T S A B S A B S A B S A B L M N Y R T O R T O R T O R T O U T P O C P O C P O C P O C P M(*)
E R I U RX 1 1 1 1 0 RO NOR 2* 1 1 1 1 SRO-I I/C *3,4 2,4 2,3,5 7 4 4 2 SRO-U MAJ 5,7 7 6,8 5 2 2 1 TS 2,3 2,3 4 0 2 2 RX 1 1 1 1 0 RO NOR 2* 1 1 1 1 SRO-I I/C 3 *3,4,5,6,8 2,5 8 4 4 2 SRO-U MAJ 5,7 7 6,8 5 2 2 1 TS 2,4,5 3 0 2 2 RX 1 1 1 1 0 RO NOR 4 1 1 1 1 SRO-I I/C 2,3,4,6 2,3,6,8 7 9 4 4 2 SRO-U MAJ 5,7 7 6,8 5 2 2 1 TS 0 0 2 2 RX 1 1 0 RO NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
ES-301, Page 26 of 27 Rev 0
ES-301 Transient and Event Checklist Form ES-301-5 Group 7 (I9, I8, R4)
Facility: Diablo Canyon Date of Exam: 07/2011 Operating Test Number: L091 A E Scenarios P V 5 2 3 4 P E T M L N CREW CREW CREW CREW O I I T POSITION POSITION POSITION POSITION T N C A I A T S A B S A B S A B S A B L M N Y R T O R T O R T O R T O U T P O C P O C P O C P O C P M(*)
E R I U RX 1 1 1 1 0 RO NOR 5 1 1 1 1 SRO-I 2,3,4,5,6, I/C 2,3,4,6 8
2,5 12 4 4 2 SRO-U MAJ 7 7 6,8 4 2 2 1 TS 3,4 2,4,5 5 0 2 2 RX 1 1 1 1 0 RO NOR 5 4 2 1 1 1 SRO-I I/C 3,4 2,3,6,8 2,3,5 9 4 4 2 SRO-U MAJ 7 7 6,8 4 2 2 1 TS 2,3 2 0 2 2 RX 1 1 1 1 0 RO NOR 5 1 1 1 1 SRO-I I/C 4,6,8 2,4 7 6 4 4 2 SRO-U MAJ 7 7 6,8 4 2 2 1 TS 0 0 2 2 RX 1 1 0 RO NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
ES-301, Page 26 of 27 Rev 0
ES-401 PWR Examination Outline Form ES-401-2 Facility: Diablo Canyon Printed: 04/11/2011 Date Of Exam: 07/08/2011 RO K/A Category Points SRO-Only Points Tier Group K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G* Total A2 G* Total
- 1. 1 3 3 3 3 3 3 18 0 0 0 Emergency 2 1 2 2 N/A 1 2 1 9 0 0 0
& N/A Abnormal Tier Plant Totals 4 5 5 4 5 4 27 0 0 0 Evolutions 1 3 2 3 3 3 2 3 3 2 2 2 28 0 0 0 2.
2 1 1 1 1 1 1 1 0 1 1 1 10 0 0 0 0 Plant Systems Tier 0 0 0 4 3 4 4 4 3 4 3 3 3 3 38 Totals 1 2 3 4 1 2 3 4
- 3. Generic Knowledge And 10 0 Abilities Categories 3 2 2 3 0 0 0 0 Note:
- 1. Ensure that at least two topics from every applicable K/A category are sampled within each tier of the RO and SRO-only outlines (i.e., except for one category in Tier 3 of the SRO-only outline, the "Tier Totals" in each K/A category shall not be less than two).
- 2. The point total for each group and tier in the proposed outline must match that specified in the table.
The final point total for each group and tier may deviate by +/-1 from that specified in the table based on NRC revisions. The final RO exam must total 75 points and the SRO-only exam must total 25 points.
- 3. Systems/evolutions within each group are identified on the associated outline; systems or evolutions that do not apply at the facility should be deleted and justified; operationally important, site-specific systems/evolutions that are not included on the outline should be added. Refer to Section D.1.b of ES-401 for guidance regarding the elimination of inappropriate K/A statements.
- 4. Select topics from as many systems and evolutions as possible; sample every system or evolution in the group before selecting a second topic for any system or evolution.
- 5. Absent a plant-specific priority, only those K/As having an importance rating (IR) of 2.5 or higher shall be selected. Use the RO and SRO ratings for the RO and SRO-only portions, respectively.
- 6. Select SRO topics for Tiers 1 and 2 from the shaded systems and K/A categories.
7.* The generic (G) K/As in Tiers 1 and 2 shall be selected from Section 2 of the K/A Catalog, but the topics must be relevant to the applicable evolution or system. Refer to Section D.1.b of ES-401 for the applicable K/As.
