FACILITY NAME: Turkey Point Section 5 REPORT NUMBER: 2009-302 DRAFT SIM/IN-PLANT JPMS CONTENTS:

E:J'braft SIMULATOR liN-PLANT JPMs Location of Electronic Files:

Submitted By By: Ul~ tjw#

idJm ~I Verified By !oJ J' ~

111oJ

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Turkey Point Task No: 24094001501 Place Unit 4 Post Accident Task

Title:

Hydrogen Monitor In Service JPM No: NRC-25-IP-JPM-1 KIA

Reference:

028 A2.02 {3.5/3.9}

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing: In Plant Simulated Performance X

~-------------

Classroom - - - - - - - - Simulator - - - - - - - Plant - X- - - - - - -

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. Unit 4 has experienced a valid Safety Injection signal.
2. All applicable prerequisites listed in Section 3.0 are satisfied.
3. Post Accident Hydrogen Monitoring system is in normal standby alignment.
  • Task Standard:
1. PAHMS Alignment Completed per Section 7.1 of 4-0P-094,"Containment Post-Accident Monitoring Systems."

Required Materials:

1. Two way radio (optional communications device)
2. 4-0P-094, "Containment Post-Accident Monitoring Systems"
3. "A" key
4. Valve Operating Handle (located in Aux Bldg EIW hallway)

General

References:

1. 4-0P-094, "Containment Post-Accident Monitoring Systems"

Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:

1. You have been directed by the RO to place the Post Accident Hydrogen Monitor in service in
  • accordance with 4-0P-094, Section 7.1.

Time Critical Task: YES (30 min)

Validation Time: 15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE A T THIS TIME!

I Appendix C Page 3 of 12 Form ES-C-1 I SIMULATOR SETUP Reset to IC #

  • N/A Load Lesson N/A Ensure Simulator Operator Checklist is complete N/A

Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark( I)

Start Time Obtain Required Materials STEP 1 - - SAT

- - UNSAT

1. Obtains a copy of 4-0P-094, Post Accident Monitoring System.
2. Verifies latest revision and no outstanding OTSCs.

Standard:

3. Begins review of section: 7.1 Post Accident H2 Monitor Startup.

Evaluator may choose to require the candidate to obtain procedure section.

Cue When the correct procedure is identified & verified, provide the operator with the procedure.

Comment NOTE Hydrogen Monitors should be in service within 30 minutes of a valid SI NOTE: signal.

I Appendix C Page 5 of 12 Form ES-C-1 I NOTE

  • - - SAT STEP 2 Hydrogen Monitors should be in seNice within 30 minutes of a valid SI signal.

7.1.1 Initial Conditions - - UNSAT

_ _ 1. All applicable prerequisites listed in Section 3.0 are satisfied.

1. Reviews Note prior to step 7.1.1. Notes that the task must be completed within 30 minutes of the safety injection signal.

Standard: 2. Determines prerequisites met from JPM Briefing Sheet Initial Conditions (thus procedure initial conditions complete).

Cue N/A Comment NOTE:

Appendix C Page 6 of 12 Form ES-C-1 7.1.2 Procedure Steps STEP 3 - - SAT NOTES

..j

  • Valves PASS-4-008, 4-001 A, 4-001 B, 4-002A and 4-002B are located in the - - UNSAT floor at the junction of the north/south hallway.
  • Full travel for valves is provided in parenthesis and should not be exceeded or damage to reach rod assemblies may occur.
1. Remove the floor caps AND open the following valves using the reach rods located in the Auxiliary Building.

__ a. Post Accident Sampling System Return Line Isolation Valve, PASS-4-008 (2 turns)

__ b. H2Analyzer 4A Outlet Isol, PAHM-4-001A (3 turns)

_ _ c. H2Analyzer Outlet Isol, PAHM-4-001B (6 turns)

d. PACV Vent and Sample System to PAHM Header Isolation Valve (RR), PAHM-4-002A (6 turns)

__ e. PACV Vent and Sample System to PAHM Header Isolation Valve (RR), PAHM-4-002B (6 turns)

Proceeds to the Aux Bldg east-west hallway and describes how to unlock and obtain a T-handle tool from the rack.

Simulates removing floor caps by engaging the T-handle tool into each cap and rotating them counter clockwise. Then simulates opening the following valves by engaging the T -handle tool to the valve operator and turning the operator the specified number of turns counter Standard: clockwise:

a. PASS-4-008 (2 turns).
b. PAHM-4-001A (3 turns).
c. PAHM-4-001 B (6 turns).
d. PAHM-4-002A (6 turns).
e. PAHM-4-002B (6 turns).

For each of the valves listed above, when applicant correctly identifies how to remove floor cap, state, "The floor cap is removed."

Cue When applicant correctly demonstrates how to operate valve in the open direction, state, "The valve operator has been rotated the applicable number of turns".

Comment NOTES

  • Valves PASS-4-008, 4-001A, 4-001 B, 4-002A and 4-002B are located in the floor at the junction of the north/south hallway.

NOTE:

  • Full travel for valves is provided in parenthesis and should not be exceeded or damage to reach rod assemblies may occur.

NUREG 1021 Rev 9 Appendix C

I Appendix C Page 7 of 12 Form ES-C-1 I 7.1.2 (Cont'd)

STEP 4 - - SAT

  • ..j _ _ 2. Unlock and open PACVS Isol Vlv Penet 51, HV-4-3, outside the Unit 4 Pipe and Valve Room. (An A key is required for this lock.) --

UNSAT Removes lock from HV-4-3 remote operator handwheel (South end of Standard: Aux Bldg 18' elevation N/S hallway outside U4 P&V Room) using an A key, then opens valve using remote operator handwheel.

Cue When candidate simulates turning valve handwheel counterclockwise, point to open indicator to show valve is open.

Comment NOTE: Although not specified in the procedure, candidate may reinstall lock on valve. This is not required for this JPM .

NUREG 1021 Rev 9 Appendix C

I Appendix C Page 9 of 12 Form ES-C-1 I Request the Unit 4 RO perform step 7.1.2.4 STEP 6 --

SAT UNSAT Standard: Simulates request for Unit 4 RO to perform step 7.1.2.4 of 4-0P-094

1. As Unit 4 RO acknowledge request to perform step 7.1.2.4 of 4-0P-094 (Control Room Portion)

Cue

2. As Unit 4 RO, tell candidate step 7.1.2.4 has been completed.

Direct candidate to continue with step 7.1.2.5.

Comment NOTE: Candidate may attempt to use a communication device or simulate communication directly to the evaluator.

Appendix C Page 10 of 12 Form ES-C-1

__ 5. At the area outside the Unit 3 BA Evap Room, remove floor STEP 7 - - SAT cap AND close WHT Waste Transfer Pump Discharge to Rad Waste

..J Building, MPAS-001,(1I4 tum) .

OR - - UNSAT

__ At the Waste Evaporator Feed Pump Room in the Radwaste Bldg, close Aux Bldg WHT valve to Radwaste Bldg WHT, 1731.

1. Attempts to remove the floor cap for MPAS-001.
2. When MPAS-001 floor cap determined to be jammed in place, Standard: leaves the Aux Building and proceeds to the Waste Evaporator Feed Pump room in the Radwaste Building.
3. Closes valve 1731 (Rotates handwheel fully clockwise until the valve stem is fully inserted.)
1. When candidate attempts to remove MPAS-001 floor cap, state that it is jammed and cannot be removed Cue 2. When candidate identifies 1731 handwheel has been rotated fully clockwise and valve stem inserted, confirm this indication.

Comment

  • NOTE:

I Appendix C Page 11 of 12 Form ES-C-1 NOTE STEP 8 The following valves are located on the Auxiliary Building roof near the Unit 4 - - SAT

  • ..j containment wall.
6. Perfonn the following:

__ a. Unlock and open Isol Vlv from WHT Pp Back, MPAS-4-004 (an A key is required).

- - UNSAT

1. Proceeds to Auxiliary Building roof near Unit 4 Containment wall.

Standard: 2. Unlocks MPAS-4-004 handwheel with an A key, then opens valve.

(Rotates handwheel fully counterclockwise until valve stem fully withdrawn.)

When candidate identifies handwheel has been rotated fully Cue counterclockwise and valve stem withdrawn, confirm this indication Comment NOTE: Although not specified in the procedure, candidate may reinstall lock on valve.

Appendix C Page 12 of 12 Form ES-C-1

  • STEP 9 V

_ _ b. Close Isol Vlv MPAS to Purge Air Rtn, MPAS-4-00S.

- - SAT

- - UNSAT Standard: Simulates Closing MPAS-4-005. (Rotates handwheel fully clockwise until the valve stem is fully inserted.)

1. When candidate identifies handwheel has been rotated fully clockwise and valve stem inserted, confirm that valve travel Cue has stopped and stem is inserted.
2. Tell candidate another operator will perform step 7.1.2.7 Comment NOTE:
  • Termination Cue:

Operator returns JPM briefing sheet when informed step 7.1.2.7 will be performed by another operator.

Stop Time STOP

I Appendix C Page 13 of 12 Form ES-C-1 I Verification of Completion

Examinee's Name:

NRC-25-IP-JPM-1 Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory

  • Examiner's signature and date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

NUREG 1021 Rev 9 Appendix C

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit 4 has experienced a valid Safety Injection signal.
2. All applicable procedure prerequisites are satisfied.
3. Post Accident Hydrogen Monitoring system is in NORMAL STANDBY ALIGNMENT.

INITIA TlNG CUE:

You are the Primary Operator and you have been directed by the Unit 4 RO to place the Post Accident Hydrogen Monitor in service per 4-0P-094 section 7.1.

This is a Simulate JPM. No plant equipment is to be manipulated during the performance of this task.

HAND THIS PAPER BACK TO YOUR EVALUATOR

  • WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Turkey Point Task No:

TRIP and RESET AFW Pump Task

Title:

"A" T&T Valve, MOV-6459A JPM No: NRC-25-IP-JPM-J 061-K4.07 Turbine trip, including overspeed 3. 1/3.3 KIA

Reference:

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance X Actual Performance

~-------------- ---------------------

Classroom - - - - - - - - Simulator Plant X Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. 3-0P-075, Auxiliary Feedwater System, Section 7.8, Auxiliary Feedwater Pump A Manual Start is in progress.
2. 3-0P-075, Auxiliary Feedwater System has been completed up to Section 7.8.7 by another NPO.
3. The Unit 3 Unit Supervisor has directed the NPO to perform steps 7.8.8 through 7.8.10 of 3-OP-075, Auxiliary Feedwater System.

Task Standard:

  • AFW Pump "A" T&T Valve, MOV-6459A, is TRIPPED.in accordance with 3-0P-075, Auxiliary Feedwater System, Section 7.8.
  • AFW Pump "A" T& T Valve, MOV-6459A is RESET, in accordance with 3-0P-075, Auxiliary Feedwater System, Section 7.8.

Required Materials:

  • Applicable Personal Protective Equipment

References:

Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue: You have been directed to perform steps 7.8.8 through 7.8.10 of3-0P-075, Auxiliary Feedwater System to TRIP and RESET AFW Pump "A" T&T Valve, MOV-6459A.

  • Time Critical Task: No Validation Time: 15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

I Appendix C Page 3 of 12 Form ES-C-1 I SIMULATOR SETUP Reset to IC #

  • N/A Load Lesson N/A Ensure Simulator Operator Checklist is complete N/A

Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark( I)

Start Time Trip AFW Pump A T&T Valve, MOV-6459A.

