ML110350277
| ML110350277 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 01/26/2011 |
| From: | Susquehanna |
| To: | Gerlach R Office of Nuclear Reactor Regulation |
| References | |
| 028401, 2011-4705 | |
| Download: ML110350277 (25) | |
Text
Jan.
26, 2011 Page 1
of 2
MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2011-4705 USER INFORMATION:
GERLACH*ROSE M EMPL#:028401 CA#:
0363 Address: NUCSA2 Phone#:
254-3194 TRANSMITTAL INFORMATION:
TO:
GERLACH*ROSE M 01/26/2011 LOCATION:
USNRC FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.
HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.
WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.
TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION:
"REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TSBI -
TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL REMOVE MANUAL TABLE OF CONTENTS DATE: 01/14/2011 ADD MANUAL TABLE OF CONTENTS DATE: 01/25/2011 CATEGORY:
DOCUMENTS TYPE: TSBI 4~oo
Jan.
26, 2011 Page 2
of 2
ID:
TEXT 3.4.6 REMOVE:
REV:2 ADD:
REV:
3 CATEGORY: DOCUMENTS TYPE: TSB1 ID:
TEXT LOES ADD:
REV: 101 REMOVE:
REV:100 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.
UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.
FOR ELECTRONIC MANUAL
- USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES MAMIJAL Manual Name:
TSB1 Manual
Title:
TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL Table Of Contents Issue Date:
01/25/2011 Procedure Name Rev TEXT LOES 101
Title:
LIST OF EFFECTIVE SECTIONS Issue Date 01/25/2011 Change ID Change Number TEXT TOC
Title:
TABLE OF CONTENTS 20 09/01/2010 TEXT 2.1.1 5
Title:
SAFETY LIMITS (SLS)
REACTOR TEXT 2.1.2 1
Title:
SAFETY LIMITS (SLS)
REACTOR 05/06/2009 CORE SLS 10/04/2007 COOLANT SYSTEM (RCS)
PRESSURE S TEXT 3.0 3
08/20/2009
Title:
LIMITING CONDITION FOR OPERATION (LCO)
APPLICABILITY TEXT 3. 1. 1
Title:
REACTIVITY TEXT 3.1.2
Title:
REACTIVITY TEXT 3.1.3
Title:
REACTIVITY TEXT 3.1.4
Title:
REACTIVITY TEXT 3.1.5
Title:
REACTIVITY TEXT 3.1.6
Title:
REACTIVITY 1
04/18/2006 CONTROL SYSTEMS SHUTDOWN MARGIN (SDM) 0 11/15/2002 CONTROL SYSTEMS REACTIVITY ANOMALIES 2
01/19/2009 CONTROL SYSTEMS CONTROL ROD OPERABILITY 4
CONTROL SYSTEMS 01/30/2009 CONTROL ROD SCRAM TIMES 1
07/06/2005 CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS 2
04/18/2006 CONTROL SYSTEMS ROD PATTERN CONTROL Pagel of 8
Report Date: 01/25/11 Page 1 of
.8 Report Date: 01/25/11
SSES MANUAL Manual Name:
TSB1 Manual
Title:
TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.1.7
Title:
REACTIVITY CONTROL TEXT 3.1.8
Title:
REACTIVITY CONTROL TEXT 3.2.1
Title:
POWER DISTRIBUTION TEXT 3.2.2
Title:
POWER DISTRIBUTION 3
04/23/2008 SYSTEMS STANDBY LIQUID CONTROL (SLC)
SYSTEM 3
05/06/2009 SYSTEMS SCRAM DISCHARGE VOLUME (SDV)
VENT AND DRAIN VALVES 2
04/23/2008 LIMITS AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR) 3 05/06/2009 LIMITS MINIMUM CRITICAL POWER RATIO (MCPR) 2 04/23/2008 LIMITS LINEAR HEAT GENERATION RATE (LHGR)
TEXT 3.2.3
Title:
POWER DISTRIBUTION TEXT 3.3.1.1
Title:
INSTRUMENTATION TEXT 3.3.1.2
Title:
INSTRUMENTATION TEXT 3.3.2.1
Title:
INSTRUMENTATION TEXT 3.3.2.2
Title:
INSTRUMENTATION TEXT 3.3.3.1
Title:
INSTRUMENTATION TEXT 3.3.3.2
Title:
INSTRUMENTATION TEXT 3.3.4.1
Title:
INSTRUMENTATION 4
04/23/2008 REACTOR PROTECTION SYSTEM (RPS)
INSTRUMENTATION 2
01/19/2009 SOURCE RANGE MONITOR (SRM)
INSTRUMENTATION 3
04/23/2008 CONTROL ROD BLOCK INSTRUMENTATION 2
04/05/2010 FEEDWATER MAIN TURBINE HIGH WATER LEVEL TRIP INSTRUMENTATION 8
10/27/2008 POST ACCIDENT MONITORING (PAM)
INSTRUMENTATION 1
04/18/2005 REMOTE SHUTDOWN SYSTEM 1
04/23/2008 END OF CYCLE RECIRCULATION PUMP TRIP (EOC-RPT)
INSTRUMENTATION Page2 of 8 Report Date: 01/25/11 Page 2 of
.8 Report Date: 01/25/11
SSES MANUAL Manual Name:
TSB1 Manual
Title:
TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.3.4.2 0
11/15/2002
Title:
INSTRUMENTATION ANTICIPATED TRANSIENT WITHOUT SCRAM RECIRCULATION PUMP TRIP (ATWS-RPT)
INSTRUMENTATION TEXT 3.3.5.1 3
08/20/2009
Title:
INSTRUMENTATION EMERGENCY CORE COOLING SYSTEM (ECCS)
INSTRUMENTATION TEXT 3.3.5.2 0
11/15/2002
Title:
INSTRUMENTATION REACTOR CORE ISOLATION COOLING (RCIC)
SYSTEM INSTRUMENTATION TEXT 3.3.6.1 4
04/23/2008
Title:
INSTRUMENTATION PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.6.2 4
09/01/2010
Title:
INSTRUMENTATION SECONDARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.7.1
Title:
INSTRUMENTATION INSTRUMENTATION 2
10/27/2008 CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS)
SYSTEM TEXT 3.3.8.1 2
12/17/2007
Title:
INSTRUMENTATION LOSS OF POWER (LOP)
INSTRUMENTATION TEXT 3.3.8.2 0
11/15/2002
Title:
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS)
ELECTRIC POWER MONITORING TEXT 3.4.1 4
04/27/2010
Title:
RECIRCULATION LOOPS OPERATING TEXT 3.4.2 2
04/27/2010
Title:
JET PUMPS TEXT 3.4.3
Title:
REACTOR COOLANT TEXT 3.4.4
Title:
04/23/2008 SYSTEM RCS SAFETY RELIEF VALVES S/RVS 0
11/15/2002 SYSTEM (RCS)
RCS OPERATIONAL LEAKAGE Page3~
of 8
Report Date: 01/25/11 Page 3 of8 Report Date: 01/25/11
SSES MANUIAL3 Manual Name:
TSB1 Manual
Title:
TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.4.5
Title:
REACTOR COOLANT TEXT 3.4.6
Title:
01/16/2006 SYSTEM (RCS)
RCS PRESSURE ISOLATION VALVE (PIV) LEAKAGE 3
01/25/2011 SYSTEM (RCS)
RCS LEAKAGE DETECTION INSTRUMENTATION TEXT 3.4.7 2
10/04/2007
Title:
RCS SPECIFIC ACTIVITY TEXT 3.4.8
Title:
REACTOR COOLANT HOT SHUTDOWN TEXT 3.4.9
Title:
REACTOR COOLANT COLD SHUTDOWN 1
SYSTEM (RCS) 04/18/2005 RESIDUAL HEAT REMOVAL (RHR)
SHUTDOWN COOLING SYSTEM 0
11/15/2002 SYSTEM (RCS)
SHUTDOWN COOLING SYSj TEXT 3.4.10 3
04/23/2008
Title:
RCS PRESSURE AND TEMPERATURE (P/T) LIMITS TEXT 3.4.11 0
11/15/2002
Title:
REACTOR STEAM DOME PRESSURE TEXT 3. 5. 1 2
01/16/2006
Title:
EMERGENCY CORE COOLING SYSTEMS (ECCS)
AND REACTOR CORE ISOLATION SYSTEM ECCS -
OPERATING TEXT 3.5.2 0
11/15/2002
Title:
EMERGENCY CORE COOLING SYSTEMS (ECCS)
AND REACTOR CORE ISOLATION SYSTEM ECCS -
SHUTDOWN TEXT 3.5.3 2
07/09/2010
Title:
EMERGENCY CORE COOLING SYSTEMS (ECCS)
AND REACTOR CORE ISOLATION SYSTEM RCIC SYSTEM TEXT 3.6.1.1 3
04/23/2008
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT TEXT 3.6.1.2 1
04/23/2008
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT AIR LOCK COOLING (RCIC)
COOLING (RCIC)
COOLING (RCIC)
Page4 of 8 Report Date: 01/25/11 Page 4 of 8
Report Date: 01/25/11
SSES MANUAL Manual Name:
TSBI Manual
Title:
TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.6.1.3
Title:
CONTAINMENT I
TEXT 3.6.1.4
Title:
CONTAINMENT TEXT 3.6.1.5
Title:
CONTAINMENT TEXT 3.6.1.6
Title:
CONTAINMENT TEXT 3.6.2.1
Title:
CONTAINMENT TEXT 3.6.2.2
Title:
CONTAINMENT TEXT 3.6.2.3
Title:
CONTAINMENT TEXT 3.6.2.4
Title:
CONTAINMENT TEXT 3.6.3.1
Title:
CONTAINMENT TEXT 3.6.3.2
Title:
CONTAINMENT TEXT 3.6.3.3
Title:
CONTAINMENT TEXT 3.6.4.1
Title:
CONTAINMENT 9
04/14/2010 SYSTEMS PRIMARY CONTAINMENT ISOLATION VALVES (PCIVS)
LDCN 3092 1
04/23/2008 SYSTEMS CONTAINMENT PRESSURE 1
10/05/2005 SYSTEMS DRYWELL AIR TEMPERATURE 0
11/15/2002 SYSTEMS SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKERS 2
04/23/2008 SYSTEMS SUPPRESSION POOL AVERAGE TEMPERATURE 0
11/15/2002 SYSTEMS SUPPRESSION POOL WATER LEVEL 1
01/16/2006 SYSTEMS RESIDUAL HEAT REMOVAL (RHR)
SUPPRESSION POOL COOLING 0
11/15/2002 SYSTEMS RESIDUAL HEAT REMOVAL (RHR)
SUPPRESSION POOL SPRAY 2
06/13/2006 SYSTEMS PRIMARY CONTAINMENT HYDROGEN RECOMBINERS 1
04/18/2005 SYSTEMS DRYWELL AIR FLOW SYSTEM 0
11/15/2002 SYSTEMS PRIMARY CONTAINMENT OXYGEN CONCENTRATION 7
10/04/2007 SYSTEMS SECONDARY CONTAINMENT PageS of ~
Report Date: 01/25/11 Page 5 of8 Report Date: 01/25/11
SSES MANUAL Manual Name:
TSB1 Manual
Title:
TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.6.4.2 3
03/10/2010
Title:
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT ISOLATION VALVES (SCIVS)
TEXT 3.6.4.3 4
09/21/2006
Title:
CONTAINMENT SYSTEMS STANDBY GAS TREATMENT (SGT)
SYSTEM 0
TEXT 3.7.1
Title:
PLANT SYSTEMS ULTIMATE HEAT 4
04/05/2010 RESIDUAL HEAT REMOVAL SERVICE WATER (RHRSW)
SYSTEM AND THE SINK (UHS)
TEXT 3.7.2
Title:
PLANT TEXT 3.7.3
Title:
PLANT TEXT 3.7.4
Title:
PLANT TEXT 3.7.5
Title:
PLANT TEXT 3.7.6
Title:
PLANT TEXT 3.7.7
Title:
PLANT 2
02/11/2009 SYSTEMS EMERGENCY SERVICE WATER (ESW)
SYSTEM 1
01/08/2010 SYSTEMS CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS)
SYSTEM 0
11/15/2002 SYSTEMS CONTROL ROOM FLOOR COOLING SYSTEM 1
10/04/2007 SYSTEMS MAIN CONDENSER OFFGAS 2
04/23/2008 SYSTEMS MAIN TURBINE BYPASS SYSTEM 1
10/04/2007 SYSTEMS SPENT FUEL STORAGE POOL WATER LEVEL TEXT 3.7.8
Title:
PLANT SYSTEMS 0
04/23/2008 TEXT 3.8.1 6
05/06/2009
Title:
ELECTRICAL POWER SYSTEMS AC SOURCES -
OPERATING TEXT 3.8.2 0
11/15/2002
Title:
ELECTRICAL POWER SYSTEMS AC SOURCES -
SHUTDOWN Pages of 8 Report Date: 01/25/11 Page 6 of 8
Report Date: 01/25/11
SSES MANUAL Manual Name:
TSB1 Manual
Title:
TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.8.3
Title:
ELECTRICAL TEXT 3.8.4
Title:
ELECTRICAL TEXT 3.8.5
Title:
ELECTRICAL TEXT 3.8.6
Title:
ELECTRICAL TEXT 3.8.7
Title:
ELECTRICAL TEXT 3.8.8
Title:
ELECTRICAL TEXT 3.9.1
Title:
REFUELING TEXT 3.9.2
Title:
REFUELING TEXT 3.9.3
Title:
REFUELING TEXT 3.9.4
Title:
REFUELING TEXT 3.9.5
Title:
REFUELING TEXT 3.9.6
Title:
REFUELING 2
POWER SYSTEMS 04/14/2010 DIESEL FUEL OIL, LUBE OIL, AND STARTING AIR 3
01/19/2009 POWER SYSTEMS DC SOURCES -
OPERATING 1
12/14/2006 POWER SYSTEMS DC SOURCES -
SHUTDOWN POWER SYS9 POWER SYST POWER SYST OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS 1
12/14/2006 rEMS BATTERY CELL PARAMETERS 1
10/05/2005
'EMS DISTRIBUTION SYSTEMS -
OPERATING 0
11/15/2002 rEMS DISTRIBUTION SYSTEMS -
SHUTDOWN 0
11/15/2002 REFUELING EQUIPMENT INTERLOCKS 1
09/01/2010 REFUEL POSITION ONE-ROD-OUT INTERLOCK 0
11/15/2002 CONTROL ROD POSITION 0
11/15/2002 CONTROL ROD POSITION INDICATION 0
11/15/2002 CONTROL ROD OPERABILITY -
REFUELING 1
10/04/2007 REACTOR PRESSURE VESSEL (RPV)
WATER LEVEL Pagel of 8 Report Date: 01/25/11 Page 7 of 8
Report Date: 01/25/11
SSES MANUAL Manual Name:
TSB1 Manual
Title:
TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.9.7 0
11/15/2002
Title:
REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR)
HIGH WATER LEVEL TEXT 3.9.8 0
11/15/2002
Title:
REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR)
LOW WATER LEVEL TEXT 3.10.1
Title:
SPECIAL TEXT 3.10.2
Title:
SPECIAL TEXT 3.10.3
Title:
SPECIAL TEXT 3.10.4
Title:
SPECIAL TEXT 3.10.5
Title:
SPECIAL TEXT 3.10.6
Title:
SPECIAL TEXT 3.10.7
Title:
SPECIAL TEXT 3.10.8
Title:
SPECIAL OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS 1
01/23/2008 INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION 0
11/15/2002 REACTOR MODE SWITCH INTERLOCK TESTING 0
11/15/2002 SINGLE CONTROL ROD WITHDRAWAL -
HOT SHUTDOWN 0
11/15/2002 SINGLE CONTROL ROD WITHDRAWAL -
COLD SHUTDOWN 0
11/15/2002 SINGLE CONTROL ROD DRIVE (CRD)
REMOVAL -
REFUELING 0
11/15/2002 MULTIPLE CONTROL ROD WITHDRAWAL -
REFUELING 1
04/18/2006 CONTROL ROD TESTING -
OPERATING 1
04/12/2006 SHUTDOWN MARGIN (SDM)
TEST -
REFUELING Pages of 8
Report Date: 01/25/11 Page 8 of 3
Report Date: 01/25/11
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision TOC Table of Contents 20 B 2.0 SAFETY LIMITS BASES Page B 2.0-1 0
Page TS / B 2.0-2 3
Page TS / B 2.0-3 5
Page TS / B 2.0-4 3
