Category:Letter type:RS
MONTHYEARRS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-064, Nuclear Radiological Emergency Plan Document Revisions2024-06-28028 June 2024 Nuclear Radiological Emergency Plan Document Revisions RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-014, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-02-22022 February 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-23-120, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-103, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor RS-23-084, Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis2023-07-24024 July 2023 Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-048, Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements2023-03-0707 March 2023 Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-037, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station2023-02-22022 February 2023 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-22-085, Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis2023-01-12012 January 2023 Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis RS-23-006, Supplemental Information Regarding License Amendment Request Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report2023-01-10010 January 2023 Supplemental Information Regarding License Amendment Request Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-109, Response to Request for Additional Information License Amendments Related to Fuel Storage2022-10-12012 October 2022 Response to Request for Additional Information License Amendments Related to Fuel Storage RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-083, Response to Request for Additional Information Related to the License Amendment Request to Change New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical2022-06-17017 June 2022 Response to Request for Additional Information Related to the License Amendment Request to Change New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical RS-22-051, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-04-12012 April 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations RS-22-035, Supplemental Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs2022-03-0404 March 2022 Supplemental Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs RS-22-033, Response to Request for Additional Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs2022-03-0303 March 2022 Response to Request for Additional Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs RS-22-032, Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs2022-03-0202 March 2022 Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs RS-22-023, Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement2022-02-23023 February 2022 Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P RS-22-018, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station2022-02-22022 February 2022 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station RS-22-019, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-02-16016 February 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-015, Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC2022-02-0101 February 2022 Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-121, Proposed Changes to Decommissioning Trust Agreements and Master Terms2021-12-15015 December 2021 Proposed Changes to Decommissioning Trust Agreements and Master Terms RS-21-115, Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.52021-11-0404 November 2021 Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.5 RS-21-109, Request to Withhold Meeting Materials for the Non-Public Meeting Held on September 2, 20212021-10-14014 October 2021 Request to Withhold Meeting Materials for the Non-Public Meeting Held on September 2, 2021 RS-21-091, Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes2021-09-13013 September 2021 Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes RS-21-078, Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel2021-08-19019 August 2021 Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel RS-21-085, Response to Request for Additional Information Regarding License Amendment Request to Incorporate Licensing Topical Report NEDE-33885PA, Revision 1, GNF CRDA Application Methodology (EPID-L-2021-LLA-0016)2021-08-17017 August 2021 Response to Request for Additional Information Regarding License Amendment Request to Incorporate Licensing Topical Report NEDE-33885PA, Revision 1, GNF CRDA Application Methodology (EPID-L-2021-LLA-0016) RS-21-070, Proposed Alternative to Utilize Code Case N-8932021-06-30030 June 2021 Proposed Alternative to Utilize Code Case N-893 RS-21-063, Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2021-06-30030 June 2021 Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-064, License Amendment Request Re New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies - Cover Letter2021-06-30030 June 2021 License Amendment Request Re New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies - Cover Letter 2024-09-12
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23073A2182023-03-22022 March 2023 Issuance of Amendment No. 258 to Renewed Facility Operating Licenses Exigent Amendment to Revise Design Basis Related to Seismic Requirements RS-23-048, Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements2023-03-0707 March 2023 Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements RS-23-006, Supplemental Information Regarding License Amendment Request Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report2023-01-10010 January 2023 Supplemental Information Regarding License Amendment Request Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report ML22332A4492022-11-10010 November 2022 License Amendment Request - Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21277A1932021-11-16016 November 2021 Enclosure 2, Draft Conforming License Amendments RS-21-115, Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.52021-11-0404 November 2021 Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.5 JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RS-21-064, License Amendment Request Re New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies - Cover Letter2021-06-30030 June 2021 License Amendment Request Re New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies - Cover Letter RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments ML21057A2732021-02-25025 February 2021 Application for Order Approving License Transfers and Proposed Conforming License Amendments RS-20-115, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-11-18018 November 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements RS-20-087, Request for a License Amendment to LaSalle County Station, Units 1 and 2, Technical Specification 3.7.3, Ultimate Heat Sink2020-07-17017 July 2020 Request for a License Amendment to LaSalle County Station, Units 1 and 2, Technical Specification 3.7.3, Ultimate Heat Sink RS-20-031, License Amendment Request - Application to Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2 .5 and TS 3.6 .3.2, Using the Consolidated Line Item Improvement Process2020-04-30030 April 2020 License Amendment Request - Application to Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2 .5 and TS 3.6 .3.2, Using the Consolidated Line Item Improvement Process RS-20-009, Application to Revise LaSalle County Station Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2020-01-31031 January 2020 Application to Revise LaSalle County Station Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RS-20-011, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2020-01-31031 January 2020 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors RS-19-044, License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions2019-08-28028 August 2019 License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions RS-19-069, License Amendment Request Supporting Emergency Plan Emergency Action Level Change (EAL RAL3)2019-08-23023 August 2019 License Amendment Request Supporting Emergency Plan Emergency Action Level Change (EAL RAL3) JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-19-040, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-06-25025 June 2019 