MUAP-10023-NP(R0), Initial Type Test Result of Class 1E Gtg System-NP(R0)
ML110120120
Person / Time
Site: 05200021
Issue date: 12/31/2010
From:
Mitsubishi Heavy Industries, Ltd
To:
Office of New Reactors
References
UAP-HF-10346 MUAP-10023-NP, Rev 0
Download: ML110120120 (140)


Text

INITIAL TYPE TEST RESULT OF CLASS 1 E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(RO)

Initial Type Test Result of Class 1 E Gas Turbine Generator System Non Proprietary Version December 2010

©2010 Mitsubishi Heavy Industries, Ltd.

All Rights Reserved Mitsubishi Heavy Industries, LTD.

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Revision History Revision Page Description 0 All Original issued Mitsubishi Heavy Industries, LTD.

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

© 2010 MITSUBISHI HEAVY INDUSTRIES, LTD.

All Rights Reserved This document has been prepared by Mitsubishi Heavy Industries, Ltd. (MHI) in connection with the U.S. Nuclear Regulatory Commission (NRC) licensing review of MHIs US-APWR nuclear power plant design. No right to disclose, use or copy any of the information in this document, other that by the NRC and its contractors in support of the licensing review of the US-APWR, is authorized without the express written permission of MHI.

This document contains technology information and intellectual property relating to the US-APWR and it is delivered to the NRC on the express condition that it not be disclosed, copied or reproduced in whole or in part, or used for the benefit of anyone other than MHI without the express written permission of MHI, except as set forth in the previous paragraph.

This document is protected by the laws of Japan, U.S. copyright law, international treaties and conventions, and the applicable laws of any country where it is being used.

Mitsubishi Heavy Industries, Ltd.

16-5, Konan 2-chome, Minato-ku Tokyo 108-8215 Japan Mitsubishi Heavy Industries, LTD.

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Abstract This technical report describes the summary of result of initial type test of Class 1E Gas Turbine Generator (GTG) unit of US-APWR.

MHI have performed initial type test required in IEEE 387-1995 as part of Class 1E qualification program of Class 1E GTG units of US-APWR.

This report notices that GTG passed the initial type test required and verified the availability to apply for Class 1E emergency power units.

This technical report describes the followings Scope of qualification Specification of components tested Procedures, acceptance criteria and test conditions of tests Summary of result Consideration Mitsubishi Heavy Industries, LTD.

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Table of Contents List of Tables ************************************************************************************************************************* iii List of Figures ***********************************************************************************************************************iv List of Acronyms ********************************************************************************************************************v

1.0 INTRODUCTION

/OVERVIEW ................................................................................ 1-1 2.0 LIST OF STANDARDS AND REGULATIONS ......................................................... 2-1 2.1 NRC Documents ............................................................................................ 2-1 2.2 Industry Standards - IEEE ............................................................................. 2-1 2.3 Other Industry Standards ............................................................................... 2-2 3.0 DEFINITIONS............................................................................................................ 3-1 4.0 SCOPE......................................................................................................................4-1 4.1 General..4-1 4.2 Prototype System Tested4-2 5.0 PROTOTYPE SYSTEM ............................................................................................ 5-1 5.1 General........................................................................................................... 5-1 5.2 System specification....................................................................................... 5-1 5.3 Component Specification ............................................................................... 5-3 6.0 INITIAL TYPE TEST ................................................................................................. 6-1 6.1 General........................................................................................................... 6-1 6.2 Load Capability Test....................................................................................... 6-1 6.3 Start And Load Acceptance Tests .................................................................. 6-3 6.4 Margin Tests................................................................................................... 6-5 6.5 Load Transient Tests...................................................................................... 6-6 7.0 CONSIDERATION .................................................................................................... 7-1

8.0 CONCLUSION

S........................................................................................................ 8-1

9.0 REFERENCES

.......................................................................................................... 9-1 Appendix A US-APWR Typical Load Profiles ............................................................ A-1 Appendix B GTG Technical Specification.................................................................. B-1 Mitsubishi Heavy Industries, LTD. i

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Appendix C Parameter Chart ...................................................................................... C-1 Appendix D Initial Type Test Procedure .................................................................... D-1 Mitsubishi Heavy Industries, LTD. ii

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

List of Tables Table 4.0-1 Design Condition of Prototype GTG System...................................................... 4-2 Table 5.3-1 Specification of GT ............................................................................................. 5-3 Table 5.3-2 Specification of Generator .................................................................................. 5-3 Table 5.3-3 Specification of Fuel Day Tank ........................................................................... 5-4 Table 5.3-4 Specification of Air Receiver............................................................................... 5-4 Table 6.2-1 Engine Lubricant Oil Parameter ......................................................................... 6-2 Table 6.2-2 Engine Temperature Parameter ......................................................................... 6-2 Table 6.2-3 Generator Parameter ......................................................................................... 6-3 Table 6.3-1 Starting Time ...................................................................................................... 6-4 Table 6.3-2 Engine Parameter .............................................................................................. 6-4 Table 6.5-1 Voltage and Frequency Variation........................................................................ 6-6 Table A.1.0-1 Class 1E GTG - LOCA Load List.....................................................................A-1 Table A.1.0-2 Class 1E GTG -LOOP Load List .....................................................................A-1 Table A.1.0-3 Class 1E GTG Starting Sequence Train A - LOCA .........................................A-2 Table A.1.0-4 Class 1E GTG Starting Sequence Train A - LOOP.........................................A-2 Table A.1.0-5 Class 1E GTG Starting Sequence Train B - LOCA ........................................A-3 Table A.1.0-6 Class 1E GTG Starting Sequence Train B - LOOP ........................................A-3 Table A.1.0-7 Class 1E GTG Starting Sequence Train C - LOCA ........................................A-4 Table A.1.0-8 Class 1E GTG Starting Sequence Train C - LOOP ........................................A-4 Table A.1.0-9 Class 1E GTG Starting Sequence Train D - LOCA ........................................A-5 Table A.1.0-10 Class 1E GTG Starting Sequence Train D - LOOP ......................................A-5 Table B.1.0-1 Main Parts of Fuel, Oil, and Air System ..........................................................B-1 Table B.1.0-2 Main Parts of Electric System .........................................................................B-2 Table B.1.0-3 Engine Operation Limit and Protective Device Set Value ...............................B-3 T

Mitsubishi Heavy Industries, LTD. iii

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

List of Figures Figure 4.0-1 Scope Diagram................................................................................................. 4-1 Figure A.1.0-1 LOCA Condition Class 1E GTG Load Profile (Train A) .................................A-6 Figure A.1.0-2 LOOP Condition Class 1E GTG Load Profile (Train A) .................................A-7 Figure A.1.0-3 LOCA Condition Class 1E GTG Load Profile (Train B) .................................A-8 Figure A.1.0-4 LOOP Condition Class 1E GTG Load Profile (Train B).................................A-9 Figure A.1.0-5 LOCA Condition Class 1E GTG Load Profile (Train C) ...............................A-10 Figure A.1.0-6 LOOP Condition Class 1E GTG Load Profile (Train C)...............................A-11 Figure A.1.0-7 LOCA Condition Class 1E GTG Load Profile (Train D) ...............................A-12 Figure A.1.0-8 LOOP Condition Class 1E GTG Load Profile (Train D)...............................A-13 Figure B.1.0-1 Cross Sectional View of Power Section........................................................B-4 Figure B.1.0-2 Gear Train of Reduction Gear Box................................................................B-5 Figure B.1.0-3 Installation Drawing of Gas Turbine Assembly..............................................B-6 Figure B.1.0-4 Drawing of Fuel Day Tank...........................................................................B-12 Figure B.1.0-5 Drawing of Air Reciever ..............................................................................B-14 Figure B.1.0-6 Drawing of Enclosure and Skid...................................................................B-17 Figure B.1.0-7 Configuration of Lubricant Oil System ........................................................B-20 Figure B.1.0-8 Configuration of Fuel Oil System ................................................................B-22 Figure B.1.0-9 Configuration of Starting Air System ...........................................................B-23 Figure B.1.0-10 Drawing of Inlet Air / Exhaust System.......................................................B-25 Figure B.1.0-11 Drawing of Generator Circuit.....................................................................B-26 Figure B.1.0-12 Drawing of Alarm Panel ............................................................................B-27 Figure C.1.0-1 Parameter Chart of Load Capability Test..................................................... C-1 Figure C.1.0-2 Parameter Chart of Start and Load Acceptance Test, No.77, Cold.............. C-2 Figure C.1.0-3 Parameter Chart of Start and Load Acceptance Test, No.78, Hot................ C-3 Figure C.1.0-4 Parameter Chart of Start and Load Acceptance Test, No.79, Hot................ C-4 Figure C.1.0-5 Parameter Chart of Start and Load Acceptance Test, No.80, Hold.............. C-5 Figure C.1.0-6 Parameter Chart of Start and Load Acceptance Test, No.81, Hot................ C-6 Figure C.1.0-7 Parameter Chart of No.1 Margin Test .......................................................... C-7 Figure C.1.0-8 Parameter Chart of No.2 Margin Test .......................................................... C-8 Figure C.1.0-9 Parameter Chart of Load Transient Test, 25%............................................. C-9 Figure C.1.0-10 Parameter Chart of Load Transient Test, 50%......................................... C-10 Figure C.1.0-11 Parameter Chart of Load Transient Test, 75% ......................................... C-12 Figure C.1.0-12 Parameter Chart of Load Transient Test, 100%....................................... C-14 Mitsubishi Heavy Industries, LTD. iv