Page TS / B 2.0-5 5
Page TS / B 2.0-6 1
Pages TS / B 2.0-7 through TS / B 2.0-9 1
B 3.0 LCO AND SR APPLICABILITY BASES Page TS / B 3.0-1 1
Pages TS / B 3.0-2 through TS / B 3.0-4 0
Pages TS / B 3.0-5 through TS / B 3.0-7 1
Page TS / B 3.0-8 3
Pages TS / B 3.0-9 through TS / B 3.0-11 2
Page TS / B 3.0-11 a 0
Page TS / B 3.0-12 1
Pages TS / B 3.0-13 through TS / B 3.0-15 2
Pages TS / B 3.0-16 and TS / B 3.0-17 0
B 3.1 REACTIVITY CONTROL BASES Pages B 3.1-1 through B 3.1-4 0
Page TS / B 3.1-5 1
Pages TS / B 3.1-6 and TS / B 3.1-7 2
Pages B 3.1-8 through B 3.1-13 0
Page TS / B 3.1-14 1
Page B 3.1-15 0
Page TS / B 3.1-16 1
Pages B 3.1-17 through B 3.1-19 0
Pages TS / B 3.1-20 and TS / B 3.1-21 1
Page TS / B 3.1-22 0
Page TS / B 3.1-23 1
Page TS / B 3.1-24 0
Pages TS / B 3.1-25 through TS / B 3.1-27 1
Page TS / B 3.1-28 2
Page TS / B 3.1-29 1
Pages B 3.1-30 through B 3.1-33 0
Pages TS / B 3.3-34 through TS / B 3.3-36 1
Pages TS / B 3.1-37 and TS / B 3.1-38 2
Pages TS / B 3.1-39 and TS / B 3.1-40 2
Page TS / B 3.1-40a 0
Pages TS / B 3.1-41 and TS / B 3.1-42 2
SUSQUEHANNA
- UNIT I TS/BLOES-1 Revision 101 SUSQUEHANNA - UNIT 1 TS / B LOES-1 Revision 101
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision Page TS / B 3.1.43 1
Page TS / B 3.1-44 0
Page TS / B 3.1-45 3
Pages TS / B 3.1-46 through TS / B 3.1-49 1
Page TS / B 3.1-50 0
Page TS / B 3.1-51 3
B 3.2 POWER DISTRIBUTION LIMITS BASES Page TS / B 3.2-1 2
Pages TS / B 3.2-2 and TS / B 3.2-3 3
Pages TS / B 3.2-4 and TS / B 3.2-5 2
Page TS / B 3.2-6 3
Page B 3.2-7 1
Pages TS / B 3.2-8 and TS / B 3.2-9 3
Page TS / B 3.2.10 2
Page TS / B 3.2-11 3
Page TS / B 3.2-12 1
Page TS / B 3.2-13 2
B 3.3 INSTRUMENTATION Pages TS / B 3.3-1 through TS / B 3.3-4 1
Page TS / B 3.3-5 2
Page TS / B 3.3-6 1
Page TS / B 3.3-7 3
Page TS / B 3.3-7a I
Page TS / B 3.3-8 4
Pages TS / B 3.3-9 through TS / B 3.3-12 3
Pages TS / B 3.3-12a 1
Pages TS / B 3.3-12b and TS / B 3.3-12c 0
Page TS / B 3.3-13 1
Page TS / B 3.3-14 3
Pages TS / B 3.3-15 and TS / B 3.3-16 1
Pages TS / B 3.3-17 and TS / B 3.3-18 4
Page TS / B 3.3-19 1
Pages TS / B 3.3-20 through TS / B 3.3-22 2
Page TS / B 3.3-22a 0
Pages TS / B 3.3-23 and TS / B 3.3-24 2
Pages TS / B 3.3-24a and TS / B 3.3-24b 0
Page TS / B 3.3-25 3
Page TS / B 3.3-26 2
Page TS / B 3.3-27 1
Pages TS / B 3.3-28 through TS / B 3.3-30 3
Page TS / B 3.3-30a 0
SUSQUEHANNA-UNIT 1 TS / B LOES-2 Revision 101
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision Page TS / B 3.3-31 4
Page TS / B 3.3-32 5
Pages TS / B 3.3-32a 0
Page TS / B 3.3-32b 1
Page TS / B 3.3-33 5
Page TS / B 3.3-33a 0
Page TS / B 3.3-34 1
Pages TS / B 3.3-35 and TS / B 3.3-36 2
Pages TS / B 3.3-37 and TS / B 3.3-38 1
Page TS / B 3.3-39 2
Pages TS / B 3.3-40 through TS / B 3.3-43 1
Page TS / B 3.3-44 4
Pages TS / B 3.3-44a and TS / B 3.3-44b 0
Page TS / B 3.3-45 3
Pages TS / B 3.3-45a and TS / B 3.3-45b 0
Page TS / B 3.3-46 3
Pages TS / B 3.3-47 2
Pages TS / B 3.3-48 through TS / B 3.3-51 3
Pages TS / B 3.3-52 and TS / B 3.3-53 2
Page TS / B 3-3-53a 0
Page TS / B 3.3-54 4
Page TS / B 3.3-55 2
Pages TS / B 3.3-56 and TS / B 3.3-57 1
Page TS / B 3.3-58 0
Page TS / B 3.3-59 1
Page TS / B 3.3-60 0
Page TS / B 3.3-61 1
Pages TS / B 3.3-62 and TS / B 3.3-63 0
Pages TS / B 3.3-64 and TS / B 3.3-65 2
Page TS / B 3.3-66 4
Page TS / B 3.3-67 3
Page TS / B 3.3-68 4
Page TS / B 3.3-69 5
Pages TS / B 3.3-70 4
Page TS / B 3.3-71 3
Pages TS / B 3.3-72 and TS I B 3.3-73 2
Page TS / B 3.3-74 3
Page TS / B 3.3-75 2
Page TS / B 3.3-75a 6
Page TS / B 3.3-75b 7
Page TS / B 3.3-75c 5
SUSQUEHANNA - UNIT 1 TSIBLOES-3 Revision 101 SUSQUEHANNA - UNIT 1 TS / B LOES-3 Revision 101
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision Pages B 3.3-76 through 3.3-77 0
Page TS / B 3.3-78 1.