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML19036A5862019-03-21021 March 2019 Issuance of Amendments to Revise the Emergency Response Organization Staffing Requirements RS-19-003, Application to Adopt TSTF-564, Safety Limit Mcpr.2019-02-0101 February 2019 Application to Adopt TSTF-564, Safety Limit Mcpr. RS-18-130, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO2018-11-0101 November 2018 Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement2018-06-15015 June 2018 Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement RS-18-032, Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers2018-04-25025 April 2018 Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers RS-18-028, License Amendment Request to Remove Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery and High Pressure Core Spray Diesel Generator2018-04-19019 April 2018 License Amendment Request to Remove Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery and High Pressure Core Spray Diesel Generator RS-17-161, Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR)2018-03-0101 March 2018 Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR) RS-18-023, License Amendment Request to Revise the Technical Specifications (TS) Surveillance Requirement (SR) 3.4.4.1 to Revise the Lower Setpoint Tolerances for Safety/Relief Valves (S/Rvs)2018-02-27027 February 2018 License Amendment Request to Revise the Technical Specifications (TS) Surveillance Requirement (SR) 3.4.4.1 to Revise the Lower Setpoint Tolerances for Safety/Relief Valves (S/Rvs) ML18053A1762018-01-31031 January 2018 Attachment 5B - LaSalle Clean Emergency Plan EP-AA-1000 Pages ML18053A1842018-01-31031 January 2018 Enclosure 5 - LaSalle - Evaluation of Proposed Changes ML18053A1752018-01-31031 January 2018 Attachment 5A - LaSalle Marked-up Emergency Plan EP-AA-1000 Pages RS-18-021, Exelon Generation Co, LLC - License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements2018-01-31031 January 2018 Exelon Generation Co, LLC - License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements RS-18-021, License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements2018-01-31031 January 2018 License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements RS-18-009, License Amendment Request for Temporary Extensions to Technical Specifications Supporting Maintenance on Portions of the Core Standby Cooling System2018-01-24024 January 2018 License Amendment Request for Temporary Extensions to Technical Specifications Supporting Maintenance on Portions of the Core Standby Cooling System RS-17-127, Submittal of Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2017-12-13013 December 2017 Submittal of Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. RS-17-137, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2017-11-0808 November 2017 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements RS-17-049, Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process2017-03-28028 March 2017 Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process RS-16-225, Revised Request for License Amendment Regarding High Burnup Atrium-10 Partial Length Fuel Rods and Request for Exigent Review2016-11-0808 November 2016 Revised Request for License Amendment Regarding High Burnup Atrium-10 Partial Length Fuel Rods and Request for Exigent Review RS-16-191, License Amendment Request to Revise Technical Specifications 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2016-10-26026 October 2016 License Amendment Request to Revise Technical Specifications 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML16280A4022016-10-0606 October 2016 License Amendment Request - Supplement Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. RS-16-198, Request for License Amendment Regarding High Burnup Atrium-10 Partial Length Fuel Rods2016-09-30030 September 2016 Request for License Amendment Regarding High Burnup Atrium-10 Partial Length Fuel Rods ML16209A2182016-07-26026 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. ML16036A3482016-02-0505 February 2016 Maintenance of Draft Supplemental Environmental Impact Statement at the Seneca Public Library in Regards to the Review of the LaSalle County Station License Renewal Application (TAC Nos. MF5567 and MF5568) RS-16-035, County, and Quad Cities - Request for License Amendment to Address Secondary Containment Access Openings2016-02-0303 February 2016 County, and Quad Cities - Request for License Amendment to Address Secondary Containment Access Openings RS-15-305, Corrections to the License Renewal Application Dated December 9, 20142015-12-0202 December 2015 Corrections to the License Renewal Application Dated December 9, 2014 RS-15-279, Request for License Amendment to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls.2015-11-19019 November 2015 Request for License Amendment to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls. RS-15-193, Responds to NRC Requests for Additional Information, Set 5, Dated July 7, 2015 Related to the License Renewal Application2015-08-0606 August 2015 Responds to NRC Requests for Additional Information, Set 5, Dated July 7, 2015 Related to the License Renewal Application 2024-04-12
[Table view] Category:Technical Specifications
MONTHYEARML24018A0682024-02-0909 February 2024 Issuance of Amendment Nos. 262 and 247 Revised Design Bases of Lower Downcomer Braces RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs ML22332A4502022-11-10010 November 2022 Attachment 2 - Markup of Technical Specification Pages ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21158A2282021-07-13013 July 2021 Issuance of Amendments to Renewed Facility Operating Licenses a License Amendment to Technical Specification 3.7.3, Ultimate Heat Sink ML21265A5362021-06-30030 June 2021 Attachment 2: LaSalle County Station Units 1 & 2 - Proposed Technical Specifications Markups ML21082A4222021-05-27027 May 2021 Issuance of Amendment Nos. 249 and 235 to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 RS-20-136, Response to Request for Additional Information Re License Amendment Requests for Amendments to Renewed Facility OL to Adopt 10CFR50.69 & to Adopt TSTF-505, Rev. 2 (EPID L-2020-LLA-0017 and EPID-L-2020-LLA-0018)2020-10-29029 October 2020 Response to Request for Additional Information Re License Amendment Requests for Amendments to Renewed Facility OL to Adopt 10CFR50.69 & to Adopt TSTF-505, Rev. 2 (EPID L-2020-LLA-0017 and EPID-L-2020-LLA-0018) RS-20-016, County, Nine Mile Point, Peach Bottom Atomic and Quad Cities - Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems2020-04-13013 April 2020 County, Nine Mile Point, Peach Bottom Atomic and Quad Cities - Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement2018-06-15015 June 2018 Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement RS-17-127, Submittal of Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2017-12-13013 December 2017 Submittal of Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. ML17257A3042017-10-30030 October 2017 Non-Proprietary - Issuance of Amendments Request to Revise Suppression Pool Swell Design Analysis and the Facility Licensing Basis ML16259A0592016-10-19019 October 2016 License Appendix a and B RS-16-035, County, and Quad Cities - Request for License Amendment to Address Secondary Containment Access Openings2016-02-0303 February 2016 County, and Quad Cities - Request for License Amendment to Address Secondary Containment Access Openings ML15324A4392015-12-17017 December 2015 Issuance of Amendments (CAC Nos. MF5471-MF5476) RS-15-279, Request for License Amendment to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls.2015-11-19019 November 2015 Request for License Amendment to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls. ML15202A5782015-11-19019 November 2015 Issuance of Amendment to Revise the Ultimate Heat Sink Temperature Limits ML15141A0582015-07-28028 July 2015 Issuance of Amendments Regarding Emergency Action Level Schemes (TAC Nos. MF4232-MF4251) ML14323A5222015-04-0808 April 2015 Issuance of Amendments Regarding the Emergency Plan Definition of Annual Training ML14353A0832015-01-29029 January 2015 Issuance of Amendments Revising Peak Calculated Primary Containment Internal Pressure