ML112440292

From kanterella
Jump to navigation Jump to search
Report 22 - Vogtle
ML112440292
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/01/2011
From:
NRC/RGN-II
To:
Shared Package
ML112440284 List:
References
Download: ML112440292 (2)


Text

Page 1 of 2 Vogtle 09/01/2011 08:50:56 Inspection / Activity Plan Report 22 09/01/2011 - 12/31/2012 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1-RP - RAD HAZARD ASSESSMENT AND INSTRUMENTS 3 1, 2 09/19/2011 09/23/2011 IP 2515/179 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 1, 2 09/19/2011 09/23/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 09/19/2011 09/23/2011 IP 71124.05 Radiation Monitoring Instrumentation EB3 ISI - UNIT 2 INSERVICE INSPECTION 1 2 09/26/2011 09/30/2011 IP 7111108P Inservice Inspection Activities - PWR EB3SGISI - UNIT 2 SG INSERVICE INSPECTION 1 2 09/26/2011 09/30/2011 IP 7111108P Inservice Inspection Activities - PWR OL RQ - REQUAL INSPECTION 6 1, 2 10/24/2011 10/28/2011 IP 7111111B Licensed Operator Requalification Program OL EXAM - INITIAL EXAM PREP 4 1 03/05/2012 03/09/2012 V23368 VOGTLE / MARCH 2012 EXAM AT POWER FACILITIES PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 1, 2 03/19/2012 03/23/2012 IP 7111401 Exercise Evaluation 1, 2 03/19/2012 03/23/2012 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 03/19/2012 03/23/2012 IP 71151 Performance Indicator Verification OL EXAM - INITIAL EXAM - WEEK 1 4 1 03/26/2012 03/30/2012 V23368 VOGTLE / MARCH 2012 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 4 1 04/09/2012 04/13/2012 V23368 VOGTLE / MARCH 2012 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 3 4 1 04/16/2012 04/20/2012 V23368 VOGTLE / MARCH 2012 EXAM AT POWER FACILITIES TI-177 - TI-177 GAS INTRUSION 3 1, 2 05/21/2012 05/25/2012 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System PSB1-RP - OCCUPATIONAL RP BASELINE WK1 3 1, 2 09/17/2012 09/21/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 09/17/2012 09/21/2012 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 09/17/2012 09/21/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 09/17/2012 09/21/2012 IP 71124.04 Occupational Dose Assessment 1, 2 09/17/2012 09/21/2012 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 09/17/2012 09/21/2012 IP 71151 Performance Indicator Verification EB3 ISI - UNIT 1 INSERVICE INSPECTION 1 1 09/24/2012 09/28/2012 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Vogtle 09/01/2011 08:50:56 Inspection / Activity Plan Report 22 09/01/2011 - 12/31/2012 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1-RP - OCCUPATIONAL RP BASELINE WK2 3 1, 2 10/01/2012 10/05/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 10/01/2012 10/05/2012 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 10/01/2012 10/05/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 10/01/2012 10/05/2012 IP 71124.04 Occupational Dose Assessment 1, 2 10/01/2012 10/05/2012 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 10/01/2012 10/05/2012 IP 71151 Performance Indicator Verification EB3SGISI - UNIT 1 SG INSERVICE INSPECTION 1 1 10/03/2012 10/07/2012 IP 7111108P Inservice Inspection Activities - PWR VOG TFPI - TRIENNIAL FIRE PROTECTION INSPECTION 10 1, 2 11/26/2012 11/30/2012 IP 7111105T Fire Protection [Triennial]

1, 2 12/10/2012 12/10/2012 IP 7111105T Fire Protection [Triennial]

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure