L-2011-312, Point Beach and St. Lucie, Units 1 and 2 and Turkey Point, Units 3 and 4 - Regarding Online Reference Portal
Letter Sequence Request | |
---|---|
TAC:ME6818, (Approved, Closed) | |
MONTHYEARML1017602192010-06-22022 June 2010
[Table View]NFPA 805 Transition Pilot Plant FAQ 07-0030, Revision 1 Project stage: Request ML1026401142010-09-16016 September 2010 NFPA 805 Transition Pilot Plant FAQ 07-0030, Revision 4 Project stage: Request ML1030802102010-11-0404 November 2010 NRC Staff Response to NFPA 805 Transition Pilot Plant FAQ 07-0030, Revision 4 Project stage: Request ML1030906022010-11-0404 November 2010 NFPA 805 Transition Pilot Plant FAQ 07-0030, Revision 5 Project stage: Request ML1035103792010-12-17017 December 2010 NFPA 805 Transition Pilot Plant FAQ 08-0054, Revision 1 Project stage: Request ML1100704852011-02-0404 February 2011 Close-out of National Fire Protection Association Frequently Asked 07-0030 on Establishing Recovery Actions Project stage: Request ML1111804812011-04-21021 April 2011 NFPA 805 Transition FAQ 10-0059, Rev 1 Project stage: Request NG-11-0267, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) (TSCR-128)2011-08-0505 August 2011 Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) (TSCR-128) Project stage: Request L-2011-312, Point Beach and St. Lucie, Units 1 and 2 and Turkey Point, Units 3 and 4 - Regarding Online Reference Portal2011-08-0505 August 2011 Point Beach and St. Lucie, Units 1 and 2 and Turkey Point, Units 3 and 4 - Regarding Online Reference Portal Project stage: Request ML11277A2852011-10-0303 October 2011 NRR E-mail Capture - FW: ME6818 - NFPA 805 Adoption Acceptance Review RAIs and Clarification Conference Call of 9/30/2011 Project stage: RAI NG-11-0384, Clarification of Information Contained in License Amendment Request (TSCR-128): Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) (TSCR-128)2011-10-14014 October 2011 Clarification of Information Contained in License Amendment Request (TSCR-128): Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) (TSCR-128) Project stage: Request ML11304A1242011-10-27027 October 2011 NRR E-mail Capture - ME6818 - Duane Arnold - LIC-109 Acceptance Review Results - Transition to 10 CFR 50.48(c) - Adoption of NFPA 805 Performance-Based Fire Protection Standard Project stage: Acceptance Review ML11304A1482011-10-28028 October 2011 NRR E-mail Capture - ME6818 - Duane Arnold Adoption of NFPA-805 - Generic List of Documents Requested for the Sharepoint Portal Project stage: Other ML11334A1502011-11-30030 November 2011 NRR E-mail Capture - ME6818 - DAEC NFPA-805 Adoption - Pre-Audit Discussion - 29 Nov 2011 Conference Call Project stage: Other ML12031A1122012-01-31031 January 2012 NRR E-mail Capture - ME6818 - DAEC Adoption of NFPA-805 - Afpb, Ihpb, Apla Request for Additional Information (RAI) Project stage: RAI ML12058A5702012-02-24024 February 2012 NRR E-mail Capture - ME6818 Record of Duane Arnold RAI Clarification Call - Wednesday, February 22, 2012 2:15 PM-3:15 PM ET Project stage: RAI ML12058A5722012-02-27027 February 2012 NRR E-mail Capture - ME6818 - Clarification Conference Call of 2/22/2012 - Licensee and NRC Attendance - Supplemental Record Project stage: Other ML12079A2322012-03-19019 March 2012 NRR E-mail Capture - ME6818 DAEC 60/90 Day Matrix - RAI Processing Identifier Syntax Project stage: RAI NG-12-0177, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generational Plants2012-04-23023 April 2012 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generational Plants Project stage: Response to RAI ML12115A0782012-04-24024 April 2012 NRR E-mail Capture - FW: ACRS July 2012 NFPA-805 Subcommittee Meeting - Invitation for DAEC Participation Project stage: Meeting ML1214300352012-05-21021 May 2012 NFPA 805 Transition FAQ 12-0062, Revision 1 Project stage: Request NG-12-0225, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2012-05-23023 May 2012 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Response to RAI ML12284A0212012-10-0808 October 2012 NRR E-mail Capture - ME6818 Duane Arnold NFPA-805 - Second Audit Visit Questions (Retrieved Copy) Project stage: Other NG-12-0419, Response to Second Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2012-10-15015 October 2012 Response to Second Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Request ML12304A0692012-10-26026 October 2012 NRR E-mail Capture - ME6818, Additional RAIs for Duane Arnold Energy Center, LAR to Adopt NFPA 805 Project stage: RAI ML12318A3942012-11-0808 November 2012 NRR E-mail Capture - ME6818 - DAEC Adoption of NFPA-805 - Record of RAI Clarification Conference Call Conducted on 11/08/2012 Project stage: RAI ML12340A4502012-12-0505 December 2012 NRR E-mail Capture - ME6818 - DAEC Adoption of NFPA 805 - Request for Additional Information (RAI) Items - Round 2 (More) Project stage: RAI ML12355A0722012-12-19019 December 2012 NRR E-mail Capture - FW: ME6818 - DAEC