ML14220A5172014-11-25025 November 2014 Issuance of Amendment Revising Pressure and Temperature Limits ML14085A5322014-07-21021 July 2014 Issuance of Amendments Adoption of TSTF-522 Ventilation System Surveillance Requirements RS-13-092, License Amendment Request to Revise Peak Calculated Primary Containment Internal Pressure2013-09-0505 September 2013 License Amendment Request to Revise Peak Calculated Primary Containment Internal Pressure RS-13-137, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process2013-09-0303 September 2013 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process RS-11-149, Request for Technical Specification Change for Minimum Critical Power Ratio Safety Limit2011-10-12012 October 2011 Request for Technical Specification Change for Minimum Critical Power Ratio Safety Limit RS-11-036, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.2011-04-0404 April 2011 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. RS-11-014, Additional Information Supporting License Amendment Request Regarding the Use of Neutron Absorbing Inserts in Unit 2 Spent Fuel Pool Storage Racks2011-01-28028 January 2011 Additional Information Supporting License Amendment Request Regarding the Use of Neutron Absorbing Inserts in Unit 2 Spent Fuel Pool Storage Racks ML1018303612010-09-16016 September 2010 License Amendment, Measurement Uncertainty Recapture Power Uprate RS-10-080, License Amendment Request Regarding Reactor Coolant System Pressure and Temperature Limit Curves2010-04-19019 April 2010 License Amendment Request Regarding Reactor Coolant System Pressure and Temperature Limit Curves RS-10-015, Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System.2010-02-22022 February 2010 Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System. RS-10-001, LaSalle, Units 1 and 2, Attachment 2 - Markup of Proposed Operating License and Technical Specifications Pages2010-01-27027 January 2010 LaSalle, Units 1 and 2, Attachment 2 - Markup of Proposed Operating License and Technical Specifications Pages ML1003213062010-01-27027 January 2010 Attachment 2 - Markup of Proposed Operating License and Technical Specifications Pages ML0927202312009-10-0202 October 2009 Correction Letter for License Amendment Nos. 195 and 182, Revise Local Power Range Monitor Calibration Frequency ML0924504042009-09-0303 September 2009 Correction Letter for License Amendment Nos. 193 and 180 Obsolete License Conditions and Revise Technical Specifications RS-09-110, Additional Information Supporting Request for License Amendment to Delete Obsolete License Conditions and Revise Technical Specifications2009-08-11011 August 2009 Additional Information Supporting Request for License Amendment to Delete Obsolete License Conditions and Revise Technical Specifications RS-09-020, Request for a License Amendment to Technical Specification 3.5.1, Emergency Core Cooling Systems (ECCS) Operating.2009-03-26026 March 2009 Request for a License Amendment to Technical Specification 3.5.1, Emergency Core Cooling Systems (ECCS) Operating. ML0823907072008-08-21021 August 2008 Revised T.S. Pages Oyster Creek Nuclear Generating Station and Peach Bottom Atomic Power Station, Unit 3-Correction to Facility Operating Licenses ML0821301362008-07-25025 July 2008 Braidwood/Byron/Clinton/Dresden/Lasalle/Oyster Creek/Peach Bottom/Quad Cities/Three Mile Island - Tech Spec Pages for Amds to Change TS Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators RS-08-091, Request for a License Amendment to Revise Local Power Range Monitor Calibration Frequency2008-07-25025 July 2008 Request for a License Amendment to Revise Local Power Range Monitor Calibration Frequency RA-08-024, Amergen, Energy LLC, License Amendment Request to Remove References to NRC Generic Letter 82-12, Nuclear Power Plant Staff Working Hours.2008-04-21021 April 2008 Amergen, Energy LLC, License Amendment Request to Remove References to NRC Generic Letter 82-12, Nuclear Power Plant Staff Working Hours. ML0807303512008-03-10010 March 2008 Tech. Spec. Pages, Issuance of Amendments Revise TS 3.7.5 RS-08-012, Amergen Company, Request for Amendment to Administrative Controls Section of Technical Specifications2008-02-28028 February 2008 Amergen Company, Request for Amendment to Administrative Controls Section of Technical Specifications ML0733310942007-11-19019 November 2007 Tech Specs for Amendments to Provide Consistency with Quality Assurance Topical Report ML0731003892007-10-31031 October 2007 Technical Specifications, Changes Resulting from the Incorporation of TSTF-448, Control Room Habitability. ML0728907472007-10-12012 October 2007 Technical Specifications, Revise Technical Specifications, Section 5.5.7, Inservice Testing Program. 2024-02-09
[Table view] |
Text
Exelon Generation www.exeloncorp.com Exelbn 4300 Winfield Road Nuclear Warrenville, I L60555 RS-10-080 10 CFR 50.90 April 19, 2010 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374
Subject:
License Amendment Request Regarding Reactor Coolant System Pressure and Temperature Limit Curves In accordance with 10 CFR 50.90, "Application for amendment of license, construction permit, or early site permit," Exelon Generation Company, LLC (EGC) requests an amendment to Facility Operating License Nos. NPF-1 1 and NPF-1 8 for LaSalle County Station (LSCS), Units 1 and 2. The proposed change revises Technical Specifications (TS) 3.4.11, "RCS Pressure and Temperature (P/T) Limits," to incorporate revised P/T curves that are valid for up to 32 effective full power years of operation.
This request is subdivided as follows.
" Attachment 1 provides a description and evaluation of the proposed change.
- Attachment 2 provides a markup of the affected TS pages.
- Attachment 3 provides a markup of the affected TS Bases page. The TS Bases page is provided for information only and does not require NRC approval.
- Attachments 4 and 5 provide General Electric Company (GE) proprietary reports that support the proposed change, for LSCS Units 1 and 2, respectively.
- Attachments 6 and 7 provide non-proprietary versions of the GE reports contained in Attachments 4 and 5, for LSCS Units 1 and 2, respectively.
Some of the information in Attachments 4 and 5 is proprietary to GE, and is supported by an affidavit signed by GE-Hitachi, the owner of the information. The affidavits, which are provided within the applicable documents, set forth the basis on which the information may be withheld from public disclosure by the NRC, and addresses with specificity the considerations listed in paragraph (b)(4) of 10 CFR 2.390, "Public inspections, exemptions, requests for withholding."
A01)l
April 19, 2010 U.S. Nuclear Regulatory Commission Page 2 Accordingly, it is respectfully requested that the information be withheld from public disclosure in accordance with 10 CFR 2.390. Non-proprietary versions of the information contained in Attachments 4 and 5 are provided in Attachments 6 and 7, respectively.
The proposed change has been reviewed by the LSCS Plant Operations Review Committee and approved by the Nuclear Safety Review Board in accordance with the requirements of the EGC Quality Assurance Program.
The existing P/T curves contained in TS 3.4.11 are valid for up to 20 effective full power years of operation. Current projections indicate that LSCS Units 1 and 2 will reach 20 effective full power years of operation in April 2011 and December 2011, respectively. Therefore, EGC requests approval of the proposed change by April 19, 2011. Once approved, the amendment will be implemented within 60 days. This implementation period will provide adequate time for the affected station documents to be revised using the appropriate change control mechanisms.
In accordance with 10 CFR 50.91, "Notice for public comment; State consultation,"
paragraph (b), EGC is notifying the State of Illinois of this application for license amendment by transmitting a copy of this letter and its attachments to the designated State Official.
There are no regulatory commitments contained in this letter. Should you have any questions concerning this letter, please contact Mr. Kenneth M. Nicely at (630) 657-2803.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 19th day of April 2010.
