July 15, 2010 Administrative Judge Administrative Judge Richard F. Cole Paul B. Abramson Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Ann Marshall Young, Chair Atomic Safety and Licensing Board Panel Mail Stop T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc.
(Pilgrim Nuclear Power Station)
Docket No. 50-293-LR; ASLBP No. 06-848-02-LR
Dear Administrative Judges:
The NRC Staff hereby provides notice that it has updated the hearing file for this proceeding pursuant to 10 C.F.R. § 2.336(d), as modified by the Board's Order Regarding Schedule for Proceeding and Related Matters (November 29, 2006).
As required by 10 C.F.R. § 2.336(b)(5), the Staff is producing an updated privilege log, identifying documents withheld under the deliberative process privilege, which are appended hereto as Attachment 2. Also, attached is the Declaration of Brian E. Holian formally invoking the deliberative process privilege with respect to each of the documents in Attachment 2. The Staff will preserve and maintain the privileged documents identified in these logs during the pendency of this proceeding. Further, pursuant to 10 C.F.R. § 2.336(c) is the attached Affidavit of Lisa M. Regner.
Sincerely,
/RA/
Andrea Z. Jones Counsel for NRC Staff
Enclosures:
Attachment 1 - Hearing File Index, Supplement 23
- Deliberative Process Privilege Log Declaration of Brian E. Holian Affidavit of Lisa M. Regner cc w/Encls.:
Service List
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
)
ENTERGY NUCLEAR OPERATIONS, INC.
)
Docket No. 50-293-LR
)
(Pilgrim Nuclear Power Station)
)
)
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing Letter to the Atomic Safety and Licensing Board regarding the Pilgrim Nuclear Power Station Hearing File, including: Attachment 1 - Pilgrim Nuclear Power Station License Renewal Hearing File Index Supplement 23, Attachment 2 -
Deliberative Process Privilege Log, Declaration of Brian E. Holian and Affidavit of Lisa M.
Regner have been served upon the following through deposit in the NRCs internal mail system, with copies by electronic mail, or, as indicated by an asterisk, by deposit in the U.S. Postal Service, with copies by electronic mail this 15th day of July, 2010:
Administrative Judge Richard F. Cole Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: Richard.Cole@nrc.gov Administrative Judge Paul B. Abramson Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: Paul.Abramson@nrc.gov Administrative Judge Ann Marshall Young, Chair Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: Ann.Young@nrc.gov Office of Commission Appellate Adjudication Mail Stop: O-16G4 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: OCAAMAIL.Resource@nrc.gov Atomic Safety and Licensing Board Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 (VIA INTERNAL MAIL ONLY)
Office of the Secretary Attn: Rulemakings and Adjudications Staff Mail Stop: O-16G4 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: Hearing.Docket@nrc.gov
Sheila Slocum Hollis*
Duane Morris LLP 1667 K Street, NW, Suite 700 Washington, DC 20006 E-mail: sshollis@duanemorris.com Terence A. Burke, Esq.*
Entergy Nuclear 1340 Echelon Parkway Mail Stop: M-ECH-62 Jackson, MS 39213 E-mail:
tburke@entergy.com Mary Lampert*
148 Washington Street Duxbury, MA 02332 E-mail: mary.lampert@comcast.net David R. Lewis, Esq*.
Paul A. Gaukler, Esq.
Pillsbury, Winthrop, Shaw, Pittman, LLP 2300 N Street, NW Washington, DC 20037-1137 E-mail: david.lewis@pillsburylaw.com paul.gaukler@pillsburylaw.com Chief Kevin M. Nord*
Fire Chief & Director Duxbury Emergency Management Agency 668 Tremont Street Duxbury, MA 02332 E-mail: nord@town.duxbury.ma.us Town Manager*
Town of Plymouth 11 Lincoln St.