- 8. On the following pages, enter the K/A numbers, a brief description of each topic, the topics' importance ratings (IRs) for the applicable license level, and the point totals (#) for each system and category. Enter the group and tier totals for each category in the table above; if fuel handling equipment is sampled in other than Category A2 or G* on the SRO-only exam, enter it on the left side of Column A2 for Tier 2, Group 2 (Note #1 does not apply). Use duplicate pages for RO and SRO-only exams.
- 9. For Tier 3, select topics from Section 2 of the K/A catalog, and enter the K/A numbers, descriptions, IRs, and point totals (#) on Form ES-401-3. Limit SRO selections to K/As that are linked to 10 CFR 55.43.
04/11/2011 12:39:10 pm 1
PWR RO Examination Outline Printed: 04/11/2011 Facility: Diablo Canyon ES - 401 Emergency and Abnormal Plant Evolutions - Tier 1 / Group 1 Form ES-401-2 E/APE # / Name / Safety Function K1 K2 K3 A1 A2 G KA Topic Imp. Points 000007 Reactor Trip - Stabilization - X EK2.02 - Breakers, relays and 2.6 1 Recovery / 1 disconnects 000009 Small Break LOCA / 3 X EA2.17 - Total flow meter 3.3? 1 000011 Large Break LOCA / 3 X EK1.01 - Natural circulation and 4.1 1 cooling, including reflux boiling 000015/000017 RCP Malfunctions / 4 X 2.4.49 - Ability to perform without 4.6 1 reference to procedures those actions that require immediate operation of system components and controls.
000022 Loss of Rx Coolant Makeup / 2 X AK1.02 - Relationship of charging flow 2.7 1 to pressure differential between charging and RCS 000025 Loss of RHR System / 4 X AK2.01 - RHR heat exchangers 2.9 1 000026 Loss of Component Cooling Water / X AK3.04 - Effect on the CCW flow 3.5 1 8 header of a loss of CCW 000038 Steam Gen. Tube Rupture / 3 X EK3.04 - Automatic actions provided 3.9 1 by each PRM 000054 Loss of Main Feedwater / 4 X AK1.02 - Effects of feedwater 3.6 1 introduction on dry S/G 000055 Station Blackout / 6 X EA2.03 - Actions necessary to restore 3.9 1 power 000056 Loss of Off-site Power / 6 X AA2.37 - ED/G indicators for the 3.7* 1 following: voltage, frequency, load, load-status, and closure of bus tie breakers 000057 Loss of Vital AC Inst. Bus / 6 X 2.1.28 - Knowledge of the purpose and 4.1 1 function of major system components and controls.
000058 Loss of DC Power / 6 X AA1.02 - Static inverter dc input 3.1* 1 breaker, frequency meter, ac output breaker, and ground fault detector 000062 Loss of Nuclear Svc Water / 4 X 2.1.27 - Knowledge of system purpose 3.9 1 and/or function.
000065 Loss of Instrument Air / 8 X AK3.03 - Knowing effects on plant 2.9 1 operation of isolating certain equipment from instrument air 000077 Generator Voltage and Electric Grid X AA1.02 - Turbine / generator controls 3.8 1 Disturbances / 6 W/E05 Inadequate Heat Transfer - Loss of X EA1.2 - Operating behavior 3.7 1 Secondary Heat Sink / 4 characteristics of the facility 04/11/2011 12:38:35 pm 1
PWR RO Examination Outline Printed: 04/11/2011 Facility: Diablo Canyon ES - 401 Emergency and Abnormal Plant Evolutions - Tier 1 / Group 1 Form ES-401-2 E/APE # / Name / Safety Function K1 K2 K3 A1 A2 G KA Topic Imp. Points W/E11 Loss of Emergency Coolant Recirc. / X EK2.2 - Facility's heat removal systems, 3.9 1 4 including primary coolant, emergency coolant, the decay heat removal systems, and relations between the proper operation of these systems to the operation of the facility K/A Category Totals: 3 3 3 3 3 3 Group Point Total: 18 04/11/2011 12:38:35 pm 2
PWR RO Examination Outline Printed: 04/11/2011 Facility: Diablo Canyon ES - 401 Emergency and Abnormal Plant Evolutions - Tier 1 / Group 2 Form ES-401-2 E/APE # / Name / Safety Function K1 K2 K3 A1 A2 G KA Topic Imp. Points 000024 Emergency Boration / 1 X AK2.04 - Pumps 2.6 1 000036 Fuel Handling Accident / 8 X AA2.03 - Magnitude of potential 3.1* 1 radioactive release 000037 Steam Generator Tube Leak / 3 X AK1.01 - Use of steam tables 2.9* 1 000059 Accidental Liquid RadWaste Rel. / X AK3.04 - Actions contained in EOP for 3.8 1 9 accidental liquid radioactive-waste release 000069 Loss of CTMT Integrity / 5 X AK2.03 - Personnel access hatch and 2.8* 1 emergency access hatch W/E02 SI Termination / 3 X EA2.2 - Adherence to appropriate 3.5 1 procedures and operation within the limitations in the facility's license and amendments W/E03 LOCA Cooldown - Depress. / 4 X 2.4.50 - Ability to verify system alarm 4.2 1 setpoints and operate controls identified in the alarm response manual.