Patrick R. Simpson Manager - Licensing Attachments:
- 1. Evaluation of Proposed Change
- 2. Markup of Proposed Technical Specifications Pages
- 3. Markup of Proposed Technical Specifications Bases Page
- 4. GE-NE-0000-0003-5526-02R1, "Pressure-Temperature Curves For Exelon LaSalle Unit 1," dated May 2004 (Proprietary)
- 5. GE-NE-0000-0003-5526-01 R1, "Pressure-Temperature Curves For Exelon LaSalle Unit 2," dated May 2004 (Proprietary)
- 6. GE-NE-0000-0003-5526-02Rla, "Pressure-Temperature Curves For Exelon LaSalle Unit 1," dated May 2004 (Non-Proprietary)
- 7. GE-NE-0000-0003-5526-01R1a, "Pressure-Temperature Curves For Exelon LaSalle Unit 2," dated May 2004 (Non-Proprietary) cc: NRC Regional Administrator, Region III NRC Senior Resident Inspector - LaSalle County Station Illinois Emergency Management Agency - Division of Nuclear Safety
ATTACHMENT I Evaluation of Proposed Change 1.0
SUMMARY
DESCRIPTION 2.0 DETAILED DESCRIPTION
3.0 TECHNICAL EVALUATION
4.0 REGULATORY EVALUATION
4.1 Applicable Regulatory Requirements/Criteria 4.2 No Significant Hazards Consideration 4.3 Conclusions
5.0 ENVIRONMENTAL CONSIDERATION
6.0 REFERENCES
Page 1
ATTACHMENT I Evaluation of Proposed Change 1.0
SUMMARY
DESCRIPTION In accordance with 10 CFR 50.90, "Application for amendment of license, construction permit, or early site permit," Exelon Generation Company, LLC (EGC) requests an amendment to Facility Operating License Nos. NPF-1 1 and NPF-1 8 for LaSalle County Station (LSCS), Units 1 and 2. The proposed change revises Technical Specifications (TS) 3.4.11, "RCS Pressure and Temperature (P/T) Limits," to incorporate revised P/T curves that are valid for up to 32 effective full power years (EFPY) of operation.
2.0 DETAILED DESCRIPTION TS 3.4.11 contains Reactor Coolant System (RCS) P/T curves for heatup, cooldown, inservice leak and hydrostatic testing, and criticality, and also limits the maximum rate of change of RCS temperature. The existing P/T curves contained in TS 3.4.11 are valid for up to 20 EFPY of operation. Current projections indicate that LSCS Units 1 and 2 will reach 20 EFPY of operation in April 2011 and December 2011, respectively.
The proposed change modifies Surveillance Requirements (SRs) 3.4.11.1 and 3.4.11.2 to replace the existing references to the 20 EFPY curves with references to the new 32 EFPY curves. Specifically, the SRs are revised to read as follows.
SR 3.4.11.1 - ------------------------ NOTE -----------------------
Only required to be performed during RCS heatup and cooldown operations, and RCS inservice leak and hydrostatic testing.
Verify:
- a. RCS pressure and RCS temperature are within the applicable limits specified in Figures 3.4.11-1, 3.4.11-2, 3.4.11-3 for Unit 1 up to 32 EFPY, and Figures 3.4.11-4, 3.4.11-5, and 3.4.11-6 for Unit 2 up to 32 EFPY;
- b. RCS heatup and cooldown rates are < 100°F in any 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period; and
- c. RCS temperature change during system leakage and hydrostatic testing is < 20°F in any one hour period when the RCS pressure and RCS temperature are not within the limits of Figure 3.4.11-2 for Unit 1 up to 32 EFPY and Figure 3.4.11-5 for Unit 2 up to 32 EFPY.
SR 3.4.11.2 Verify RCS pressure and RCS temperature are within the criticality limits specified in Figure 3.4.11-3 for Unit 1 up to 32 EFPY and Figure 3.4.11-6 for Unit 2 up to 32 EFPY.
Page 2
ATTACHMENT I Evaluation of Proposed Change The proposed change also replaces Figures 3.4.11-1 through 3.4.11-6 with revised figures that are applicable to 32 EFPY.
A markup of the proposed TS changes is provided in Attachment 2.
3.0 TECHNICAL EVALUATION
Components of the RCS are designed to withstand effects of cyclic loads due to system pressure and temperature changes. These loads are introduced by startup (i.e., heatup) and shutdown (i.e., cooldown) operations, power transients, and reactor trips. TS 3.4.11 limits the pressure and temperature changes during RCS heatup and cooldown, within the design assumptions and the stress limits for cyclic operation.
TS 3.4.11 contains P/T curves for heatup, cooldown, inservice leak and hydrostatic testing, and criticality and also limits the maximum rate of change of RCS temperature. Each P/T curve defines an acceptable region for normal operation. The typical use of the curves is during RCS heatup or cooldown maneuvering, when pressure and temperature indications are monitored and compared to the applicable curve to determine that operation is within the allowable region.
The P/T curves establish operating limits that provide a margin to brittle failure of the reactor vessel and piping of the reactor coolant pressure boundary (RCPB).
The P/T curves are composite curves established by superimposing limits derived from stress analyses of those portions of the reactor vessel and head that are the most restrictive. At any specific pressure, temperature, and temperature rate of change, one location within the reactor vessel will dictate the most restrictive limit. Across the span of the P/T curves, different locations are more restrictive, and, thus, the curves are composites of the most restrictive regions.
The existing P/T curves contained within TS 3.4.11 (i.e., Figures 3.4.11-1 through 3.4.11-6) are applicable up to 20 EFPY. The NRC approved the existing 20 EFPY P/T curves for LSCS in Reference 1, in response to EGC's license amendment request dated January 31, 2003, (i.e.,
Reference 2), as supplemented by References 3 and 4.
Reference 4 provided information, in response to an NRC request, regarding the chemical composition of vertical and girth welds, and the impact of these chemical compositions on the adjusted reference temperature and P/T limits. In addition, Reference 4 provided information to demonstrate that the Low Pressure Coolant Injection (LPCI) nozzle forging adjusted reference temperature bounds that for the LPCI nozzle weld for both units. The information in Reference 4 described above is applicable to the new 32 EFPY curves.
Updated P/T curves have been created to replace the existing P/T curves with new curves that are applicable up to 32 EFPY, which represents the end of the current 40-year operating licenses (i.e., assuming an 80 percent capacity factor). Attachments 4 and 5 provide General Electric Company (GE) proprietary reports that describe the analyses scope, assumptions, methodology, and results for LSCS Units 1 and 2, respectively. The new P/T curves were developed to present steam dome pressure versus minimum vessel metal temperature incorporating appropriate non-beltline limits and irradiation embrittlement effects in the beltline.
Page 3
ATTACHMENT I Evaluation of Proposed Change Non-proprietary versions of the information contained in Attachments 4 and 5 are provided as Attachments 6 and 7, respectively.