Plymouth, MA 02360 E-mail: marrighi@townhall.plymouth.ma.us Richard R. MacDonald*
Town Manager 878 Tremont Street Duxbury, MA 02332 E-mail:
macdonald@town.duxbury.ma.us
/RA/
Andrea Z. Jones Counsel for the NRC Staff
- Pilgrim Nuclear Power Station License Renewal Hearing File Index Supplement 23 - July 15, 2010
- These documents have been redacted because they contained personally identifiable information (PII)
Page 1 of 1 ID #
Accession Number Document Date Title 23-001 ML101950338
- 1/23/2008 2008/01/23 Pilgrim Renewal Hearing - FW Hearing on Plymouth MA Pilgrim Nuclear Plant/Entergy 23-002 ML093640058 12/28/2009 Pilgrim Nuclear Power Station License Renewal Application Annual Update (TAC MC9669).23-003 ML101820041 5/7/2010 2010/05/07 Pilgrim Renewal Hearing - RE: License Renewal guidance documents23-004 ML101820034 5/19/2010 2010/05/19 Pilgrim Renewal Hearing - Pilgrim DRAFT RAIs - Buried Piping and EDG Fogger Housing 23-005 ML101820032 5/20/2010 2010/05/20 Pilgrim Renewal Hearing - RE: Pilgrim DRAFT RAIs - Buried Piping and EDG Fogger Housing 23-006 ML101950315*
5/26/2010 2010/05/26 Pilgrim Renewal Hearing - RE: Pilgrim DRAFT RAIs - Buried Piping and EDG Fogger Housing 23-007 ML101820027 5/28/2010 2010/05/28 Pilgrim Renewal Hearing - Pilgrim Small Bore Piping Socket Welds23-008 ML101820026 6/2/2010 2010/06/02 Pilgrim Renewal Hearing - RE: Participant List 23-009 ML101820017 6/22/2010 2010/06/22 Pilgrim Renewal Hearing - RE: Didn't forget about you
- Pilgrim Nuclear Power Station License Renewal Hearing File Index Deliberative Process Privilege, Supplement 23 - July 15, 2010 Page 1 of 5 ID #
Accession Number Author Name/Affiliation Document Date Document Type Title Addressee/
Affiliation Comment Page Count DPP 001 ML101810564 Steve Jones, NRC/NRR 2/3/2010 E-Mail 2010/02/03 Pilgrim Renewal Hearing -
Pilgrim License Renewal Update Item 5 NRR/DLR Internal discussion related to possible SER supplement 2
DPP 002 ML101810562 Steve Jones, NRC/NRR 2/16/2010 E-Mail 2010/02/16 Pilgrim Renewal Hearing -
RE: Pilgrim License Renewal Update Item 5 NRR/DLR Internal discussion related to possible SER supplement 3
DPP 003 ML101810561 Steve Jones, NRC/NRR 3/9/2010 E-Mail 2010/03/09 Pilgrim Renewal Hearing -
RE: Pilgrim Annual Update NRR/DLR Internal discussion related to possible SER supplement 3
DPP 004 ML101890141 William Holston, NRC/NRR 3/17/2010 E-Mail 2010/03/17 Pilgrim Renewal Hearing -
Buried Pipe OE Related RAI for Cooper VY and Pilgrim NRR/DLR Internal discussion related to possible SER supplement 4
DPP 005 ML101890143 William Holston, NRC/NRR 3/19/2010 E-Mail 2010/03/19 Pilgrim Renewal Hearing -
RE: Buried Pipe OE Related RAI for Cooper VY and Pilgrim NRR/DLR Internal discussion related to possible SER supplement 6
DPP 006 ML101890145 William Holston, NRC/NRR 3/23/2010 E-Mail 2010/03/23 Pilgrim Renewal Hearing -
Revised Buried Pipe RAIs for Vermont Yankee and Pilgrim NRR/DLR Internal discussion related to possible SER supplement 4
DPP 007 ML101890147 William Holston, NRC/NRR 3/24/2010 E-Mail 2010/03/24 Pilgrim Renewal Hearing -
FW: Revised Buried Pipe RAIs for Vermont Yankee and Pilgrim NRR/DLR Internal discussion related to possible SER supplement 4
Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosures as predecisional, deliberative information. Pursuant to 10 C.F.R. § 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the "deliberative process" privilege.