W/E10 Natural Circ. / 4 X EK3.1 - Facility operating 3.4 1 characteristics during transient conditions, including coolant chemistry and the effects of temperature, pressure, and reactivity changes and operating limitations and reasons for these operating characteristics W/E16 High Containment Radiation / 9 X EA1.2 - Operating behavior 2.9 1 characteristics of the facility K/A Category Totals: 1 2 2 1 2 1 Group Point Total: 9 04/11/2011 12:38:43 pm 1
PWR RO Examination Outline Printed: 04/11/2011 Facility: Diablo Canyon ES - 401 Plant Systems - Tier 2 / Group 1 Form ES-401-2 Sys/Evol # / Name K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G KA Topic Imp. Points 003 Reactor Coolant Pump X K2.01 - RCPS 3.1 1 004 Chemical and Volume Control X K6.26 - Methods of pressure 3.8 1 control of solid plant (PZR relief and water inventory) 005 Residual Heat Removal X K1.11 - RWST 3.5 1 006 Emergency Core Cooling X K6.10 - Valves 2.6 1 007 Pressurizer Relief /Quench X K3.01 - Containment 3.3 1 Tank 008 Component Cooling Water X A1.02 - CCW temperature 2.9 1 010 Pressurizer Pressure Control X K1.03 - RCS 3.6 1 012 Reactor Protection X A4.03 - Channel blocks and 3.6 1 bypasses 012 Reactor Protection X K5.02 - Power density 3.1* 1 013 Engineered Safety Features X A4.01 - ESFAS-initiated 4.5 1 Actuation equipment which fails to actuate 013 Engineered Safety Features X K4.11 - Vital power load 3.2 1 Actuation control 022 Containment Cooling X A2.03 - Fan motor thermal 2.6 1 overload/high-speed operation 026 Containment Spray X K2.01 - Containment spray 3.4* 1 pumps 039 Main and Reheat Steam X K5.08 - Effect of steam 3.6 1 removal on reactivity 059 Main Feedwater X A2.03 - Overfeeding event 2.7 1 059 Main Feedwater X 2.2.42 - Ability to recognize 3.9 1 system parameters that are entry-level conditions for Technical Specifications.
061 Auxiliary/Emergency X K1.01 - S/G system 4.1 1 Feedwater 061 Auxiliary/Emergency X K5.01 - Relationship 3.6 1 Feedwater between AFW flow and RCS heat transfer 062 AC Electrical Distribution X A1.03 - Effect on 2.5 1 instrumentation and controls of switching power supplies 062 AC Electrical Distribution X A3.04 - Operation of 2.7 1 inverter (e.g., precharging synchronizing light, static transfer) 063 DC Electrical Distribution X A3.01 - Meters, 2.7 1 annunciators, dials, recorders, and indicating lights 063 DC Electrical Distribution X K3.01 - ED/G 3.7* 1 04/11/2011 12:38:51 pm 1
PWR RO Examination Outline Printed: 04/11/2011 Facility: Diablo Canyon ES - 401 Plant Systems - Tier 2 / Group 1 Form ES-401-2 Sys/Evol # / Name K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G KA Topic Imp. Points 064 Emergency Diesel Generator X K4.08 - ED/G fuel isolation 2.9* 1 valves 073 Process Radiation Monitoring X K4.01 - Release termination 4.0 1 when radiation exceeds setpoint 076 Service Water X A2.01 - Loss of SWS 3.5* 1 078 Instrument Air X K3.03 - Cross-tied units 3.0 1 078 Instrument Air X 2.1.28 - Knowledge of the 4.1 1 purpose and function of major system components and controls.
103 Containment X A1.01 - Containment 3.7 1 pressure, temperature, and humidity K/A Category Totals: 3 2 3 3 3 2 3 3 2 2 2 Group Point Total: 28 04/11/2011 12:38:51 pm 2
PWR RO Examination Outline Printed: 04/11/2011 Facility: Diablo Canyon ES - 401 Plant Systems - Tier 2 / Group 2 Form ES-401-2 Sys/Evol # / Name K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G KA Topic Imp. Points 011 Pressurizer Level Control X K5.12 - Criteria and purpose 2.7 1 of PZR level program 015 Nuclear Instrumentation X 2.4.20 - Knowledge of 3.8 1 operational implications of EOP warnings, cautions, and notes.