GE recently became aware of an administrative error in the Unit 2 report provided in . Specifically, on Table F-I, "Upper Shelf Energy Evaluation for LaSalle Unit 2 Beltline Materials," weld heat 3P4000 was listed as being associated with a "Lower-Intermediate" weld, and weld heat 3P4966 was listed as being associated with a "Lower" weld.
As listed in Table 4-4, "LaSalle Unit 2 Beltline ART Values (32 EFPY)," weld heat 3P4000 is actually associated with a "Lower" weld, and weld heat 3P3966 is associated with a "Lower-Intermediate" weld. This administrative error has no impact on the fracture toughness evaluation.
In Reference 1, the NRC indicated that when the 32 EFPY curves are submitted for NRC review and approval, EGC must perform a quantitative evaluation to demonstrate that the feedwater nozzles are more limiting than the-Unit 2 LPCI nozzles, or provide PIT limit curves based on the adjusted reference temperature for the LPCI nozzles. As discussed in Attachment 5, for Unit 2, the LPCI nozzle is the limiting material for the beltline region for 32 EFPY. The beltline pressure test P/T curves were calculated in the same manner as the feedwater nozzle P/T curves as described in Section 4.3.2.1.3 of Attachment 5. The initial RTNDT for the LPCI nozzle materials is -6°F. The generic pressure test P/T curve is applied to the Unit 2 feedwater nozzle curve by shifting the P vs. (T - RTNDT) values in Section 4.3.2.1.3 of Attachment 5 to reflect the LPCI nozzle adjusted reference temperature Value of 52°F. Therefore, the proposed 32 EFPY curves for Unit 2 are based on the adjusted reference temperature for the LPCI nozzles.
The new P/T curves for LSCS were developed using the methodology of GE Topical Report NEDC-32983P, "General Electric Methodology for Reactor Pressure Vessel Fast Neutron Flux Evaluation," (i.e., Reference 5). In Reference 6, the NRC approved the NEDC-32983P methodology for pressure and core shroud fast neutron flux evaluation. However, the approval was subject to the following limitations.
(1) Within three years from the day of the approval of this methodology, GE Nuclear Energy will perform predictive calculations of at least four additional boiling water reactor surveillance capsule dosimetry measurements which will be submitted to the NRC before initiation of the measurements.
(2) Comparisons of the measurements and calculations will also be submitted to the
,NRC.
(3) Shroud fluence estimates will be limited to the beltline region, without bias adjustment.
(4) GE Nuclear Energy will perform dosimetry analysis to confirm and remove the conservatism in the shroud fluence calculations.
(5) Revisions to the fluence methodology and supporting uncertainty analysis will be provided, if the calculated/measured comparisons (i.e., for the additional analysis for the vessel and the shroud) are not consistent with the NEDC-32983P fluence methodology.
Page 4
ATTACHMENT 1 Evaluation of Proposed Change Subsequently, GE Nuclear Energy submitted additional information to the NRC to justify removing methodology limitations (1) through (4), listed above, associated with NEDC-32983P.
In Reference 7, the NRC concluded that the information submitted by GE Nuclear Energy provided sufficient justification to remove limitations (1) through (4). However, limitation (5) remains as a condition of applicability of the NEDC-32983P methodology.
EGC has evaluated compliance with limitation (5) and has concluded that there are no new data obtained from the material surveillance program that impacts the NEDC-32983P fluence methodology. Both the current 20 EFPY curves and the proposed 32 EFPY curves are based on the fluence methodology and uncertainty analyses in NEDC-32983P. These analytical methods can be compared to measured values when surveillance capsules are removed from the reactor and analyzed in accordance with Appendix H to 10 CFR 50, "Reactor Vessel Material Surveillance Program Requirements." LSCS demonstrates its compliance with the Appendix H requirements through participation in the Boiling Water Reactor Vessel and Internals Project (BWRVIP) Integrated Surveillance Program (ISP) (i.e., Reference 8).
Reference 9 provides industry results of surveillance capsule testing.
The ISP representative surveillance materials for LSCS Unit 1 plate and weld metals are contained in the LSCS Unit 1 capsule. EGC removed this surveillance capsule during the spring 2010 refueling outage, and plans are to evaluate the materials in 2010. Therefore, no new materials data applicable to LSCS Unit 1 have been obtained since the approval of the 20 EFPY curves, and no comparison between calculated and measured values can be made.
The ISP representative surveillance materials for LSCS Unit 2 plate metals are contained in the River Bend capsules. The River Bend capsule is not scheduled for testing until 2025. The ISP representative surveillance materials for LSCS Unit 2 weld metals are contained in the Susquehanna Unit 1 capsules. The Susquehanna Unit 1 capsule is not scheduled for testing until 2012. Therefore, no new materials data applicable to LSCS Unit 2 have been obtained since the approval of the 20 EFPY curves, and no comparison between calculated and measured values can be made.
4.0 REGULATORY EVALUATION
4.1 Applicable Regulatory Requirements/Criteria 10 CFR 50.60, "Acceptance criteria for fracture prevention measures for lightwater nuclear power reactors for normal operation," paragraph (a) states:
Except as provided in paragraph (b) of this section, all light-water nuclear power reactors, other than reactor facilities for which the certifications required under
§50.82(a)(1) have been submitted, must meet the fracture toughness and material surveillance program requirements for the reactor coolant pressure boundary set forth in appendices G and H to this part.
The NRC has established requirements in Appendix G to 10 CFR 50, "Fracture Toughness Requirements," to protect the integrity of the RCPB in nuclear power plants.
Appendix G to 10 CFR 50 requires that the P/T limits be at least as conservative as those obtained by following the methods of analysis and the margins of safety of Page 5
ATTACHMENT 1 Evaluation of Proposed Change Appendix G to Section XI of the American Society of Mechanical Engineers (ASME)
Boiler and Pressure Vessel Code (Code). Appendix G also requires that applicable surveillance data from material surveillance programs be incorporated into the calculations of plant-specific P/T limits, and that the P/T limits for operating reactors be generated using a method that accounts for the effects of neutron irradiation on the material properties of the reactor vessel beltline materials.
Table 1, "Pressure and Temperature Requirements for the Reactor Pressure Vessel," of Appendix G to 10 CFR 50 provides the NRC's criteria for meeting the P/T limit requirements of ASME Code,Section XI, Appendix G, as well as the minimum temperature requirements of the rule for bolting up the reactor vessel during normal and pressure testing operations. In addition, NRC guidance related to P/T limit curves is found in Regulatory Guide (RG) 1.99, Revision 2, "Radiation Embrittlement of Reactor Vessel Materials," (i.e., Reference 10) and Standard Review Plan Section 5.3.2, "Pressure-Temperature Limits, Upper-Shelf Energy, and Pressurized Thermal Shock,"
(i.e., Reference 11).