STEP 1 - - SAT

..J

- - UNSAT 7.8.8 Push the mechanical trip button for the AFW Pump AT&T Standard: Valve, MOV-6459A Cue Once NPO identifies Mechanical Trip Button and simulates depressing the button, confirm Trip Button has been depressed.

Comment NOTE:

I Appendix C Page 5 of 12 Form ES-C-1 I NPO verifies AFW Pump A T&T Valve, MOV-6459A, is closed.

STEP 2

- - SAT UNSAT then verify the following:

1. AFW Pump A T&T Valve, MOV-6459A, is closed.

Standard:

2. Control Room mechanical trip light is ON.
1. If operator verifies MOV-6459A CLOSED by valve stem moving downward and stopping, confirm CLOSED.

Cue 2. When NPO simulates contacting Control Room confirm that Control Room mechanical trip light is On and valve indicates CLOSED.

Comment NOTE: Evaluator may act as Control Room Operator to simulate communications.

Appendix C Page 6 of 12 Form ES-C-1 NPO confirms Local Test Panel Mechanical Trip Light is on.

- - UNSAT Local Test Panel mechanical trip light is On.

Standard:

Cue When NPO identifies Local Test Panel mechanical trip light tell the NPO that the RED light is OFF and the GREEN light is on.

Comment NOTE: Local Test Panel Mechanical Trip Light is AMBER.

I Appendix C Page 7 of 12 Form ES-C-1 Reset AFW Pump A T&T Valve, MOV-6459A STEP 4 --

SAT

..j UNSAT CAUTION When releasing the mechanical trip rod, ensure the rod does not snap back towards the turbine. This could damage the turbine overspeed tappet shaft.

Standard:

7.8.9 Reset AFW Pump A T&T Valve, MOV-6459A, by pulling the mechanical trip rod approximately one inch.

When NPO describes operating mechanical trip rod tell operator that the Cue mechanical trip rod will travel no further and does not snap back to the tripped position.

Comment

Appendix C Page 8 of 12 Form ES-C-1 LEVER_

HEAD LEVER

]APPET NUT SCRIBE MARK HEAD BRACKET NOTE: GUIDE SPRING*

SPRING -

TAPPET ASSEMBL Y.- Y_- ... --

SCRlB" MA.~K

" f----.>,.,..""'-:

TRIP HEAD LEVER TRIP HEAD LEVER INCORRECT CORRECT POSITION POSITION ( HELD BY TAPPET)

I Appendix C Page 9 of 12 Form ES-C-1 I Verify the limit switch arm roller is properly positioned.

STEP 5 SAT

- - UNSAT 7.8.10 Verify the limit switch arm roller is on the North side of the roller plate AND the tappet nut is contacting the head lever below the Standard: scribe mark.

Cue When operator describes the correct standard, confirm that the limit switch arm roller is properly positioned.

Comment NOTE:

  • Terminating Cue:

The task is complete when the Examinee returns the cue sheet to the examiner.

Stop Time STOP

Appendix C Page 10 of 12 Form ES-C-1 Verification of Completion

Examinee's Name:

NRC-25-1 P-JPM-J Examiner'S Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory

  • Examiner's signature and date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

NUREG 1021 Rev 9 Appendix C

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

  • INITIAL CONDITIONS:

I. 3-0P-075, Auxiliary Feedwater System, Section 7.8, Auxiliary Feedwater Pump A Manual Start is in progress.

2. 3-0P-075, Auxiliary Feedwater System has been completed up to Section 7.8.7 by another NPO.
3. The Unit 3 Unit Supervisor has directed the NPO to perform steps 7.8.8 through 7.8.10 of 3-0P-075, Auxiliary Feedwater System.

INITIA TlNG CUE:

You have been directed to perform steps 7.8.8 through 7.8.10 of 3-0P-075, Auxiliary Feedwater System to TRIP and RESET AFW Pump "A" T& T Valve, MOV-6459A.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

Appendix C Job Performance Measure Form ES-C-1 Worksheet

  • Facility:

Task

Title:

KJA

Reference:

Turke}" Point Transfer Vital Loads Between Inverters 062-A4.04 {2.6/2.71 Task No:

Job Performance Measure No: NRC-25-IP-JPM-K Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing: In Plant Simulated Performance X Actual Performance Classroom - -------------


Simulator --- ----- -- ----- --- Plant - X- - - - - - - -

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. 3B Inverter is Supplying Load, 4B Inverter is Supplying Load, and B SPARE Inverter is in STANDBY.
2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.
  • Task Standard:
1. Transfer load to the correct inverter.

Required Materials:

1. 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM (12/08)

General

References:

1. 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM (12/08)

Appendix C Page 2 of 17 Form ES-C-1 Initiating Cue:

  • In preparation for inverter maintenance, you have been directed by the Unit 4 RO to transfer 4P08 bus load from the 48 (4Y02) Inverter to the 8 SPARE (4Y04) Inverter in accordance with 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, Section 7.1.

Time Critical Task: No Validation Time: 18 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

I Appendix C Page 3 of 17 Form ES-C-1 I SIMULATOR SETUP Reset to IC #

N/A Load Lesson N/A Ensure Simulator Operator Checklist is complete N/A

Appendix C Page 4 of 17 Form ES-C-1 INSTRUCTIONS TO OPERA TOR

  • INITIAL CONDITIONS:

HAND JPM BRIEFING SHEET TO OPERATOR A T THIS TIME!

1. Two inverters in service, B SPARE (4Y04) in standby and 4B (4Y02) supplying load.
2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.

INITIA TlNG CUE:

In preparation for inverter maintenance, you have been directed by the Unit 4 RO to transfer 4P08 bus load from the 4B (4Y02) Inverter to the B SPARE (4Y04) Inverter.

TERMINA TlON CUE:

When you feel that you have satisfactorily completed the assigned task, hand your JPM Briefing Sheet back to me.

Do you have any questions?

You may begin.

NOTES TO EVALUATOR:

1. Two inverters in service, B SPARE (4Y04) in standby and 4B (4Y02) supplying load.
2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.

NOTE: This is a SIMULATE JPM. Tell candidate that NO plant equipment is to be manipulated during the performance of this task.

I Appendix C Page 5 of 17 Form ES-C-1 Denote critical steps with a check mark (I)

Start Time 7.0 INFREQUENT OPERATIONS STEP 1 7.1 Transfer of Bus Load from Normal to Spare Inverter (Normal SAT Transfer)

UNSAT INIT Transfer from Inverter- - - - -

Date/Time Started: ------~--------


~------

/

7.1.1 Initial Conditions

__ 1. All applicable prerequisites listed in Section 3.0 are satisfied.

__ 2. The applicable Spare Inverter is in Standby in accordance with Subsection 5.1 of this procedure.

1.0btains copy of 0-OP-003.3, 120V VITAL INSTRUMENT AC STANDARD: SYSTEM.

2Verifies procedure is current with no outstanding OTSCs.

1. Provide copy of procedure once operator has located & verified 0-OP-003.3, or require candidate to obtain procedure.
2. Inform operator that Sections 3.0 and 5. 1 conditions have been
  • CUES:

met.

3. Candidate should proceed to Control Room, ask permission to enter and go to the Inverter Room.

Once candidate has identified need to go to the Control Room tell the candidate to insure that the specific task to be performed is not re/aved to Control Room personnel.

Comment NOTE Enclosure 1 provides a reference for Typical Normal Vital AC Inverter Switch Location, or NOTE: Enclosure 2 provides a reference for Typical Spare Vital AC Inverter Switch Location as applicable.

Appendix C Page 6 of 17 Form ES-C-1 (procedure step 7.1.2.1)

~ __ 1. Place the Alternate Source Transfer Switch to the position indicated in - - UNSAT Table 2, TABLE 2 I I

Pia,..

Wbon for ALITR"AIT

~ub')tituting [\'SERYICE SOCRCE T() Position (LOCKED) I~TI SPARE  :,\OR\lU TRA.'\SFER D.I:RTER J:\,I:RTER SWITCH AS (3Y04) 3A(3Y01) .\YOIB BACKL? TO SPARE I).,*ERTER (3Y04) AS AS (3Y041 4A(W01) 4YOIB BACKL? TO SPARE I).,'ERTER (3Y04) AS BS(W04) 3B13Y02) 3Y02B BACKL? TO SPARE IXVERTER (W04) BS BS (W04) .JB (4Y02) 4Y028 BACKL? TO SPARE J:\,'ERTER (W04) BS C$ (3YOti) 3C (W05) 3YOSE BACKe? TO SPARE I).YERTER (WOO) CS CS OY06) 4UW05) 4YOSE BACKeP TO SPARE Th:YERTER (3Y06) CS DS(W06\ 3D (WOn 3Y07B BACKL? TO SPARE Th:YERTER (4Y06) DS DS(4Y06) 4D(.JY07) 4Y07B BACKe? TO SPARE lNYERTER 14Y(6) DS

1. Selects correct switch (4Y02B) and unlocks operating handle.

STANDARD: 2. Repositions switch 4Y02B to BACKUP TO SPARE INVERTER (4Y04) BS and re-installs lock.

1. Once candidate locates switch, correctly describes how to remove lock from operating handle and simulates repositioning switch CUES: handle, confirm these operations.
2. When candidate correctly describes how to re-installiock on switch handle, confirm this operation.

Comment NOTE:

I Appendix C Page 7 of 17 Form ES-C-1 I DO NOT ALLOW THE BS INVERTER STEP 3 SAT 4 DOOR TO BE OPENED UNSAT (procedure step 7.1.2.2)

2. Place the Sync Reference Selector Switch (SW-2) inside the applicable SPARE inverter to NORMAL (DOWN) position.
1. Operator identifies the B SPARE (4Y04) inverter.

STANDARD:

2. Simulates positioning switch SW-2 to NORMAL (DOWN) position.
1. When candidate identifies B SPARE (4Y04)inverter and states that the switch is inside the inverter requiring door opening to operate, CUE: tell the operator to simulate going inside the inverter to pOSition the switch.
2. When SW-2 operation properly described, confirm re-positioning.

Comment DO NOT ALLOW THE BS INVERTER

  • NOTE:

DOOR TO BE OPENED

Appendix C Page 8 of 17 Form ES-C-1 (procedure step 7.1.2.3)

STEP 4 - - SAT

3. Verify the following at the SPARE inverter:

__ a. The IN SYNC light is ON. - - UNSAT

__ b. The AL T SOURCE A VAIL light is ON.

_ _ c. The SYNC REFERENCE NORMAL light is ON.

STANDARD: Determines the B SPARE (4Y04) inverter lights listed above are all ON.

CUE: When each light properly identified, state light is ON.

Comment NOTE:

I Appendix C Page 9 of 17 Form ES-C-1 I DO NOT ALLOW THE 4B(4Y02)

STEP 5 SAT

..j INVERTER DOOR TO BE OPENED UNSAT (procedure step 7.1.2.4)

4. Place the Sync Reference Selector Switch (SW-2) inside the applicable INSERVICE NORMAL inverter to the EXTERNAL (UP) position
1. Operator identifies 48 (4Y02) inverter.

STANDARD: 2. Simulates positioning switch SW-2 to EXTERNAL (UP) position.

1. When candidate identifies 48 (4Y02)inverter and states that the switch is inside the inverter requiring door opening to operate, tell CUE: the operator to simulate going inside the inverter to position the switch.
2. When SW-2 operation properly described, confirm re-positioning.

