G20100619/EDATS: OEDO-2010-0804 - Eric J. Epstein E-mail 2.206 - Demand for Information Proposed Merger Between Firstenergy and Allegheny Energy - Three Mile Island, Unit 2
ML102770308
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 09/30/2010
From: Epstein E
- No Known Affiliation
To: Stephen Burns
NRC/OGC, NRC/FSME
John Buckley 415-6607
References
2.206, EDATS: OEDO-2010-0804, G20100619, OEDO-2010-0804
Download: ML102770308 (22)


Text

EDO Principal Correspondence Control FROM: DUE: 11/01/10 EDO CONTROL: G20100619 DOC DT: 09/30/10 FINAL REPLY:

Eric J. Epstein Harrisburg, Pennsylvania TO:

Burns, OGC FOR SIGNATURE OF : ** GRN ** CRC NO:

Miller, FSME DESC: ROUTING:

2.206 - Demand for Information Proposed Merger Borchardt Between FirstEnergy and Allegheny Energy - Three Weber Mile Island Unit 2 (EDATS: OEDO-2010-0804) Virgilio Ash Mamish OGC/GC DATE: 10/01/10 Dapas, RI Burns, OGC ASSIGNED TO: CONTACT: Mensah, NRR Scott, OGC FSME Miller Brock, OEDO SPECIAL INSTRUCTIONS OR REMARKS:

41

EDATS Number: OEDO-2010-0804 Source: OEDO General Information Assigned To: FSME OEDO Due Date: 1 I/1/2010 11:00 PM Other Assignees: SECY Due Date: NONE

Subject:

2.206 - Demand for Information Proposed Merger Between FirstEnergy and Allegheny Energy - Three Mile Island Unit 2

==

Description:==

CC Routing: Regionl; OGC; Tanya.Mensah@nrc.gov; Catherine.Scott@nrc.gov ADAMS Accession Numbers - Incoming: NONE Response/Package: NONE Ote Infomaio Cross Reference Number: G20100619 Staff Initiated: NO Related Task: Recurring Item: NO File Routing: EDATS Agency Lesson Learned: NO OEDO Monthly Report Item: NO Action Type: 2.206 Review Priority: Medium Sensitivity: None Signature Level: N14:R PS ME Urgency: NO Approval Level: No Approval Required OEDO Concurrence: NO OCM Concurrence: NO OCA Concurrence: NO Special Instructions:

Originator Name: Eric J. Epstein Date of Incoming: 9/30/20 10 Originating Organization: Citizens Document Received by OEDO Date: 10/1/2010 Addressee: Stephen Bums, OGC Date Response Requested by Originator: NONE Incoming Task Received: E-mail Page 1 of I

Jaegers, Cathy From: Eric Epstein [lechambon@comcast. net]

Sent: Friday, October 01, 2010 8:52 AM To: OGCLT Resource

Subject:

Fwd: -Petition Pursuant to 10 CFR 2.206 - Demand for Information; Proposed Merger between FirstEnergy & Allegheny Energy Re: The Impact on Three Mile Island .Unit-2's Nuclear Decommissioning Trust Fund Attachments: TMI-2 DFI Petition.pdf; ATT00003.htm; Enclosure l.pdf; ATT00004.htm Stephen Burns, General Counsel U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 2o852 September 30, 2010 Pursuant to §2.206 of Title lo of the Code of Federal Regulations, Eric Joseph Epstein ("Epstein" or Mr. "Epstein") hereby petitions the Nuclear Regulatory Commission ("NRC" or "the Commission") to take enforcement action in the form of a Demand for Information from FirstEnergy ("FENOC", "the Company" or "the licensee") relating to inadequate financial assurances provided by the licensee for Three Mile Island Unit-2's ("TMI-2") nuclear decommissioning fund (1) priorto the consummation of FirstEnergy's proposed merger with Allegheny Energy.

