Supplement to Request for Approval of the Cyber Security Plan (Public Version)
ML11171A191
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 06/16/2011
From: Bauder D
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML11171A191 (3)


Text

SOUTHERN CALIFORNIA Douglas R. Bauder JED_

Site Vice President & Station Manager ESan Onofre Nuclear Generating Station An EDISON INTERNATIONAL Company M'

/T1-Y"I 1. EloT A T P TR

"-I'*EIk1 4A4 "I'T.N Withhld fiem Public Diselesifc e icodac Witoh 1 CF4R 2.39 (Decontrolled when separated from Enclosure)

June 16, 20il 10 CFR 50.90 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001-

Subject:

Docket Nos. 50-361 and 50-362 Supplement to Request for Approval of the Cyber Security Plan San Onofre Nuclear Generating Station, Units 2 and 3

References:

1) Letter from Ross T. Ridenoure (SCE) to the U.S. Nuclear Regulatory Commission (NRC) dated July 22, 2010;

Subject:

Docket Nos.

50-361 and 50-362, Withdrawal and Resubmittal of the SONGS Units 2 and 3 Cyber Security Plan, Docket Nos. 50-361 and 50-362, Amendment Application Numbers 257 and 243, Proposed Change Number NPF-10/15-595, Rev. 1.

2) Letter from Douglas R. Bauder (SCE) to the U.S. Nuclear Regulatory Commission (NRC) dated March 31, 2011;

Subject:

Docket Nos. 50-361 and 50-362, Response to Request for Additional Information regarding Request for Approval of the Cyber Security Plan San Onofre Nuclear Generating Station, Unit 2 and Unit 3.

Dear Sir or Madam,

By letter dated July 22, 2010 (Reference 1), Southern California Edison submitted a license amendment request for approval of the Cyber Security Plan for San Onofre Nuclear Generating Station (SONGS) in accordance with 10 CFR 73.54. The purpose of this license amendment was to provide an Implementation Schedule, provide a table of SONGS deviations from NEI 08-09 Revision 6, and add a sentence to the existing Facilities Operating Licenses (FOL) license condition for Physical Security to require SCE to fully implement and maintain in effect all provisions of the Commission approved Cyber Security Plan.

Wi*thhld efrm Publie DiTTlestwe in AcrdTerTEan e With 10

.FR 2.3 90" (Decontrolled when separated from Enclosure)

P.O. Box 128 San Clemente,. CA 92672 (949) 368-9275 PAX 89275 Fax: (949) 368-9881 Doug.Bauder@sce.com

SEGUT:Y RELATED-JN ýOPRATION AWithld frfo PTubli-. DiscleAuTe in Accor-dance With 10 CFR 2.30 (Decontrolled when separated from Enclosure)

Document Control Desk June 16, 2011 By letter dated March 31, 2011 (Reference 2), Southern California Edison submitted responses to additional information requested by the NRC by e-mail dated March 1, 2011. Southern California Edison wishes to change the actions associated with Milestone #6 as indicated in the Enclosure to this letter.

The response to the request for additional information does not expand the scope of the application and does not impact the conclusions of the no significant hazards consideration determination provided in Reference 1.

This letter and the enclosure contain no new commitments.

Should you have any questions, please contact Ms. Linda T. Conklin at (949) 368-9443.

I declare under penalty of perjury that the following is true and correct.

Executed on:

(.0P/1 t

/

(Date)

Sincerely,

Enclosure:

as stated cc:

E. E. Collins, Regional Administrator, NRC Region IV R. Hall, NRC Project Manager, San Onofre Units 2 and 3 G. G. Warnick, NRC Senior Resident Inspector, San Onofre Units 2 and 3 S. Y. Hsu, California Department of Public Health, Radiologic Health Branch SECU~TJTy RELATED TWFORMATiN (DecorfoT DTsled whens A

raed from E nclosre)

(Decontrolled when separated from Enclosure)

SEcGUJ:YREATED-ThWOR4TION Withhld fromf PubliT D T

l "urc-in Aer-dae-An-WiKh 10 CFR -2.39 Enclosure Changed Response to Request for Additional Information Regarding Milestone #6 SEG1ý:Y RELATED-ThORMA ION