017 In-core Temperature Monitor X K4.03 - Range of 3.1 1 temperature indication 028 Hydrogen Recombiner and X A1.01 - Hydrogen 3.4 1 Purge Control concentration 029 Containment Purge X K3.01 - Containment 2.9 1 parameters 033 Spent Fuel Pool Cooling X K1.05 - RWST 2.7* 1 034 Fuel Handling Equipment X K6.02 - Radiation 2.6 1 monitoring systems 072 Area Radiation Monitoring X A3.01 - Changes in 2.9* 1 ventilation alignment 075 Circulating Water X K2.03 - Emergency/essential 2.6* 1 SWS pumps 086 Fire Protection X A4.06 - Halon system 3.2 1 K/A Category Totals: 1 1 1 1 1 1 1 0 1 1 1 Group Point Total: 10 04/11/2011 12:38:58 pm 1
Generic Knowledge and Abilities Outline (Tier 3)
PWR RO Examination Outline Printed: 04/11/2011 Facility: Diablo Canyon Form ES-401-3 Generic Category KA KA Topic Imp. Points Conduct of Operations 2.1.14 Knowledge of criteria or conditions that require 3.1 1 plant-wide announcements, such as pump starts, reactor trips, mode changes, etc.
2.1.38 Knowledge of the station's requirements for 3.7* 1 verbal communications when implementing procedures.
2.1.43 Ability to use procedures to determine the effects 4.1 1 on reactivity of plant changes, such as reactor coolant system temperature, secondary plant, fuel depletion, etc.
Category Total: 3 Equipment Control 2.2.3 (multi-unit license) Knowledge of the design, 3.8 1 procedural, and operational differences between units.
2.2.36 Ability to analyze the effect of maintenance 3.1 1 activities, such as degraded power sources, on the status of limiting conditions for operations.
Category Total: 2 Radiation Control 2.3.7 Ability to comply with radiation work permit 3.5 1 requirements during normal or abnormal conditions.
2.3.13 Knowledge of radiological safety procedures 3.4 1 pertaining to licensed operator duties, such as response to radiation monitor alarms, containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, aligning filters, etc.
Category Total: 2 Emergency Procedures/Plan 2.4.1 Knowledge of EOP entry conditions and 4.6 1 immediate action steps.
2.4.14 Knowledge of general guidelines for EOP usage. 3.8 1 2.4.26 Knowledge of facility protection requirements, 3.1 1 including fire brigade and portable fire fighting equipment usage.
Category Total: 3 Generic Total: 10 04/11/2011 12:39:05 pm 1
ES-401 PWR Examination Outline Form ES-401-2 Facility: Diablo Canyon Printed: 04/11/2011 Date Of Exam: 07/08/2011 RO K/A Category Points SRO-Only Points Tier Group K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G* Total A2 G* Total
- 1. 1 0 0 0 0 0 0 0 3 3 6 Emergency 2 0 0 0 N/A 0 0 0 0 2 2 4
& N/A Abnormal Tier Plant Totals 0 0 0 0 0 0 0 5 5 10 Evolutions 1 0 0 0 0 0 0 0 0 0 0 0 0 3 2 5 2.
2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 1 3 Plant Systems Tier 5 3 8 0 0 0 0 0 0 0 0 0 0 0 0 Totals 1 2 3 4 1 2 3 4
- 3. Generic Knowledge And 0 7 Abilities Categories 0 0 0 0 2 2 1 2 Note:
- 1. Ensure that at least two topics from every applicable K/A category are sampled within each tier of the RO and SRO-only outlines (i.e., except for one category in Tier 3 of the SRO-only outline, the "Tier Totals" in each K/A category shall not be less than two).
- 2. The point total for each group and tier in the proposed outline must match that specified in the table.
The final point total for each group and tier may deviate by +/-1 from that specified in the table based on NRC revisions. The final RO exam must total 75 points and the SRO-only exam must total 25 points.
- 3. Systems/evolutions within each group are identified on the associated outline; systems or evolutions that do not apply at the facility should be deleted and justified; operationally important, site-specific systems/evolutions that are not included on the outline should be added. Refer to Section D.1.b of ES-401 for guidance regarding the elimination of inappropriate K/A statements.
- 4. Select topics from as many systems and evolutions as possible; sample every system or evolution in the group before selecting a second topic for any system or evolution.
- 5. Absent a plant-specific priority, only those K/As having an importance rating (IR) of 2.5 or higher shall be selected. Use the RO and SRO ratings for the RO and SRO-only portions, respectively.
- 6. Select SRO topics for Tiers 1 and 2 from the shaded systems and K/A categories.