Pages B 3.3-79 through B 3.3-81 0
Page B 3.3-82 1
Page B 3.3-83 0
Pages B 3.3-84 and B 3.3-85 1
Page B 3.3-86 0
Page B 3.3-87 1
Page B 3.3-88 0
Page B 3.3-89 1
Page TS / B 3.3-90 1
Page B 3.3-91 0
Pages TS / B 3.3-92 through TS / B 3.3-100 1
Pages TS / B 3.3-101 through TS / B 3.3-103 0
Page TS / B 3.3-104 2
Pages TS / B 3.3-105 and TS / B 3.3-106 0
Page TS / B 3.3-107 1
Page TS / B 3.3-108 0
Page TS / B 3.3-109 1
Pages TS / B 3.3-110 and TS / B 3.3-111 0
Pages TS / B 3.3-112 and TS / B 3.3-112a 1
Pages TS / B 3.3-113 through TS / B 3.3-115 1
Page TS / B 3.3-116 3
Page TS / B 3.3-117 1
Pages TS / B 3.3-118 through TS / B 3.3-122 0
Pages TS / B 3.3-123 and TS / B 3.3-124 1
Page TS / B 3.3-124a 0
Page TS / B 3.3-125 0
Pages TS / B 3.3-126 and TS / B 3.3-127 1
Pages TS / B 3.3-128 through TS/ B 3.3-130 0
Page TS / B 3.3-131 1
Pages TS / B 3.3-132 through TS / B 3.3-134 0
Pages B 3.3-135 through B 3.3-137 0
Page TS / B 3.3-138 1
Pages B 3.3-139 through B 3.3-149 0
Pages TS / B 3.3-150 and TS / B 3.3-151 1
Pages TS / B 3.3-152 through TS / B 3.3-154 2
Page TS / B 3.3-155 1
Pages TS / B 3.3-156 through TS / B 3.3-158 2
Pages TS / B 3.3-159 through TS / B 3.3-162 1
Page TS / B 3.3-163 2
Pages TS / B 3.3-164 and TS / B 3.3-165 1
Pages TS / B 3.3-166 and TS / B 3.3-167 2
SUSQUEHANNA
- UNIT 1 TS/BLOES-4 Revision 101 SUSQUEHANNA - UNIT 1 TS / B LOES-4 Revision 101
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision Pages TS / B 3.3-168 and TS / B 3.3-169 1
Page TS / B 3.3-170 2
Pages TS I B 3.3-171 through TS / B 3.3-177 1
Pages TS / B 3.3-178 through TS I B 3.3-179a 2
Pages TS / B 3.3-179b and TS / B 3.3-179c 0
Page TS / B 3.3-180 1
Page TS / B 3.3-181 3
Page TS / B 3.3-182 1
Page TS / B 3.3-183 2
Page TS / B 3.3-184 1
Page TS / B 3.3-185 4
Page TS / B 3.3-186 1
Pages TS / B 3.3-187 and TS I B 3.3-188 2
Pages TS / B 3.3-189 through TS / B 3.3-191 1
Page TS / B 3.3-192 0
Page TS / B 3.3-193 1
Pages TS / B 3.3-194 and TS / B 3.3-195 0
Page TS / B 3.3-196 2
Pages TS / B 3.3-197 through TS / B 3.3-204 0
Page TS / B 3.3-205 1
Pages B 3.3-206 through B 3.3-209 0
Page TS / B 3.3-210 1
Pages B 3.3-211 through B 3.3-219 0
B 3.4 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 and B 3.4-2 0
Pages TS / B 3.4-3 and Page TS / B 3.4-4 4
Page TS / B 3.4-5 3
Pages TS / B 3.4-6 through TS / B 3.4-9 2
Page TS / B 3.4-10 1
Pages TS / 3.4-11 and TS/ B 3.4-12 0
Page TS / B 3.4-13 1
Page TS / B 3.4-14 0
Page TS / B 3.4-15 2
Pages TS / B 3.4-16 and TS / B 3.4-17 3
Page TS / B 3.4-18 2
Pages B 3.4-19 through B 3.4-27 0
Pages TS / B 3.4-28 through TS / B 3.4-30 1
Page TS / B 3.4-31 0
Pages TS / B 3.4-32 and TS / B 3.4-33 1
Page TS / B 3.4-34 0
Pages TS / B 3.4-35 and TS / B 3.4-36 1
Page TS / B 3.4-37 2
Page TS / B 3.4-38 1
SUSQUEHANNA
- UNIT I TS I B LOES-5 Revision 101 SUSQUEHANNA - UNIT 1 TS / B LOES-5 Revision 101
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision Pages B 3.4-39 and B 3.4-40 0
Page TS / B 3.4-41 1
Pages B 3.4-42 through B 3.4-48 0
Page TS / B 3.4-49 3
Page TS / B 3.4-50 1
Page TS / B 3.4-51 3
Page TS / B 3.4-52 2
Page TS / B 3.4-53 1
Pages TS / B 3.4-54 through TS / B 3.4-56 2
Page TS / B 3.4-57 3
Pages TS / B 3.4-58 through TS / B 3.4-60 1
B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 0
Page TS / B 3.5-3 2
Page TS / B 3.5-4 1
Page TS / B 3.5-5 2
Page TS / B 3.5-6 1
Pages B 3.5-7 through B 3.5-10 0
Page TS / B 3.5-11 1
Page TS / B 3.5-12 0
Page TS / B 3.5-13 1
Pages TS / B 3.5-14 and TS / B 3.5-15 0