Respectfully submitted, Eric J. Epstein 41oo Hillsdale Road, Harrisburg PA 17112 (717)-541-1101 lechambon Pcomcast.net 1

EDO -- G20100619

Received: from mail .nrc.gov (148.184.176.41) by TWMSO1 .nrc.gov (148.184.200.145) with Microsoft SMTP Server id 8.1.393.1; Fri, 1 Oct 2010 08:52:02 -0400 X-Ironport-ID: mail1 X-SBRS: 4.5 X-MID: 23400117 X-fn: None X-lronPort-AV: E=Sophos;i="4.57,266,1283745600";

d="pdf'?scan'208,217";a="23400117" Received: from qmta03.westchester. pa. mail. comcast. net ([76.96.62.32]) by maill.nrc.gov with ESMTP; 01 Oct 2010 08:52:02 -0400 Received: from omta 14.westchester. pa. mail.comcast. net ([76.96.62.60]) by qmta03.westchester. pa. mail. comcast. net with comcast id DNk81f0061HzFnQ53Qs3oJ; Fri, 01 Oct 2010 12:52:03 +0000 Received: from [192.168.1.3] ([174.60.141.1]) by omta 14.westchester. pa. mail.comcast. net with comcast id DQs1 lfOOJ020XUm3aQs2GW; Fri, 01 Oct 2010 12:52:02 +0000 From: Eric Epstein <lechambon@comcast. net>

Content-Type: multipart/alternative; boundary="Apple-Mail-69-540158991"

Subject:

?windows-1252?Q?Fwd:_-PetitionPursuant to_10_CFR_2.206_-_Deman?

?windows-1252?Q?d for Information;_ProposedMerger betweenFirs?

?windows-1 252?Q?tEnergy_=09=09=09&_AlleghenyEnergyRe:_TheI m?

?windows-1252?Q?pact on ThreeMileIslandUnit-2=92sNuclearDe?

?windows-1 252?Q?commissioning TrustFund_?

Date: Fri, 1 Oct 2010 08:52:00 -0400

References:

<27FB3DFE-1 D3B-4762-AFA3-C8E7ACCCE47D@comcast. net>

To: General Counsel <OGCLT@NRC.gov>

Message-ID: <560D39B0-0D52-4D7B-AE2D-2512590C6858@comcast. net>

MIME-Version: 1.0 (Apple Message framework v1 077)

X-Mailer: Apple Mail (2.1077)

Return-Path: lechambon@comcast.net

- Petition Pursuant to 10 CFR 2.206 -

Demand for Information Proposed Merger between FirstEnergy and Allegheny Energy Re: The Impact on Three Mile Island Unit-2's Nuclear Decommissioning Trust Fund Stephen Burns, General Counsel U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 September 30, 2010 I. Introduction Pursuant to §2.206 of Title 10 of the Code of Federal Regulations, Eric Joseph Epstein ("Epstein" or Mr. "Epstein") hereby petitions the Nuclear Regulatory Commission ("NRC" or "the Commission") to take enforcement action in the form of a Demand for Information from FirstEnergy ("FENOC", "the Company" or "the licensee") relating to inadequate financial assurances provided by the licensee for Three Mile Island Unit-2's ("TMI-2") nuclear decommissioning fund (1) prior to the consummation of FirstEnergy's proposed merger with Allegheny Energy.

According to the NRC, (1) FirstEnergy's Decommissioning Trust Fund for TMI-2 is grossly underfunded: "The current radiological decommissioning cost estimate is $831.5 million. The current amount in the decommissioning trust fund is $484.5 million, as of December 31, 2008." (2) However, the level of rate recovery for the Trust Fund has been set by the Pennsylvania Public Utility Commission ("PUC"). The proposed merger with Allegheny Energy will endanger an already fragile funding protocol.

1 Per lo CFR 50.75(f)(1), licensees for shutdown reactors are required to report annually on the status of decommissioning funding by March 31 (in the following year).