Comment

  • NOTE:

DO NOT ALLOW THE 4B(4Y02)

INVERTER DOOR TO BE OPENED

Appendix C Page 10 of 17 Form ES-C-1 (procedure step 7.1.2.5)

5. Verify the following at the INSERVICE NORMAL inverter:

__ a. The IN SYNC Light is ON. - - UNSAT

__ b. The SYNC REFERENCE EXTERNAL light is ON.

STANDARD: Determines the 48 (4Y02)inverter lights listed above are all ON.

CUE: When each light properly identified, state light is ON.

Comment:

NOTE:

, Appendix C Page 11 of 17 Form ES-C-1 (procedure step 7.1.2.6)

STEP 7 - - SAT

..J __ 6. Using Table 3, determine which Instrument AC Selector Switch should be used AND record: - - UNSAT TABLE 3 For Plart When Substitutiug ~SER\'ICE ToSt1'PLY

~STRnlL'\"I AC I:\TTIALS SPARE I:\T£RTIR  :-;OR.'L.u. Posltion SELECTOR S"TICH I:\YERTER AS (3Y04) 3A(3YOJ) 3P07A AC LI:\1:

AS OY(4) 4A(-lYOl) 4P07A AC u:-.1:

BS (4Y04) 3B (3YO~) 3P08A AC u:-.1:

BS (4Y04) 4B 14Y02, 4POSA ACLDo1:

CS (3Y06)

OY06) 3C (3Y')5) 3P06A AC ID1:

(W06)

CS (W061 4C (WO))

4C(-tYO)) 4POM AC u:-.1:

D<; i4'{(6) 3D (3Y07) 3P09A AC ID1:

DS (~Y06) 4D (4YO!) 4P09A ACLI:\1:

STANDARD: Using Table 3, identifies 4P08A as the correct Selector Switch to use.

CUE: N/A Comment

  • NOTE:

Appendix C Page 12 of 17 Form ES-C-1 (procedure step 7.1.2. 7.a)

7. Perform the following steps at the appropriate Instrument AC Selector Switch panel in the Cable Spreading Room:

- - UNSAT

_ _ a. Verify that the Alternate Power Available light is ON.

Verifies 4P08A alternate power available light ON STANDARD:

CUE: When 4P08A alternate power available light correctly identified, tell candidate that light is ON.

Comment NOTE:

I Appendix C Page 13 of 17 Form ES-C-1 I (procedure step 7.1.2. 7.b)

b. Test the Sync Verification Light as follows:

_ _ (1) Position the Sync Switch to SYNCH LAMP TEST.

- - UNSAT

_ _ (2) Verify lamp comes ON.

1. Positions 4P08A SYNC switch to SYNCH LAMP TEST.

STANDARD:

2. Verifies 4P08A SYNC Verification Light ON.
1. When SYNC switch identified and operation correctly described, confirm switch manipulation.

CUE:

2. When Sync Verification Light correctly identified, tell candidate light is ON.

Comment NOTE:

Appendix C Page 14 of 17 Form ES-C-1 (procedure step 7.1.2. 7.c)

STEP 10 - - SAT NOTE In the following Substeps 7.1.2. 7.c. (1) and 7.1.2. 7.c. (2) the bright light will go - - UNSAT OFF, but a slight glow is expected. This is acceptable.

c. Perform a synch check as follows:

__ (1) Position the Sync Switch to SYNCH CHECK PUSH.

_ _ (2) Depress and hold the Sync Switch.

_ _ (3) Verify that the Sync Verification Light stays OFF.

1. Positions 4P08A SYNC Switch to SYNCH CHECK PUSH.
2. Depresses & holds 4P08A SYNC Switch.

STANDARD:

3. Verifies 4P08A Sync Verification Ught stays OFF.
4. Releases 4P08A SYNC Switch.
1. When SYNC switch identified and operation correctly described, confirm switch manipulations.

CUE:

2. When Sync Verification Ught correctly identified, tell candidate light is OFF.
  • Comment NOTE:

NOTE In the following Substeps 7. 1.2.7. c. (1) and 7. 1.2.7. c. (2) the bright light will go OFF, but a slight glow is expected. This is acceptable.

I Appendix C Page 15 of 17 Form ES-C-1

_ _ d. Place the Instrument AC Selector Switch to the position

  • - - SAT STEP 11 indicated in Table 3.

~ NOTE Initials should be entered for the applicable inverter. NIA should be entered - - UNSAT for all others.

TABLE.'

For Place Wb~n Sub,tituting I~SERYICE To st'PPLY

[\,STRc\!E~T AC L'"ITLUS SPARE I!'-TERTER  :-;OR\L\L Po,ition SELE( TOR SWITCH L"\"ERTER A5(31"04)

AS '3Y041 3A(3YC]1 3A t3YC] 1 3PO-"; ACrn.:E AS f3Y(4) 4.40 (':'Y01) ~P07A .4.(' Ln,:::

as (4Yi}~) 38 {3Y02\ 3P83A ACrn,:::

3-'3 (*P{IJ"':} 4B (4"i")J~l "P~SA ACrn,:::

CS (:Y'OC: 3C (;::05') 3Pc'6A ACLn,""E CS (3\1J¢\ 4C (4\1:5) "])06A AC Ln'::::

DS (4YO~) ~3YO')

3D (3YO') 3P09A AC lJ}.;E DS (4YOo) "D ("YO:', 4P09A AC lJ}.;:::

1. Selects correct switch (4P08A).

STANDARD:

2. Positions 4P08A Instrument AC Selector Switch to AC LINE.

CUE: When 4P08A Instrument AC Selector Switch identified and operation correctly described, confirm switch manipulation.

Comment NOTE Initials should be entered for the applicable inverter. NIA should be entered NOTE: for all others.

Tell candidate that another operator op_erator will continue with step 7. 1.2.8 Terminating The task is complete when the Examinee returns the cue sheet to the STOP Cue: examiner.

Appendix C Page 16 of 17 Form ES-C-1 Verification of Completion

Examinee's Name:

NRC-25-IP-JPM-K Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory

  • Examiner's signature and date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

NUREG 1021 Rev 9 Appendix C

JPM BRIEFING SHEET

  • THIS IS A SIMULATED PLANT JPM. DO NOT OPERATE ANY PLANT EQUIPMENT.

Initial Conditions:

1. 3B Inverter is Supplying Load, 4B Inverter is Supplying Load, and B SPARE Inverter is in STANDBY.
2. All initial conditions in 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, specifically Sections 3.0 and 5.1, have been verified satisfactorily and complete.

!NITIA TlNG CUE:

In preparation for inverter maintenance, you have been directed by the Unit 4 RO to transfer 4P08 bus load from the 4B (4Y02) Inverter to the B SPARE (4Y04) Inverter in accordance with 0-OP-003.3, 120V VITAL INSTRUMENT AC SYSTEM, Section 7.1.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

Appendix C Job Performance Measure Form ES-C-1 Worksheet

  • Facility: _T_ur_k_e-"-y_P_o_in_t

__ _ _ _ _ _Task No:

T-ur-k-e-L-y-P-o-in-t-:------Task Respond to Turbine Runback, Rods Fail to NRC Task

Title:

Insert JPM No: SIM-1PM-A 045 K4.12 Automatic turbine runback 3.3/3.6 KIA

Reference:

Examinee:


NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance


Actual Performance xX Classroom SimulatorX Plant------------

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

  • Unit 3 is operating at 60% power and stable
  • Unit 3 is preparing to return to 100% power.
  • No equipment is out of service.

Task Standard:

  • 3-0NOP-089, Turbine Runback actions have been performed correctly.
  • Tavgrrref within 4°F in accordance with 0-ONOP-089, Turbine Runback (Match Tavg-Tref), 0-ADM-211, Emergency and Off-Normal Operating Procedure Usage (Tavg-Tref within 4° F during a transient)

Required Materials:

  • 0-ONOP-089, Turbine Runback
  • 0-ADM-211, Emergency and Off-Normal Operating Procedure Usage General

References:

  • 0-ADM-211, Emergency and Off-Normal Operating Procedure Usage
  • 0-ONOP-089, Turbine Runback

Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:

  • You have been directed to Respond to Plant Conditions
  • Time Critical Task: No Validation Time Time:: 10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT A T THIS TIMEI TIMEt

~ppendix C Page 3 of 12 Form ES-C-1!

SIMULATOR SETUP Reset to IC #

  • 16 Instructor Facility Operator Actions
1. Verify Reset to IC 24
2. Schema>> Reactor>> Rod Control/Rod Position>> SC408 Rod Motion Failures & Controls>>

TFL 10101:L 1-SC408 Rods Fail to Move Auto>> TRUE>> INSERT

3. Verify RED SQUARE framing SC408.
4. Schema>> Feedwater >> FIW Main>> Condensate Polishing Demineralizers >> Feedwater Pumps>>

3P1B (B Feedwater Pump) >>TVFABP1B:FA-3P1B Bearing>> Selected 1.0>> Pending>> Verify ORANGE SQUARE framing 3P1 B.

Ensure Simulator Operator Checklist is complete Instructor Facility Operator Actions (Cont)

5. Go to RUN.
6. Go to

SUMMARY

>> PENDING>> Right click on TVFABP1 B >> TRIGGER

Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark.O Start Time Recognition by Operator that Turbine Runback is occurring.

STEP 1 - -SAT

- -UNSAT Standard: Operator recognizes the Turbine Runback and identifies the need to respond in accordance with 3-0NOP-089, Turbine Runback.

Cue Provided by Simulator response.

Comment NOTE: Operator may identify that 38 Feedwater Pump is degrading and trip the 38 Feedwater Pump .

~ppendiX C Page 5 of 12 Form ES-C-1!

  • STEP 2

~

~.O IMMEDIATE OPERA TOR ACTIONS 14.0 4.1 Verify the automatic actions listed in Section 3.0 are functioning to

~tabilize and maintain plant conditions, or assume manual control.

iStabilize

- -SAT

- -UNSAT Standard: Used 3-0NOP-089, Turbine Runback to verify Immediate Operator

~ctions have been completed.

1. Provided by Simulator response.

Cue

~.

2. Terminate JPM after Operator matches Tavg-Trefwithin 4° F.

Comment Operator may choose at any time to address the lack of Control Rod

'nsertion and take manual action in accordance with Elements 6, 7, and 8.

NOTE: Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.

  • Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.

Appendix C Page 6 of 12 Form ES-C-1

  • 3.1 Main Turbine Control Valves and the Reheat Intercept Valves STEP 3 Imodulate closed upon receipt of a runback signal from the Generator - -SAT lGovernor/Speed povernorlSpeed Changer.

- -UNSAT Standard:

IV erified Main Turbine Control Valves and the Reheat Intercept Valves Imodulate closed Cue Provided by Simulator response.

Comment Operator may choose at any time to address the lack of Control Rod

  • NOTE:

'nsertion and take manual action in accordance with Elements 6,7, and 8.

Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.

IAppendix C Page 7 of 12 Form ES-C-11 3.2 Steam Dump Valves ann and open to relieve excess steam to the STEP 4 1C0ndenser condenser due to the load rejection and subsequent Tavg/Tref - -SAT

  • Standard:

Imismatch.

mismatch.

lVerified Verified Steam Dump Valves are armed and opened if needed.

- -UNSAT Cue Provided by Simulator response.

Comment Operator may choose at any time to address the lack of Control Rod

'nsertion and take manual action in accordance with Elements 6, 7, and

!insertion 8.

NOTE: Operator may choose to review al/ Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the Isubsequent subsequent actions after verifying Automatic Actions w/3-0NOP-089.