Pages TS / B 3.5-16 through TS / B 3.5-18 1
Pages B 3.5-19 through B 3.5-24 0
Page TS / B 3.5-25 through TS / B 3.5-27 1
Page TS / B 3.5-28 0
Page TS / B 3.5-29 1
Pages TS / B 3.5-30 and TS / B 3.5-31 0
B 3.6 CONTAINMENT SYSTEMS BASES Page TS / B 3.6-1 2
Page TS / B 3.6-1a 3
Page TS / B 3.6-2 4
Page TS / B 3.6-3 3
Page TS / B 3.6-4 4
Pages TS / B 3.6-5 and TS / B 3.6-6 3
Pages TS / B 3.6-6a and TS / B 3.6-6b 2
Page TS / B 3.6-6c 0
Page B 3.6-7 0
Page B 3.6-8 1
Pages B 3.6-9 through B 3.6-14 0
Page TS / B 3.6-15 2
Page TS / B 3.6-15a 0
Page TS / B 3.6-15b 2
SUSQUEHANNA - UNIT 1SUSQUEHANNA UNIT I TS / B LOES-6 Revision 101 TS / B LOES-6 Revision 101
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision Pages TS / B 3.6-16 and TS / B 3.6-17 1
Page TS / B 3.6-17a 0
Pages TS / B 3.6-18 and TS / B 3.6-19 0
Page TS / B 3.6-20 1
Page TS / B 3.6-21 2
Page TS / B 3.6-22 1
Page TS / B 3.6-22a 0
Page TS / B 3.6-23 1
Pages TS / B 3.6-24 and TS / B 3.6-25 0
Pages TS / B 3.6-26 and TS / B 3.6-27 2
Page TS / B 3.6-28 7
Page TS / B 3.6-29 2
Page TS / B 3.6-30 1
Page TS / B 3.6-31 3
Pages TS / B 3.6-32 and TS / B 3.6-33 1
Pages TS / B 3.6-34 and TS / B 3.6-35 0
Page TS / B 3.6-36 1
Page TS / B 3.6-37 0
Page TS / B 3.6-38 3
Page TS / B 3.6-39 2
Page TS / B 3.6-40 6
Page B 3.6-41 1
Pages B 3.6-42 and B 3.6-43 3
Pages TS / B 3.6-44 and TS / B 3.6-45 1
Page TS / B 3.6-46 2
Pages TS / B 3.6-47 through TS / B 3.6-51 1
Page TS / B 3.6-52 2
Pages TS / B 3.6-53 through TS / B 3.6-56 0
Page TS / B 3.6-57 1
Page TS / 3.6-58 2
Pages B 3.6-59 through B 3.6-63 0
Pages TS / B 3.6-64 and TS / B 3.6-65 1
Pages B 3.6-66 through B 3.6-69 0
Pages TS / B 3.6-70 through TS / B 3.6-72 1
Page TS / B 3.6-73 2
Pages TS / B 3.6-74 and TS / B 3.6-75 1
Pages B 3.6-76 and B 3.6-77 0
Page TS / B 3.6-78 1
Pages B 3.6-79 through B 3.3.6-83 0
Page TS / B 3.6-84 3
Page TS / B 3.6-85 2
Page TS / B 3.6-86 4
SUSQUEHANNA - UNIT 1 TS / B LOES-7 Revision 101
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision Pages TS / B 3.6-87 through TS / B 3.6-88a 2
Page TS /.B 3.6-89 4
Page TS / B 3.6-90 2
Page TS / B 3.6-91 3
Pages TS / B 3.6-92 through TS / B 3.6-96 1
Page TS / B 3.6-97 2
Pages TS / B 3.6-98 and TS / B 3.6-99 1
Page TS / B 3.6-100 3
Page TS / B 3.6-100a 0
Pages TS / B 3.6-101 and TS / B 3.6-102 1
Pages TS / B 3.6-103 and TS / B 3.6-104 2
Page TS / B 3.6-105 3
Page TS / B 3.6-106 2
Page TS / B 3.6-107 3
B 3.7 PLANT SYSTEMS BASES Pages TS / B 3.7-1 3
Page TS / B 3.7-2 4
Pages TS / B 3.7-3 through TS / B 3.7-5 3
Page TS / B 3.7-5a 1
Page TS / B 3.7-6 3
Page TS / B 3.7-6a 2
Page TS / B 3.7-6b I
Page TS / B 3.7-6c 2
Page TS / B 3.7-7 3
Page TS / B 3.7-8 2
Pages TS / B 3.7-9 through TS B 3.7-11 1
Pages TS / B 3.7-12 and TS / B 3.7-13 2
Pages TS / B 3.7-14 through TS / B 3.7-18 3
Page TS / B 3.7-18a 1
Pages TS / B 3.7-18b through TS / B 3.7-18e 0
Pages TS / B 3.7-19 through TS / B 3.7-23 1
Page TS / B 3.7-24 1
Pages TS / B 3.7-25 and TS / B 3.7-26 0
Pages TS / B 3.7-27 through TS / B 3.7-29 5
Page TS / B 3.7-30 2
Page TS / B 3.7-31 1
Page TS / B 3.7-32 0
Page TS / B 3.7-33 1
Pages TS / B 3.7-34 through TS / B 3.7-37 0
SUSQUEHANNA
- UNIT I TS / B LOES-8 Revision 101 SUSQUEHANNA - UNIT 1 TS / B LOES-8 Revision 101
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision B 3.8 ELECTRICAL POWER SYSTEMS BASES Page TS / B 3.8-1 3
Pages TS / B 3.8-2 and TS / B 3.8-3 2
Page TS / B 3.8-4 3
Pages TS / B 3.8-4a and TS / B 3.8-4b 0
Page TS / B 3.8-5 5
Page TS / B 3.8-6 3