7.* The generic (G) K/As in Tiers 1 and 2 shall be selected from Section 2 of the K/A Catalog, but the topics must be relevant to the applicable evolution or system. Refer to Section D.1.b of ES-401 for the applicable K/As.
- 8. On the following pages, enter the K/A numbers, a brief description of each topic, the topics' importance ratings (IRs) for the applicable license level, and the point totals (#) for each system and category. Enter the group and tier totals for each category in the table above; if fuel handling equipment is sampled in other than Category A2 or G* on the SRO-only exam, enter it on the left side of Column A2 for Tier 2, Group 2 (Note #1 does not apply). Use duplicate pages for RO and SRO-only exams.
- 9. For Tier 3, select topics from Section 2 of the K/A catalog, and enter the K/A numbers, descriptions, IRs, and point totals (#) on Form ES-401-3. Limit SRO selections to K/As that are linked to 10 CFR 55.43.
04/11/2011 12:52:49 pm 1
PWR SRO Examination Outline Printed: 04/11/2011 Facility: Diablo Canyon ES - 401 Emergency and Abnormal Plant Evolutions - Tier 1 / Group 1 Form ES-401-2 E/APE # / Name / Safety Function K1 K2 K3 A1 A2 G KA Topic Imp. Points 000007 Reactor Trip - Stabilization - X EA2.05 - Reactor trip first-out 3.9 1 Recovery / 1 indication 000008 Pressurizer Vapor Space Accident / X AA2.04 - High-temperature computer 3.4 1 3 alarm and alarm type 000026 Loss of Component Cooling Water / X 2.2.38 - Knowledge of conditions and 4.5 1 8 limitations in the facility license.
000040 Steam Line Rupture - Excessive X AA2.03 - Difference between steam line 4.7 1 Heat Transfer / 4 rupture and LOCA 000055 Station Blackout / 6 X 2.4.30 - Knowledge of events related to 4.1 1 system operation/status that must be reported to internal organizations or external agencies, such as the State, the NRC, or the transmission system operator.
W/E04 LOCA Outside Containment / 3 X 2.4.41 - Knowledge of the emergency 4.6 1 action level thresholds and classifications.
K/A Category Totals: 0 0 0 0 3 3 Group Point Total: 6 04/11/2011 12:50:21 pm 1
PWR SRO Examination Outline Printed: 04/11/2011 Facility: Diablo Canyon ES - 401 Emergency and Abnormal Plant Evolutions - Tier 1 / Group 2 Form ES-401-2 E/APE # / Name / Safety Function K1 K2 K3 A1 A2 G KA Topic Imp. Points 000001 Continuous Rod Withdrawal / 1 X 2.4.9 - Knowledge of low 4.2 1 power/shutdown implications in accident (e.g., loss of coolant accident or loss of residual heat removal) mitigation strategies.
000067 Plant Fire On-site / 9 X 2.4.4 - Ability to recognize abnormal 4.7 1 indications for system operating parameters that are entry-level conditions for emergency and abnormal operating procedures.
W/E06 Inad. Core Cooling / 4 X EA2.2 - Adherence to appropriate 4.1 1 procedures and operation within the limitations in the facility's license and amendments W/E15 Containment Flooding / 5 X EA2.2 - Adherence to appropriate 3.3 1 procedures and operation within the limitations in the facility's license and amendments K/A Category Totals: 0 0 0 0 2 2 Group Point Total: 4 04/11/2011 12:50:44 pm 1
PWR SRO Examination Outline Printed: 04/11/2011 Facility: Diablo Canyon ES - 401 Plant Systems - Tier 2 / Group 1 Form ES-401-2 Sys/Evol # / Name K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G KA Topic Imp. Points 003 Reactor Coolant Pump X A2.01 - Problems with RCP 3.9 1 seals, especially rates of seal leak-off 005 Residual Heat Removal X 2.4.1 - Knowledge of EOP 4.8 1 entry conditions and immediate action steps.
013 Engineered Safety Features X A2.04 - Loss of instrument 4.2 1 Actuation bus 026 Containment Spray X 2.2.36 - Ability to analyze 4.2 1 the effect of maintenance activities, such as degraded power sources, on the status of limiting conditions for operations.
076 Service Water X A2.01 - Loss of SWS 3.7* 1 K/A Category Totals: 0 0 0 0 0 0 0 3 0 0 2 Group Point Total: 5 04/11/2011 12:51:02 pm 1
PWR SRO Examination Outline Printed: 04/11/2011 Facility: Diablo Canyon ES - 401 Plant Systems - Tier 2 / Group 2 Form ES-401-2 Sys/Evol # / Name K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G KA Topic Imp. Points 011 Pressurizer Level Control X A2.05 - Loss of PZR heaters 3.7 1 045 Main Turbine Generator X A2.17 - Malfunction of 2.9* 1 electrohydraulic control 056 Condensate X 2.2.42 - Ability to recognize 4.6 1 system parameters that are entry-level conditions for Technical Specifications.