Appendix C Page 8 of 12 Form ES-C-1 G.3 3.3 Automatic Rod Insertion Control adjusts core reactivity to match STEP 5 Tavg with Tref.

iTavg - -SAT

  • Standard: Operator recognizes that Control Rods did not insert as required and

- -UNSAT inserts Control Rods to match Tavg within 4 degrees F.

Cue Provided by Simulator response.

Comment Operator may choose at any time to address the lack of Control Rod iinsertion and take manual action in accordance with Elements 6, 7, and linsertion a.

NOTE: Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOp-Oa9 .

IAppendiX C Page 9 of 12 Form ES-C-11 Operator places Rod Control Selector Switch to MANUAL.

STEP 6 SAT

..j UNS AT Standard: Operator placed Rod Control Selector Switch to MANUAL.

Cue Provided by Simulator response.

Comment Operator may choose at any time to address the lack of Control Rod

  • nsertion and take manual action in accordance with Elements 6, 7, and iinsertion 8.

NOTE: Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.

Appendix C Page 10 of 12 Form ES-C-1 Insertion Control Rods to adjusts core reactivity to match Tavg with STEP 7 Tref.

iTref. - -SAT

  • ..j Standard:

Operator places IN-HOLD-OUT Switch to IN to insert Control Rods to match Tavg with Tref within 4 [] F.

- -UNSAT Cue Provided by Simulator response.

Comment Operator may choose at any time to address the lack of Control Rod

'nsertion and take manual action in accordance with Elements 6, 7, and 8.

NOTE: Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.

!Appendix C Page 11 of 12 Form ES-C-11 Tavg and Tref are matched.

ravg STEP 8 - -SAT
  • ~

Standard:

UNS AT n-avg Tavg and Tref are within 4°F.

Cue Provided by Simulator response.

Comment Operator may choose at any time to address the lack of Control Rod "nsertion and take manual action in accordance with Elements 6, 7, and iinsertion 8.

NOTE: Operator may choose to review all Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the

!Subsequent

!subsequent actions after verifying Automatic Actions w/3-0NOP-089.

Appendix C Page 12 of 12 Form ES-C-1 3.4 Verifies Main Feedwater Control Valves open or close in STEP 9 programmed response to steamflow/feedflow mismatch and level input - -SAT signals, to maintain steam generator levels at program.

- -UNSAT

~erified Verified that Main Feedwater Control Valves responded properly to steamflow/feedflow mismatch and level input signals, to maintain

!Steamflow/feedflow Standard: steam generator levels at program.

!Steam Cue Provided by Simulator response.

Comment Operator may choose at any time to address the lack of Control Rod

'nsertion and take manual action in accordance with Elements 6, 7, and linsertion 8.

NOTE: Operator may choose to review a/l Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the

!Subsequent subsequent actions after verifying Automatic Actions w/3-0NOP-089.

!Appendix C I Page 13 of 12 I Form ES-C-11 3.5 Verify Pressurizer Level Controller and Pressurizer Pressure STEP 10 Controller vary charging pumps speed and Heater/Spray actuation to - -SAT Imaintain maintain the programmed level and pressure, as required for the

~hanging changing values of Tavg. - -UNSAT

~erifies Verifies that Pressurizer Level Controller and Pressurizer Pressure

[controller Controller maintaining the programmed level and pressure, as required Standard: ~or

-"or the changing values of Tavg.

Cue Provided by Simulator response.

Comment Operator may choose at any time to address the lack of Control Rod

'nsertion and take manual action in accordance with Elements 6, 7, and 8.

NOTE: Operator may choose to review al/ Automatic Actions prior to addressing lack of Control Rod insertion.

Inserting rods to match Tavg and Tref may be delayed until the subsequent actions after verifying Automatic Actions w/3-0NOP-089.

Appendix C Page 14 of 12 Form ES-C-1

$UBSEQUENT SUBSEQUENT OPERA TOR ACTIONS STEP 11 5.1 Determine the cause of the runback initiation AND refer to the - -SAT

~ ~ppropriate appropriate ONOP for specific recovery instructions.

5.2 Verify the following conditions: - -UNSAT 5.2.1 Stearn generator levels and pressures stabilized.

5.2.2 Stearn dumps closed.

5.2.3 Tavg matches Tref.

5.2.4 Pressurizer levels and pressures stabilized.

5.2 Verify the following conditions:

5.2.1 Stearn generator levels and pressures stabilized.

5.2.2 Stearn dumps closed.

Standard:

~.2.3 5.2.3 Tavg matches Trefwithin 4° F.

5.2.4 Pressurizer levels and pressures stabilized.

Cue Irerminate Terminate JPM after Operator matches Tavg-Trefwithin 4° F.

Comment

  • NOTE: Critical Step: 5.2.3 Tavg matches Trefwithin 4° F.

Terminating [The The task is complete when the Examinee returns the cue sheet to Cue: STOP

~he

..he examiner.

Stop Time -

/Appendix C Page 15 of 12 Form ES-C-11 Verification of Completion

Examinee's Name:

Examiner's Name:

NRC-25-SIM-JPM-A Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory

  • Examiner's signature and date:

NUREG 1021 Rev 9 Appendix C

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

  • Unit 3 is operating at 60% power and stable
  • Unit 3 is preparing to return to 100% power.
  • No equipment is out of service.

INITIA TlNG CUE:

You have been directed to respond to plant conditions.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: _T-.:.-u=:;r:..:..:k:..::.eLy-'-P--'

_T...:.-=.ur:..:..k:..::.eLy-' P-"o:..:..:i o:..:..inn:..:..t=--_

...:..:t'--__________

_ _ _ _ _ Task No:

Pressurizer Level Control Task

Title:

Channel Fails Low JPM No: NRC-25-SIM-JPM-8 APE 028 AA2.01 PZR level indicators and alarms 3.4 13.6 KJA

Reference:

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance


Actual Performance xX Classroom


-=====-=!.X~_ _

Simulator -=====-:::::!.X~ Plant - - - - - - - - - -

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

  • Unit 3 is at 100% and stable
  • No equipment is out of service
  • Task Standard:
  • Unit 3 is at 100% and stable.
  • Pressurizer level stable and returning to programmed level.
  • Letdown has been returned to service.

Required Materials:

  • 3-0NOP-041.6, Pressurizer Level Control Malfunction General

References:

  • 3-0NOP-041.6, Pressurizer Level Control Malfunction

Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:

  • You have been directed to respond to plant conditions.
  • Time Critical Task: No Validation Time: XX minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT TH/STIMEI

I Appendix C Page 3 of 12 Form ES-C-1 I SIMULATOR SETUP Reset to IC #

  • IC-1: 100% Power MOL Ensure Simulator Operator Checklist is complete Simulator Operator Instructions
1. Verify IC-1
2. Place Simulator to RUN
3. Schema>> Reactor Coolant System>> Pressurizer>> L-459 >> LT-459 >> TFH1TV59:H1-L T-459 Transmitter Fail Low>> TRUE>> INSERT

Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark( /)

Start Time Respond to Pressurizer Level Control Channel 459 fails low.

STEP 1 - - SAT

- - UNSAT Standard:

  • Operator refers to 3-0NOP-041.6 Pressurizer Level Control Malfunction.

Cue Comment NOTE: Operator may choose to refer to ARP prior to entering ONOP.

I Appendix C Page 5 of 12 Form ES-C-1 I Verify automatic actions occur.

STEP 2 - - SAT

- - UNSAT Operator verifies the following:

1. High Pressure LTON Isolation Valve LCV-3-460 CLOSES.
2. LTON Orifice Isolation Valves, CV-3-200A, CV-3-200B AND CV Standard:

200C CLOSE.

3. All Pressurizer Heaters turn OFF.
4. Charging flow INCREASES.

Cue Comment NOTE:

Appendix C Page 6 of 12 Form ES-C-1 Check pressurizer level indicators LI-3-459A, LI-3-460 AND LI-3-461,

  • STEP 3 Identifies Channel 459 as failed low.

- - SAT

- - UNSAT Standard:

Cue Comment NOTE:

I Appendix C Page 7 of 12 Form ES-C-1 I Place CHANNEL SELECT PRESSURIZER LEVEL CONTROL switch STEP 4 in position 2 or 3. -

SAT

..j UNSAT Standard: Places CHANNEL SELECT PRESSURIZER LEVEL CONTROL switch in position 2 or 3.

Cue Comment NOTE:

Appendix C Page 8 of 12 Form ES-C-1 Place MASTER CHARGING PUMP CONTROLLER, LC-3-459G in

  • STEP 5

..j MANUAL. - - SAT

- - UNSAT

1. Placed MASTER CHARGING PUMP CONTROLLER, LC-3-459G Standard: in MANUAL
2. Maintain programmed level per Enclosure 1.

Cue Comment NOTE:

I, Appendix C Page 9 of 12 Form ES-C-1 I,

  • STEP 6 IF LR-3-459 is selected to a defective channel, THEN place CHANNEL SELECT PRESSURIZER LEVEL RECORDER in another position.

- - SAT

- - UNSAT Placed CHANNEL SELECT PRESSURIZER LEVEL RECORDER in Standard: position other than Channel 459.

Cue Comment NOTE:

Appendix C Page 10 of 12 Form ES-C-1 Re-establish Letdown flow

  • STEP 6

~

1. Throttle Low Pressure LTON Controller, PCV-3-145, as necessary SAT

- - UNSAT to prevent LTON relief valve from lifting, (approximately 50 percent open).

2. Manually control Low Pressure Letdown Control Valve, PCV 145, to limit pressure spike.
3. OPEN High Pressure UO Isol Vlv from Loop B Cold Leg LCV Standard: 460.
4. OPEN UO Isolation Valves, CV-3-200 A, B OR C as required to restore pressurizer level to programmed level.
5. Return Lower Pressure Letdown Control Valve, PCV-3-145 to automatic.

Cue Tell operator that another operator will perform the remainder of the procedure.

Comment

  • NOTE: Steps 1, 2, and 5 are not critical steps.

Terminating The task is complete when the Examinee returns the cue sheet to Cue: STOP the examiner.