Appendix H to 10 CFR 50 establishes requirements related to facility material surveillance programs. LSCS demonstrates its compliance with the Appendix H requirements through participation in the Boiling Water Reactor Vessel and Internals Project (BWRVIP) Integrated Surveillance Program (ISP) (i.e., Reference 8).
In March 2001, the NRC issued RG 1.190, "Calculational and Dosimetry Methods for Determining Pressure Vessel Neutron Fluence," (i.e., Reference 12). RG 1.190 describes methods and assumptions acceptable to the NRC for determining neutron fluence. The new P/T curves for LSCS were developed using the methodology of GE Topical Report NEDC-32983P, "General Electric Methodology for Reactor Pressure Vessel Fast Neutron Flux Evaluation," (i.e., Reference 5), which was approved by the NRC in Reference 6 and adheres to the guidance in RG 1.190.
Section 182a of the Atomic Energy Act of 1954 requires applicants for nuclear power plant operating licenses to include TS as part of the license. The NRC requirements related to the content of TS are set forth in 10 CFR 50.36, "Technical specifications,"
which requires that the TS include items in five specific categories: (1) safety limits, limiting safety system settings and limiting control settings; (2) limiting conditions for operation (LCOs); (3) SRs; (4) design features; and (5) administrative controls.
10 CFR 50.36(c)(2)(ii) requires that LCOs be established for the P/T limits because the parameters fall within the scope of Criterion 2 identified in the rule:
A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.
The P/T limits fall within the scope of Criterion 2 of 10 CFR 50.36(c)(2)(ii) and are therefore required to be included within the TS LCOs for a plant-specific facility operating license.
Page 6
ATTACHMENT 1 Evaluation of Proposed Change The regulatory requirements described above will continue to be met with implementation of the proposed change. The analyses provided in Attachments 4 and 5 provide additional details to demonstrate compliance with these regulatory requirements.
4.2 No Significant Hazards Consideration In accordance with 10 CFR 50.90, "Application for amendment of license, construction permit, or early site permit," Exelon Generation Company, LLC (EGC) requests an amendment to Facility Operating License Nos. NPF-1 1 and NPF-1 8 for LaSalle County Station (LSCS), Units 1 and 2. The proposed change revises Technical Specifications (TS) 3.4.11, "RCS Pressure and Temperature (P/T) Limits," to incorporate revised P/T curves that are valid for up to 32 effective full power years (EFPY) of operation.
According to 10 CFR 50.92, "Issuance of amendment," paragraph (c), a proposed amendment to an operating license involves no significant hazards consideration if operation of the facility in accordance with the proposed amendment would not:
(1) Involve a significant increase in the probability or consequences of any accident previously evaluated; or (2) Create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) Involve a significant reduction in a margin of safety.
EGC has evaluated the proposed change, using the criteria in 10 CFR 50.92, and has determined that the proposed change does not involve a significant hazards consideration. The following information is provided to support a finding of no significant hazards consideration.
- 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No The proposed change revises TS Section 3.4.11 to replace the existing P/T curves with revised curves that are valid up to 32 EFPY. The revised curves were developed using the methodology of General Electric (GE) Topical Report NEDC-32983P, "General Electric Methodology for Reactor Pressure Vessel Fast Neutron Flux Evaluations." The NEDC-32983P methodology has been approved by the NRC for use by licensees. The P/T limits are not derived from design basis accident analyses. They are prescribed during normal operation to avoid encountering pressure, temperature, and temperature rate of change conditions that might cause undetected flaws to propagate and cause non-ductile failure of the reactor coolant pressure boundary, a condition that is unanalyzed. Since the P/T limits are not derived from any design basis accident, there are no acceptance limits related to the P/T limits. Rather, the P/T limits are acceptance limits themselves since they preclude operation in an unanalyzed condition.
Page 7
ATTACHMENT 1 Evaluation of Proposed Change Thus, the proposed changes do not have any affect on the probability of an accident previously evaluated.
The P/T curves are used as operational limits during heatup or cooldown maneuvering, when pressure and temperature indications are monitored and compared to the applicable curve to determine that operation is within the allowable region. The P/T curves provide assurance that station operation is consistent with previously evaluated accidents. Thus, the radiological consequences of any accident previously evaluated are not increased.
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No The proposed change does not change the response of plant equipment to transient conditions. The proposed change does not introduce any new equipment, modes of system operation, or failure mechanisms.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No The proposed change adopts P/T curves that have been developed using the methodology of GE Topical Report NEDC-32983P. The NEDC-32983P methodology adheres to the guidance in NRC Regulatory Guide 1.190, "Calculation and Dosimetry Methods for Determining Pressure Vessel Neutron Fluence," dated March 2001. In a letter dated September 14, 2001, the NRC approved NEDC-32983P for use by licensees. The proposed change does not alter the manner in which safety limits, limiting safety system settings, or limiting conditions for operation are determined. The setpoints at which protective actions are initiated are not altered by the proposed change.
Therefore, the proposed change does not involve a significant reduction in a margin of safety.
Based on the above evaluation, EGC concludes that the proposed amendment presents no significant hazards consideration under the standards set forth in 10 CFR 50.92, paragraph (c), and accordingly, a finding of no significant hazards consideration is justified.
Page 8
ATTACHMENT I Evaluation of Proposed Change 4.3 Conclusions In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or the health and safety of the public.
5.0 ENVIRONMENTAL CONSIDERATION
EGC has determined that the proposed amendment would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, "Standards for Protection Against Radiation." However, the proposed amendment does not involve: (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22, "Criterion for categorical exclusion; identification of licensing and regulatory actions eligible for categorical exclusion or otherwise not requiring environmental review,"
paragraph (c)(9). Therefore, pursuant to 10 CFR 51.22, paragraph (b), no environmental impact statement or environmental assessment needs to be prepared in connection with the proposed amendment.
