MONTHYEARRS-09-074, License Amendment Request to Modify Clinton Power Station Facility Operating License in Support of the Use of Isotope Test Assemblies2009-06-26026 June 2009 License Amendment Request to Modify Clinton Power Station Facility Operating License in Support of the Use of Isotope Test Assemblies Project stage: Request ML0931006042009-11-0202 November 2009 Email from Fred Stein, Maya K. Van Rossum, Delaware Riverkeeper Requesting a 60 Day Extension to File a Request for Hearing in the Hope Creek and the Salem 1 and 2 License Renewal Proceeding Project stage: Request LR-N09-0237, License Amendment Request H09-05 Revision to Technical Specification 4.0.5, Surveillance Requirements for Inservice Inspection and Testing of ASME Code Components2009-11-0404 November 2009 License Amendment Request H09-05 Revision to Technical Specification 4.0.5, Surveillance Requirements for Inservice Inspection and Testing of ASME Code Components Project stage: Request ML1013903182009-11-15015 November 2009 Calculation 80096650, Revision 0, Leakage Reduction Program Calculation, Attachment 6 to LR-N10-0163 Project stage: Request RS-09-171, Supplemental Information Supporting the Request for a License Amendment to Modify Operating License in Support of the Use of Lsotope Test Assemblies2009-12-14014 December 2009 Supplemental Information Supporting the Request for a License Amendment to Modify Operating License in Support of the Use of Lsotope Test Assemblies Project stage: Supplement HCH-2009-142, Discharge Monitoring Report, NJPDES Permit NJ00254112009-12-21021 December 2009 Discharge Monitoring Report, NJPDES Permit NJ0025411 Project stage: Request ML0936401982009-12-21021 December 2009 License Amendment Request Supporting the Use of Co-60 Isotope Test Assemblies (Isotope Generation Pilot Project) Project stage: Request LR-N09-0290, NEDO-33529, Rev. 0, Safety Analysis Report to Support Introduction of GE14i Isotope Test Assemblies (Itas) in Hope Creek Generating Station2009-12-31031 December 2009 NEDO-33529, Rev. 0, Safety Analysis Report to Support Introduction of GE14i Isotope Test Assemblies (Itas) in Hope Creek Generating Station Project stage: Request ML1002800042010-01-28028 January 2010 Acceptance Review for TAC ME2949 - Hope Creek - License Amendment Request Regarding Use of ITAs for Cobalt-60 Production Project stage: Acceptance Review ML1002907322010-01-28028 January 2010 Draft Request for Additional Information Project stage: Draft RAI ML1002607732010-02-0404 February 2010 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance ML1006104462010-03-10010 March 2010 Audit of Supporting Design, Licensing and Other Documents Related to LAR to Support the Use of Co-60 Isotope Test Assemblies at HCGS Project stage: Approval ML1009205472010-03-16016 March 2010 Comment (1) of William E. Morris on PSEGs Plan to Produce Cobalt-60 Which Can Be Used to Promote and Maintain Human Health Project stage: Request ML1009205482010-03-25025 March 2010 Comment (2) of William H. Day Supporting Proposal to Produce Cobalt-60 at Hope Creek Project stage: Request ML1009205492010-03-26026 March 2010 Comment (4) of David A. Lochbaum on Behalf of Union of Concerned Scientists on the Proposal of PSEG to Load Cobalt-60 Producing Rods in Reactor Core at Hope Creek Project stage: Request ML1009701262010-03-31031 March 2010 Comment (3) of 243 Individuals Regarding Notice; Applications and Amendments to Facility Operating Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Project stage: Other ML1009500372010-04-0101 April 2010 Comment (5) of Leigh Davis, Dena Jaborska, Wenonah Hauter, Amy Goldsmith, Jeff Tittel, William Kibler, Jennifer Coffey & Norm Cohen on Behalf of Food & Water Watch Opposing Proposal of PSEG to Start a Pilot Project to Produce Cobalt-60 at H Project stage: Request ML1009904032010-04-0808 April 2010 Draft Request for Additional Information Project stage: Draft RAI ML1011701132010-04-0909 April 2010 License Amendment Request H09-01 Supporting the Use of Cobalt-60 Isotope Test Assemblies Project stage: Request ML1011004322010-04-19019 April 2010 PSEG Slides for Salem and Hope Creek Annual Assessment Meeting, April 6, 2010 Project stage: Request LR-N10-0163, Response to Request for Additional Information - License Amendment Request (H09-01) Supporting the Use of Co-60 Isotope Test Assemblies (Isotope Generation Pilot Project)2010-05-11011 May 2010 Response to Request for Additional Information - License Amendment Request (H09-01) Supporting the Use of Co-60 Isotope Test Assemblies (Isotope Generation Pilot Project) Project stage: Response to RAI ML1013303612010-06-0303 June 2010 Letter Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance LR-N10-0210, Response to Request