2 NRC website: http://www.nrc.gov/info-finder/decommissioning/power-reactor/three-mile-island-unit-2.html. 1

According to the NRC, the cost to decommission TMI-2 has increased by

$26.5 million in less than three years while the Decommissioning Trust Fund's assets have decreased by $116.5 million during the same period. The NRC determined in 2007, "The current radiological decommissioning cost estimate is $805 million and $27 million for non-radiological funds. The current amount in the decommissioning trust fund is $6ol million, as of December 31, 2007." (3)

Mr. Epstein seeks enforcement action in the form of a Demand for Information ("DFI") requiring FirstEnergy to provide the NRC with site-specific information and financial guarantees that demonstrate and verify the licensee has adequate funding in place to decommission and decontaminate TMI-2, and that the proposed merger will not place additional financial pressures on FirstEnergy's. ability to satisfy its decommissioning obligations in 2036.

FirstEnergy's decommissioning report is inadequate, and fails to account for the special status of TMI-2, the current level of underfunding, or the fact that decommissioning rate recovery for Metropolitan Edison (4) and Pennsylvania Electric cease per PUC Orders on December 31, 2010. (5)

The decommissioning trusts of JCP&L and the Pennsylvania Companies are subject to regulatory accounting, with unrealized gains and losses recorded as regulatory assets or liabilities, since the difference between investments held in trust and the decommissioning liabilities will be recovered from or refunded to customers. NGC, OE and TE recognize in earnings the unrealized losses on available-for-sale securities held in their nuclear decommissioning trusts as other-than-temporary impairments.

On June 18, 2009, the NRC informed FENOC that its review tentatively concluded that a shortfall existed in the decommissioning trust fund for Beaver Valley Unit 1. On November 24, 2009, FENOC submitted a revised decommissioning funding calculation using the NRC formula 3 NRC website: http: !/www.nrc.gov/info-finder/decommissioning/power-reactor/three- mile-island-unit-2.html.

4 Metropolitan Edison (Docket No. R-oo9740o8) and Penn Electric (Docket No. R-oo974009).

5 Penn Elec's final TMI-2 collection for $7.817 million occurred in 2009.

2

method based on the renewed license for Beaver Valley Unit 1, which extended operations until 2036. FENOC's submittal demonstrated that there was a de minimis shortfall. On December 11, 2009, the NRC's review of FirstEnergy's methodology for the funding of decommissioning of this facility concluded that there was reasonable assurance of adequate decommissioning funding at the time permanent termination of operations is expected. FirstEnergy continues to evaluate the status of its' funding obligations for the decommissioning of these nuclear facilities. (6)

The Company acknowledged, "The values of FirstEnergy's nuclear decommissioning trusts fluctuate based on market conditions. If the value of the trusts decline by a material amount, FirstEnergy's obligation to fund the trusts may increase. Disruptions in the capital markets and its effects on particular businesses and the economy in general also affects the values of the nuclear decommissioning trusts."

However, FirstEnergy's rate recovery opportunities in Pennsylvania are restricted after December 31, 2010. Three Mile Island Unit-2 will no longer receive rate payer funding for decommissioning after December 31, 2010 when Metropolitan Edison and Penn Elec's "rate caps" are lifted. (Please refer to )

This is a settled issue at the Pennsylvania Public Utility Commission. (7)

TMI-2's decommissioning funding was litigated in both Met Ed and Penn Elec's Restructuring Cases as well as the 2oo6 Distribution base rate case at the PUC.

As part of the Restructuring Settlement, Met Ed and Penn Elec are collecting TMI-2 decommissioning expenses through the Competitive Transition Cost

("CTC") as a stranded cost through December 31, 2010. In the 2o06 Distribution base rate case; however, Met Ed sought an increase in the TMI-2 decommissioning expense as part of its CTC revenue requirement. The claim was made as part of a request for a specific exception to the generation rate cap that was allowed under the restructuring settlement. (8) 6 FirstEnergy2009 Annual Report, p. 44.

7 FirstEnergy2009 Annual Report, p. 59.

8 Metropolitan Edison and Pennsylvania Electric Company v. Pa. PUC No. 2404 C.D. 2003 (Pa. Cmwlth. 2006) (filed July 19, 2006).