6.0 REFERENCES
- 1. Letter from S. P. Sands (U.S. NRC) to C. M. Crane (Exelon Generation Company, LLC),
"LaSalle County Station, Units 1 and 2, Issuance of Amendments Re: Pressure-Temperature Limits (TAC Nos. MB7795 and MB7796)," dated December 10, 2004
- 2. Letter from K. R. Jury (Exelon Generation Company, LLC) to U.S. NRC, "Request for Amendment to Technical Specifications Section 3.4.11, 'RCS Pressure and Temperature (P/T) Limits,"' dated January 31, 2003
- 3. Letter from K. A. Ainger (Exelon Generation Company, LLC) to U.S. NRC, "Supplement to Request for Amendment to Technical Specifications Section 3.4.11, 'RCS Pressure and Temperature (P/T) Limits,"' dated July 7, 2004
- 4. Letter from K. A. Ainger (Exelon Generation Company, LLC) to U.S. NRC, "Response to Request for Additional Information Regarding Request for Amendment to Technical Specifications Section 3.4.11, 'RCS Pressure and Temperature (P/T) Limits,"' dated November 15, 2004
- 5. General Electric Topical Report NEDC-32983P, "General Electric Methodology for Reactor Pressure Vessel Fast Neutron Flux Evaluations"
- 6. Letter from S. A. Richards (U.S. NRC) to J. F. Klapproth (GE Nuclear Energy), "Safety Evaluation for NEDC-32983P, 'General Electric Methodology for Reactor Pressure Vessel Fast Neutron Flux Evaluation' (TAC No. MA9891)," dated September 14, 2001 Page 9
ATTACHMENT 1 Evaluation of Proposed Change
- 7. Letter from H. N. Berkow (U.S. NRC) to G. B. Stramback (GE Nuclear Energy), "Final Safety Evaluation Regarding Removal of Methodology Limitations for NEDC-32983P-A,
'General Electric Methodology for Reactor Pressure Vessel Fast Neutron Flux Evaluation' (TAC No. MC3788)," dated November 17, 2005
- 8. Letter from W. A. Macon (U.S. NRC) to J. L. Skolds, "LaSalle County Station, Units 1 and 2 - Issuance of Amendment (TAC Nos. MB7001 and MB7002)," dated August 13, 2003
- 9. Boiling Water Reactor Vessels and Internals Project (BWRVIP) Report BWRVIP-135, Revision 1, "Integrated Surveillance Program (ISP) Data Source Book and Plant Evaluations," dated June 2007
- 10. NRC Regulatory Guide 1.99, Revision 2, "Radiation Embrittlement of Reactor Vessel Materials," dated May 1988
- 11. NUREG-0800, Standard Review Plan Section 5.3.2, "Pressure-Temperature Limits, Upper-Shelf Energy, and Pressurized Thermal Shock," dated March 2007
- 12. NRC Regulatory Guide 1.190, "Calculational and Dosimetry Methods for Determining Pressure Vessel Neutron Fluence," dated March 2001 Page 10
ATTACHMENT 2 Markup of Proposed Technical Specifications Pages LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 REVISED TECHNICAL SPECIFICATIONS PAGES 3.4.11-3 3.4.11-6 3.4.11-7 3.4.11-8 3.4.11-9 3.4.11-10 3.4.11-11
RCS P/T Limits 3.4.11 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.11.1 -------------------NOTE------------------
Only required to be performed during RCS heatup and cooldown operations, and RCS inservice leak and hydrostatic testing.
Verify: 30 minutes
- a. RCS pressure and RCS temperature are within the applicable limits specified in Figures 3.4.11-1, 3.4.11-2, 3.4.11-3 for Unit 1 up to *-G EFPY, and Figures 3.4.11-4, 3.4.11-5 and 3.4.11-6 for Unit 2 up to EFPY;
- b. RCS heatup and cooldown rates are 1 0 °F in any 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period; and IO
- c. RCS temperature change during system leakage and hydrostatic testing is
- 20°F in any one hour period when the RCS pressure and RCS temperature are not within the limits of Figure 3.4.11-2 for. Unit 1 up to 2-0 EFPY and Figure 3.4.11-5 for Unit 2 up to 4 EFPY.
SR 3.4.11.2 Verify RCS pressure and RCS temperature are Once within within the criticality limits specified in 15 minutes Figure 3.4.11-3 for Unit 1 up to J- EFPY prior to and Figure 3.4.11-6 for Unit 2 upo 2-0 control rod EFPY. withdrawal for the purpose of achieving criticality (continued)
LaSalle 1 and 2 3.4.11-3 Amendment No.170/156
RCS P/T Limits 3.4.11 INSERT 3.4.11-1 Replacewt Figure 3.4.11-1 (Page 1 of 1)
Unit 1 P-T Curves for Hydrostatic or Leak Testing up to-E& EFPY LaSalle I and 2 3.4.11-6 Amendment No.170/156
INSERT 3.4.11-1 1400 1300 INITIAL RTndt VALUES ARE
-30'F FOR BELTLINE, 40*F FOR UPPER VESSEL, AND 1100 47°F FOR BOTTOM HEAD 02 1000 BELTLINE CURVES ADJUSTED AS SHOWN:
(. S0900 EFPY SHIFT ('F) 32 130 i-(0 800 , , ,
o 700 ,__..
HEATUP/COOLDOWN RATE OF COOLANT 1% 6002i < 20°F/HR
- 500 BOTTOM Wu HEAD" 68"F ow 400 _, ,
3 00 ,r' _
FLANGE UPPER VESSEL 200 ' EGONAND REIO BELTLINE LIMITS
BOTTOM HEAD 100 CURVE 0=
0 25 50 75 100 125 150 175 200 MINIMUM REACTOR VESSEL METAL TEMPERATURE
(°F)
RCS P/T Limits 3.4.11-2 3.4.11 with INSERT Replace 1 1400 - -
Figure 3.4.11-2 (Page 1 of 1)
Unit I P-T Curves for Heatup by Non-Nuclear Means, Cooldown Following a Nuclear Shutdown and Low Power Physics Testing up to EFPY LaSalle I and 2 3.4.11-7 Amendment No.170/156
INSERT 3.4.11-2 1400 1300 1200 INITIAL RTndt VALUES ARE
-30*F FOR BELTLINE, 40*F FOR UPPER VESSEL, 1100 AND 61.6*F FOR BOTTOM HEAD 1000 BELTLINE CURVES ADJUSTED AS SHOWN:
IL 900 EFPY SHIFT (°F) 0 32 130 800 I.-
O 700 Z
HEATUP/COOLDOWN LU RATE OF COOLANT z 3600 < 100°F/HR I-j500 u*400 LU 3O00 UPPER VESSEL 200 AND BELTLINE LIMITS 100 ...... BOTTOM HEAD CURVE 0
0 25 50 75 100 125 150 175 200 MINIMUM REACTOR VESSEL METAL TEMPERATURE
(°F)
RCS P/T Limits 3.4.11 Replace with INSERT 3.4.11-3 Figure 3.4.11-3 (Page I of 1)
Unit 1 P-T Curves for Operation with a Core Critical other than Low Power Physics Testing up to -N& EFPY 32 LaSalle I and 2 3.4.11-8 Amendment No.170/156
INSERT 3.4.11-3 1400 INITIAL RTndt VALUES ARE 1300 --- 30°F FOR BELTLINE, 40'F FOR UPPER VESSEL, Z/
1200- AND 47°F FOR BOTTOM HEAD 1100-CL BELTLINE CURVE 10 ADJUSTED AS SHOWN:
EFPY SHIFT ('F) 32 130
. 900 I-
-I U) 800 80 -HEATUP/COOLDOWN
> RATE OF COOLANT wI I < 100°F/HR o 700
j500 __
iLl 400
- a. 312 PSIG 300 __
200 00- BELTLINE AND NON-BELTLINE 100 Minimum Criticality LIMITS Temperature 72°F 0
0 25 50 75 100 125 150 175 200 225 250 MINIMUM REACTOR VESSEL METAL TEMPERATURE
(°F)
RCS P/T Limits 3.4.11 Replace with INSERT 3.4.11-4 Figure 3.4.11-4 (Page 1 of 1)
Unit 2 /
P-T Curves for Hydrostatic or Leak Testing up to 29 EFPY LaSalle I and 2 3.4.11-9 Amendment No.170/156
INSERT 3.4.11-4 1400 1300 1200 INITIAL RTndt VALUES ARE
-6'F FOR LPCI NOZZLE, 1100 40°F FOR UPPER VESSEL, AND 49°F FOR BOTTOM HEAD 0- 1000 Note: The LPCI Nozzle is the limiting material for the CL 900 beitline region.