K/A Category Totals: 0 0 0 0 0 0 0 2 0 0 1 Group Point Total: 3 04/11/2011 12:51:20 pm 1
Generic Knowledge and Abilities Outline (Tier 3)
PWR SRO Examination Outline Printed: 04/11/2011 Facility: Diablo Canyon Form ES-401-3 Generic Category KA KA Topic Imp. Points Conduct of Operations 2.1.5 Ability to use procedures related to shift staffing, 3.9 1 such as minimum crew complement, overtime limitations, etc.
2.1.35 Knowledge of the fuel-handling responsibilities 3.9 1 of SROs.
Category Total: 2 Equipment Control 2.2.25 Knowledge of the bases in Technical 4.2 1 Specifications for limiting conditions for operations and safety limits.
2.2.37 Ability to determine operability and/or 4.6 1 availability of safety related equipment.
Category Total: 2 Radiation Control 2.3.6 Ability to approve release permits. 3.8 1 Category Total: 1 Emergency Procedures/Plan 2.4.8 Knowledge of how abnormal operating 4.5 1 procedures are used in conjunction with EOPs.
2.4.18 Knowledge of the specific bases for EOPs. 4.0 1 Category Total: 2 Generic Total: 7 04/11/2011 12:51:38 pm 1
ES-401 Record of Rejected K/As Form ES-401-4 Tier / Randomly Reason for Rejection Group Selected K/A S-T1G1 APE027AA2.13 Unable to create SRO level question that properly discriminates as the tie of the KA between Pressurizer Pressure malfunctions and seal return flow is tenuous at best. Replaced with systematically selected K/A EPE 007 EA2.05 in same group, to keep outline balanced. Updated ES-401-2 S-T2G1 E08 G2.4.11 There are no abnormal procedures dealing with PTS. FR-P.1 and 2 are Function Restoration Procedures, part of the Emergency Operating Procedure network. Replaced with systematically selected K/A APE067 G2.4.4. Updated ES-401-2.
S-T2G1 004 A2.23 Unable to write a question to SRO level due to KA of low SRO discrimination value.
The only procedure is alarm response on high DP, and action is at RO level (low seal injection on all RCPs, swap filters). Replaced with systematically selected KA 076 A2.01. Note, at DCPP Service Water is Aux Salt Water. Updated ES-401-2 S-T2G1 022 A2.01 Unable to write a question to SRO level due to KA of low SRO discrimination value.
Plausible action, ie start another CFCU, would be RO knowledge. no EOP or Abnormal procedure actions for this malfunction. While there may be TS implications, the next SRO question for Containment Spray is also a TS KA and both use the same Technical Specification, 3.6.6. Used the KA sample program to systematically replace the KA. KA 013 A2.04 randomly selected by the program.
Updated ES-401-2 R-T1G1 Charging pump recirc valves 8105 & 8106 do not have any automatic features and are not operated in FR-S.1 - ATWS. The valves are not addressed.
Randomly selected APE 206 AK3.04 using the sample plan program. updated ES-401-2.
R-T2G1 010 A3.01 KA could not be tested without compromising another question (KA 007 K3.01).
Randomly selected 061 K5.01 using sample plan program updated ES-401-2 ES-401, Page 27 of 33
ES-401 Record of Rejected K/As Form ES-401-4 Tier / Randomly Reason for Rejection Group Selected K/A R-T2G1 062 G2.4.41 EAL classification not RO knowledge. Randomly selected replacement KA 062 A3.04. updated ES-401-2 R0T2G2 068 A2.03 KA has no impact on DCPP operation. randomly selected replacement KA 011 K5.12 using KA selection program. ES-401-2 updated.
S-T3 G2.4.49 KA is RO knowledge, as RO's are responsible to know immediate actions.
Randomly selected KA 2.4.18. ES-401-2 updated.