- Pilgrim Nuclear Power Station License Renewal Hearing File Index Deliberative Process Privilege, Supplement 23 - July 15, 2010 Page 2 of 5 ID #
Accession Number Author Name/Affiliation Document Date Document Type Title Addressee/
Affiliation Comment Page Count DPP 008 ML101890149 William Holston, NRC/NRR 3/24/2010 E-Mail 2010/03/24 Pilgrim Renewal Hearing -
FW: VY and Pilgrim buried pipe RAIs NRR/DLR Internal discussion related to possible SER supplement 3
DPP 009 ML101820410 Robert Kuntz, NRC/NRR 3/24/2010 E-Mail 2010/03/24 Pilgrim Renewal Hearing -
RE: VY and Pilgrim buried pipe RAIs NRR/DLR Internal discussion related to possible SER supplement 4
DPP 010 ML101890148 William Holston, NRC/NRR 3/24/2010 E-Mail 2010/03/24 Pilgrim Renewal Hearing -
VY and Pilgrim buried pipe RAIs NRR/DLR Internal discussion related to possible SER supplement 3
DPP 011 ML101820074 Lisa Regner, NRC/NRR 3/25/2010 E-Mail 2010/03/25 Pilgrim Renewal Hearing -
RE: Pilgrim NRR/DLR Internal discussion related to possible SER supplement 4
DPP 012 ML101820072 Lisa Regner, NRC/NRR 3/26/2010 E-Mail 2010/03/26 Pilgrim Renewal Hearing -
RE: Pilgrim LR Annual Update RAIs NRR/DLR Internal discussion related to possible SER supplement 3
DPP 013 ML101820056 Lisa Regner, NRC/NRR 4/16/2010 E-Mail 2010/04/16 Pilgrim Renewal Hearing -
FW: VY and Pilgrim buried pipe RAIs NRR/DLR Internal discussion related to possible SER supplement 4
DPP 014 ML101890151 William Holston, NRC/NRR 4/19/2010 E-Mail 2010/04/19 Pilgrim Renewal Hearing -
RE: VY and Pilgrim buried pipe RAIs NRR/DLR Internal discussion related to possible SER supplement 6
DPP 015 ML101890136 William Holston, NRC/NRR 4/23/2010 E-Mail 2010/04/23 Pilgrim Renewal Hearing -
RE: Buried Piping and Tank RAI NRR/DLR Internal discussion related to possible SER supplement 3
- Pilgrim Nuclear Power Station License Renewal Hearing File Index Deliberative Process Privilege, Supplement 23 - July 15, 2010 Page 3 of 5 ID #
Accession Number Author Name/Affiliation Document Date Document Type Title Addressee/
Affiliation Comment Page Count DPP 016 ML101890152 William Holston, NRC/NRR 4/27/2010 E-Mail 2010/04/27 Pilgrim Renewal Hearing -
Draft Buried Pipe RAI for Current Applicants NRR/DLR Internal discussion related to possible SER supplement 3
DPP 017 ML101820409 Robert Kuntz, NRC/NRR 4/27/2010 E-Mail 2010/04/27 Pilgrim Renewal Hearing -
RE: Strategy Meeting for VY/Pilgrim BP RAI NRR/DLR Internal discussion related to possible SER supplement 2
DPP 018 ML101890134 William Holston, NRC/NRR 4/27/2010 E-Mail 2010/04/27 Pilgrim Renewal Hearing -
Strategy Meeting for VY/Pilgrim BP RAI NRR/DLR Internal discussion related to possible SER supplement 2
DPP 019 ML101890154 William Holston, NRC/NRR 4/29/2010 E-Mail 2010/04/29 Pilgrim Renewal Hearing -
Status - Thursday Aft.