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

List of Acronyms ac Alternate Current dc Direct Current CDP Compressor Discharge Pressure CPS Control Protection and Surveillance systems CPU Central Processing Unit CT Current Transformer DG Diesel Generator ECCS Emergency Core Cooling System EGT Exhaust Gas Temperature ESI Engine System Inc.

ESFAS Engineered Safety Features Actuation System FMEA Failure Modes and Effects Analysis FOA Fuel, Oil and Air GTG Gas Turbine Generator I&C Instrumentation and Control I/O Input/Output IV&V Independent Verification and Validation KHI Kawasaki Heavy Industries LOCA Loss of Coolant Accident LOOP Loss of Offsite Power MCR Main Control Room MHI Mitsubishi Heavy Industries MTBF Mean Time Between Failure QA Quality Assurance RTD Resistance Temperature Detector SLS Safety Logic System UV Under Voltage VDU Visual Display System VT Voltage Transformer Mitsubishi Heavy Industries, LTD. v

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

1.0 INTRODUCTION

/OVERVIEW The US-APWR applies Gas Turbine Generators (GTG), as Emergency Power Supply in lieu of the most commonly used Diesel Generators (DGs).

Since GTG has not been applied for Class 1E Emergency Power Sources (EPSs) of nuclear power plants in US, there is no regulatory requirement for Class 1E GTG. MHI decided to perform the Class 1E qualification in accordance with R.G 1.9/IEEE 387. MHI performed Initial Type Test of US-APWRs GTG system required in IEEE 387. NRC has issued Interim Staff Guidance ISG-21 which is requirement about design and qualification of Class 1E GTG. ISG-21 seems to be regulatory guideline in future. MHI also reflects the requirement of ISG GTG in qualification.This report describes and concludes the result of initial type test of GTG. MHI will submit the whole qualification detail report including seismic qualification in March of 2011.

Initial type test consists of three kinds of test, Load capability test, Start and load acceptance test and margin test. MHI performed all the three tests and this report summarizes those test results. It should be noted that part of the voltage and frequency data specified in this report is draft data. The final data will be replaced according to the report from the qualification company in the above mentioned detailed report that will be released in March.

Mitsubishi Heavy Industries, LTD. 1-1

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0) 2.0 LIST OF STANDARDS AND REGULATIONS The requirements of various standards and regulations presently used for DGs that are pertinent to a GTG will be implemented in US-APWR design.

2.1 NRC Documents (1) Regulatory Guide 1.6 Rev 0. Independence Between Redundant Standby (Onsite)

Power Sources and Between Their Distribution Systems (Safety Guide 6)

(2) Regulatory Guide 1.9 Rev. 4 Application and Testing of Safety-Related Diesel Generators in Nuclear Power Plants (3) Regulatory Guide 1.28 Rev. 3 Quality Assurance Program Requirements (4) Regulatory Guide 1.32 Rev. 3. Criteria for Power Systems for Nuclear Power Plants (5) Regulatory Guide 1.38 Rev. 2 Quality Assurance Requirements for Packaging, Shipping, Receiving, Storage, and Handling of Items for Water-Cooled Nuclear Power Plants (Rev. 2)

(6) Regulatory Guide 1.75 Rev. 3. Physical Independence of Electric Systems (7) Regulatory Guide 1.93 Rev. 0. Availability of Electric Power Sources (8) Regulatory Guide 1.118 Rev. 3. Periodic Testing of Electric Power and Protection Systems (9) Regulatory Guide 1.137 Rev. 1. Fuel-Oil Systems for Standby Diesel Generators (10) NUREG/CR-6928, Industry-Average Performance for Components and Initiating Events at U.S. Commercial Nuclear Power plant, February 2007 (11) NRC Information Notice 2006-22 New Ultra-low-sulfur Diesel Fuel Oil Could Adversely Impact Diesel Engine Performance (12) 40CFR 50 NATIONAL PRIMARY AND SECONDARY AMBIENT AIR QUALITY STANDARDS (13) 40CFR 52 APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (14) 40CFR 60 STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES (15) 40CFR 61 NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS (16) 40CFR 63 NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (17) 40CFR 68 CHEMICAL ACCIDENT PREVENTION PROVISIONS (18) 40CFR 70 STAGE OPERATING PERMIT PROGRAMS (19) 40CFR 71 FEDERAL OPERATING PERMIT PRGRAMS (20) 40CFR 81 DESIGNATION OF AREAS FOR AIR QUALITY PLANING PURPOSES (21) DC/COL-ISG-021, Interim Staff Guidance on the Review of Nuclear Power Plant Designs using a Gas Turbine Driven Standby Emergency Alternating Current Power System 2.2 Industry Standards - IEEE (1) IEEE 1-2000, Recommended Practice - General Principles for Temperature Limits in the Rating of Electrical Equipment and for the Evaluation of Electrical Insulation (2) IEEE 43-2000, Recommended Practice for Testing Insulation Resistance of Rotating Machinery (3) IEEE Std 96-1969, General Principles for Rating Electric Apparatus for Short-Time, Intermittent, or Varying Duty (4) IEEE Std 115-1995, Test Procedures for Synchronous Machines (5) IEEE 142-2007, Recommended Practice for Grounding of Industrial and Commercial Power Systems Mitsubishi Heavy Industries, LTD. 2-1

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

(6) IEEE 275-1992, Recommended Practice for Thermal Evaluation of Insulation Systems for Alternating-Current Electric Machinery Employing Form-Wound Preinsulated Stator Coils for Machines Rated 6900 V and Below (7) IEEE Std 308-2001 - IEEE Standard Criteria for Class 1E Power Systems for Nuclear Power Generating Stations (8) IEEE Std 323-2003 - IEEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations (9) IEEE 336-2005 IEEE Guide for Installation, Inspection, and Testing for Class 1E Power, Instrumentation, and Control Equipment at Nuclear Facilities (10) IEEE 338-2006 - IEEE Standard Criteria for the Periodic Surveillance Testing of Nuclear Power Generating Station Safety Systems (11) IEEE-344-2004 IEEE Recommended Practice for Seismic Qualification of Class 1E Equipment for Nuclear Power Generating Stations (12) IEEE-379-2000 IEEE Standard Application of the Single Failure Criterion to Nuclear Power Generating Stations Safety Systems (13) IEEE Std 384-2008 IEEE Standard Criteria for Independence of Class 1E Equipment and Circuits (14) IEEE Std 387-1995 - IEEE Standard Criteria for Diesel Generator Units Applied as Standby Power Supply for Nuclear Power Generating Stations.

(15) IEEE-415-1986 IEEE Guide for Planning of Preoperational Testing Programs for Class 1E Power Systems for Nuclear Power Generating Stations.