3

The Pennsylvania Public Commission stated:

The Commonwealth Court affirmed the Commission's order requiring Metropolitan Edison and Pennsylvania Electric Company (Electric Companies) to retroactively adjust their accounting entries for stranded cost recovery, as if their Settlement Stipulation had never been approved by the Commission. The Electricity Generation Customer Choice and Competition Act (Competition Act) allowed electric companies to recover stranded costs through a competitive transition charge (CTC), subject to a rate cap. Every electric company was also required to file a restructuring plan explaining its compliance with the Competition Act, subject to

- approval by the Commission. After the Commission approved the Electric Companies' merger, they sought a rate increase pursuant to the Competition Act, or an immediate rate cap increase of $316 million per year. Interveners opposed the merger and Electric Companies' requests.

The parties failed to reach a consensus, and the Electric Companies proposed a "Settlement Stipulation," which the Commission adopted in 2001. However, Commonwealth Court voided the Stipulation Settlement and reversed the Commission's order in ARIPPPA v. Pa. PUC, 892 A.2d 636

( Pa. Cmwlth. 2002) after multiple parties appealed. In response to the decision, the Commission ordered the Electric Companies to reverse any accounting changes made pursuant to the Settlement Stipulation.

The Commonwealth Court held that the Commission complied with its order directing the Electric Companies to return revenues collected for the distribution and transmission rates to the same levels that existed before the Settlement, thereby ensuring customers were placed back in the same position before the rate change occurred. Furthermore, the Commission guaranteed that when the amount of stranded costs they received was settled, the Electric Companies could collect for any deficiencies. The Court also disagreed with the Electric Companies that the Commission can only change approved rates prospectively and are not subject to retroactive adjustment, since the rates previously approved by the Commission were not legal. (9)

Additionally, long-standing Atomic Energy Commission and Nuclear Regulatory Commission precedent makes it clear that "once a regulation is adopted, the standards it embodies represent the Commission definition of what is required to protect the public health and safety."

9 Metropolitan Edison and Pennsylvania Electric Company v. Pa. PUC, No.

2404 C.D. 2003 (Pa. Cmwlth. 2006) (filed July 19, 2006).

4

By the same token, neither the applicant nor the staff should be permitted to challenge applicable regulations, either directly or in directly , those parties should not generally be permitted to seek or justify the licensing of a reactor which does not comply with applicable standards. Nor can they avoid compliance by arguing that, although an applicable regulation is not met, the public health and safety will still be protected. For, once a regulation is adopted,the standards it embodies represent the Commission s definition of what is required to protect the public health and safety. In short, in order for a facility to be licensed to operate,the applicant must establish that the facility complies with all applicable regulations. If the facility does not comply, or if there has been no showing that it does comply, it may not be licensed. (9)

The NRC can not ignore or manipulate its own regulations relating to financial assurances for decommissioning FirstEnergy recently acknowledged the embedded uncertainty and historic variability associated with "nuclear generation involves risks that include uncertainties relating to health and safety, additional capital costs, the adequacy of insurance coverage and nuclear plant decommissioning." (io) The Company's statement is underscored by the inability of TMI-2's management to predict decommissioning costs or funding levels over the past 25 years.

On January 18, 1994, at the NRC's Advisory Panel meeting, GPU's President Robert E. Long stated that the Company had $104.7 million on hand to decommission TMI-2. GPU's spokesperson, Mary Wells said, "We have a detailed plan in place to make sure that the money is going to be there."

By February, 1997, GPU reported in its 1997 Annual Report that the cost to decommission TMI-2 doubled in four years. The original $200 million projection has been increased to $399 million for radioactive decommissioning.

An additional $34 million will be needed for non-radiological decommissioning.

9 Vermont Yankee Nuclear Power Station), United Sates of America Atomic Energy Commission Atomic Safety & Licensing Appeal Board, Memorandum and Order, (ALAB-138) Docket No. 50-271, IV., p. 528,Section IV, Paragraph A., p.

528, July 31, 1973.

10 FirstEnergy 2oo9 Annual Report, p. 17.

5

The new funding "target" was $433 million or a $328.3 million increase in just 48 months. Ten years later, according to the NRC, the radiological decommissioning cost estimate was $779 million and $26 million for non-radiological funds. The amount in the decommissioning trust fund was

$559 million, as of December 31, 2oo6.