for Additional Information, License Amendment Request (H09-01) Supporting the Use of Co-60 Isotope Test Assemblies2010-06-10010 June 2010 Response to Request for Additional Information, License Amendment Request (H09-01) Supporting the Use of Co-60 Isotope Test Assemblies Project stage: Response to RAI LR-N10-0217, Supplemental Safety Analysis Report Information - License Amendment Request (H09-01) Supporting the Use of Co-60 Isotope Test Assemblies (Isotope Generation Pilot Project)2010-06-24024 June 2010 Supplemental Safety Analysis Report Information - License Amendment Request (H09-01) Supporting the Use of Co-60 Isotope Test Assemblies (Isotope Generation Pilot Project) Project stage: Supplement ML1017600102010-06-24024 June 2010 Draft Request for Additional Information Project stage: Draft RAI ML1016600492010-07-0202 July 2010 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance ML1018303302010-07-14014 July 2010 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance LR-N10-0289, Response to Request for Additional Information - License Amendment Request (H09-01) Supporting the Use of Co-60 Isotope Test Assemblies (Isotope Generation Pilot Project)2010-07-28028 July 2010 Response to Request for Additional Information - License Amendment Request (H09-01) Supporting the Use of Co-60 Isotope Test Assemblies (Isotope Generation Pilot Project) Project stage: Response to RAI LR-N10-0181, Supplement to RAI Responses Submitted in PSEG Letter LR-N10-0181 Dated June 1, 2010, Related to the Severe Accident Mitigation Alternatives Review2010-08-18018 August 2010 Supplement to RAI Responses Submitted in PSEG Letter LR-N10-0181 Dated June 1, 2010, Related to the Severe Accident Mitigation Alternatives Review Project stage: Request ML1024400262010-08-18018 August 2010 Letter in Regard to License Amendment Request H09-01 Supporting the Use of Cobalt-60 Isotope Test Assemblies (Isotope Generation Pilot Program) Project stage: Request ML1023903302010-09-0909 September 2010 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance ML1023903432010-09-0909 September 2010 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance LR-N10-0341, Supplement - License Amendment Request (H09-01) Supporting the Use of Co-60 Isotope Test Assemblies (Isotope Generation Pilot Project)2010-09-10010 September 2010 Supplement - License Amendment Request (H09-01) Supporting the Use of Co-60 Isotope Test Assemblies (Isotope Generation Pilot Project) Project stage: Supplement LR-N10-0357, Supplement - License Amendment Request (H09-01) Supporting the Use of Co-60 Isotope Test Assemblies (Isotope Generation Pilot Project)2010-09-17017 September 2010 Supplement - License Amendment Request (H09-01) Supporting the Use of Co-60 Isotope Test Assemblies (Isotope Generation Pilot Project) Project stage: Supplement ML1027100322010-09-28028 September 2010 Transmittal of Draft Safety Evaluation for Proposed Amendment Use of Isotope Test Assemblies for Cobalt-60 Production Project stage: Draft Approval ML1027002712010-10-0707 October 2010 License Amendment, Use of Isotope Test Assemblies for Cobalt-60 Production Project stage: Other ML1027101562010-10-0707 October 2010 Safety Evaluation, Related to Amendment No. 184 to Facility Operating License No. NPF-057 Project stage: Approval 2010-04-01
[Table View] |
Text
March 10, 2010 MEMORANDUM TO:
Harold K. Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:
Travis L. Tate, Chief /RA/
Accident Dose Branch Division of Risk Assessment Office of Nuclear Reactor Regulation
SUBJECT:
HOPE CREEK GENERATING STATION - AUDIT OF SUPPORTING DESIGN, LICENSING AND OTHER DOCUMENTS RELATED TO LICENSE AMENDMENT REQUEST TO SUPPORT THE USE OF Co-60 ISOTOPE TEST ASSEMBLIES AT HCGS (TAC No. ME2949)
By letter dated December 21, 2009, PSEG Nuclear LLC., in collaboration with Global Nuclear Fuels - Americas, LLC and GE-Hitachi Nuclear Energy Americas, LLC (GEH) requested an amendment for Hope Creek Generating Station (HCGS) to develop and implement a pilot program to irradiate Cobalt (Co)-59 targets to produce Co-60. Co-60 is intended for use in the medical, and food industry. The attached report summarizes description of the GE14i fuel assembly, as well as, descriptions of the nuclear core design and applicability of nuclear and safety analysis methods. GEH has provided detailed documents on nuclear design methods and licensing evaluations to support the license amendment request at the Washington, DC GE offices. The Accident Dose Branch staff intends to perform a regulatory audit of these documents in accordance with LIC-111, Regulatory Audits. The audit date will be determined later. The plan for our review is attached.
If you have any comments or concerns, please let me know.