Pages TS / B 3.8-7 through TS/B 3.8-8 2
Page TS / B 3.8-9 4
Page TS / B 3.8-10 3
Pages TS / B 3.8-11 and TS / B 3.8-17 2
Page TS / B 3.8-18 3
Pages TS / B 3.8-19 through TS / B 3.8-21 2
Pages TS / B 3.8-22 and TS / B 3.8-23 3
Pages TS / B 3.8-24 through TS / B 3.8-37 2
Pages B 3.8-38 through B 3.8-44 0
Page TS / B 3.8-45 1
Pages TS / B 3.8-46 through TS / B 3.8-48 0
Pages TS / B 3.8-49 through TS / B 3.8-51 1
Page TS / B 3.8-52 0
Page TS / B 3.8-53 1
Pages TS / B 3.8-54 through TS / B 3.8-57 2
Pages TS / B 3.8-58 through TS I B 3.8-61 3
Pages TS / B 3.8-62 and TS / B 3.8-63 5
Page TS / B 3.8-64 4
Page TS / B 3.8-65 5
Pages TS / B 3.8-66 through TS / B 3.8-77 1
Pages TS / B 3.8-77A through TS / B 3.8-77C 0
Pages B 3.8-78 through B 3.8-80 0
Page TS / B 3.8-81 1
Pages B 3.8-82 through B 3.8-90 0
B 3.9 REFUELING OPERATIONS BASES Pages TS / B 3.9-1 and TS / B 3.9-1a 1
Pages TS / B 3.9-2 through TS / B 3.9-5 1
Pages TS / B 3.9-6 through TS / B 3.9-8 0
Pages B 3.9-9 through B 3.9-18 0
Pages TS / B 3.9-19 through TS / B 3.9-21 1
Pages B 3.9-22 through B 3.9-30 0
SUSQUEHANNA - UNIT 1 TS / B LOES-9 Revision 101
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision B 3.10 SPECIAL OPERATIONS BASES Page TS / B 3.10-1 2
Pages TS / B 3.10-2 through TS / B 3.10-5 1
Pages B 3.10-6 through B 3.10-31 0
Page TS / B 3.10-32 2
Page B 3.10-33 0
Page TS / B 3.10-34 1
Pages B 3.10-35 and B 3.10-36 0
Page TS / B 3.10-37 1
Page TS / B 3.10-38 2
TSB1 Text LOES.doc 1/21/2011 SUSQUEHANNA - UNIT 1 TS / B LOES-lO Revision 101 SUSQUEHANNA - UNIT 1 TS / B LOES-10 Revision 101
PPL Rev. 3 RCS Leakage Detection Instrumentation B 3.4.6 B 3.4 REACTOR COOLANT SYSTEM (RCS)
B 3.4.6 RCS Leakage Detection Instrumentation BASES BACKGROUND GDC 30 of 10 CFR 50, Appendix A (Ref. 1), requires means for detecting and, to the extent practical, identifying the location of the source of RCS LEAKAGE. Regulatory Guide 1.45 (Ref. 2) describes acceptable methods for selecting leakage detection systems.
Limits on LEAKAGE from the reactor coolant pressure boundary (RCPB) are required so that appropriate action can be taken before the integrity of the RCPB is impaired (Ref. 2). Leakage detection systems for the RCS are provided to alert the operators when leakage rates above normal background levels are detected and also to supply quantitative measurement of leakage rates. The Bases for LCO 3.4.4, "RCS Operational LEAKAGE," discuss the limits on RCS LEAKAGE rates.
Systems for separating the LEAKAGE of an identified source from an unidentified source are necessary to provide prompt and quantitative information to the operators to permit them to take immediate corrective action.
LEAKAGE from the RCPB inside the drywell is detected by at least one of two or three independently monitored variables, such as sump level changes and drywell gaseous and particulate radioactivity levels. The primary means of quantifying LEAKAGE in the drywell is the drywell floor drain sump monitoring system which consists of two drywell floor drain sump level Channels. Both Channels are required to be Operable to satisfy the LCO.
The drywell floor drain sump monitoring system monitors the LEAKAGE collected in the floor drain sump. This unidentified LEAKAGE consists of LEAKAGE from control rod drives, valve flanges or packings, floor drains, the Closed Cooling Water System, and drywell air cooling unit condensate drains, and any LEAKAGE not collected in the drywell equipment drain tank.
