UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 March 3, 2010 Mr. J. R. Morris Site Vice President Duke Energy Carolinas, LLC Catawba Nuclear Station 4800 Concord Road York, SC 29745-9635
SUBJECT:
ANNUAL ASSESSMENT LETTER - CATAWBA NUCLEAR STATION (NRC INSPECTION REPORT 05000413/2010001 AND 05000414/2010001)
Dear Mr. Morris:
On February 9, 2010, the NRC staff completed its performance review of the Catawba Nuclear Station. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and the enclosed inspection plan do not include security information.
A separate letter designated and marked as Official Use Only - Security Related Information will include the Security Cornerstone performance review and resultant inspection plan.
Overall, Catawba Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting several infrequently performed inspections, which include: Inspection Procedure 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants; Temporary Instruction (TI) 2515/177, Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal and Containment Spray Systems; TI 2515/173, Review of the Implementation of the Industry Groundwater Protection Voluntary Initiative; TI 2515/172, Reactor Coolant System Dissimilar Metal Butt Welds; and operator licensing examinations.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through June 30, 2011. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The inspections listed in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.
DEC 2
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4607 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Jonathan H. Bartley, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-413, 50-414,72-045 License Nos.: NPF-35, NPF-52
Enclosure:
Catawba Inspection/Activity Plan cc w/encl: (See page 3)
X SUNSI REVIEW COMPLETE JHB OFFICE RII:DRP RII:DRP SIGNATURE JHB /RA for/
JHB /RA/
NAME EStamm JBartley DATE 03/03/2010 03/02/2010 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO
DEC 3
cc w/encl:
Randy D. Hart Regulatory Compliance Manager Duke Energy Carolinas, LLC Electronic Mail Distribution R. L. Gill, Jr.
Manager Nuclear Regulatory Issues & Industry Affairs Duke Energy Carolinas, LLC Electronic Mail Distribution Dhiaa M. Jamil Group Executive and Chief Nuclear Officer Duke Energy Carolinas, LLC Electronic Mail Distribution Kathryn B. Nolan Senior Counsel Duke Energy Corporation 526 South Church Street-EC07H Charlotte, NC 28202 Lisa F. Vaughn Associate General Counsel Duke Energy Corporation 526 South Church Street-EC07H Charlotte, NC 28202 David A. Repka Winston Strawn LLP Electronic Mail Distribution North Carolina MPA-1 Suite 600 P.O. Box 29513 Raleigh, NC 27525-0513 Susan E. Jenkins Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control Electronic Mail Distribution County Manager of York County York County Courthouse York, SC 29745 R. Mike Gandy Division of Radioactive Waste Mgmt.
S.C. Department of Health and Environmental Control Electronic Mail Distribution W. Lee Cox, III Section Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution Vanessa Quinn Federal Emergency Management Agency 500 C Street, SW Room 840 Washington, DC 20472 Steve Weatherman, Operations Analyst North Carolina Electric Membership Corporation Electronic Mail Distribution Piedmont Municipal Power Agency Electronic Mail Distribution Peggy Force Assistant Attorney General State of North Carolina P.O. Box 629 Raleigh, NC 27602
DEC 4
Letter to J. R. Morris from Jonathan H. Bartley dated March 3, 2010
SUBJECT:
ANNUAL ASSESSMENT LETTER - CATAWBA NUCLEAR STATION (NRC INSPECTION REPORT 05000413/2010001 AND 05000414/2010001)
Distribution w/encl:
C. Evans, RII L. Slack, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMCatawba Resource ROP Reports Institute of Nuclear Power Operations (INPO)