In 2007 the TMI-2 site summary on the NRC's website stated as of December 31, 2007, "The current radiological decommissioning cost estimate is

$805 million and $27 million for non-radiological funds. The current amount in the decommissioning trust fund is $6ol million, as of December 31, 2007."

In 2008, according to the NRC, the radiological decommissioning cost estimate was $831.5 million. The amount in the decommissioning trust fund was $484.5 million as of December 31, 2008.

According to the NRC, the cost to decommission TMI-2 has increased by

$26.5 million in less than three years while FirstEnergy decommissioning trust fund's assets has decreased by $116.5 million during the same period.

However, the owners of Three Mile island Unit-2 promised the NRC that delaying the cleanup would decrease cost and increase safety. Frank Standerfer GPU vice-president and director of TMI-2 told the NRC, "If we wait [to decommission TMI-2] there would be less risk to our workers and it would be more cost effective. He also told the NRC's TMI Advisory Panel, "GPU will not have a problem finding funds to shut both reactors in the next century." (11)

After 31 years of broken promises, faulty assumptions, and inaccurate projections, the NRC should hold FirstEnergy accountable and demand a site-specific funding plan at the site of the nation's worst commercial nuclear accident. At, a minimum, the proposed Merger must be held in abeyance unit Three Mile Island-2 can demonstrate that is has adequate funding in place to decommission Three Mile Island Unit-2 in 2036 - 57 years after the Accident.

11 Transcript from the NRC's TMI-2 Citizens Advisory Panel convened on May 27, 1988 in Harrisburg, PA.

6

II. Background In July, 1969 Met Ed began construction on Three Mile Island-2 Unit 2, and the station came on line in December 1978. TMI-2 was grossly over budget and behind schedule. The plant had been on-line for just 90 days, or 1/120 of its expected operating life, before the March, 1979, accident. One billion dollars was spent to defuel the facility. Three months of nuclear power production at TMI-2 has cost close to $2 billion dollars in construction and cleanup bills; or the equivalent of over $1o.6 million for every day TMI-2 produced electricity. The above mentioned costs do not include nuclear decontamination and decommissioning or restoring the site to "Greenfield. TMI-2 had no funds socked away at the time of meltdown for decontamination or decommissioning.

At the time of the core-melt, LOCA in March 1979, Three Mile Island I and 2 were owned three utilities operating in two states, i.e., Metropolitan Edison (5o%), Jersey Central Power & Light (25%) and Pennsylvania Electric (25%).

The companies were organized under the General Public Utilities holding company umbrella. The operator of both plants was Met Ed.

On March 25, 198o, Met Ed, blamed the plant's designer, Babcock &

Wilcox (B&W) for the TMI accident, sue B&W for $500 million. TMI's owners also filed an unsuccessful $4 billion law suit against the NRC alleging that the Agency's negligence contributed to the TMI accident.

In September, 198o, Met Ed renamed itself GPU Nuclear. Met Ed continued to operate the plant and owned 50% of its assets.

On January 18, 1994 at the NRC's Advisory Panel meeting, GPU's President Robert E. Long stated that the Company had $104.7 million on hand to decommission TMI-2. GPU's spokesperson, Mary Wells said, "We have a detailed plan in place to make sure that the money is going to be there."

7

On September 20, 1995, the Pennsylvania Supreme Court reversed a lower court's decision, and sided with GPU in allowing the Company to charge rate payers for the TMI-2 accident. One billion has been spent to defuel the plant, which now lays in idle shutdown, i.e., Post-Defueling Monitored Storage.

By February, 1997, GPU reported in its 1997 Annual Report that the cost to decommission TMI-2 doubled in four years. The original $200 million projection has been increased to $399 million for radioactive decommissioning. An additional $34 million will be needed for non-radiological decommissioning.

The new funding "target" was $433 million or a $328.3 million increase in just 48 months.

On July 17, 1998, AmerGen Energy announced that it reached an Agreement with GPU to purchase TMI-1 for $1oo million. The proposed sale includes $23 million for the fuel inventory.

On July 21, 1999, GPU Nuclear received permission form the NRC to reduce the insurance at TMI-2 from $1.o6 billion to $5o million.