(16) IEEE-421.3-1997 IEEE Standard for High Potential Test Requirements for Excitation Systems for Synchronous Machines (17) IEEE-421.4-2004 IEEE Guide for the Preparation of Excitation System Specifications (18) IEEE 429-1994, Recommended Practice for Thermal Evaluation of Sealed Insulation Systems for AC Electric Machinery Employing Form-Wound Preinsulated Stator Coils for Machines Rated 6900 V and Below (19) IEEE-493-2007, Recommended Practice for the Design of Reliable Industrial and Commercial Power System (20) IEEE Std 500-1984 IEEE Guide to the Collection and Presentation of Electrical, Electronic, Sensing Component, and Mechanical Equipment Reliability Data for Nuclear-Power Generating Stations (21) IEEE-603-1998, IEEE Standard Criteria for Safety Systems for Nuclear Power Generating Stations (22) IEEE-627-1980, IEEE Standard Criteria for Design Qualification of Safety Equipment Used in Nuclear Power Generating Stations 2.3 Other Industry Standards (1) NEMA FU-1-2002 Low Voltage Cartridge Fuses (2) NEMA MG-1-2006 Motors and Generators (3) ANSI/ASME NQA-1-2008 Quality Assurance Requirements for Nuclear Facility Applicants (4) ANSI B31.1-2007 Power Piping (5) ANSI B37.20 Switchgear Assemblies including Metal Enclosed Bus (6) ANSI C37-90.1-2002 IEEE Standard for Surge Withstand Capabilities (SWC) Tests foor Relays and Relay Systems Associated with Electric Power Apparatus (7) ANSI C37-101-2006 IEEE Guide for Generator Ground Protection (8) ANSI C37.102-2006 IEEE Guide for AC Generator Protection (9) ANSI C50.13-2005 IEEE Standard for Cylindrical-Rotor 50 Hz and 60 Hz Synchronous Generators Rated 10 MVA and Above Mitsubishi Heavy Industries, LTD. 2-2

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

(10) ANSI C50.14-1977 American National Standard Requirements for Combustion Gas Turbine Driven Cylindrical Rotor Synchronous Generators (11) ANSI C57.13-1993 IEEE Standard Requirements for Instrument Transformers (if needed)

(12) ANSI C62.92.2-1989 IEEE Guide for the Application Guide for Neutral Grounding in Electrical Utility Systems, Pt II - Grounding of Synchronous Generator Systems.

(13) ANSI/ASME B16.11-2009, Forged Fittings, Socket Welding and Threaded.

(14) ANSI/ASME B16.25-2007, Buttwelding Ends.

(15) ANSI/ANS-59.51-1997, Fuel Oil Systems for Standby Diesel Generators (16) ASTM D975-1981, Standard Specification for Diesel Fuel Oils (17) ANSI/NFPA 37-2006, Combustion Engines and Gas Turbines, Stationary (18) ASME Boiler and Pressure Vessel Code (19) Standard Practices for Low and Medium Seed Stationary Diesel and Gas Engines, 6th Edition, p. 94, Diesel Engine Manufacturers Association (DEMA), 1972 (20) TEMA Standards of the Tubular Exchanger Manufacturers Association, 9th Edition (21) ICEA S-19-81 (NEMA WC3) Rubber Insulated Wire and Cable for the Transmission and Distribution of Electrical Energy (22) ICEA S-66-524 Cross-linked Thermosetting Polyethylene Insulated Wire and Cable for the Transmission and Distribution of Electrical Energy (23) ICEA S-68-516 (NEMA WCB) Ethylene-Propylene-Rubber Insulated Wire and Cable for the Transmission and Distribution of Electrical Energy.

(24) NFPA Vol. 1 Flammable Liquids - Tank Storage (25) NFPA No. 30 Flammable and Combustible Liquids Code (26) NFPA No. 37 Standard for the Installation and Use of Stationary Combustion Engines and Gas Turbines (29) Boiler and Pressure Vessel Code. Section iii, Division 1, Nuclear Power Plant Components, ASME, 2001 Edition including Addenda through 2003.

Mitsubishi Heavy Industries, LTD. 2-3

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0) 3.0 DEFINITIONS

3.1 Acceptable

Demonstrated to be adequate by the safety analysis of the plant.

3.2 Continuous Rating (of Unit):

The electric power output capability that the GTG unit can maintain in the service environment for 1,000 hrs of operation between overhauls only scheduled outages for maintenance.

3.3 Design Basis Events:

Postulated events used in the design to establish the performance requirements of the structures and systems.

3.4 Design Load:

That combination of electric loads (kW and kVAR), having the most severe power demand characteristic, which is provided with electric energy from a GTG unit for the operation of engineered safety features and other systems required during and following shutdown of the reactor.

3.5 Gas Turbine Generator Unit:

An independent source of standby electrical power that consists of a diesel-fueled internal combustion engine (or engines) coupled to an electrical generator (or generators) through a reducing gearbox; the associated mechanical and electrical auxiliary systems; and the control, protection, and surveillance systems.

3.6 Engine Equilibrium Temperature:

The conditions at which the lube oil temperatures are both within +/- 5.5°C (10°F) of their normal operating temperatures established by the engine manufacturer.

3.7 Load Profile:

The magnitude and duration of loads (kW and kVAR) applied in a prescribed time sequence, including the transient and steady-state characteristics of the individual loads.

3.8 Qualified Gas Turbine Generator Unit:

A GTG unit that meets the qualification requirements of the applicable standards and regulations.

3.9 Redundant Equipment or System:

An equipment or system that duplicates the essential function of another equipment or system to the extent that either may perform the required function regardless of the state of operation or failure of the other.

Mitsubishi Heavy Industries, LTD. 3-1

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0) 3.10 Service Environment:

The aggregate of conditions surrounding the GTG unit in its enclosure, while serving the design load during normal, accident, and post-accident operation.

3.11 Short-Time Rating (of Gas Turbine Generator Unit):

The electric power output capability that the GTG unit can maintain in the service environment for 300 hrs , without exceeding the manufacturers design limits and without reducing the maintenance interval established for the continuous rating.

3.12 Slave Equipment:

Equipment not permanently installed, used for testing only.

3.13 Standby Power Supply:

The power supply that is selected to furnish electric energy when the preferred power supply is not available.

3.14 Start Signal:

That input signal to the GTG unit start logic that initiates a GTG unit start and run sequence.

3.15 Surveillance:

The determination of the state or condition of a system or subsystem.

Mitsubishi Heavy Industries, LTD. 3-2

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0) 4.0 SCOPE 4.1 General When in service, the GTG unit has the capability of performing as a redundant unit of a standby power supply, in accordance with the requirements stated in IEEE Std 308.

EEE 387 defines the boundaries of systems and equipment included its scope. Although there is no regulatory requirement for Class 1E GTG system, MHI decided the scope of systems and equipment to be tested in Class 1E GTG qualification same with IEEE 387 shown in Figure-4.1.

MHI manufactured prototype system based on Figure-4.1 and tested.

CT CLASS 1E A C REMOTE ELECTRIC REMOTE CONTROL EXHAUST DISTRIBUTION SYSTEM PROTECTION POWER AND SURVEILLANCE SILENCER VT SYSTEM SUPPLIES SYSTEM GENERATOR TERMINALS LOCAL CONTROL, PROTECTION AND CPS SURVEILLANCE SYSTEMCPS)

EXHAUST GAS CPS EXCITER AND EXCITER AND VOLTAGE VOLTAGE REG-REGU- GENERATOR G T GOVERNOR ULATOR LATOR SYSTEM SYSTEM CPS STARTING COOLING COMBUSTION LUBE OIL FUEL OIL SYSTEM SYSTEM AIR SYSTEM SYSTEM SYSTEM CPS COOLING SERVICE GT GENERATOR VENTILA- AIR STARTING LIMIT OF ENVIRON- UNIT TING FUEL OIL SYSTEM SCOPE OF MENT FOUNDATION SYSTEM STORAGE AND GT GENERATOR AIR SUPPLY GT UNIT ENCLOSURE SUPPLY SYSTEM GENERATOR UNIT

ELECTRIC CIRCUITS (CONTROL, AUXILIARY POWER, ETC; MAIN POWER)
NON_ELECTRICAL CHANNELS(OIL, AIR, EXHAUST. ETC; DRIVE)

LIMITED OF SCOPE OF GT GENERATOR UNIT WITH INTERFACE( )

CPS CONTROL PROTECTION AND SURVEILLANCE SYSTEMS Figure 4.0-1 Scope Diagram Mitsubishi Heavy Industries, LTD. 4-1

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0) 4.2 PROTOTYPE SYSTEM TESTED Table-4.1 shows the list of systems, components and equipment of prototype system to be performed initial type test.

Systems or components of prototype GTG system inside the broken line in the previous figure were designed and manufactured in the same design conditions as actual plant system. The other systems or components outside the line are temporary and commercial and only supplied for these tests.

Table 4.0-1 Design Condition of Prototype GTG System Component Condition Gas Turbine Engine Same with actual plant design With gearbox Generator Same with actual plant design Enclosure Same with actual plant design Skid Same with actual plant design Fuel day tank Same with actual plant design Starting air receiver Same with actual plant design Air start valve unit Same with actual plant design Air intake/ exhaust air duct Temporary equipment for test Local control cabinet Same with actual plant design Plant control cabinet Temporary equipment for test Power supply Temporary equipment for test Fuel storage and transfer Temporary equipment for test system Starting air compressor Temporary equipment for test Mitsubishi Heavy Industries, LTD. 4-2

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0) 5.0 PROTOTYPE SYSTEM 5.1 General When in service, the GTG unit has the capability of performing as a redundant unit of a standby power supply, in accordance with the requirements stated in IEEE Std 308. Also GTG system should be designed in accordance with IEEE Std 387.

5.2 System specification 5.2.1 Starting Time (1) Starting time of GTG is required within 100 seconds by safety design and analysis of US-APWR. GTG to be reached set voltage and frequency, and GTG breaker should be closed within 100 seconds after starting signal is initiated.

(2) US-APWR GTG is reached set voltage and frequency within 40 seconds as its standard specification.

5.2.2 Rating The US-APWR GTG is rated as follows:

4500 kW Continuous @ 1,000 hrs Engine Overhaul Interval, 115°F Air Intake Temperature 4950 kW Short Time @ 300 hrs Engine Overhaul Interval, 115°F Air Intake Temperature 5.2.3 Fuel Oil System (1) Engine fuel will be commercial grade No. 2 fuel oil with limits as stated in ASTM Specification D-396.

(2) A direct engine/gearbox driven pump that pumps fuel oil from the day tank to the fuel control valve is provided.

(3) The welded steel day tank, to hold a total quantity of fuel required for 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> operation at the continuous rating (2000 gallon rated) is provided. Tank is constructed in accordance with ASME Section , Class 3.

The system configuration is shown in Figure B.1.0-8.

5.2.4 Lubrication Oil System (1) A complete lube oil system is furnished to supply oil under pressure to the engine bearings and reducing gear bearings.

(2) A lube oil cooler is supplied to remove heat from the engine and speed reducer oil during operation. The cooler shall be of the air to oil type and shall be driven by an electric motor driven fan, mounted close to the radiator core.

The system configuration is shown in Figure B.1.0-7.

Mitsubishi Heavy Industries, LTD. 5-1

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0) 5.2.5 Starting Air System The engine shall be capable of being started by compressed air within 100 seconds after signal for start.

There are two air receivers in prototype system tested. In the actual plant design, four receivers capacity is designed that there is sufficient air at required pressure for three starts.

The receivers are to be constructed in accordance with ASME Section , Class 3.

The starting manifold assembly consists of reduction valves, pipes, gauges, Y-strainer, and control valves. This unit reduces air pressure at the inlet of this unit to the specified pressure (the secondary air pressure). The secondary air pressure depends on air starter's maximum limit pressure at inlet.

The air compressor and compressor motor are designed as non safety related components.

The system configuration of starting air system is shown in Figure B.1.0-9.

5.2.6 Intake/Exhaust Air System Air intake and exhaust systems consist of duct, silencer and ventilation fans. Drawing of tested system is shown in Figure B.1.0-10. Those will be designed in accordance with the site specific condition at actual plant project stage.

5.2.7 Enclosure/Skid The skid type base plate is provided of rolled steel sections welded together to form a rigid base for mounting the engine and generator systems above and suitable for bolting to a reinforced concrete foundation.

5.2.8 Control system One free standing local control panel having following function is furnished.

Manual GTG start/stop operation for maintenance Individual start/stop operation of related GTG components for maintenance Monitoring of GTG and related component parameters for maintenance The local control cabinet is actuated by sent signal from safety logic system of GTG which is digital control cabinet and not within the qualification scope.

5.2.7 Load Profiles The load profiles of US-APWR used as test condition are shown in Appendix A.

Mitsubishi Heavy Industries, LTD. 5-2

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0) 5.3 Component specification 5.3.1 Gas Turbine Engine & Gearbox Specification of gas turbine engine & gearbox is shown in Table 5.3-1.

Table 5.3-1 Specification Of GT Item Specification Gas Turbine Product Kawasaki M1T-33 (twin engines with on gearbox)

Engine Two-stage Centrifugal Compressor Single Can Type Combustor Three-stage Axial Turbine Type Simple & Open Cycle Single-shaft type Rotation Speed 17,944 min-1 Dimension Size 3,398 mm, 2,679 mm, 2,403 mm (L, W, H) (with Gearbox)

Weight 14,000 kg (with Gearbox)

Gearbox Type Epicyclic Gear + Parallel Gear, Rotation Speed 1800 min-1 Drawing Figure B.1.0-1 to -3 5.3.2 Generator Specification of generator is shown in Table 5.3-2.

Table 5.3-2 Specification Of Generator Item Specification Rating 5625 kVA Power Factor 0.8 Rated Rated Voltage 6900 V Phase 3 Connection Wye Wire 6 Frequency 60 Hz Insulation Class F Enclosure Drip proof Drawing Figure B.1.0-11 Mitsubishi Heavy Industries, LTD. 5-3

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0) 5.3.3 Enclosure Drawings of enclosure are shown in Figure B.1.0-6.

5.3.4 Skid Drawings of skid are shown in Figure B.1.0-6.

5.3.5 Fuel Day Tank Table 5.3-3 Specification Of Fuel Day Tank Item Specification Quantity 1 Capacity 2000 gallon (7.57 cubic meter)

Drawings Figure B.1.0-4 5.3.6 Air Receiver Table 5.3-4 Specification Of Air Receiver Item Specification Quantity 1 Capacity 1250 gallon Drawings Figure B.1.0-5 Mitsubishi Heavy Industries, LTD. 5-4

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0) 6.0 INITIAL TYPE TEST 6.1 General The testing was in accordance with the initial type test portion of IEEEStd-387-1995 (section 6.2) and ISG-021 for application to gas turbine generator sets.

6.2 Load capability tests 6.2.1 Outline These tests demonstrate the capability of the GTG unit to carry the following rated loads at rated power factor for the period of time indicated, and to successfully reject load. One successful completion of the test sequence shall satisfy this particular requirement.

6.2.2 Procedure, Test Condition a) Load equal to the continuous rating shall be applied for the time required to reach engine temperature equilibrium.

b) Immediately following step a), the short-time rated load shall be applied for a period of 2 h and the continuous rated load shall be applied of 22 h. The short-time rating load rejection test shall be performed.

c) Light-load or no-load capability as described shall be demonstrated by test. Light -load or no-load operation shall be followed by a load application 50% of the continuous kilowatt rating for a minimum of 0.5 h.

The detail test procedure is shown in Appendix D.

6.2.3 Acceptance Criteria 1 Maintain for duration while maintain normal temperature limits.

2) The load rejection test will be acceptable if the increase in speed of the engine does not exceed 75% if the difference between nominal speed and the overspeed trip set point, or 15% above nominal, whichever is lower.

Mitsubishi Heavy Industries, LTD. 6-1

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0) 6.2.3 Result Parameters measured during the test are shown in Tables 6.2-1 to 6.2-3. The GTG was operated in the stable condition with no troubles, failures or abnormal conditions. All the parameters remained almost constant.

Also at the rejection of 110 % load, the engine did not stall. And the frequency did not exceed 63 Hz as shown in Figure C.1.0-1 which satisfies the acceptance criteria.

It is concluded that these test results are successful.

Table 6.2-1 Engine Lubricant Oil Parameter Engine #1 Engine #2 Oil Temp Oil Temp Oil Oil Temp Oil Oil Temp Bug Bug Pressure Engine In Pressure Engine In Drain Drain Average during 100%

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 46 150 157 46 155 142 operation Average during 110%

45 154 160 46 154 148 operation Average Minimum 44 150 144 46 150 135 during 100% Average 46 151 155 48 151 141 22 hour2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> operation Maximum 47 155 162 50 156 145 Table 6.2-2 Engine Temperature Parameter Engine #1 Engine #2 Ambient Temp Exhaust Air Compressor Exhaust Air Compressor Inlet Discharge Inlet Discharge Temp Temp Restriction Pressure Restriction Pressure Average during 100% 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 81 388.8 6.5 126 385.4 6.1 128 operation Average during 110%

operation 78 496.1 6.4 135 512.7 6.1 140 Average Minimum 56 441.0 6.5 135 438.0 6.1 140 during 100% Average 65 453.5 6.5 141 449.4 6.4 143 22 hour2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> operation Maximum 73 468.0 6.5 150 463.0 6.5 150 Mitsubishi Heavy Industries, LTD. 6-2

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Table 6.2-3 Generator Parameter Exciter Field Exciter Field AC Volts AC Amps DC Amps DC Volts Average during 100% 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 6.94 292.6 1.85 40.75 operation Average during 110%

6.96 537.4 2.8 64.75 operation Average Minimum 6.90 452.3 2.6 56 during 100% Average 6.91 469.3 2.6 57.5 22 hour2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> operation Maximum 6.92 477.60 2.6 58 6.3 Start and load acceptance tests 6.3.1 Outline A series of tests shall be conducted to establish the capability of the GTG unit to start and accept load within the period of time necessary to satisfy the plant design requirement.

Total 150 starts were performed.

6.3.2 Procedure, Test Condition a) Engine cranking shall begin upon receipt of the start-diesel signal, and the diesel-generator unit shall accelerate to specified frequency and voltage within the required time interval.

b) Immediately following step a), the diesel-generator unit shall accept a single-step load 50% of the continuous kilowatt rating. Load may be totally resistive or a combination of resistive and inductive loads.

c) 20 starts were performed under the cold condition, and 130 starts were performed under the hot condition.

The detail test procedure is shown in Appendix D.

Note) GT manufacture defines the cold condition of GT that the condition 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> turning performed after GT stopped run.

6.3.3 Acceptance Criteria All starts should be achieved within 100 seconds. 150 starts should be performed with no failures.

Mitsubishi Heavy Industries, LTD. 6-3

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0) 6.3.4 Result A part of the charts of 151 starts (Starts No.77 to No.81) are shown in Figures C.1.0-2 to C.1.0-6. Starting time is shown in Table 6.3-1. And the parameters measured during the test are shown in Table 6.3-2.

MHI has performed total 151 starts, and all the starts were conducted successfully without failures or abnormal conditions. Also all the starts achieved the ready to load condition within 30 seconds.

It is concluded that these test results are successful.

Table 6.3-1 Starting Time Minimum Average Maximum Cold 26.0 26.6 27.5 (20 times)

Hot 26.0 28.0 29.0 131 times Table 6.3-2 Engine Parameter Cold Hot Itake Air 59.4 64.6

°F EGT 323.3 357.3 Engine Lube Oil 33.2 67.0

  1. 1 temperature Lube Oil 56.5 46.4 Pressure EGT 323.4 357.6 Engine Lube Oil 33.1 66.7
  1. 2 temperature Lube Oil 57.4 46.5 Pressure Mitsubishi Heavy Industries, LTD. 6-4

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0) 6.4 Margin tests 6.4.1 Outline Tests shall be conducted to demonstrate the GTG unit capability to start and carry loads that are greater than the magnitude of the most severe step load within the plant design load profile, including step changes above base load.

6.4.2 Procedure, Test Condition At least two margin tests shall be performed using either the same or different load arrangement. A margin test load at least 10% greater than the magnitude of the most severe single-step load within the load profile is considered sufficient for the margin test. The frequency and voltage excursions recorded may exceed those values specified for the plant design load.

The detail test procedure is shown in Appendix D.

6.4.3 Acceptance Criteria a) Demonstrate the ability of the generator and excitation system to accept the margin test load (usually the low power factor, high inrush, and high starting current of a pump motor) without experiencing instability resulting in generator voltage collapse, or significant evidence of the inability of the voltage to recover.

b) Demonstrate that there is sufficient engine torque available to prevent engine stall, and to permit the engine speed to recover, when experiencing the margin test load.

6.4.4 Result Charts of two margin tests are shown in Figures C.1.0-7 to C.1.0-8.

The GTG did not stall in the two tests. Although the voltage and frequency dropped just after loaded, they recovered within 2 seconds as shown in Figures C.1.0-7 and Figure C.1.0-8.

It is concluded that these test results are successful.

Mitsubishi Heavy Industries, LTD. 6-5

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0) 6.5 Load Transient Tests 6.5.1 Outline This test is not required in R.G 1.9/IEEE Std 387. MHI performed this test as internal test in accordance with recommendation of manufacture. This test confirms capability for load transient and rejection.

6.5.2 Procedure, Test Condition Three load transient tests were performed using condition with 25% to 100 % load.

The detail test procedure is shown in Appendix D.

6.5.3 Acceptance Criteria Demonstrate that there is sufficient engine torque available to prevent engine stall, and to permit the engine speed to recover.

6.5.4 Result Charts of the tests are shown in Figures C.1.0-9 to C.1.0-12. And the variation of voltage and frequency is shown in Table 6.5-1.

The GTG did not stall at all the transients and rejections. Although the voltage and frequency were fluctuated at load transient and rejection, the frequency recovered within 4 seconds.

It is concluded that these test results are successful.

Table 6.5-1 Voltage and Frequency Variation Rejection Transient Parameters Variation Recovery Time Variation Recovery Time

% Sec  % Sec Voltage 3.5 0.7 -4.4 0.8 25%

Frequency 0.3 2.5 -0.3 2.6 Voltage 7.5 0.7 -8.6 1.1 50%

Frequency 0.6 3.0 -0.6 3.2 Voltage 12.1 0.7 -12.5 2.2 75%

Frequency 0.9 3.9 -0.9 2.9 Voltage 16.9 0.7 -16.6 2.4 100%

Frequency 1.4 3.4 -1.4 2.4 Mitsubishi Heavy Industries, LTD. 6-6

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0) 7.0 CONSIDERATION Based on the test results provided in this Technical Report it is concluded that the GTG unit provided by KHI and Class 1E qualified by Engine System Inc. (ESI) was successful in the initial type test.

(1) US-APWR GTG system was successful in all three initial type tests, Load Capability Test, Start and Load Acceptance Test and Margin Test.

(2) During Load Capability Test, GTG was operated without failures or troubles. Each parameter such as engine lubricant oil temperature, engine compressor pressure, exhaust gas temperature (EGT) and others was almost constant during 100% operation. During 110% operation EGT remained stable although it was higher than 100% operation.

(3) The 150 starts test was carried out with no failures or troubles. Ready to Load time of all starts was less than 30 seconds. The rotation speed increased at almost the same rate between all the tests conducted. When comparing the starting time between cold and hot conditions, the average starting time was shorter at the cold condition. This is because the governor is controlled by EGT to supply more fuel in the cold condition and start the GTG faster. Such design properties were confirmed during this test.

(4) GTGs rotate at 18000min-1 and GD2 is large. Therefore, transient load changes do not have much impact on rotation speed and also recovering from the rotation speed variation is quick because the governor is controlled by rotation speed and EGT. At 100% load transient/rejection, the frequency variation was -1.4 %/ 1.4 % respectively, which is very small and the recovery to the rated frequency was 2.4 seconds/ 3.5 seconds. Results were achieved which would not have happened in DG tests. This GTGs frequency stabilizing capability is one of the advantages for GTG and well known in the specification of GTGs. It can be said that GTG is well qualified for nuclear power plant Class 1E emergency power sources which assume loading of large loads in sequence. It can be concluded that the Class 1E test proves this GTGs capability and was meaningful.

Mitsubishi Heavy Industries, LTD. 8-1

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

8.0 CONCLUSION

S Based on the results provided in this Technical Report, it is concluded that the US-APWR GTG unit is successful in the initial type test and meets the requirements for Class 1E emergency power sources described in R.G 1.9 and IEEE Std-387.

Mitsubishi Heavy Industries, LTD. 8-1

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

9.0 REFERENCES

In this section, references in this technical report except for applicable codes, standards and regulatory guidance in section 2 are listed.

1. ASME Section , Class 3
2. The requirements of MNES, Quality Assurance Administrative and System Requirements (Nuclear)
3. The requirements of MNES, Quality Assurance Administrative and System Requirements for Safety Related Electrical Equipment
4. MUAP-07024, Qualification and Test Plan of Class 1E Gas Turbine Generator System Mitsubishi Heavy Industries, LTD. 9-1

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Appendix A US-APWR Typical Load Profiles Typical load profiles of Loss of Coolant Accident (LOCA) and LOOP are shown in Table A.1.0-1 to A.1.0-10 and Fig. A.1.0-1 to A.1.0-8 Table A.1.0-1 Class 1E GTG - LOCA Load List Rated Load Efficiency Power Ratio of Starting Power Factor Load Load Load Output Factor Factor Current to Normal at Starting Starting Capacity Necessary Input Load Name Group Current (kW) (%) (%) (%) (%) (%) (kW) (kW) 1 Moter Control Center 861.0 ---- ---- ---- ---- 30.0 258.3 77.0 371.0 ---- ---- ---- ---- ---- ---- 371.0 2 MOV Operated by SI Signal 109.1 ---- 90.0 85.0 6.5 30.0 278.1 ----

MOV Operated by SP Signal 3 Safety Injection Pump 900.0 95.0 90.0 85.0 6.5 25.0 1911.8 950.0 4 Componet Cooling Water Pump 610.0 95.0 90.0 85.0 6.5 25.0 1295.8 643.9 5 Service Water Pump 720.0 95.0 90.0 85.0 6.5 25.0 1529.4 760.0 6 Containment Spray/Residual 400.0 95.0 90.0 85.0 6.5 25.0 849.7 422.2 Heat Removal Pump 7 Emergency Feed Water Pump 590.0 72.5 90.0 85.0 6.5 25.0 1253.3 475.0 8 Class 1E Electrical Room 80.0 95.0 85.0 80.0 6.5 25.0 191.2 89.4 Air Handling Supply Fan 9 Safety Chiller Unit 290.0 95.0 85.0 80.0 6.5 25.0 693.0 324.1 10 Safety Chilled Water Pump 53.0 95.0 94.0 91.0 6.5 25.0 100.7 53.6 Table A.1.0-2 Class 1E GTG -LOOP Load List Rated Load Efficiency Power Ratio of Starting Power Factor Load Load Load Load Name Output Factor Factor Current to Normal at Starting Starting Capacity Necessary Input Group Current (kW) (%) (%) (%) (%) (%) (kW) (kW) 1 Moter Control Center 687.0 ---- ---- ---- ---- 30.0 206.1 55.0 326.0 ---- ---- ---- ---- ---- ---- 326.0 2 Componet Cooling Water Pump 610.0 95.0 90.0 85.0 6.5 25.0 1295.8 643.9 3 Service Water Pump 720.0 95.0 90.0 85.0 6.5 25.0 1529.4 760.0 4 Containment Spray/Residual 400.0 95.0 90.0 85.0 6.5 25.0 849.7 422.2 Heat Removal Pump 5 Charging Pump 820.0 95.0 90.0 85.0 6.5 25.0 1741.8 865.6 6 Emergency Feed Water Pump 450.0 95.0 90.0 85.0 6.5 25.0 955.9 475.0 7 Class 1E Electrical Room 80.0 95.0 85.0 80.0 6.5 25.0 191.2 89.4 Air Handling Supply Fan 8 Safety Chiller Unit 290.0 95.0 85.0 80.0 6.5 25.0 693.0 324.1 9 Plessurizer Heater 562.0 100.0 100.0 100.0 ----- ----- 562.0 562.0 10 Safety Chilled Water Pump 53.0 95.0 94.0 91.0 6.5 25.0 100.7 53.6 Mitsubishi Heavy Industries, LTD. A-1

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Table A.1.0-3 Class 1E GTG Starting Sequence Train A - LOCA LOCA Signal LOCA Sequence Refer Base Start Max Base Initiated Time Invest Load Load Load1 Load Load Load2 Time [Sec] [Sec] Group [KW] [KW] [KW] [KW]

100 0 MOV Operated by SI Signal 2

MOV Operated by SP Signal 0 907 907 448 Moter Control Center 1 105 5 A Safety Injection Pump 3 448 1912 2360 1398 110 10 A Component Cooling Water Pump 4 1398 1296 2694 2042 A Safety Chilled Water Pump 10 115 15 A Service Water Pump 5 2042 1529 3571 2802 130 30 A Containment Spray/Residual Heat Removal Pump 6 2802 850 3652 3224 140 40 A Class 1E Electrical Room Supply Air Handling Unit 8 3224 191 3415 3313 150 50 A Safety Chiller Unit 9 3313 693 4006 3637 Manual Moter Control Center 3637 102 3739 3739 Start Table A.1.0-4 Class 1E GTG Starting Sequence Train A - LOOP LOOP Signal LOOP Sequence Refer Base Start Max Base Initiated Time Invest Load Load Load1 Load Load Load2 Time [Sec] [Sec] Group [KW] [KW] [KW] [KW]

100 0 Moter Control Center 0 532 532 381 1

105 5 A Charging Pump 5 381 1742 2123 1247 110 10 A Component Cooling Water Pump 2 1247 1296 2543 1891 115 15 A Service Water Pump 3 1891 1630 3521 2705 A Safety Chilled Water Pump 10 130 30 A Class 1E Electrical Room Supply Air Handling Unit 7 2705 191 2896 2794 140 40 A Safety Chiller Unit 8 2794 693 3487 3118 Manual Moter Control Center 1 3118 627 3745 3745 Start A Plessurizer Heater 9 Mitsubishi Heavy Industries, LTD. A-2

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Table A.1.0-5 Class 1E GTG Starting Sequence Train B - LOCA LOCA Signal LOCA Sequence Refer Base Start Max Base Initiated Time Invest Load Load Load1 Load Load Load2 Time [Sec] [Sec] Group [KW] [KW] [KW] [KW]

100 0 MOV Operated by SI Signal 2

MOV Operated by SP Signal 0 907 907 448 Moter Control Center 1 105 5 B Safety Injection Pump 3 448 1912 2360 1398 110 10 B Component Cooling Water Pump 4 1398 1296 2694 2042 B Safety Chilled Water Pump 10 115 15 B Service Water Pump 5 2042 1529 3571 2802 120 20 B Emergency Feed Water Pump 7 2802 1253 4055 3277 130 30 B Containment Spray/Residual Heat Removal Pump 6 3277 850 4127 3699 140 40 B Class 1E Electrical Room Supply Air Handling Unit 8 3699 191 3890 3788 150 50 B Safety Chiller Unit 9 3788 693 4481 4112 Manual Moter Control Center 4112 102 4214 4214 Start Table A.1.0-6 Class 1E GTG Starting Sequence Train B - LOOP LOOP Signal LOOP Sequence Refer Base Start Max Base Initiated Time Invest Load Load Load1 Load Load Load2 Time [Sec] [Sec] Group [KW] [KW] [KW] [KW]

100 0 Moter Control Center 0 532 532 381 1

110 10 B Component Cooling Water Pump 2 381 1296 1677 1025 115 15 B Service Water Pump 3 1025 1630 2655 1839 B Safety Chilled Water Pump 10 120 20 B Emergency Feed Water Pump 6 1839 956 2795 2314 130 30 B Class 1E Electrical Room Supply Air Handling Unit 7 2314 191 2505 2403 140 40 B Safety Chiller Unit 8 2403 693 3096 2727 Manual Moter Control Center 1 2727 627 3354 3354 Start B Plessurizer Heater 9 Mitsubishi Heavy Industries, LTD. A-3

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Table A.1.0-7 Class 1E GTG Starting Sequence Train C - LOCA LOCA Signal LOCA Sequence Refer Base Start Max Base Initiated Time Invest Load Load Load1 Load Load Load2 Time [Sec] [Sec] Group [KW] [KW] [KW] [KW]

100 0 MOV Operated by SI Signal 2

MOV Operated by SP Signal 0 907 907 448 Moter Control Center 1 105 5 C Safety Injection Pump 3 448 1912 2360 1398 110 10 C Component Cooling Water Pump 4 1398 1296 2694 2042 C Safety Chilled Water Pump 10 115 15 C Service Water Pump 5 2042 1529 3571 2802 120 20 C Emergency Feed Water Pump 7 2802 1253 4055 3277 130 30 C Containment Spray/Residual Heat Removal Pump 6 3277 850 4127 3699 140 40 C Class 1E Electrical Room Supply Air Handling Unit 8 3699 191 3890 3788 150 50 C Safety Chiller Unit 9 3788 693 4481 4112 Manual Moter Control Center 4112 102 4214 4214 Start Table A.1.0-8 Class 1E GTG Starting Sequence Train C - LOOP LOOP Signal LOOP Sequence Refer Base Start Max Base Initiated Time Invest Load Load Load1 Load Load Load2 Time [Sec] [Sec] Group [KW] [KW] [KW] [KW]

100 0 Moter Control Center 0 532 532 381 1

110 10 C Component Cooling Water Pump 2 381 1296 1677 1025 115 15 C Service Water Pump 3 1025 1630 2655 1839 C Safety Chilled Water Pump 10 120 20 C Emergency Feed Water Pump 6 1839 956 2795 2314 130 30 C Class 1E Electrical Room Supply Air Handling Unit 7 2314 191 2505 2403 140 40 C Safety Chiller Unit 8 2403 693 3096 2727 Manual Moter Control Center 1 2727 627 3354 3354 Start C Plessurizer Heater 9 Mitsubishi Heavy Industries, LTD. A-4

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Table A.1.0-9 Class 1E GTG Starting Sequence Train D - LOCA LOCA Signal LOCA Sequence Refer Base Start Max Base Initiated Time Invest Load Load Load1 Load Load Load2 Time [Sec] [Sec] Group [KW] [KW] [KW] [KW]