Docket No. 50-354
Enclosure:
As stated CONTACT: Mark Blumberg, NRR/DRA/AADB 301-415-1083
MEMORANDUM TO:
Harold K. Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:
Travis L. Tate, Chief Accident Dose Branch Division of Risk Assessment Office of Nuclear Reactor Regulation
SUBJECT:
HOPE CREEK GENERATING STATION - AUDIT OF SUPPORTING DESIGN, LICENSING AND OTHER DOCUMENTS RELATED TO LICENSE AMENDMENT REQUEST TO SUPPORT THE USE OF Co-60 ISOTOPE TEST ASSEMBLIES AT HCGS (TAC No. ME2949)
By letter dated December 21, 2009, PSEG Nuclear LLC., in collaboration with Global Nuclear Fuels - Americas, LLC and GE-Hitachi Nuclear Energy Americas, LLC (GEH) requested an amendment for Hope Creek Generating Station (HCGS) to develop and implement a pilot program to irradiate Cobalt (Co)-59 targets to produce Co-60. Co-60 is intended for use in the medical, and food industry. The attached report summarizes description of the GE14i fuel assembly, as well as, descriptions of the nuclear core design and applicability of nuclear and safety analysis methods. GEH has provided detailed documents on nuclear design methods and licensing evaluations to support the license amendment request at the Washington, DC GE offices. The Accident Dose Branch staff intends to perform a regulatory audit of these documents in accordance with LIC-111, Regulatory Audits. The audit date will be determined later. The plan for our review is attached.
If you have any comments or concerns, please let me know.
Docket No. 50-354
Enclosure:
As stated CONTACT: Mark Blumberg, NRR/DRA/AADB 301-415-1083 DISTRIBUTION:
Rick Ennis Melanie Galloway Matthew Panicker Accession Number: ML100610446 OFFICE DRA/AADB DRA/AADB NAME MBlumberg TTate DATE 03/10/10 03/10/10 OFFICIAL RECORD COPY
HOPE CREEK GENERATING STATION, PSEG NUCLEAR LLC AUDIT OF NUCLEAR DESIGN METHODS AND LICENSING EVALUATIONS RELATED TO LICENSE AMENDMENT REQUEST SUPPORTING THE USE OF COBALT-60 ISOTOPE TEST ASSEMBLIES AT HCGS BACKGROUND By letter dated December 21, 2009, PSEG Nuclear LLC., in collaboration with Global Nuclear Fuels (GNF) - Americas, LLC and GE-Hitachi Nuclear Energy Americas, LLC (GEH) requested an amendment to FOL No. NPF-57 for Hope Creek Generating (HGCS) to develop and implement a pilot program to irradiate Cobalt (Co)-59 targets to produce Co-60.
to the above letter provides GEH report NEDC-33529P, Safety Analysis Report to Support Introduction of GE14i Isotope Test Assemblies (ITAs) in Hope Creek Generating Station, dated December 2009. Section 2 of the attachment addresses GE14i (GE14 assembly with few cobalt pellet filled fuel rods) fuel design, nuclear characteristics, mechanical characteristics, and thermal-hydraulic characteristics of the GE14i ITAs. This section describes the compatibility of GE14i ITAs with current GE14 fuel being loaded in to the HCGS.
Section 3 of the attachment addresses core design, and nuclear and safety analyses methods.
Section 4 provides information relative to the evaluations that were performed by GNF and GEH to assist PSEG in their evaluation of the effect of implementing GE14i ITAs on the HCGS design and licensing basis.
NEDC-33529 summarizes many of the topics described above. To supplement the summary information provided in the report, GEH and GNF have made available to the NRC staff supporting documents, detailed engineering drawings, analyses and design basis calculations at the GE offices in downtown Washington, DC. The regulatory audit of these documents will be in accordance with NRR procedure, LIC-111.
REGULATORY AUDIT SCOPE The scope of the regulatory audit is to more efficiently conduct the Staffs technical review and gain insight in to the licensees license amendment request with respect to the design of the new fuel assemblies (GE14i), GE14i assembly thermal-mechanical design, ITA margin considerations, nuclear design methods, and licensing evaluations. Specific topics and documents subjected to the audit include, but not limited to:
Design basis dose calculations and engineering assessments used to show that Hope Creek continues to meet Title 10 of the Code of Federal Regulations (10 CFR) 50.67, or 10 CFR 100 and General Design Criterion 19 (if applicable).
Enclosure
TEAM ASSIGNMENT Mark Blumberg, Sr. Reliability and Risk Analyst, NRR/DRA/AADB LOGISTICS Dates of Audit: To be determined Location: GE Office, Downtown Washington, DC SPECIAL REQUESTS Staff from PSEG, GEH, and GNF should be available to discuss any issues raised by the agency staff on the documents and analyses.
DELIVERABLES A regulatory audit summary will be provided within 90 days of the completion of the audit.
REFERENCES
- 1. Letter from PSEG Nuclear LLC (John F. Perry) to US NRC, License Amendment Request Supporting the Use of Co-60 Isotope Test Assemblies (Isotope Generation Pilot Project),
PSEG Nuclear, December 2009.
- 2. GEH Report NEDC-33529P, Revision 0, Safety Analysis Report to Support Introduction of GE14i Isotope Test Assemblies (ITAs) in Hope Creek Generating Station, GE Hitachi Nuclear Energy, December 2009.