Supplemental Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems
ML102010381
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 06/30/2010
From: Belcher S
Constellation Energy Nuclear Group, EDF Group, Nine Mile Point
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-08-001
Download: ML102010381 (2)


Text

Sam Belcher P.O. Box 63 Vice President-Nine Mile Point Lycoming, New York 13093 315.349.5200 315.349.1321 Fax CENG a joint venture of AM Constellation wEnergy NINE MILE POINT NUCLEAR STATION June 30, 2010 U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION:

Document Control Desk

SUBJECT:

Nine Mile Point Nuclear Station, LLC Unit No. 2; Docket No. 50-4 10 Supplemental Response to NRC Generic Letter 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems"

REFERENCES:

(a)

NRC Generic Letter 2008-01, dated January 11, 2008, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems" (b)

Letter from T. A. Lynch (NMPNS) to Document Control Desk (NRC) dated December 14, 2009, "Supplemental Response to NRC Generic Letter 2008-01, 'Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems"'

(c)

Letter from S. Belcher (NMPNS) to Document Control Desk (NRC) dated. May 1, 2010, "Response to NRC Generic Letter 2008-01,

'Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems' - Commitment Completion Date Change" The Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2008-01 (Reference a) to request that each licensee evaluate the licensing basis, design, testing, and corrective action programs for the Emergency Core Cooling Systems, Residual Heat Removal System, and Containment Spray System, to ensure that gas accumulation is maintained less than the amount that challenges operability of these systems, and that appropriate action is taken when conditions adverse to quality are identified.

41396

Document Control Desk June 30, 2010 Page 2 In a letter dated December 14, 2009 (Reference b), Nine Mile Point Nuclear Station, LLC (NMPNS) committed to send a supplemental response to the NRC within 60 days following the startup from the Nine Mile Point Unit 2 (NMP2) spring 2010 refueling outage to notify the NRC of the completion of those design changes that were to be installed during the outage. NMPNS has implemented design changes to minimize voiding in the Low Pressure Core Spray and Residual Heat Removal systems at NMP2.

The design change to add a vent valve downstream of the Low Pressure Core Spray outside containment isolation valve was not completed as previously discussed in Reference (c).

This change has been deferred to the 2012 refueling outage.

There are no new regulatory commitments identified in this submittal.

Should you have any questions regarding this submittal, please contact T. F. Syrell, Licensing Director, at (315) 349-5219.

Very truly yours, STATE OF NEW YORK

TO WIT:

COUNTY OF OSWEGO I, Sam Belcher, being duly sworn, state that I am Vice President-Nine Mile Point, and that I am duly authorized to execute and file this response on behalf of Nine Mile Point Nuclear Station, LLC. To the best of my knowledge and belief, the statements contained in this document are true and correct. To the extent that these statements are not based on my personal knowledge, they are based upon information provided by other Nine Mile Point employees and/or consultants. Such information has been reviewed in accordance with company practice and I believe it to be reliable.

Subscribed and sworn before me, a Notary Public in and for the State of New York and County of 0_____

, this '30 day of "i'xAe

,2010.

WITNESS my Hand and Notarial Seal:

J3

--- e" Notary Public My Commission Expires:

NOTAXW I=1,5THA'EI'EO=NEW YONa D~te NO. 01JOff3 OUAAUFIED IN OSWEGO COUNTY COMMISSION EXPIRES SB/BC cc:

R. V. Guzman, NRC Project Manager S. J. Collins, NRC Regional Administrator, Region I NRC Resident Inspector