Stop Time _ _ __

I Appendix C Page 11 of 12 Form ES-C-1 I Verification of Completion

Examinee's Name:

NRC-25-SIM-JPM-8

~~~~~~~~------------------------------------

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory

  • Examiner's signature and date: _________________________

NUREG 1021 Rev 9 Appendix C

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

  • Unit 3 is at 100% and stable
  • No equipment is out of service INITIA TlNG CUE:
  • You have been directed to respond to plant conditions.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: T--'

--'. .T--u-'-,-,-ur_k.

'-r_k..:...ey"------P..:...o_i

.c:. .e, --Y_P..c:. .o_inn. c..:...t

. .t_ _ _ _ _ _ _Task No:
  • Task

Title:

ALIGN SAFETY INJECTION FOR HOT LEG RECIRC


~--------

011 EK3.13 Hot-leg injection/recirculation 3.8 14.2 JPM No: NRC-25-SIM-JPM -C KJA

Reference:

Examinee:


NRC Examiner: -

Facility Evaluator: Date:

Method of testing:

Actual Simulated Performance Performance x Classroom Simulator====-:!.X~_

Simulator====~X~ _____ Plant-Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

  • UNIT ON COLD LEG RECIRCULATION (RHR LOOP A) 12 HOURS HAVE ELAPSED SINCE EVENT INITIATION IDLE RHR TRAIN AVAILABLE (RHR LOOP B)

POWER AVAILABLE TO BOTH 4 KV BUSSES 3A HHSI PUMP IS RUNNING RHR SUPPLYING COLD LEG RECIRCULATION

  • ALL CCW HEAT EXCHANGERS ARE IN SERVICE
  • STEP 32 OF 3-EOP-E-1, Loss of Reactor or Secondary Coolant. IS IN PROGRESS
  • 3-EOP-E-l, Loss of Reactor or Secondary Coolant. IS OPEN ON THE UNIT SUPERVISOR DESK AND OPEN TO STEP 32 WITH STEP 32 CIRCLED.

Task Standard:

  • S.1. FLOW SUPPLIED TO HOT LEGS Required Materials:
  • 3-EOP-ES-1.4, TRANSFER TO HOT LEG RECIRCULATION
  • 3-EOP-E-1, Loss of Reactor or Secondary Coolant General

References:

3-EOP-ES-l.4, TRANSFER TO HOT LEG RECIRCULATION 3-EOP-E-1, Loss of Reactor or Secondary Coolant NUREG 1021 Rev 9 Appendix C

Appendix C Page 2 of 12 Form ES-C-1

  • Initiating Cue:

You have been directed to ALIGN SAFETY INJECTION FOR HOT LEG RECIRC AS REQUIRED BY STEP 32 OF 3-EOP-E-1, Loss of Reactor or Secondary Coolant.

Time Critical Task: NO Validation Time: 15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIMEI

jAppendix C Page 3 of 12 Form ES-C-11 SIMULATOR SETUP Reset to IC # 58

  • Load Lesson LOADAND EXECUTE LESSON: JPM Ol062012501.LSN TRIGGER "MOV-3-869 CLOSED" OPEN MOV 863A & MOY 863B
  • Unfreeze simulator.

Ensure Simulator Operator Checklist is complete

Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark.O Start Time

  • STEP

..J 1 jrRANSITION AS REQUIRED BY STEP 32 OF 3-EOP-E-1 - -SAT

- -UNSAT Standard: ITRANSITION MADE TO 3-EOP-ES-1.4, TRANSFER TO HOT LEG

!TRANSITION RECIRCULATION Cue Comment NOTE: Candidate should place a mark through circled step 32 prior to transition.

!Appendix C I Page 5 of 12 I Form ES-C-11 STEP 2 Check High-Head SI Pumps - ANY SAT RUNNING

- UNSAT Standard:

  • Candidate recognizes that 3A HHSI Pump is running Cue Comment NOTE:

Appendix C Page 6 of 12 Form ES-C-1 Verify RHR Heat Exchanger CCW Outlet Valve On Operating RHR STEP 3 Train - OPEN MOV-3-749A for train A SAT UNSAT MOV-3-749A, RHR Heat Exchanger CCW Outlet Valve VERIFIED Standard: OPEN Cue Comment NOTE:

jAppendix C Page 7 of 12 Form ES-C-1!

STEP 4 - -SAT 3 Verify Safety Injection To Hot Leg Isolation Valve, MOV-3-869 -

..J OPEN

- -UNSAT 1.MOV-3-869 ATTEMPTED TO BE VERIFIED OPEN. (Candidate Standard: IShould attempt to open valve prior to transitioning to Att. 1 )

Ishould I2.Candidate i2.Candidate transitions to to ATTACHMENT 1.

Cue If candidate calls to locally open MOV-3-869 tell candidate that valve is inaccessible.

Comment MOV-3-869 is closed and cannot be opened. Operator should attemp o open valve prior to transitioning to Att. 1 NOTE:

Appendix C Page 8 of 12 Form ES-C-1

  • STEP 4

-J ESTABLISH ALTERNATE HOT LEG INJECTION FLOWPATH (ATT.

1)

1. TRANSITIONED TO ATTACHMENT 1 OF 3-EOP-ES-1.4 SAT UNSAT
2. Primary Operator DIRECTED TO CLOSE 3-752A AND 3-752B Standard:
3. RHR LOOP VALVES MOV-3-750 AND MOV-3-751 OPENED BOOTH OPERATOR RESPOND AS PO/FS AND ON SIMULATOR

!TRIGGER ITRIGGER "CLOSE 3-752A1B",

Cue I.F. OPERATOR REPORTS COMPLETION OF TASK.

Comment

  • NOTE:

!Appendix C Page 9 of 12 Form ES-C-1j STEP 5 SAT VERIFY THE POSITION OF THE RHR HEAT EXCHANGER OUTLET -

VALVE UNSAT SNPO DIRECTED TO VERIFY THAT 3-759A IS OPEN Standard:

Cue BOOTH OPERATOR RESPOND AS PO/FS AND ON SIMULATOR REPORT 3-759A OPEN Comment NOTE:

Appendix C Page 10 of 12 Form ES-C-1 STEP 6 SAT REMOVE THE HHSI PUMPS AND CONTAINMENT SPRAY PUMPS -

..j FROM SERVICE UNSAT CONTROL SWITCHES FOR ALL HHSI PUMPS ALIGNED TO UNIT 3 Standard: RWST AND THE UNIT 3 CONTAINMENT SPRAY PUMPS POSITIONED TO PULL-TO-LOCK Cue Comment NOTE:

!Appendix C Page 11 of 12 I Form ES-C-11 STEP 7 SAT

~ERIFY RHR COLD LEG INJECTION ISOLATION VALVE OPEN -

  • Standard:

MOV-3-744A AND/OR MOV-3-744B VERIFIED OPEN UNSAT Cue Comment NOTE:

Appendix C Page 12 of 12 Form ES-C-1 STEP 8 ISOLATE THE RHRALTERNATE DISCHARGE FLOW-PATH -

SAT

- UNSAT

  • MOV-3-863A, RHR ALTERNATE DISCHARGE VALVE, CLOSED Standard:
  • MOV-3-863B, RHR ALTERNATE DISCHARGE VALVE, CLOSED Cue Comment NOTE:

~ppendix C Page 13 of 12 Form ES-C-1!

STEP 9 ALIGN THE RHR RECIRCULATION FLOWPATH -

SAT

..j UNSAT SNPO DIRECTED TO OPEN 3-741A, RHR RECIRC ISOLATION Standard: ~ALVE VALVE Cue BOOTH OPERATOR TRIGGERS "OPEN 3-741A" AND REPORT STATUS TO OPERATOR 1-2 MINUTES AFTER ORDER WAS GIVEN Comment NOTE:

Appendix C Page 14 of 12 Form ES-C-1

~ERIFY VERIFY STATUS OF CORE EXIT THERMOCOUPLES STEP 10 SAT

.,j UNSAT CORE EXIT TEMPERATURES VERIFIED STABLE OR Standard: DECREASING Cue Comment NOTE:

[Appendix C 1 Page 15 of 12 I Form ES-C-11

~ONTINUE CONTINUE LONG-TERM RECOVERY ACTIONS STEP 11 SAT

  • RESTORATION OF NORMAL HOT LEG RECIRCULATION ATTEMPTED AS DIRECTED BY THE TSC STAFF

- UNSAT

  • INJECTION TO BOTH HOT LEGS AND COLD LEGS Standard: VERIFIED
  • RHR PUMP INJECTION TO HOT AND COLD LEGS MAINTAINED UNTIL NORMAL HOT LEG RECIRCULATION LINEUP IS ESTABLISHED BOOTH OPERATOR RESPOND AS TSC AND CONFIRM PLAN IS Cue IN PROGRESS TO RESTORE NORMAL HOT LEG INJECTION Comment OPERA TOR SHOULD USE OPERATOR ERDADS SCREEN TO CONFIRM AL TERNA TE RHR FLOW NOTE:

Appendix C Page 16 of 12 Form ES-C-1 Return To Procedure And Step In Effect STEP 12 - -SAT

  • Standard:

RETURNED TO 3-EOP-E-1, Loss of Reactor or Secondary Coolant, STEP 15.

- -UNSAT Cue Comment NOTE:

Terminating [The STOP The task is complete when the Examinee returns the cue sheet to the Cue: ~xaminer.

examiner.

Stop Time

!AppendiX C Page 17 of 12 Form ES-C-11 Verification of Completion

~ JobPe~rmanceMeasureNo.

JobPe~rmanceMeasureNo.N N~R_C_-_25_-_S_IM~~_P_M_-_C~~~~~~~~~~~~~~~~~_

__R_C_-_25_-_S_I~~~_P_~_-_C~~~~~~~~~~~~~~~~~_

Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

~

Response

Result: Satisfactory/Unsatisfactory

  • Examiner's signature and date:

NUREG 1021 Rev 9 Appendix C

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

  • UNIT ON COLD LEG RECIRCULATION (RHR LOOP A)
  • 12 HOURS HAVE ELAPSED SINCE EVENT INITIATION
  • POWER AVAILABLE TO BOTH 4 KV BUSSES
  • 3A HHSI PUMP IS RUNNING
  • RHR SUPPLYING COLD LEG RECIRCULATION
  • ALL CCW HEAT EXCHANGERS ARE IN SERVICE
  • STEP 32 OF 3-EOP-E-l, Loss of Reactor or Secondary Coolant. IS IN PROGRESS
  • 3-EOP-E-l, Loss of Reactor or Secondary Coolant. IS OPEN ON THE UNIT SUPERVISOR DESK AND OPEN TO STEP 32 WITH STEP 32 CIRCLED.

INITIA TlNG CUE:

You have been directed to ALIGN SAFETY INJECTION FOR HOT LEG RECIRC AS REQUIRED BY STEP 32 OF 3-EOP-E-1, Loss of Reactor or Secondary Coolant.

  • Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

NUREG 1021 Rev 9 Appendix C

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Turkey Point Task No:

Respond to a Source Range Nuclear Instrument Malfunction Job Performance Task

Title:

(MODE 6) Measure No: NRC-2S-SIM-JPM-D KIA

Reference:

015 A2.02 (3.1/3.5)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing: Simulator / Control Room Simulated Performance Actual Performance Yes Classroom Simulator- - -Yes Plant._ _ _ _ _ __

Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. Unit 3 is in Mode 6.
2. Refueling activities are in progress.
3. NIS Source Ranges N-31 and N-32 are both in service.
  • 4. Both Gamma Metrics Channels are OOS for maintenance.

Task Standard:

1. N-32 selected for audio count rate.
2. Core alterations suspended.

Required Materials:

3-0NOP-059.5, Source Range Nuclear Instrumentation Malfunction General

References:

3-0NOP-059.5, Source Range Nuclear Instrumentation Malfunction Initiating Cue:

Respond to plant conditions.

Time Critical Task: No Validation Time: 10 minutes

  • HAND JPM BRIEFING SHEET TO EXAMINEE A T THIS TIMEI

Appendix C Page 2 of 7 Form ES-C-1 INITIAL CONDITIONS:

1. Unit 3 is in Mode 6.
2. Refueling activities are in progress.
3. NIS Source Ranges are both in service.
4. Both Gamma Metrics are OOS for maintenance.

/NITIA TlNG CUE:

Respond to plant conditions.

TERMINA TlON CUE:

When you feel that you have satisfactorily completed the assigned task, hand your JPM briefing sheet back to me.

Do you have any questions?

You may begin.

!AppendiX C Page 3 of 7 Form ES-C-11 NOTES TO EVALUATOR AND BOOTH OPERATOR:

1. Reset to IC 117 Cavity Drain Pre-Req's Complete
2. Place both channels of Gamma-Metrics O.O.S.:
a. Schema 0 REACTOR 0 INCORE/EXCORE DETECTORS 0 Detector #90 TFN1WAFL NEB01A DETECTOR FAIL LOW 0 TRUE then INSERT
b. Detector #100 TFN1WBFL NEB01B DETECTOR FAIL LOW 0 TRUE then INSERT
c. Place both Gamma-Metric Block Switches to BLOCK on console