The level of each drywell sump is continuously recorded in the Main Control Room. The change in (continued)
SUSQUEHANNA - UNIT 1 TS / B 3.4-30 Revision 1
PPL Rev. 3 RCS Leakage Detection Instrumentation B 3.4.6 BASES BACKGROUND (continued) sump level per unit time determines the leak rate and is calculated from the recorder.
The floor drain sump level indicators have switches that start and stop the sump pumps when required. If the sump fills to the high high level setpoint, an alarm sounds in the control room.
The primary containment air monitoring systems continuously monitor the primary containment atmosphere for airborne particulate and gaseous radioactivity. A sudden increase of radioactivity, which may be attributed to RCPB steam or reactor water LEAKAGE, is annunciated in the control room. The primary containment atmosphere particulate and gaseous radioactivity monitoring systems are not capable of quantifying LEAKAGE rates. These monitors provide an alternate means of leak detection to that supplied by the sump level monitors, and although they cannot ensure detection of a 1 gpm leak in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> in all cases, they provide a diverse means of leak detection (Ref. 3).
APPLICABLE SAFETY ANALYSES A threat of significant compromise to the RCPB exists if the barrier contains a crack that is large enough to propagate rapidly. LEAKAGE rate limits are set low enough to detect the LEAKAGE emitted from a single crack in the RCPB (Refs. 4 and 5). Each of the leakage detection systems inside the drywell is designed with the capability of detecting LEAKAGE less than the established LEAKAGE rate limits. The allowed LEAKAGE rates are well below the rates predicted for critical crack sizes (Ref. 6). Therefore, these actions provide-adequate response before a significant break in the RCPB can occur.
RCS leakage detection instrumentation satisfies Criterion 1 of the NRC Policy Statement (Ref. 7).
LCO The drywell floor drain sump monitoring system is required to quantify the unidentified LEAKAGE from the RCS. Thus, for the system to be considered OPERABLE, the system must be capable of measuring reactor coolant leakage. The other monitoring systems provide early alarms to the operators so closer examination of other detection systems will be made (continued)
SUSQUEHANNA - UNIT 1 TS / B 3.4-31 Revision 0
PPL Rev. 3 RCS Leakage Detection Instrumentation B 3.4.6 BASES LCO to determine the extent of any corrective action that may be required.
(continued)
With the leakage detection systems inoperable, monitoring for LEAKAGE in the RCPB is degraded.
APPLICABILITY In MODES 1, 2, and 3, leakage detection systems are required to be OPERABLE to support LCO 3.4.4. This Applicability is consistent with that for LCO 3.4.4.
ACTIONS A.1 With the drywell floor drain sump monitoring system inoperable, the primary containment atmospheric activity monitor will provide indication of changes in leakage.
With the drywell floor drain sump monitoring system inoperable, operation may continue for 30 days. However, RCS unidentified and total LEAKAGE is still required to be determined every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (SR 3.4.4.1).
The 30 day Completion Time of Required Action A.1 is acceptable, based on operating experience, considering the multiple forms of leakage detection that are still available.
B.1 and B.2 With both gaseous and particulate primary containment atmospheric monitoring channels inoperable, grab samples of the primary containment atmosphere must be taken and analyzed to provide periodic leakage information. Provided a sample is obtained and analyzed once every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, the plant may be operated for up to 30 days to allow restoration of at least one of the required monitors.
The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> interval provides periodic information that is adequate to detect LEAKAGE. The 30 day Completion Time for (continued)
SUSQUEHANNA - UNIT 1 TS / B 3.4-32 Revision 1
PPL Rev. 3 RCS Leakage Detection Instrumentation B 3.4.6 BASES ACTIONS B.1 and B.2 (continued) restoration recognizes that at least one other form of leakage detection is available.
C.1 and C.2 If any Required Action of Condition A or B cannot be met within the associated Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
The allowed Completion Times are reasonable, based on operating experience, to perform the actions in an orderly manner and without challenging plant systems.
D. 1 With all required monitors inoperable, no required automatic means of monitoring LEAKAGE are available, and immediate plant shutdown in accordance with LCO 3.0.3 is required.
SURVEILLANCE REQUIREMENTS SR 3.4.6.1 This SR is for the performance of a CHANNEL CHECK of the required primary containment atmospheric monitoring system. The check gives reasonable confidence that the channel is operating properly. The Frequency of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is based on instrument reliability and is reasonable for detecting off normal conditions.
(continued)
SUSQUEHANNA - UNIT 1 TS / B 3.4-33 Revision 1
PPL Rev. 3 RCS Leakage Detection Instrumentation B 3.4.6 BASES SURVEILLANCE REQUIREMENTS (continued)
SR 3.4.6.2 This SR is for the performance of a CHANNEL FUNCTIONAL TEST of the required RCS leakage detection instrumentation. The test ensures that the monitors can perform their function in the desired manner. The Frequency of 31 days considers instrument reliability, and operating experience has shown it proper for detecting degradation.
SR 3.4.6.3 This SR is for the performance of a CHANNEL CALIBRATION of required leakage detection instrumentation channels. The calibration verifies the accuracy of the instrument string, including the instruments located inside containment. The Frequency of 24 months is a typical refueling cycle and considers channel reliability.
REFERENCES
- 1. 10 CFR 50, AppendixA, GDC 30.
- 2. Regulatory Guide 1.45, May 1973.
- 3. FSAR, Section 5.2.5.1.2.
- 4. GEAP-5620, April 1968.
- 5. NUREG-75/067, October 1975.
- 6. FSAR, Section 5.2.5.4.
- 7. Final Policy Statement on Technical Specifications Improvements, July 22, 1993 (58 FR 39132).
SUSQUEHANNA - UNIT 1 TS / B 3.4-34 Revision 0