NRR/DLR Internal discussion related to possible SER supplement 2
DPP 020 ML101890156 William Holston, NRC/NRR 5/4/2010 E-Mail 2010/05/04 Pilgrim Renewal Hearing -
Draft RAIs for VY and Pilgrim for Buried Pipe NRR/DLR Internal discussion related to possible SER supplement 4
DPP 021 ML101890118 William Holston, NRC/NRR 5/4/2010 E-Mail 2010/05/04 Pilgrim Renewal Hearing -
RE: Draft RAIs for VY and Pilgrim for Buried Pipe NRR/DLR Internal discussion related to possible SER supplement 3
DPP 022 ML101890158 William Holston, NRC/NRR 5/6/2010 E-Mail 2010/05/06 Pilgrim Renewal Hearing -
RE: Draft Buried Pipe RAI for Current Applicants NRR/DLR Internal discussion related to possible SER supplement 4
DPP 023 ML101890115 William Holston, NRC/NRR 5/10/2010 E-Mail 2010/05/10 Pilgrim Renewal Hearing -
Buried Pipe RAIs for VY and Pilgrim NRR/DLR Internal discussion related to possible SER supplement 4
- Pilgrim Nuclear Power Station License Renewal Hearing File Index Deliberative Process Privilege, Supplement 23 - July 15, 2010 Page 4 of 5 ID #
Accession Number Author Name/Affiliation Document Date Document Type Title Addressee/
Affiliation Comment Page Count DPP 024 ML101890171 William Holston, NRC/NRR 5/18/2010 E-Mail 2010/05/18 Pilgrim Renewal Hearing -
Pilgrim Buried Pipe RAI NRR/DLR Internal discussion related to possible SER supplement 2
DPP 025 ML101810558 Steve Jones, NRC/NRR 5/19/2010 E-Mail 2010/05/19 Pilgrim Renewal Hearing -
RE: Regner modification for review:
Pilgrim EDG Fogger Housing DRAFT RAI NRR/DLR Internal discussion related to possible SER supplement 2
DPP 026 ML101820035 Lisa Regner, NRC/NRR 5/19/2010 E-Mail 2010/05/19 Pilgrim Renewal Hearing -
Regner modification for review: Pilgrim EDG Fogger Housing DRAFT RAI NRR/DLR Internal discussion related to possible SER supplement 3
DPP 027 ML101820033 Lisa Regner, NRC/NRR 5/20/2010 E-Mail 2010/05/20 Pilgrim Renewal Hearing -
RE: Buried Pipes RAI NRR/DLR Internal discussion related to possible SER supplement 3
DPP 028 ML101890016 Allen Hiser, NRC/NRR 5/20/2010 E-Mail 2010/05/20 Pilgrim Renewal Hearing -
REVIEW - Final Comments Requested:
Pilgrim Draft RAI on Neutron Absorbers NRR/DLR Internal discussion related to possible SER supplement 3
DPP 029 ML101820029 Lisa Regner, NRC/NRR 5/26/2010 E-Mail 2010/05/26 Pilgrim Renewal Hearing -
FW: Pilgrim License Renewal and Palo Verde NRR/DLR Internal discussion related to possible SER supplement 3
DPP 030 ML101820024 Lisa Regner, NRC/NRR 6/8/2010 E-Mail 2010/06/08 Pilgrim Renewal Hearing -
RE: Pilgrim LRA NRR/DLR Internal discussion related to possible SER supplement 2
DPP 031 ML101820405 Robert Kuntz, NRC/NRR 6/28/2010 E-Mail 2010/06/28 Pilgrim Renewal Hearing -
Pilgrim annual update RE: AST approval NRR/DLR Internal discussion related to possible SER supplement 3
- Pilgrim Nuclear Power Station License Renewal Hearing File Index Deliberative Process Privilege, Supplement 23 - July 15, 2010 Page 5 of 5 ID #
Accession Number Author Name/Affiliation Document Date Document Type Title Addressee/
Affiliation Comment Page Count DPP 032 ML101820014 Lisa Regner, NRC/NRR 6/30/2010 E-Mail 2010/06/30 Pilgrim Renewal Hearing -
FW: Pilgrim License Renewal NRR/DLR Internal discussion related to possible SER supplement 10 DPP 033 ML101820015 Lisa Regner, NRC/NRR 6/30/2010 E-Mail 2010/06/30 Pilgrim Renewal Hearing -
FW: RAI on coatings NRR/DLR Internal discussion related to possible SER supplement 2
DPP 034 ML101820012 Lisa Regner, NRC/NRR 7/1/2010 E-Mail 7/1/2010 Pilgrim Renewal Hearing -
Pilgrum tritium info NRR/DLR Internal discussion related to possible SER supplement 2
July 15, 2010 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
)
ENTERGY NUCLEAR GENERATION
)
Docket No. 50-293-LR COMPANY AND ENTERGY NUCLEAR
)
OPERATIONS, INC.