3. Select N-31 for Audio Count Rate; Select N-31/N-32 and N-35/N-36 on console NIS Recorder
4. Place CSD Placards on Vertical Panels.
5. =

Update console placard to read RCS BORON 2000 ppm

6. Adjust Boric Acid and Primary Water Auto Makeup flow controller potentiometers for 2000 ppm boron

concentration (HIC-3-114 4.0, FC-3-113 B.O)

7. Change ERDADS screen on VPA to P-T display.

B. Provide an extra Operator to acknowledge annunciators and maintain stable plant conditions.

9. When Operator has received a turnover of plant status, fail Source Range NI N-31 HIGH:

Schema 0 REACTOR 0 INCORE/EXCORE DETECTORS 0 Detector #1 0 TFN1SAFH NE101N31 DETECTOR FAIL HIGH 0 TRUE then INSERT

Appendix C Page 4 of7 Form ES-C-1 Denote critical steps with a check mark.O Start Time - - - -

  • STEP 1

..j Perform Immediate actions of 3-0NOP-059.5, SOURCE RANGE NUCLEAR INSTRUMENTATION MALFUNCTION.

14.0 14.0 IMMEDIATE ACTIONS

- - SAT UNSAT 14.5 r.5 Mode 6 - Refueling 14.5.1 f4..5.1 Malfunction of ONE channel:

1. Switch the AUDIO COUNT RATE CHANNEL SELECTOR to the operable source range.
2. Verify at least 2 out of 4 Source Range and Backup NIS (Gamma Metrics) channels are operable, with one Source Range having audible count rate in the Control Room and Containment.
a. IF the above requirement is not met, THEN suspend all operations involving core alterations OR positive reactivity changes.
  • STANDARD:
3. IF applicable, THEN notify plant personnel of erroneous Containment Evacuation Alarm.
1. Switches AUDIO COUNT RATE CHANNEL SELECTOR from N-31 to N-32.

~.

2. Suspends all operations involving core alterations since only one of four source range Nls are operable. *
3. Notifies plant personnel of erroneous Containment Evacuation Alarm Operator may reference procedure to verify I perform actions.

Respond as Refueling SRO and/or Reactor Engineer/STA if notified to stop refueling activities and store fuel assemblies in a safe location.

CUE: Report that refueling has stopped and fuel assemblies are all safely oeated.

Comment

  • NOTE: Source Range N-31 has failed HIGH.

!AppendiX C Page 5 of 7 Form ES-C-11

  • Operator obtains copy of 3-0NOP-059.5.

STEP 2 - -SAT

- -UNSAT

1. Operator obtains Simulator copy of 3-0NOP-059.5 STANDARD:

~. Operator verifies Immediate Actions are correct.

Cue Comment NOTE:

Appendix C Page 6 of7 Form ES-C-1 5.0 SUBSEQUENT ACTIONS STEP 3 5.5 Mode 6 - Refueling - -SAT

..J 5.5.1 Malfunction of ONE channel: - -UNSAT

1. Place LEVEL TRIP switch on failed channel in BYPASS position.
2. Place HIGH FLUX AT SHUTDOWN switch on failed channel in BLOCK position.
3. Switch an NIS RECORDER to the operable source range.
4. IF one Source Range having audible count rate in the Control Room and Containment, AND 2 out of 4 NIS (NSSS Source Range and Gamma Metrics) Channels are not operable, THEN verify RCS boron concentration is greater than or equal to the required boron concentration at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
5. Notify I&C.
6. Monitor Backup NIS (Gamma Metric) Source Range Count Rate .
  • STANDARD: Operator removes N-31 from service.
1. Positions LEVEL TRIP switch to BYPASS.

~.

2. Positions HIGH FLUX AT SHUTDOWN switch to BLOCK.
3. Verifies N-32 displayed on console NIS recorder.
4. Contacts Chemistry determines Boron concentration:::: 1950 ppm.

f4.

5. Notifies I&C of N-31 failure.

~.

6. Determines both backup NIS (Gamma-Metric) channels OOS.

1.lf called as Reactor Engineering, state that the required RCS Boron

~oncentration is> 1950 ppm.

jeoncentration

~.If called as Chemistry, confirm Boron concentration is 2000 ppm.

12.lf CUES:

3.Respond as I&C if notified of N-31 failure.

14.

f4.lnform Inform the applicant that another operator will continue from this ipoint.

Comment

  • NOTE: Only Standards 1 and 2 are critical.

\Appendix C Page 7 of 7 Form ES-C-11 iApplicant Applicant should return JPM Initial Condition sheet and state that STEP 4 - -SAT pperator operator actions are complete.

- -UNSAT Terminating If operator attempts any other compensatory actions beyond this point STOP CUE: ell operator that JPM has been completed.

Stop Time ----

Appendix C Page 8 of7 Form ES-C-1 Verification of Completion

  • ~ Job JobPe~rmanceMeasuffiNo.N Performance Measure No.N ~=R~C~-~2~5-~S=IM~~~P=M~-D~~~~~~~~~~~~~~~~~_

=-:..:..R:..;:C=---=.2=-5-...::S:..:..IM:..:..=--J:.:P-=.M.:..=-..:-D=---_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

  • ~

Response

Result: Satisfactory/Unsatisfactory

  • ~

Examiner's signature and date:

~ppendix C Page 9 of 7 Form ES-C-11

JPM BRIEFING SHEET

  • INITIAL CONDITIONS:
1. Unit 3 is in Mode 6.
2. Refueling activities are in progress.
3. NIS Source Ranges are both in service.
4. Both Gamma Metrics are OOS for maintenance.

!NITIA TlNG CUE:

Respond to plant conditions.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK .

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: _T_u_rk_e___y_P_o_in_t T_ur_k_e-'-y_P_o_in_t_ _ _ _ _ _ _Task No:

  • Task

Title:

Purging the PRT to Reduce Oxygen or Hydrogen Concentration (Major Gas Volume) 007 Kl.04 Nitrogen 2.1/2.3 JPM No: NRC-25-SIM-JPM-E KIA

Reference:

Examinee:


NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance Actual Performance x Classroom SimulatorX Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

  • Chemistry reports that PRT Oxygen Concentration is 2.5% by Volume
  • Unit 3 is in Mode 1 at 100% Power with no equipment out of service.
  • 3-NOP-041.3, Pressurizer Relief Tank up to and including step 5.5.11 has been completed by the off-
  • going shift
  • You are the oncoming Reactor Operator and have been briefed on the evolution.
  • PRT Level is at 80%.

Task Standard:

  • Purge the PRT to Reduce Oxygen Concentration to within required specifications.

Required Materials:

  • 3-NOP-041.3, Pressurizer Relief Tank General

References:

  • 3-NOP-041.3, Pressurizer Relief Tank

Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:

  • You have been directed to Purge the PRT to Reduce Oxygen Concentration to within required specifications using 3-NOP-041.3, Pressurizer Relief Tank step 5.5.11.
  • All prerequisites have been satisfied.
  • You are continuing 3-NOP-041.3 after a turnover from the off-going shift.

Time Critical Task: No Validation Time: 10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

!AppendiX C Page 3 of 12 Form ES-C-1!

SIMULATOR SETUP Reset to IC #

  • Load saved IC on Flash Drive XR-043.dat Load Lesson Ensure Simulator Operator Checklist is complete CLOSE Gas waste Disposal V4658A & B

Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark,O Start Time - - - -

  • STEP 1

..J

11. ENSURE CV-3-549, PRT VENT, is OPEN SAT UNSAT
1. Placed PRT Vent Valve, CV-3-S49 switch to open.

Standard:

2. Verified PRT Vent Valve, CV-3-S49 Red Ught ON Green Ught OFF.

Cue Comment NOTE: Standard #2 is not critical.

!Appendix C Page 5 of 12 Form ES-C-1!

13. OPEN CV-3-519B, PRT PRIMARY WATER MAKE UP.

STEP 2 SAT UNSAT

1. Placed PRT Vent Valve, CV-3-5198 switch to open.

Standard:

~.

2. Verified PRT Vent Valve, CV-3-5198 Red Light ON Green Light OFF.

Cue Comment NOTE: Standard #2 is not critical.

Appendix C Page 6 of 12 Form ES-C-1 5.5 Purging the PRT to Reduce Oxygen or Hydrogen STEP 3 ~oncentration SAT Concentration (Major Gas Volume) (continued) -

~

UNSAT

14. WHEN any of the following conditions exists: -
  • PRT level approaches 95% on LI-3-470, PRZR RELIEF TK LEVEL
  • PRT pressure approaches 10 psig on PI-3-472, PRZR RELIEF TK PRESSURE THEN CLOSE CV-3-519B, PRT PRIMARY

~ATER WATER MAKE UP.

1. When PRT level approaches 95% placed PRT Vent Valve, CV 5198 switch to close.

Standard:

~.

2. Verified PRT Vent Valve, CV-3-5198 Red light OFF Green light ON Cue Comment
1. Standard #2 is not critical.

NOTE:

NUREG 1021 Rev 9 Appendix C

jAppendix C Page 7 of 12 Form ES-C-1!

15. MAINTAIN PRT level at 90 to 95% for 25 to 35 minutes.

STEP 4 SAT UNSAT Standard:

1. Tell operator that 35 minutes have elapsed.

Cue ~.

2. Tell operator that 3-NOP-041.3 steps 16,17, and 18 have been completed.

Comment NOTE:

Appendix C Page 8 of 12 Form ES-C-1 STEP 5 SAT UNSAT Standard:

Cue Comment NOTE:

jAppendix C Page 9 of 12 Form ES-C-11 5.5 Purging the PRT to Reduce Oxygen or Hydrogen STEP 6 Concentration (Major SAT

.,j Gas Volume) (continued)

UNSAT

19. WHEN PRT pressure indicated on PI-3-472 has lowered to approximately 6 psig, as controlled by nitrogen supply regulator, THEN CLOSE CV-3-549, PRT VENT.

ITHEN

1. Placed PRT Vent Valve, CV-3-549 switch to close.

Standard: ~.

2. Verified PRT Vent Valve, CV-3-549 Red Light OFF Green Light ON Tell operator that Chemistry informs Reactor Operator that PRT trell Cue oxygen reading is less than 2 percent oxygen by volume.

Comment Standard #2 is not critical.

NOTE:

Appendix C Page 10 of 12 Form ES-C-1

~1. WHEN Chemistry reports PRT oxygen reading less than 2%

121.

STEP 7 by volume, THEN: - -SAT

..j IA.

'A. CLOSE CV-3-519A, PRT VENT. - -UNSAT

1. CV-3-519A, Primary Water to Containment Isolation switch Standard: taken to close.
2. Veriified CV-3-519A Green Light ON, Red Light OFF.

Cue ~fter After standard #2 has been completed, inform the Reactor Operator hat another operator will perform the remainder of the procedure.

Comment NOTE:

Standard #2 is not critical.

Terminating Cue: STOP

'The task is complete when the Examinee returns the cue sheet to IThe

~he the examiner.

Stop Time _ _ __

NUREG 1021 Rev 9 Appendix C

jAppendix C Page 11 of 12 Form ES-C-11 Verification of Completion

Examiner's Name:

~~~~~~~~-------------------------------------

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory

  • Examiner's signature and date:

NUREG 1021 Rev 9 Appendix C

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied .

Initial Conditions:

  • Chemistry reports that PRT Oxygen Concentration is 2.5% by Volume
  • Unit 3 is in Mode 1 at 100% Power with no equipment out of service.
  • 3-NOP-041.3, Pressurizer Relief Tank up to and including step 5.5.11 has been completed by the off-going shift
  • You are the oncoming Reactor Operator and have been briefed on the evolution.
  • PRT Level is at 80%.

Initiating Cue:

  • You have been directed to Purge the PRT to Reduce Oxygen Concentration to within required specifications using 3-NOP-041.3, Pressurizer Relief Tank step 5.5.11.
  • All prerequisites have been satisfied.
  • You are continuing 3-NOP-041.3 after a turnover from the off-going shift.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK .

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: T_u_r_k~eY,---P_oi_nt Turkey Point_ _ _ _ _ _ _Task No:

--~~---------------

INITIATE CONTAINMENT PURGE Task

Title:

NRC-25-SIM-JPM-F

- - - - - - - - - - - - -JPM No:

029 A4.01 Containment purge flow rate 2.5/2.5 KIA

Reference:

Examinee:


NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance Actual Performance x Classroom SimulatorX Plant-Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

  • UNIT 3 IS IN MODE 5 WITH ALL PURGE VALVES CLOSED.
  • UNIT 3 EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.
  • UNIT 4 IS IN MODE 1 WITH ALL PURGE VALVES CLOSED AND CONTAINMENT EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED .
  • ALL APPLICABLE PREREQUISITES OF 3-NOP-053 ARE SATISFIED.
  • CONTAINMENT PURGE RELEASE PERMIT IS APPROVED.
  • 3-NOP-053, CONTAINMENT PURGE SYSTEM IS SIGNED OFF AND COMPLETED UP TO STEP 4.1.1.1l.

Task Standard:

  • ISOLATION VALVES OPEN AND PURGE FANS RUNNING IN ACCORDANCE WITH 3NOP-053, CONTAINMENT PURGE SYSTEM Required Materials:
  • 3-NOP-053, CONTAINMENT PURGE SYSTEM
  • APPROVED CONTAINMENT PURGE RELEASE PERMIT General

References:

  • 3-NOP-053, CONTAINMENT PURGE SYSTEM

Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:

  • 1. A satisfactory shift turnover has been completed.
2. You have been directed to continue with Step 4.1.1.12 of3-NOP-053, CONTAINMENT PURGE SYSTEM and perform a purge of the Unit 3 Containment.

Time Critical Task: No Validation Time: 10 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIMEl NUREG 1021 Rev 9 Appendix C

~ppendix C Page 3 of 12 Form ES-C-1!

SIMULATOR SETUP Reset to IC #

  • Mode 5 IC with Containment Purge Valves CLOSED and Fans OFF Load Lesson Ensure Simulator Operator Checklist is complete

Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check marI(O Start Time

~.1.1.12 4.1.1.12 STEP 1 - -SAT

~ Open the following valves:

1. Containment Purge Exhaust Isol (O.C.), POV-3-2602 - -UNSAT

~.

2. Containment Purge Exhaust Isol (I.c.),

(I.e.), POV 2603

1. Containment Purge Exhaust Isol (O.C.), POV-3-2602 switch placed to Open
2. Verified Containment Purge Exhaust Isol (O.C.), POV-3-2602 Red Standard:

Light On, Green Light Off.

3. Containment Purge Exhaust Isol (I.C.), POV-3-2603 switch placed to Open

~.

4. Verified Containment Purge Exhaust Isol (O.c.),

(O.e.), POV-3-2603 Red Light On, Green Light Off.

Cue Comment

  • NOTE: Standards #2 and #4 not critical

~ppendix C Page 5 of 12 Form ES-C-11

~.1.1.13 4.1.1.13 STEP 2 - -SAT

  • Prepare to open Containment Purge Supply Isolation Valves

!prepare If both conditions are met then both Unit 3 Containment Purge Supply

Valves will be open.

lValves

- -UNSAT Standard:

1. Verified Containment Doors/Hatches closed to atmosphere.

p.2. Verified on opposite Unit that Purge Supply Valves closed or Doors/Hatches are closed to atmosphere Repeat applicable initial conditions if asked:

  • UNIT 3 EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.

Cue

  • UNIT 4 IS IN MODE 1 WITH ALL PURGE VALVES CLOSED AND CONTAINMENT EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.

Comment NOTE: [This This information is covered in the Initial Conditions

Appendix C Page 6 of 12 Form ES-C-1

~.1.1.13 4.1.1.13 (contd.)'

STEP 3 SAT Open the following valves:

~

1. Containment Purge Supply Isol (O.C.), POV-3-2600 -

UNSAT t2.Q. Containment Purge Supply Isol (I.C.), POV 2601

1. Containment Purge Supply Isol (O.C.), POV 2600 switch placed to Open.

~.

2. Verified Containment Purge Supply Isol (O.C.), POV-3-2600 Red Standard: Light On, Green Light Off.

b.

3. Containment Purge Supply Isol (I.C.), POV 2601 switch placed to Open.

~.

4. Verified Containment Purge Supply Isol (O.C.), POV-3-2601 Red Light On, Green Light Off.

Cue Comment NOTE: Standards #2 and #4 not critical NUREG 1021 Rev 9 Appendix C

jAppendiX C Page 7 of 12 Form ES-C-1!

fl.1.1.14 4.1.1.14 STEP 4 - -SAT

  • ~ Start 3V20: Unit 3 Containment Purge Exhaust Fan .
1. Control Switch Positioned to Run

- -UNSAT

~.

2. Verified Fan Red Light On and Green Light Off Standard:
3. Verified Damper Red Light On Green Light Off If candidate attempts to have 4V20: Unit 4 Containment Purge Exhaust Cue Fan, tell candidate that the Unit Supervisor desires the Unit 3 Fan to be started.

Comment NOTE: Standards 2,3, and 4 are not critical

Appendix C Page 8 of 12 Form ES-C-1

~.1.1.15 14*1.1.15 STEP 5 - -SAT

  • ..J Start 3V9: Unit 3 Containment Purge Supply Fan.
1. Verify POV-3-2600 and POV-3-2601, Containment Purge Supply Isolations are open.

- -UNSAT

~.

2. Control Switch Positioned to Run Standard: 3. Verified Fan Red Light On and Green Light Off

~.

4. Verified Damper Red Light On Green Light Off
5. Ensures MO-3-3421, Unit 3 Containment Purge Exhaust Damper is OPEN.

Cue rrell Tell candidate that another operator will complete the remainder of the procedure.

Comment NOTE:

Standards #2 and #3not critical Terminating The task is complete when the Examinee returns the cue sheet to STOP Cue: the examiner.

Stop Time NUREG 1021 Rev 9 Appendix C

~ppendix C Page 9 of 12 Form ES-C-1!

Verification of Completion

~ JobPe~rmanceMeasureNo.N _~R_C~-~2_5_-S~I_~_-_~_~~-_F~~~~~~~~~~~~~~~~~~

JobPe~rmanceMeasureNo. N~R_C_-_2_5-_S_I_~_-_~_~~-F~~~~~~~~~~~~~~~~~~

Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

~

Response

Result: Satisfactory/Unsatisfactory

  • Examiner's signature and date:

NUREG 1021 Rev 9 Appendix C

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied .

Initial Conditions:

  • UNIT 3 IS IN MODE 5 WITH ALL PURGE VALVES CLOSED.
  • UNIT 3 EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.
  • UNIT 4 IS IN MODE 1 WITH ALL PURGE V ALVES CLOSED AND CONTAINMENT EQUIPMENT, PERSONNEL, AND EMERGENCY HATCHES ARE CLOSED.
  • ALL APPLICABLE PREREQUISITES OF 3-NOP-053 ARE SATISFIED.
  • CONTAINMENT PURGE RELEASE PERMIT IS APPROVED.
  • 3-NOP-053, CONTAINMENT PURGE SYSTEM IS SIGNED OFF AND COMPLETED UP TO STEP 4.1.l.11.

!NITIA TlNG CUE:

You have been directed to commence with Step 4.1.1.12 of 3-NOP-053, CONTAINMENT PURGE SYSTEM and perform a purge of the Unit 3 Containment.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK .

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: T_ur_k_e.Ly_P_o_in_t Turkey Point_ _ _ _ _ _ _Task No:


~----------

-:Fill -II:-3.:.3A NRC-25-SIM-JPM-G Task

Title:

- : -Fi: -- .-

006 A 1.13 Accumulator

-Accumulator

. .A--=---Ac::-cc.-
. ,u:.-
. -m.:. .-
. .u=l=at-
. : .o.-
. .:. .r_

-JPM No:

pressure (level, boron concentration )3.5/3.7 KIA

Reference:

Examinee:

- - - - - - - - - - - - -NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance Actual Performance x Classroom Simulator======~X~_ _

Simulator----.....,X~ Plant Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

  • 3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.
  • 7.1.2.2.b,c, and d are marked N/A.
  • It is desired to use the 3A HHSI Pump for this task Task Standard:
  • Make-up to the 3A Safety Injection Accumulator to 6600 +/- 20 gallons.

Required Materials:

References:

Appendix C Page 2 of 12 Form ES-C-1 Initiating Initi ating Cue:

You have been directed to raise 3A JA Accumulator Level to 6600 +/- 20 gallons gall ons using 3A SAFETY INJECT ION PUMP INJECTION PUM P starting at step: 7. 1.2.2.3.

step: 7.1.2.2 .3.

  • 3-0 P- 064 Safety Injection Accumulators, Section 3-0P-064 Sec tion 7.1,
7. 1, Adding Make-up to the Safety Injection Injecti on Accumulators up to 7.1.2.2.2.a
7. 1.2.2.2.a has been completed.

compl eted.

  • 77.1.2.2.b,c, NIA.

. 1.2.2.b,c, and d are marked N/A.

Ti me Critical Time Cri tica l Task: NO Va lidati on Time:

Validation 15 minutes HAND Jl'M JPM BRIEFING SHEET T TOO EXAMINEE AT TID T BlS TIME!

TI ME!

NUREG 1021 Rev 9 Appendix C

~ppendiX C Page 3 of 12 Form ES-C-1!

SIMULATOR SETUP Reset to IC # 1

  • Load Lesson
  • Open SI Pump 3A and 3B Test Recirc Isolation, 3-899L.
  • Open SI Pump 3A Test Recirc Isolation, 3-899K.

Ensure Simulator Operator Checklist is complete Ensure marked up copy of 3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed. Steps 7.1.2.2.b,c, and d are marked NI A. Step 7.1.2.3 is circled.

NUREG 1021 Rev 9 Appendix C

Appendix C Page 4 of 12 Form ES-C-1 Denote critical steps with a check mark.O Start Time - - - -

  • STEP 1

..j Open the Accumulator Makeup Valve for Accumulator A, CV-3-851A

- -SAT

- -UNSAT

1. Placed Control Switch to Open for Accumulator A, CV-3-851A
2. Verified Red OPEN light ON Standard: 3. Verified Green CLOSED light OFF Cue Comment NOTE: Standards 2 and 3 are not critical.

!AppendiX C Page 5 of 12 Form ES-C-1!