100 0 MOV Operated by SI Signal 2

MOV Operated by SP Signal 0 907 907 448 Moter Control Center 1 105 5 D Safety Injection Pump 3 448 1912 2360 1398 110 10 D Component Cooling Water Pump 4 1398 1296 2694 2042 D Safety Chilled Water Pump 10 115 15 D Service Water Pump 5 2042 1529 3571 2802 130 30 D Containment Spray/Residual Heat Removal Pump 6 2802 850 3652 3224 140 40 D Class 1E Electrical Room Supply Air Handling Unit 8 3224 191 3415 3313 150 50 D Safety Chiller Unit 9 3313 693 4006 3637 Manual Moter Control Center 3637 102 3739 3739 Start Table A.1.0-10 Class 1E GTG Starting Sequence Train D - LOOP LOOP Signal LOOP Sequence Refer Base Start Max Base Initiated Time Invest Load Load Load1 Load Load Load2 Time [Sec] [Sec] Group [KW] [KW] [KW] [KW]

100 0 Moter Control Center 0 532 532 381 1

105 5 D Charging Pump 5 381 1742 2123 1247 110 10 D Component Cooling Water Pump 2 1247 1296 2543 1891 115 15 D Service Water Pump 3 1891 1630 3521 2705 D Safety Chilled Water Pump 10 130 30 D Class 1E Electrical Room Supply Air Handling Unit 7 2705 191 2896 2794 140 40 D Safety Chiller Unit 8 2794 693 3487 3118 Manual Moter Control Center 1 3118 627 3745 3745 Start D Plessurizer Heater 9 Mitsubishi Heavy Industries, LTD. A-5

5000 Class 1E Gas Turbine Generator Continuous Rating = 4500kWe 4500 4006 INITIAL TYPE TEST RESULT OF 4000 3739 3739 3652 3571 3637 3637 Moter Control Center Mitsubishi Heavy Industries, LTD.

3500 3415 A Safety Chiller Unit 3313 3224 3000 A Class 1E Electrical Room Supply Air Handling Unit 2694 2802 A Containment Spray/ Residual Heat Removal Pump 2500 2360 CLASS 1E GAS TURBINE GENERATOR SYSTEM A Service Water Pump Capacity(kW) 2000 2042 A Component Cooling Water Pump 1500 A Safety Chilled Water Pump 1398 1000 907 A Safety Injection Pump Automatic Loads Manual Loads 500 448 MOV Operated by SI Signal, MOV Operated by SP Signal Moter Control Center 0

90 0 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 Time(s)

MUAP-10023-P(R0)

A-6 Figure A.1.0-1 LOCA Condition Class 1E GTG Load Profile (Train A)

5000 Class 1E Gas Turbine Generator Continuous Rating = 4500kWe 4500 4000 3745 3745 INITIAL TYPE TEST RESULT OF 3521 3487 3500 A Plessurizer Heater Moter Control Center Mitsubishi Heavy Industries, LTD.

3118 3118 3000 2896 A Safety Chiller Unit 2794 2543 2705 A Class 1E Electrical Room Supply Air Handling Unit 2500 2123 CLASS 1E GAS TURBINE GENERATOR SYSTEM A Service Water Pump Capacity(kW) 2000 A Safety Chilled Water Pump 1891 1500 A Component Cooling Water Pump 1247 1000 532 Automatic Loads Manual Loads 500 A Charging Pump 381 Moter Control Center 0

0 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 Time(s)

Figure A.1.0-2 LOOP Condition Class 1E GTG Load Profile (Train A) MUAP-10023-P(R0)

A-7

5000 Class 1E Gas Turbine Generator Continuous Rating = 4500kWe 4500 4481 4214 4214 4127 4055 4112 4112 Moter Control Center 4000 3890 INITIAL TYPE TEST RESULT OF B Safety Chiller Unit 3788 3571 3699 B Class 1E Electrical Room Supply Air Handling Unit 3500 Mitsubishi Heavy Industries, LTD.

B Containment Spray / Residual Heat Removal Pump 3277 3000 B Emergency Feed Water Pump 2694 2802 2500 2360 CLASS 1E GAS TURBINE GENERATOR SYSTEM B Service Water Pump Capacity(kW) 2000 2042 B Component Cooling Water Pump B Safety Chilled Water Pump 1500 1398 1000 907 B Safety Injection Pump 500 Automatic Loads Manual Loads 448 MOV Operated by SI Signal, MOV Operated by SP Signal Moter Control Center 0

90 0 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 Time(s)

MUAP-10023-P(R0)

A-8 Figure A.1.0-3 LOCA Condition Class 1E GTG Load Profile (Train B)

5000 Class 1E Gas Turbine Generator Continuous Rating = 4500kWe 4500 4000 INITIAL TYPE TEST RESULT OF Mitsubishi Heavy Industries, LTD.

3500 3354 3354 3096 3000 2795 B Plessurizer Heater 2655 Moter Control Center 2727 2727 2505 2500 2403 B Safety Chiller Unit CLASS 1E GAS TURBINE GENERATOR SYSTEM 2314 B Class 1E Electrical Room Supply Air Handling Unit Capacity(kW) 2000 B Emergency Feed Water Pump 1677 1839 1500 B Service Water Pump B Safety Chilled Water Pump 1000 1025 532 Automatic Loads Manual Loads 500 B Component Cooling Water Pump 381 Moter Control Center 0

90 0 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 Time(s)

MUAP-10023-P(R0)

A-9 Figure A.1.0-4 LOOP Condition Class 1E GTG Load Profile (Train B)

5000 Class 1E Gas Turbine Generator Continuous Rating = 4500kWe 4500 4481 4214 4214 4127 4055 4112 4112 4000 3890 Moter Control Center INITIAL TYPE TEST RESULT OF C Safety Chiller Unit 3788 3571 3699 C Class 1E Electrical Room Supply Air Handling Unit Mitsubishi Heavy Industries, LTD.

3500 C Containment Spray / Residual Heat Removal Pump 3277 3000 C Emergency Feed Water Pump 2694 2802 2500 2360 CLASS 1E GAS TURBINE GENERATOR SYSTEM Capacity(kW)

C Service Water Pump 2000 2042 C Component Cooling Water Pump C Safety Chilled Water Pump 1500 1398 1000 907 C Safety Injection Pump Automatic Loads Manual Loads 500 448 MOV Operated by SI Signal, MOV Operated by SP Signal Moter Control Center 0

90 0 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 Time(s)

MUAP-10023-P(R0)

A-10 Figure A.1.0-5 LOCA Condition Class 1E GTG Load Profile (Train C)

5000 Class 1E Gas Turbine Generator Continuous Rating = 4500kWe 4500 4000 INITIAL TYPE TEST RESULT OF 3500 Mitsubishi Heavy Industries, LTD.

3354 3354 3096 3000 C Plessurizer Heater 2795 2655 Moter Control Center 2727 2727 2505 2500 C Safety Chiller Unit 2403 CLASS 1E GAS TURBINE GENERATOR SYSTEM 2314 Capacity(kW) C Class 1E Electrical Room Supply Air Handling Unit 2000 C Emergency Feed Water Pump 1839 1677 1500 C Service Water Pump C Safety Chilled Water Pump 1000 1025 532 Automatic Loads Manual Loads 500 C Component Cooling Water Pump 381 Moter Control Center 0

90 0 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 Time(s)

MUAP-10023-P(R0)

A-11 Figure A.1.0-6 LOOP Condition Class 1E GTG Load Profile (Train C)

5000 Class 1E Gas Turbine Generator Continuous Rating = 4500kWe 4500 4006 4000 INITIAL TYPE TEST RESULT OF 3739 3739 3652 3571 3637 3637 Moter Control Center 3415 Mitsubishi Heavy Industries, LTD.

3500 D Safety Chiller Unit 3313 3224 D Class 1E Electrical Room Supply Air Handling Unit 3000 2694 D Containment Spray/ Residual Heat Removal Pump 2802 2500 2360 CLASS 1E GAS TURBINE GENERATOR SYSTEM D Service Water Pump Capacity(kW) 2000 2042 D Component Cooling Water Pump 1500 D Safety Chilled Water Pump 1398 1000 907 D Safety Injection Pump Automatic Loads Manual Loads 500 448 MOV Operated by SI Signal, MOV Operated by SP Signal Moter Control Center 0

900 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 Time(s)

MUAP-10023-P(R0)

A-12 Figure A.1.0-7 LOCA Condition Class 1E GTG Load Profile (Train D)

5000 Class 1E Gas Turbine Generator Continuous Rating = 4500kWe 4500 4000 INITIAL TYPE TEST RESULT OF 3745 3745 3521 3487 D Plessurizer Heater Mitsubishi Heavy Industries, LTD.

3500 Moter Control Center 3118 3118 3000 2896 D Safety Chiller Unit 2794 2543 2705 D Class 1E Electrical Room Supply Air Handling Unit 2500 CLASS 1E GAS TURBINE GENERATOR SYSTEM 2123 D Service Water Pump Capacity(kW) 2000 D Safety Chilled Water Pump 1891 1500 D Component Cooling Water Pump 1247 1000 532 Automatic Loads Manual Loads 500 D Charging Pump 381 Moter Control Center 0

090 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 Time(s)

MUAP-10023-P(R0)

A-13 Figure A.1.0-8 LOOP Condition Class 1E GTG Load Profile (Train D)

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Main Parts of Fuel, Oil, and Air System Table B.1.0-1 GTG Technical specification Appendix B Mitsubishi Heavy Industries, LTD. B-1

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Main Parts of Electric System Table B.1.0-2 Mitsubishi Heavy Industries, LTD. B-2

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Table B.1.0-3 Engine Operation Limit and Protective Device Set Value Mitsubishi Heavy Industries, LTD. B-3

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Figure B.1.0-1 Cross Sectional View of Power Section Mitsubishi Heavy Industries, LTD. B-4

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Note : 1 Figures show the revolution speed (rpm).

The values are for 60Hz version machine and the values shown in parentheses are for 50Hz version machine.

2 The parts shown in asterisk
  • are intercepted by 55% revolution in case of electric starting system and by 50% revolution in case of pneumatic starting system.

That is, revolution speed at starter cut-off is 0.55 times of the above-mentioned value in case of electric starting system and 0.50 times of the above-mentioned value in case of pneumatic starting system.

3 The rotating direction is specified when it was viewed from the output shaft side.

Figure B.1.0-2 Gear Train of Reduction Gear Box Mitsubishi Heavy Industries, LTD. B-5

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Installation Drawing of Gas Turbine Assembly (Sheet 1 of 6)

Figure B.1.0-3 Mitsubishi Heavy Industries, LTD. B-6

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Installation Drawing of Gas Turbine Assembly (Sheet 2 of 6)

Figure B.1.0-3 Mitsubishi Heavy Industries, LTD. B-7

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Installation Drawing of Gas Turbine Assembly (Sheet 3 of 6)

Figure B.1.0-3 Mitsubishi Heavy Industries, LTD. B-8

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Installation Drawing of Gas Turbine Assembly (Sheet 4 of 6)

Figure B.1.0-3 Mitsubishi Heavy Industries, LTD. B-9

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Installation Drawing of Gas Turbine Assembly (Sheet 5 of 6)

Figure B.1.0-3 Mitsubishi Heavy Industries, LTD. B-10

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Installation Drawing of Gas Turbine Assembly (Sheet 6 of 6)

Figure B.1.0-3 Mitsubishi Heavy Industries, LTD. B-11

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Drawing of Fuel Day Tank (Sheet 1 of 2)

Figure B.1.0-4 Mitsubishi Heavy Industries, LTD. B-12

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Drawing of Fuel Day Tank (Sheet 2 of 2)

Figure B.1.0-4 Mitsubishi Heavy Industries, LTD. B-13

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Drawing of Air Receiver (Sheet 1 of 3)

Figure B.1.0-5 Mitsubishi Heavy Industries, LTD. B-14

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Drawing of Air Receiver (Sheet 2 of 3)

Figure B.1.0-5 Mitsubishi Heavy Industries, LTD. B-15

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Drawing of Air Receiver (Sheet 3 of 3)

Figure B.1.0-5 Mitsubishi Heavy Industries, LTD. B-16

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Drawing of Enclosure and Skid (Sheet 1 of 3)

Figure B.1.0-6 Mitsubishi Heavy Industries, LTD. B-17

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Drawing of Enclosure and Skid (Sheet 2 of 3)

Figure B.1.0-6 Mitsubishi Heavy Industries, LTD. B-18

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Drawing of Enclosure and Skid (Sheet 3 of 3)

Figure B.1.0-6 Mitsubishi Heavy Industries, LTD. B-19

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Configuration of Lubricant Oil System (Sheet 1 of 2)

Figure B.1.0-7 Mitsubishi Heavy Industries, LTD. B-20

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Configuration of Lubricant Oil System (Sheet 2 of 2)

Figure B.1.0-7 Mitsubishi Heavy Industries, LTD. B-21

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Configuration of Fuel Oil System Figure B.1.0-8 Mitsubishi Heavy Industries, LTD. B-22

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Configuration of Starting Air System (Sheet 1 of 2)

Figure B.1.0-9 Mitsubishi Heavy Industries, LTD. B-23

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Configuration of Starting Air System (Sheet 2 of 2)

Figure B.1.0-9 Mitsubishi Heavy Industries, LTD. B-24

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Drawing of Inlet Air / Exhaust System Figure B.1.0-10 Mitsubishi Heavy Industries, LTD. B-25

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Drawing of Generator Circuit Figure B.1.0-11 Mitsubishi Heavy Industries, LTD. B-26

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Drawing of Alarm Panel Figure B.1.0-12 Mitsubishi Heavy Industries, LTD. B-27

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Parameter Chart of Load Capability Test Figure C.1.0-1 Parameter Chart Appendix C Mitsubishi Heavy Industries, LTD. C-1

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Parameter Chart of Start and Load Acceptance Test, No.77, Cold Figure C.1.0-2 Mitsubishi Heavy Industries, LTD. C-2

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Parameter Chart of Start and Load Acceptance Test, No.78, Hot Figure C.1.0-3 Mitsubishi Heavy Industries, LTD. C-3

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Parameter Chart of Start and Load Acceptance Test, No.79, Hot Figure C.1.0-4 Mitsubishi Heavy Industries, LTD. C-4

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Parameter Chart of Start and Load Acceptance Test, No.80, Hot Figure C.1.0-5 Mitsubishi Heavy Industries, LTD. C-5

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Parameter Chart of Start and Load Acceptance Test, No.81, Hot Figure C.1.0-6 Mitsubishi Heavy Industries, LTD. C-6

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Parameter Chart of No.1 Margin Test Figure C.1.0-7 Mitsubishi Heavy Industries, LTD. C-7

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Parameter Chart of No.2 Margin Test Figure C.1.0-8 Mitsubishi Heavy Industries, LTD. C-8

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Parameter Chart of Load Transient Test , 25%

Figure C.1.0-9 Mitsubishi Heavy Industries, LTD. C-9

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Parameter Chart of Load Transient Test , 50% (Sheet 1 of 2)

Figure C.1.0-10 Mitsubishi Heavy Industries, LTD. C-10

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Parameter Chart of Load Transient Test , 50% (Sheet 2 of 2)

Figure C.1.0-10 Mitsubishi Heavy Industries, LTD. C-11

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Parameter Chart of Load Transient Test , 75% (Sheet 1 of 2)

Figure C.1.0-11 Mitsubishi Heavy Industries, LTD. C-12

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Parameter Chart of Load Transient Test , 75% (Sheet 2 of 2)

Figure C.1.0-11 Mitsubishi Heavy Industries, LTD. C-13

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Parameter Chart of Load Transient Test , 100% (Sheet 1 of 2)

Figure C.1.0-12 Mitsubishi Heavy Industries, LTD. C-14

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Parameter Chart of Load Transient Test , 100% (Sheet 2 of 2)

Figure C.1.0-12 Mitsubishi Heavy Industries, LTD. C-15

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Appendix D Initial Type Test Procedure Mitsubishi Heavy Industries, LTD. D-1

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-2

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-3

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-4

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-5

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-6

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-7

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-8

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-9

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-10

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-11

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-12

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-13

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-14

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-15

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-16

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-17

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-18

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-19

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-20

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-21

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-22

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-23

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-24

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-25

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-26

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-27

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-28

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-29

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-30

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-31

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-32

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-33

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-34

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-35

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-36

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-37

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-38

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-39

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-40

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-41

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-42

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-43

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-44

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-45

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-46

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-47

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-48

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-49

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-50

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-51

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-52

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-53

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-54

INITIAL TYPE TEST RESULT OF CLASS 1E GAS TURBINE GENERATOR SYSTEM MUAP-10023-NP(R0)

Mitsubishi Heavy Industries, LTD. D-55