On December 20, 1999, TMI-'s license was transferred from GPU Nuclear to AmerGen. TMI-2 remains a GPU possession in placed in Post-Defueling Monitored Storage in 1992. GPU contracts with AmerGen to maintain a skeletal staff presence at TMI-2.

On August 9, 20oo, FirstEnergy and GPU announced a planned merger expected to be finalized by August 2001. FENOC would acquire GPU for approximately $4.5 billion. Ownership of TMI-2 and liability for 1,99o health suits against GPU would be transferred to FirstEnergy.

In November, 2001, TMI-2 was formally transferred from GPU Nuclear to FirstEnergy. GPU Nuclear retains the license for TMI-2 and is owned by FirstEnergy Nuclear Operating Company.

8

In 2006, according to the NRC, the radiological decommissioning cost estimate was $779 million and $26 million for non-radiological funds. The amount in the decommissioning trust fund was $559 million as of December 31, 2006.

In 2007 the TMI-2 site summary for 2007, the NRC's website, "The current radiological decommissioning cost estimate is $805 million and $27 million for non-radiological funds. The current amount in the decommissioning trust fund is $6ol million, as of December 31, 2007."

And in 2008, according to the NRC, the radiological decommissioning cost estimate for TMI-2 was $831.5 million. The amount in the decommissioning trust fund was $484.5 million as of December 31, 2008.

According to the NRC, the cost to decommission TMI-2 has increased by

$26.5 million in less than three years while FirstEnergy decommissioning trust fund's assets has decreased by $116.5 million during the same period.

Winter-Spring, 2OlO, FirstEnergy and Allegheny Energy filed merger applications with various state and federal agencies, but made no such filing with the Nuclear Regulatory Commission.

On February 11, 2010, Standard & Poor's, downgraded FirstEnergy's debt:

"We downgraded FirstEnergy Corp. and subsidiaries to 'BBB-' from 'BBB' based on its intention to merge with lower-rated Allegheny Energy Inc."

9

IV. Site Status Summary.

The NRC's website stated on September 30, 2010:

"The Three Mile Island, Unit 2 (TMI-2) operating license was issued on February 8, 1978, and commercial operation was declared on December 30, 1978. On March 28, 1979, the unit experienced an accident which resulted in severe damage to the reactor core. TMI-2 has been in a non-operating status since that time. The licensee conducted a substantial program to defuel the reactor vessel and decontaminate the facility. All spent fuel has been removed except for some debris in the reactor coolant system. The plant defueling was completed in April 199o. The removed fuel is currently in storage at Idaho National Laboratory, and the U.S. Department of Energy has taken title and possession of the fuel. TMI-2 has been defueled and decontaminated to the extent the plant is in a safe, inherently stable condition suitable for long-term management. This long-term management condition is termed post-defueling monitored storage, which was approved in 1993. There is no significant dismantlement underway. The plant shares equipment with the operating TMI -

Unit 1. TMI-1 was sold to AmerGen (now Exelon) in 1999. GPU Nuclear retains the license for TMI-2 and is owned by FirstEnergy Corp. GPU contracts with Exelon for maintenance and surveillance activities. The licensee plans to actively decommission TMI-2 in parallel with the decommissioning of TMI-1.

The current radiological decommissioning cost estimate is $831.5 million. The current amount in the decommissioning trust fund is $484.5 million, as of December 31, 20o8." (Boldface type added.) (12)

Estimated Date For Closure: 12/31/2036 12 US, Nuclear Regulatory Commission, Three Mile Island - Unit 2, License No.: DPR-73 Docket No.: 50-320, License Status: Possession Only License.

http: //www.nrc.gov/info-finder/decommissioning/power-reactor/three-mile-island-unit-2.html.

10

V. Demand for Information.

Its prudent for the Commission to respond to Mr. Epstein's Petition requesting a Demand for Information in a expedited manner based on the timing of the proposed merger.