Start the 3A Safety Injection Pump document the start time on QA STEP 2 !Record Page - -SAT

  • ~

Standard:

1. 3A HHSI Pump Control Switch turned to START

~. 3A HHSI Pump Red Run light is ON

- -UNSAT l3. 3A HHSI Pump Green Stop light is OFF Cue Comment NOTE: Standards 2 and 3 are not critical.

Appendix C Page 6 of 12 Form ES-C-1 Open the Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869 to STEP 3 - -SAT establish flow to the accumulator.

..j

- -UNSAT I. Opens the Loop 3A and 3B Hot Leg SI Isolation, MOV 869.

Standard: 2. MOV-3-869 Red OPEN light is ON.

3. MOV-3-869 Green CLOSED light is OFF.

~f Operator asks for the use of another operator tell operator that the Cue

!evaluator/designated operator will serve in this capacity.

Comment IA second operator may be utilized to operate MOV-3-869 to allow sufficient time to perform the self-checking process.

NOTE:

Standards 2 and 3 are not critical.

!Appendix C Page 7 of 12 Form ES-C-1!

WHEN accumulator level has increased to 6600 +/- 20 gallons, THEN STEP 4 close Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869. - -SAT

  • -j
l. Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869 switch has been taken to CLOSE

- -UNSAT

2. Loop 3A and 3B Hot Leg SI Isolation, MOV 869 CLOSE Green Light is ON.

Standard:

3. Loop 3A and 3B Hot Leg SI Isolation, MOV-3-869 OPEN RED Light is OFF.

Cue Comment

  • NOTE: Standards 2 and 3 are not critical.

Appendix C Page 8 of 12 Form ES-C-1 STEP 5 ~perator Stops the 3A Safety Injection Pump AND verifies the control - -SAT

  • " switch is in the mid position.
1. 3A HHSI Pump Control Switch turned to Stop and released to Mid

- -UNSAT Standard: 2. 3A HHSI Pump Red Run light is OFF

3. 3A HHSI Pump Green Stop light is ON Cue Comment NOTE: Standards 2 and 3 are not Critical to this step.

NUREG 1021 Rev 9 Appendix C

!Appendix C Page 9 of 12 Form ES-C-11 STEP 6 iCLOSE the Accumulator Makeup Valve for Accumulator A, CV - -SAT

  • ~ 851A
1. Placed CV-3-851A Control Switch to CLOSE and released to MID

~. Verified CV-3-851A RED Open light OFF

- -UNSAT Standard: 3. Verified CV-3-851A GREEN CLOSED Light ON Cue pnce Operator has verified CV-3-851A is CLOSED, tell the operator hat the JPM is terminated.

Comment NOTE: Standards 2 and 3 are not Critical to this step.

Terminating !The task is complete when the Examinee returns the cue sheet to the Cue: STOP

!examiner.

  • Stop Time _ _ __

Appendix C Page 10 of 12 Form ES-C-1 Verification of Completion

  • ~ JobPertormanceMeasureNo. ~N~R~C~-=25~-~S~IM~~~P~M~-~G~~~~~~~~~~~~~~~~~~

Job Performance Measure No. :..:N:..:.-R.:..::C::..---~25:::.---=S:..:.:IM..::-.-:::J:.:..P..:.::M-=--.::::G~ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Examinee's Name:

Examiner's Name:

Date Pertormed:

Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

  • ~

Response

Result: Satisfactory/Unsatisfactory

  • Examiner's signature and date:

NUREG 1021 Rev 9 Appendix C

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

  • 3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.
  • 7.1.2.2.b,c, and d are marked N/A.
  • It is desired to use the 3A HHSI Pump for this task INITIATING CUE:

You have been directed to raise 3A Accumulator Level to 6600 +/- 20 gallons using 3A SAFETY INJECTION PUMP starting at step: 7.1.2.2.3.

  • 3-0P-064 Safety Injection Accumulators, Section 7.1, Adding Make-up to the Safety Injection Accumulators up to 7.1.2.2.2.a has been completed.
  • 7.1.2.2.b,c, and d are marked N/A.

Acknowledge to the examiner when you are ready to begin.

  • HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

Appendix C Job Performance Measure Form ES-C-1 Worksheet

  • Facility:

Task

Title:

KIA

Reference:

_T_u_r_k_ey"--P__.o_in_t

_T-' -u.:.:.:r-'. .:kc::.eYL..:.-P.. : :.o. :.:. in.:. :.t_ _ _ _ _ _ _ Task No:

Perfonn EDG Nonnal Start Test (Alternate Path)

--~----~----

---~---~~~=---

064 A2.05 Loading the EDIG 3.1/3.2 JPM No: NRC-25-SIM-JPM-H Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing: Simulator _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

_S=-I:.:..:*m~u:.:..la=:.:t:.:::o.:...r

~~~~-----------------------------------------------

Simulated Performance _ _ _ _ _ _ _ _ _ _ Actual Performance _ _ _ _ _. . :X X-.:. . . . ._ _ _ __


---------~~--------

Classroom - -----------


x

-=====-:!.X~_ __

Simulator ----------- Plant __________

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

You are the Unit 3 RCO. 3-0SP-023.1, Diesel Generator Operability Test, has been satisfactorily completed through 7.1.2.30 .

  • Task Standard:

1.

2.

The EDG will be synchronized to the Bus in accordance with 3-0SP-023 .1.

The EDG is placed to Emergency Stop when required.

Required Materials:

1. 3-0SP-023.1, "Diesel Generator Operability Test" General

References:

1. 3-0SP-023.1, "Diesel Generator Operability Test" NUREG 1021 Rev 9 Appendix C

Appendix C Page 2 of 12 Form ES-C-1 Initiating Cue:

  • You have been directed to continue the Monthly EDG Normal Start Test (3A EDG) starting at step 7.1.2.31. 3-0SP-023.1.

Time Critical Task: No Validation Time: 15 minutes HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

I Appendix C Page 3 of 12 Form ES-C-1 I SIMULATOR SETUP Reset to IC #

  • Reset to IC-1.

Load Lesson

1. Open lesson JPM 01 023006201.lsn and execute.
2. Ensure 3A EDG has been started and in stable operation.

Ensure Simulator Operator Checklist is complete

Appendix C Page 4 of 12 Form ES-C-1 Place the EDG Bkr 3AA20 Synchronizing switch to ON.

  • STEP 1

..j

1. Placed the EDG Bkr 3AA20 Synchronizing switch to ON.

- - SAT

- - UNSAT

2. Check that the WHITE synchronizing lights are cycling ON.

Standard:

Cue Comment NOTE: Standard #2 is not Critical to this step.

I Appendix C Page 5 of 12 Form ES-C-1 I

  • STEP 2 Using the A Diesel Oen Volt Regulator, adjust Incoming voltage to match Running indicated voltage .

Using the voltage adjust control switch, adjusted the generator voltage

- - SAT UNSAT Standard: on the Bus Voltage Incoming indicator to match the voltage on the Bus Voltage Running indicator.

Cue Comment NOTE:

Appendix C Page 6 of 12 Form ES-C-1 Using the A Diesel Gen Speed Changer, adjust engine speed so that the

  • - - SAT STEP 3 pointer on the Synchroscope is rotating slowly in the FAST direction .

..j

- - UNSAT Adjusted engine speed so that the pointer on the synchroscope is Standard: rotating slowly in the FAST direction.

Cue Comment NOTE:

I Appendix C Page 7 of 12 Form ES-C-1 I STEP 4 Using the A Diesel Gen Volt Regulator, adjust Incoming voltage - - SAT

  • ..j Standard:

slightly higher than Running voltage .

Using the voltage adjust control switch, adjusted the generator voltage on the Bus Voltage Incoming indicator to match the voltage on the Bus

- - UNSAT Voltage Running indicator.

Cue Comment NOTE:

Appendix C Page 8 of 12 Form ES-C-1 STEP 5 - - SAT Using the A Diesel Kilovolts indicator and 3A 4KV Bus Voltmeter, verify voltages are approximately equal between the 3A Diesel Generator output and the 3A 4KV Bus for all three phases. - - UNSAT Standard: Verified voltages are approximately equal.

Cue Comment NOTE:

I Appendix C Page 9 of 12 Form ES-C-1 I Verify 3A Diesel Generator frequency is between 58.8 and 61.2 Hz on STEP 6 - - SAT the Gen Frequency indicator

- - UNSAT Verified 3A Diesel Generator frequency is between 58.8 and 61.2 Hz Standard: on the Gen Frequency indicator Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C

Appendix C Page 10 of 12 Form ES-C-1 WHEN the synchroscope pointer is at 12 o'clock position, THEN STEP 9 - - SAT close the diesel generator breaker by placing the EDG Bkr 3AA20

..j Control Switch to the CLOSE position (spring return to nonnal).

- - UNSAT

1. Closed the diesel generator breaker by placing the EDG Bkr 3AA20 Control Switch to the CLOSE position WHEN the synchroscope pointer reached the12 o'clock position.

Standard:

2. Verified the Diesel Generator Breaker 3AA20 has closed (Breaker GREEN light is OFF and RED light is ON).

Cue Comment NOTE: Standard #2 is not Critical to this step.

I Appendix C Page 11 of 12 Form ES-C-1 I Place the EDG Bkr 3AA20 Synchronizing switch to OFF STEP 10

- - SAT

..J

- - UNSAT Placed the EDG Bkr 3AA20 Synchronizing switch to OFF Standard:

Cue Comment NOTE:

NUREG 1021 Rev 9 Appendix C

Appendix Ap pend ix C Page 12 of 12 Form ES-C-l ES-C-1 Turn u...

Tum the A EDG Speed Changerr in the RAISE. directionLand and ,. ..,

slowly SAT STEP 11  : increase diesel generator load to approximately 1000 KW. KW .

~

~-

.J..J

- - UNSAT

~-

t umed the Governor Control Switch,AND I. Turned AND slowly loadedI diesel approximatelyy 1000 KW.

generator to approximatel KW.

Standard Standard:: 22. Operator recognizes recognizes EDG problem and places EDG to Emergency SlOp.Stop.

1. If candidate asks tell candidate that vendor has cleared generator power increase to 1000 kw. kw.
2. When the 3A EDG Voltage Regulator is taken to RAISE. RAISE, 81M SIM OPERATOR initiates a continuous increase in Voltage Regulator setting up to the point where Voltage/Load begin.

increasing oscillations in Voltage/load Cue

3. When Operator places EDG to Emergency Stop or EDG trips tell operator that another operator will trips wi ll take over.

over.

4. Tell operator that JPM is is complete.

a~

Comment NOTE:

Terminating Term inating STOP The task is complete when the Examinee returns the cue sheet to the Cue:

Cue: examiner.

Stop Time _~~~

NUREG 1021 Rev 9 Appendix C

I Appendix C Page 13 of 12 Form ES-C-1 I Verification of Completion e Job Performance Measure No. NRC-25-SIM-JPM-H Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

e _______________________

Response

Result: Satisfactory/Unsatisfactory

  • Examiner's signature and date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

NUREG 1021 Rev 9 Appendix C

JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, discuss, and provide initiating cues.

When you complete the task successfully, successfully, the objective for this job performance measure will be satisfied.

satisfied .

INITIAL CONDITIONS:

You are the Unit 3 RCO . 3-0SP-023.1, 3-0SP-023.1, Diesel Generator Operability Test Test,, has been satisfactorily completed through 7.1.2.30.

INITIA TlNG CUE:

You have been directed to continue the Monthly EDG Normal Start Test (3A EDG) starting at step 7.1.2.31 7.1.2.31..

3-0SP-023.1.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

NUREG 1021 Rev 9 Appendix C