)
ASLBP No. 06-848-02-LR
)
(Pilgrim Nuclear Power Station)
)
DECLARATION OF BRIAN E. HOLIAN I, Brian E. Holian, do hereby state as follows:
- 1.
I am employed as the Director of the Division of License Renewal (DLR) in the U.S. Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation (NRR).
My supervisory responsibilities include oversight of the NRC Staffs review and evaluation of the Pilgrim Nuclear Power Stations license renewal application.
- 2.
As part of their responsibilities in updating the hearing file and mandatory disclosures for these proceedings, NRC staff members under my supervision identified certain documents as privileged because they contained information concerning the Staffs pre-decisional deliberative process. Those documents are listed in Attachment 2 to the July 15, 2010 submission of the Staffs Hearing File Index Supplement 23.
- 3.
I have personally reviewed the documents identified as privileged in Attachment 2, and have determined, in accordance with the guidance set forth in Management Directive 3.4, that they contain pre-decisional information concerning the Staffs review of the license renewal application. All documents contain either Staffs analyses, recommendations, opinions, or evaluations, and may not necessarily reflect the final agency position with respect to the matters discussed therein. Each of the documents comprises part of the deliberative process necessary for the Staffs review of the pending license renewal application.
- 4.
Further, I have determined that disclosure of these documents could result in harm to the agency, in that it would (a) prematurely disclose the preliminary views of individual Staff members and/or the Staff prior to reaching a final agency decision, and could thus create confusion as to the actual policy or views of the NRC Staff; (b) hinder the efficiency of the Staff, in that forced disclosure of its internal discussions on an unresolved issue would tend to chill all future deliberations and would interfere with the Staffs ability to engage in a free exchange of opinions and analyses prior to publishing its final review documents; and (c) imply or suggest incorrectly that the opinions of the Staff members involved in these communications are actually the final decisions of the agency, while no such final decision has yet been made.
- 5.
Accordingly, I formally invoke the deliberative process privilege with respect to each of the documents listed in Attachment 2 to the July 15, 2010 submission of the Staffs Hearing File Index Supplement 23.
- 6.
I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.
/Original Signed By/
Brian E. Holian Executed in Rockville, Maryland this 15th day of July, 2010
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
)
ENTERGY NUCLEAR GENERATION
)
Docket No. 50-293-LR COMPANY AND ENTERGY NUCLEAR
)
OPERATIONS, INC.
)
ASLBP No. 06-848-02-LR
)
(Pilgrim Nuclear Power Station)
)
AFFIDAVIT OF LISA M. REGNER CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(c)
I, Lisa M. Regner, do hereby state as follows:
- 1.
I am employed as a Project Manager in the Division of License Renewal in the Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. I serve as a project manager for the Pilgrim Nuclear Power Stations license renewal application (LRA).
- 2.
I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete as of the date of this certification.
- 3.
I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.
/Original Signed By/
Lisa M. Regner Executed in Rockville, MD this 15th day of July, 2010