0 I-800 O 700 BELTLINE CURVES ADJUSTED AS SHOWN:
600 EFPY SHIFT ('F) 32 58 500 Lu HEATUP/COOLDOWN 400 RATE OF COOLANT Lu
< 2 0 °F/HR De 300 SUPPER VESSEL 200 AND BELTLINE LIMITS
BOTTOM HEAD 100 CURVE 0
0 25 50 75 100 125 150 175 200 MINIMUM REACTOR VESSEL METAL TEMPERATURE
(*F)
RCS P/T Limits 3.4.11 Replace with INSERT 3.4.11-5 Figure 3.4.11-5 (Page 1 of 1)
Unit 2 P-T Curves for Heatup by Non-Nuclear Means, Cooldown Following a Nuclear. Shutdown and Low Power Physics Testing up to-2if EFPY -
LaSalle I and 2 3.4.11-10 Amendment No.170/156
INSERT 3.4.11-5 1400 1300 1200 INITIAL RTndt VALUES ARE 1100 -6°F FOR LPCI NOZZLE, 40°F FOR UPPER "u; VESSEL, 1000 AND 58.6°F FOR BOTTOM HEAD C. 900 0 Note: The LPCI Nozzle is
. - the limiting material for the u) ca 800 beltline region.
(Il O 700 BELTLINE CURVES ADJUSTED AS SHOWN:
EFPY SHIFT ('F)
Z
, 600 t 32 58 Bp
- 3 500 THEAD L8F HEATUP/COOLDOWN 40 RATE OF COOLANT 400< 100OF/HR a.
300 -
S- UPPER VESSEL 200 AND BELTLINE LIMITS 10l0
CURVE...... HEAD BOTTOM 0
0 25 50 75 100 125 150 175 200 MINIMUM REACTOR VESSEL METAL TEMPERATURE
(*F)
RCS P/T Limits 3.4.11 Replace with INSERT 3.4.11-6 Figure 3.4.11-6 (Page I of 1)
Unit 2 P-T Curves for Operation with a Core Critical other than Low Power Physics Testing up to -M EFPY 32 LaSalle I and 2 3.4.11-11 Amendment No.170/156
INSERT 3.4.11-6 1400 1300 INITIAL RTndt VALUES ARE
-6°F FOR LPCI NOZZLE, 1200 40'F FOR UPPER VESSEL, AND 1100 49°F FOR BOTTOM HEAD Note: The LPCI Nozzle is a 1000 the limiting material for the beitline region.
CL 900 0
Co 800 700 t- BELTLINE CURVE ADJUSTED AS SHOWN:
S600 EFPY SHIFT ('F) 32 58 Z 500 w
400 300 200 S BELTLINE AND NON-BELTLINE 100 Minimum Criticality LIMITS Temperature 86°F 0
0 25 50 75 100 125 150 175 200 225 250 MINIMUM REACTOR VESSEL METAL TEMPERATURE
(*F)
ATTACHMENT 3 Markup of Proposed Technical Specifications Bases Page LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 REVISED TECHNICAL SPECIFICATIONS BASES PAGE B 3.4.11-1
RCS P/T Limits B 3.4.11 B 3.4 REACTOR COOLANT SYSTEM (RCS)
B 3.4.11 RCS Pressure and Temperature (P/T) Limits BASES BACKGROUND All components of the RCS are designed to withstand effects of cyclic loads due to system pressure and temperature changes. These loads are introduced by startup (heatup) and shutdown (cooldown) operations, power transients, and reactor trips. This LCO limits the pressure and temperature changes during RCS heatup and cooldown, within the design assumptions and the stress limits for cyclic operation.
The Specification contains P/T limit curves for heatup, cooldown, inservice leak and hydrostatic testing, and criticality and also limits the maximum rate of change of reactor coolant temperature. The P/T limit curves are applicable for - effective full power years.
Each P/T limit curve defines an acceptable region for normal operation. The usual use of the curves is operational guidance during heatup or cooldown maneuvering, when pressure and temperature indications are monitored and compared to the applicable curve to determine that operation is within the allowable region.
The LCO establishes operating limits that provide a margin to brittle failure of the reactor vessel and piping of the reactor coolant pressure boundary (RCPB). The vessel is the component most subject to brittle failure. Therefore, the LCO limits apply mainly to the vessel.
10 CFR 50, Appendix G (Ref. 1), requires the establishment of P/T limits for material fracture toughness requirements of the RCPB materials. Reference 1 requires an adequate margin to brittle failure during normal operation, anticipated operational occurrences, and system hydrostatic tests. It mandates the use of the American Society of Mechanical Engineers (ASME) Code,Section III, Appendix G (Ref. 2).
The actual shift in the RTNDT of the vessel material will be established periodically by removing and evaluating the irradiated reactor vessel material specimens, in accordance with ASTM E 185 (Ref. 3) and 10 CFR 50, Appendix H (continued)
LaSalle 1 and 2 B 3.4.11-1 Revision 16