NFPA-805 Adoption - Record of Revisions to RAI Items, Expected Response Schedule, Participants List for Meetings on 17-18 December 2012 Project stage: RAI ML12361A0192012-12-23023 December 2012 NRR E-mail Capture - Supplement to ML12355A072 (RAI Issed as an Email on 12/19/2012, at 4:08 PM ET) Project stage: RAI NG-12-0502, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2013-01-11011 January 2013 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Response to RAI NG-13-0056, Response to RAI, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2013-02-12012 February 2013 Response to RAI, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Response to RAI NG-13-0102, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2013-03-0606 March 2013 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Response to RAI ML13070A0352013-03-0808 March 2013 NRR E-mail Capture - ME6818 - DA - NFPA-805 Adoption - Request for Portal Locations to Selected RAI Responses Project stage: RAI ML13084A0042013-03-22022 March 2013 NRR E-mail Capture - ME6818 DAEC Adoption of NFPA-805 - Request for Additional Information Project stage: RAI ML13098B0722013-04-0707 April 2013 NRR E-mail Capture - ME6818 - DAEC Adoption of NFPA-805 - Request for Additional Information (Revised) Project stage: RAI ML13119A2202013-04-26026 April 2013 NRR E-mail Capture - FW: ME6818-DAEC-Adoption of NFPA-805- RAI Dated 4/7/2013 - Record of Clarification Call of April 11, 2013 Project stage: RAI NG-13-0182, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2013-05-0101 May 2013 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Response to RAI ML13129A0742013-05-0808 May 2013 NRR E-mail Capture - ME6818 - DAEC - Adoption of NFPA 805 - Request for Additional Information (RAI) Project stage: RAI NG-13-0240, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2013-05-29029 May 2013 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Response to RAI ML13175A3932013-06-27027 June 2013 Request for Additional Information for Review Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 Project stage: RAI NG-13-0281, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2013-07-0202 July 2013 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Response to RAI NG-13-0287, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2013-07-0202 July 2013 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Response to RAI ML13210A4582013-07-30030 July 2013 Revised License Condition for the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants Project stage: Other NG-13-0318, Response to Revised License Condition for the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generation Plants2013-08-0505 August 2013 Response to Revised License Condition for the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generation Plants Project stage: Request NG-13-0341, Response to Revised License Condition for the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2013-08-28028 August 2013 Response to Revised License Condition for the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Request ML13210A4492013-09-10010 September 2013 Issuance of Amendment Regarding Transition to a Risk-Informed Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) Project stage: Approval 2012-02-27 |
ML11222A018 | |
Person / Time | |
---|---|
Site: | Saint Lucie, Point Beach, Turkey Point, Duane Arnold |
Issue date: | 08/05/2011 |
From: | Larry Nicholson Nextera Energy |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
L-2011-312 | |
Download: ML11222A018 (2) | |
Category:Letter type:L
MONTHYEARL-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024
[Table view]Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-145, Notification of Deviation from EPRI MRP-227, Revision 1-A Baffle Bolt Inspection Frequency2024-09-0909 September 2024 Notification of Deviation from EPRI MRP-227, Revision 1-A Baffle Bolt Inspection Frequency L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-131, Response to Request for Additional Information Regarding License Amendment Request 300, Modify Containment Average Air Temperature Requirements2024-08-0909 August 2024 Response to Request for Additional Information Regarding License Amendment Request 300, Modify Containment Average Air Temperature Requirements L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-113, License Amendment Request 294, Application to Revise Technical Specifications to Adopt TSTF- 577, Revised Frequencies for Steam Generator Tube Inspections2024-07-24024 July 2024 License Amendment Request 294, Application to Revise Technical Specifications to Adopt TSTF- 577, Revised Frequencies for Steam Generator Tube Inspections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-116, Preparation and Scheduling of Operator Licensing Examinations2024-07-11011 July 2024 Preparation and Scheduling of Operator Licensing Examinations L-2024-117, Safety Injection Tank Vent Through