1) Mr. Epstein respectfully requests that the NRC Issue a Demand for Information to FirstEnergy for a site-specific decommissioning funding plan for TMI-2.
2) Mr. Epstein respectfully requests that the NRC Issue a Demand for Information to FirstEnergy requesting FENOC's site-specific funding plan for the TMI-2 decommissioning trust after the rate caps expire for Metropolitan Edison and Penn Elec on December 31, 2010.
3) The current radiological decommissioning cost estimate is $831.5 million.

As of December 31, 2008, the amount in the decommissioning trust fund was

$484.5 million.

This is not a de minimis shortfall.

Mr. Epstein respectfully requests that the NRC Issue a Demand for Information to FirstEnergy relating to FENOC's investment plan to make-up the current decommissioning shortfall.

4) Mr. Epstein respectfully requests that the NRC Issue a Demand for Information to FirstEnergy regarding FENOC's proposed financial contribution plan to make-up the current decommissioning shortfall.
5) The Company anticipates that the nuclear generating stations will operate at least until the end of their current licensed lives. In the event that any of the stations are retired early, the Company anticipates that funding will be adjusted to match any change in decommissioning schedule and/or cost scenario.

11

Mr. Epstein respectfully requests that the NRC Issue a Demand for Information to FirstEnergy relating to the Company's plan to fund the decommissioning trust for TMI-2, if TMI-1 is prematurely retired.

6) The Company anticipates that the nuclear generating stations will operate at least until the end of their current licensed lives. In the event that any of the stations are retired early, the Company anticipates that funding will be adjusted to match any change in decommissioning schedule and/or cost scenario.

Mr. Epstein respectfully requests that the NRC Issue a Demand for Information to FirstEnergy relating to the Company's planned timing for decommissioning TMI-2, if TMI-1 is prematurely retired.

Additionally, Mr. Epstein requests that the Nuclear Regulatory Commission:

(a) Provide Eric Joseph Epstein with copies of all correspondence sent to First Energy regarding this Petition.

(b) Provide Mr. Epstein with advance notice of all public and private meetings conducted by the Agency with regarding this Petition.

(c) Provide Mr. Epstein with an opportunity to participate in all relevant phone calls between NRC staff and FirstEnergy regarding this Petition.

(d) Provide Mr. Epstein with copies of all correspondence sent to Members of Congress and/or industry organizations (e.g., the Nuclear Energy Institute, the Electric Power Research Institute, the Institute for Nuclear Power Operations, Commonwealth of Pennsylvania) Department of Justice, the Securities and Exchange Commission regarding this Petition.

12

Respectfully submitted, Eric J. Epstein 410o Hillsdale Roald, Harrisburg PA 17112 (717)-541-11O1 lechambon@comcast.net Enclosure Dated: September 30, 2010.

13

CERTIFICATE OF SERVICE U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 R. William Borchardt, Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Office of the Secretary, U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 (Original plus two copies)

HEARINGDOCKET@nrc.gov Mr. James H. Lash President & Chief Nuclear Officer FirstEnergy Corporation 76 South Main Street Akron, OH 44308 Mr. David W. Jenkins, Esq.

First Energy Legal Department 76 South Main St.

Akron, OH 44308 Mrs. Karen Fili Vice President GPU Nuclear Fleet Oversight 76 South Main Street Akron, OH 44308 Mr. Michael J. Casey GPU Nuclear Responsible Engineer TMI-2 FirstEnergy Nuclear Operating Company Mail Stop: A-GO-14 76 South Main Street Akron, OH 44308

Director, Bureau of Radiation Protection Department of Environmental Protection 13th Floor, Rachel Carson State Office Bldg Harrisburg, PA 17105-8469 14

GPU Nuclear, Inc.

UN

("G'PUThree Mile Island Nuclear Station NUCLEAR Route 441 South Post Office Box 480 Middletown, PA 17057-0480 Tel 717-948-8461 March 27, 2009 TMI-09-011 10 CFR 50.75 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC. 20555-0001

SUBJECT:

Three Mile Island, Unit 2 Docket No., 50-320 Submittal of the Decommissioninq Report for Three Mile Island, Unit 2 Pursuant to.1.0..CF,f075(*(1), GPU Nuclear, Inc., is hereby submitting the ecom issining.Rep r~thThree Mile Island, Unit 2 for the year ending

,Qecerbr3

ý .08 ,

There are no regulatory commitments contained in this letter. If there are any questions, or if additional information-is required,. please' contact Mr.:'Thomas A. Lentz, Manager - Fleet Licensing,ý at (330) 761-6071.