ES-401, Page 27 of 33
Appendix D (rev 9) Required Operator Actions Form ES-D-1 Facility: Diablo Canyon (PWR) Scenario No.: 1 Op-Test No.: L091-NRC Examiners: Operators:
Initial Conditions: 100% Reactor power, MOL, Boron at 774 ppm Turnover: TDAFW pp cleared, H 2 delivery in progress, maintain 100% power Event Malf Event Event No No. Type* Description 1 xmt pzr15 I (ALL) PT-455 Pzr Pressure channel fails high (interlock fails) (TS) (CT) 2 pmp cnd10 C (SRO) # 2 Htr Drain Pump trip (automatic programmed ramp @ 40 mw/min)
R (ATC) 3 xmt cvc31 C, N (ALL) Charging pump 13 high stator temperature; swaps charging pumps (ECG) 4 loa cnd1 M (ALL) Loss of condenser vacuum 5 loa afw6/7 C (SRO, AFW pumps cavitate due to suction line break; pumps are stopped to prevent BOP) further damage 6 M (ALL) LOSHS - must establish heat sink from condensate system (CT)
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Target Quantitative Attributes (Per Scenario; See Section D.5.d) (from form ES301-4) Actual Attributes
- 1. Total malfunctions (5-8) 5
- 2. Malfunctions after EOP entry (1-2) 1
- 3. Abnormal events (2-4) 3
- 4. Major transients (1-2) 2
- 5. EOPs entered/requiring substantive actions (1-2) 1
- 6. EOP contingencies requiring substantive actions (0-2) 1
- 7. Critical tasks (2-3) 2
Appendix D (rev 9) Required Operator Actions Form ES-D-1 Facility: Diablo Canyon (PWR) Scenario No.: 2 Op-Test No.: L091-NRC Examiners: Operators:
Initial Conditions: 100% power, MOL, 774 ppm boron, Cond/Bstr pump set 13 cleared, H 2 delivery in progress Turnover: Ramp to 25% power based on ODM decision due to high swell warning Event Malf Event Event No No. Type* Description 1 R (ATC) Ramp at 25 MW/min 2 xmt rcs15 I (SRO, Loop 1 Tcold channel fails high (TS)
ATC) 3 mal rcs3c C (ALL) 40 gpm RCS leak on Loop 3 (TS) 4 cnh pzr3 I (ATC, Pzr Spray valve controller loop 1 fails high in auto SRO) 5 mal rcs3c M (ALL) 3000 gpm LOCA on Loop 3 6 mal ppl3a/b I (ATC) Safety Injection fails to Actuate in Auto (CT) 7 ramp asisrwst M (ALL) Crack Drains RWST to approximately 36% over 10 minutes due to explosion by tank area - requires makeup to RWST (CT)
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Target Quantitative Attributes (Per Scenario; See Section D.5.d) (from form ES301-4) Actual Attributes
- 1. Total malfunctions (5-8) 6
- 2. Malfunctions after EOP entry (1-2) 1
- 3. Abnormal events (2-4) 3
- 4. Major transients (1-2) 2
- 5. EOPs entered/requiring substantive actions (1-2) 2
- 6. EOP contingencies requiring substantive actions (0-2) 1
- 7. Critical tasks (2-3) 3
Appendix D (rev 9) Required Operator Actions Form ES-D-1 Facility: Diablo Canyon (PWR) Scenario No.: 3 Op-Test No.: L091-NRC Examiners: Operators:
Initial Conditions: 100% power, MOL, 774 ppm boron, Cond/Bstr pump set 1-3 cleared Turnover: Maintain 100% power Event Malf Event Event No No. Type* Description 1 R (ATC) Large Steam leak from MSR 1-1A Drain Line, 25 mw/min ramp per SM 2 mal eps4c C (ALL) 4 KV Bus F differential (TS) 3 pmp cnd5 C (SRO, Cond/Bstr pp 1-2 overcurrent trip at 60% power BOP) 4 cnh pzr4 C (SRO, Pzr Press Controller becomes unstable, requiring manual pressure control ATC) (TS, PCV-474) 5 xmt rms15 I (SRO) RM-15 fails high (ECG) 6 cnh mss3 I (BOP, S/G 1-2 10% dump fails open, can be closed by backup air (CT)
SRO) 7 mal mss3 M (ALL) Steam line break outside containment **
8 vlv mss7-10 C (SRO, MSIVs fail open - must control AFW flow to limit C/D (CT)
BOP)
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Target Quantitative Attributes (Per Scenario; See Section D.5.d) (from form ES301-4) Actual Attributes
- 1. Total malfunctions (5-8) 7
- 2. Malfunctions after EOP entry (1-2) 1
- 3. Abnormal events (2-4) 4
- 4. Major transients (1-2) 1
- 5. EOPs entered/requiring substantive actions (1-2) 2
- 6. EOP contingencies requiring substantive actions (0-2) 1
- 7. Critical tasks (2-3) 2
Appendix D (rev 9) Required Operator Actions Form ES-D-1 Facility: Diablo Canyon (PWR) Scenario No.: 4 Op-Test No.: L091-NRC Examiners: Operators:
Initial Conditions: 8% power, MOL, 1181 ppm boron Turnover: Increase power to 15% using rods per OP L-3 Event Malf Event Event No No. Type* Description 1 R (ATC) Pull rods to increase power 2 mal nis3a I (SRO, Intermediate Range detector NI-35 fails high (TS) @ 9.5% power; blocks ATC) PR low and IR trips at 10% power 3 xmt rms11 I (SRO) RM-12 fails high (TS) 4 N (BOP) Places CFCU drain collection in service (CFCU to low speed) 5 cnh pzr1 I (SRO, HC-459D (Pzr level master controller) fails low (manual on FCV-128 ATC) required) 6 mal mss3c M (ALL) S/G 1-3 steam line break OC - isolate faulted S/G (CT) 7 pmp cvc1/2 C (BOP) Both CCPs must be manually started on SI (CT) 8 mal rcs4c M (ALL) S/G 1-3 SGTR (600 gpm) - concurrent with steam break (CT) **
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Target Quantitative Attributes (Per Scenario; See Section D.5.d) (from form ES301-4) Actual Attributes
- 1. Total malfunctions (5-8) 6
- 2. Malfunctions after EOP entry (1-2) 2
- 3. Abnormal events (2-4) 3
- 4. Major transients (1-2) 2
- 5. EOPs entered/requiring substantive actions (1-2) 2
- 6. EOP contingencies requiring substantive actions (0-2) 1
- 7. Critical tasks (2-3) 3
Appendix D (rev 9) Required Operator Actions Form ES-D-1 Facility: Diablo Canyon (PWR) Scenario No.: 5 Op-Test No.: L091-NRC Examiners: Operators:
Initial Conditions: 100% power MOL, 774 ppm boron, H 2 delivery in progress Turnover: RCP 1-2 elevated vibration - SM directs ramp offline at 10 mw/min Event Malf Event Event No No. Type* Description 1 R (ATC) Ramps unit at 10 mw/min 2 xmt mfw70 I (SRO) S/G 11 FW flow channel FT-511 fails low 3 xmt tur2 I (SRO, PT-505 fails low (TS)
ATC) 4 mal cvc42 I (SRO, LT-461 failure (TS)
ATC) 5 N (ALL) Return normal letdown to service 6 cnv mfw69 I (SRO, FT-510 fails low, causes FCV-510 to go to manual BOP) 7 mal sei1 M (ALL) Seismic event, causing DBA LOCA - must align CL recirc within 10 minutes mal rcs1 (CT) (TCOA) **
8 vlv sis1/2 C (BOP) Charging Injection valve 8803A or B must be manually opened (CT)
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Target Quantitative Attributes (Per Scenario; See Section D.5.d) (from form ES301-4) Actual Attributes
- 1. Total malfunctions (5-8) 6
- 2. Malfunctions after EOP entry (1-2) 1
- 3. Abnormal events (2-4) 3
- 4. Major transients (1-2) 1
- 5. EOPs entered/requiring substantive actions (1-2) 2
- 6. EOP contingencies requiring substantive actions (0-2) 0
- 7. Critical tasks (2-3) 2
- This DBA LBLOCA was evaluated against TCOA #8, and is similar to the TCOA bases event, so TCOA time limits will be applied to the scenario (operators have 10 min to align to cold leg recirculation, as timed from the RWST reaching 33% [alarm comes in] and finishing the alignment [8804A open, which is the last significant action in the lineup]).
Appendix D (rev 9) Required Operator Actions Form ES-D-1 Facility: Diablo Canyon (PWR) Scenario No.: 6 Op-Test No.: L091-NRC Examiners: Operators:
Initial Conditions: 100% Reactor power, MOL, Boron at 774 ppm Turnover: H 2 delivery in progress, RHR pp 1-2 cleared Event Malf Event Event No No. Type* Description 1 ser 0255 C (ARO) Diesel 1-1 day tank low level. (TS) 2 dsc rhr25 C (ALL), RHR pp 1-1 UC fuse blows. Estimate 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to repair, SM cues to ramp.
R (ALL) (TS) 3 cnh cvc8 I (ALL) PCV-135 L/D HX outlet controller fails to 0% demand (I) - must place excess letdown in service 4 ovr xc1s C (SRO, Rods outward rod motion (auto and manual); manual reactor trip ATC) 5 mal ppl5a/b C (ALL) ATWS (open 13D & E, trip successful, stays in EOP E-0) (CT) 6 mal rcs4d M (ALL) SGTR on S/G 1-4 (400 gpm) 5 min after reactor trip (CT on isolation) 7 8
9 10
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Target Quantitative Attributes (Per Scenario; See Section D.5.d) (from form ES301-4) Actual Attributes
- 1. Total malfunctions (5-8) 6
- 2. Malfunctions after EOP entry (1-2) 2
- 3. Abnormal events (2-4) 3
- 4. Major transients (1-2) 2
- 5. EOPs entered/requiring substantive actions (1-2) 2
- 6. EOP contingencies requiring substantive actions (0-2) 1
- 7. Critical tasks (2-3) 2