IR 05000341/2010406
Download: ML102910170
Text
October 14, 2010
Mr. Jack Senior Vice President and Chief Nuclear Officer Detroit Edison Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166
SUBJECT: FERMI POWER PLANT, UNIT 2, MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT NO. 05000341/2010406
Dear Mr. Davis:
On September 16, 2010, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Fermi Power Plant, Unit 2. The inspection covered one of the key attributes of the Security Cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on September 22, 2010, with Ms. Judith Ford, Performance Engineering Manager, and other members of your staff. The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no findings were identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
Enclosure contains Sensitive-Unclassified Non-Safeguards information. When separated from the enclosure, this document is decontrolled. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,/RA/ John B. Giessner, Chief Branch 4 Division of Reactor Projects Docket No. 50-341 License No. NPF-43 Nonpublic
Enclosure:
NRC Inspection Report 05000341/2010406
w/Attachment:
Supplemental Information cc w/encl: S. Coker, NSIR/DSO/DDSO/ST C. Johnson, NSIR J. Trapp, Region I M. Ernstes, RII M. Shannon, RIV K. Yale, State Liaison Officer, State of Michigan cc w/o encl: Distribution via ListServ