Sincerely, Joseph J. Hagan President and Chief NJear Officer

Enclosure:

Decommissioning Funding9 Status Report - Three Mi.e Island, Unit22.

cc*.,.. ,NRC Region, I-Admin istrator N R * ; ,; je t.M a nage r:;: . ":;

F.:.* . . .. ,.... . **,* .,,, : ,.

Enclosure Decommissioning Funding Status Report - Three Mile Island, Unit 2 Page 1 of 2 This report reflects FirstEnergy Corp.'s consolidated share of ownership interest in Three Mile Island, Unit 2, as of December 31, 2008.

1. Decommissioning fund estimate, pursuant to 10 CFR 50.75(b) and (c) based on a Three Mile Island, Unit 2 site specific decommissioning cost study dated September 2004 and escalated to current dollars:

Radiological $831,500,000 Non-Radiological 27,850,000 FirstEnergy Consolidated $859.,350,000

2. The amount accumulated in external trust funds at December 31, 2008:

Metropolitan Edison Company $226,138,952 Pennsylvania Electric Company 115,291,997 Jersey Central Power & Light 143,027,476 FirstEnergy Consolidated $484,458,425

3. A schedule of the annual amounts over the number of years remaining to be collected from ratepayers is attached as Schedule 1.
4. The assumptions used regarding rates of escalation in decommissioning costs, rates of earnings on decommissioning funds, and rates of other factors used in funding projections:

Consolidated Ownership Interest in Unit 100%

"Real" Rate of Return through Dismantlement 2.00%

Rate of Escalation 3.3425%

Year of Final Dismantlement 2036 Safestore Period 2014-2023 Year of Operating License Termination 2014

5. There are no contracts upon which the owners/licensees are relying pursuant to 10 CFR 50.75(e)(1)(v).
6. There are no modifications to the licensee's current method of providing financial assurance since the last submitted report.
7. There were no amendments to the Trust Agreements for the above-mentioned owners of Three Mile Island, Unit 2.

Enclosure Decommissioning Funding Status Report - Three Mile Island, Unit 2 Page 2 of 2 Schedule 1 Schedule of Annual Amounts Remaining to be Collected as of December 31, 2008 Three Mile Island, Unit 2 Annual Amounts Collected Metropolitan Pennsylvania Jersey Central FirstEnergy Year Edison Electric Power & Liqht Consolidated 2009 2,848,000 7,817,000 2,894,511 13,559,511 2010 2,848,000 2,894,511 5,742,511 2011 2,894,511 2,894,511 2012 2,894,511 2,894,511 2013 2,894,511 2,894,511 2014 2,894,511 2,894,511 2015

.2016 201.7 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027.

2028 2029 Total 5,696,000 7,817,000 17,367,066 30.880,066 5,696,000 7,817,000 17,367,066 30.880.066

Page 1 of 1 CERTIFICATE OF SERVICE U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 R. William Borchardt, Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Office of the Secretary, U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 (Original plus two copies)

HEARINGDOCKET~nrc.cov Mr. James H. Lash President & Chief Nuclear Officer FirstEnergy Corporation 76 South Main Street Akron, OH 44308 Mr. David W. Jenkins, Esq.

First Energy Legal Department 76 South Main St.

Akron, OH 443o8 Mrs. Karen Fili Vice President GPU Nuclear Fleet Oversight 76 South Main Street Akron, OH 44308 Mr. Michael J. Casey GPU Nuclear Responsible Engineer TMI-2 FirstEnergy Nuclear Operating Company Mail Stop: A-GO-14 76 South Main Street Akron, OH 44308 Director, Bureau of Radiation Protection Department of Environmental Protection 13th Floor, Rachel Carson State Office Bldg Harrisburg, PA 17105-8469 file://CA:Documents and Settings\CEJELocal Settings\Temporary Internet Files\C... 10/01/2010