Wall Leakage2024-07-11011 July 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-112, Condition Prohibited by Technical Specifications2024-07-10010 July 2024 Condition Prohibited by Technical Specifications L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review L-2024-105, License Amendment Request 300, Modify Containment Average Air Temperature Requirements2024-06-26026 June 2024 License Amendment Request 300, Modify Containment Average Air Temperature Requirements L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-107, Schedule for Subsequent License Renewal Environmental Review2024-06-25025 June 2024 Schedule for Subsequent License Renewal Environmental Review L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project L-2024-093, Steam Generator Divider Plate Assemblies Bounding Analysis Evaluation for Aging Management Commitment 14 Revision2024-06-10010 June 2024 Steam Generator Divider Plate Assemblies Bounding Analysis Evaluation for Aging Management Commitment 14 Revision L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-067, Annual Monitoring Report2024-04-26026 April 2024 Annual Monitoring Report L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 L-2024-064, Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report2024-04-17017 April 2024 Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-057, 0 for Turkey Point, Unit 3 - Condition Prohibited by Technical Specifications2024-04-11011 April 2024 0 for Turkey Point, Unit 3 - Condition Prohibited by Technical Specifications L-2024-054, 2023 Annual Environmental Operating Report2024-04-0909 April 2024 2023 Annual Environmental Operating Report L-2024-047, Proposed Use of a Subsequent ASME Code Edition and Addenda2024-03-28028 March 2024 Proposed Use of a Subsequent ASME Code Edition and Addenda L-2024-013, Submittal of Periodic Reports2024-03-28028 March 2024 Submittal of Periodic Reports 2024-09-09 |
Text
NEXTera MT ENERGY!&
August 5, 2011 L-2011-312 10 CFR 50.48(c)
U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, D.C. 20555-0001 NextEra Energy Duane Arnold, LLC Duane Arnold Energy Center, Docket No. 50-331 NextEra Energy Point Beach, LLC Point Beach Nuclear Plant, Units 1 and 2, Docket Nos. 50-266 and 50-301 Florida Power & Light Company St. Lucie Units 1 and 2, Docket Nos. 50-335 and 50-389 Turkey Point Units 3 and 4, Docket Nos. 50-250 and 50-251 RE: Online Reference Portal
References:
- 1. NextEra Energy, Inc. Letter to NRC (L-2011-235), Request for Extension of Enforcement Discretion and Commitment to Submittal Dates for 10 CFR 50.48(c) License Amendment Requests, dated June 23, 2011.
- 2. Nuclear Regulatory Commission (NRC) Letter dated July 28, 2011, NextEra National Fire Protection Association Standard 805 License Amendment Application Online Reference Portal (TAC No. ME6679).
To improve the efficiency of NRC reviews, NextEra and the NRC staff discussed the use of an online reference portal that would allow the NRC staff and its contractors limited read-only access to the basis documents and other reference materials cited in the 10 CFR 50.48(c) applications. The online reference portal would allow the NRC staff to audit basis documents to determine whether the information included in the documents supports the application. Documents identified as necessary for analysis of the application will be identified by the NRC staff. NextEra will be formally requested to submit those documents on the NRC docket.
FPL agrees to provide an online reference portal for NRC use with the following conditions placed on the use of the portal:
- The online reference portal will be password-protected and passwords will be assigned to staff directly involved in the review on a need-to-know basis.
- The online reference portal will be sufficiently secure to prevent staff from printing, saving, or downloading any documents.
" Conditions of use of the online reference portal will be displayed on the log-in screen and will require concurrence by each user, prior to initial use.
700 Universe Boulevard, Juno Beach, FL 33408
Page 2 of 2 The above conditions will be maintained throughout the duration of the NextEra 10 CFR 50.48(c) application review process.
If you have any questions, or need additional information, please do not hesitate to contact me at 561-691-2798.
Sincerely, Larry E Nicholson Director of Licensing cc: Regional Administrator Region II, USNRC Regional Administrator Region Ill, USNRC Senior Resident Inspector, USNRC, St. Lucie Senior Resident Inspector, USNRC, Turkey Point Senior Resident Inspector, USNRC, Point Beach Nuclear Plant Senior Resident Inspector, USNRC, Duane Arnold Energy Center Director, Office of Enforcement, USNRC Senior Project Manager, Plant Licensing Branch, DORL, USNRC Project Manager, USNRC, St. Lucie Project Manager, USNRC, Turkey Point Project Manager, USNRC, Point Beach Nuclear Plant Project Manager, USNRC, Duane Arnold Energy Center