UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 March 3, 2010 Mr. Barry Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760
SUBJECT:
ANNUAL ASSESSMENT LETTER - DAVIS-BESSE NUCLEAR POWER STATION (05000346/2010001)
Dear Mr. Allen:
On February 11, 2010, the NRC staff completed its performance review of the Davis-Besse Nuclear Plant. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Information" will include the Security Cornerstone review and resultant inspection plan.
Overall, Davis-Besse operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter was within the Regulatory Response column of the NRC=s Action Matrix, based on one finding associated with the Emergency Preparedness Cornerstone being classified as having low to moderate safety significance (White). This White finding, from the fourth quarter of 2009, involved your failure to classify an actual Alert in a timely manner during a June 2009 switchyard event.
Therefore, we plan to conduct Supplemental Inspection 95001 in addition to baseline inspection activities based on your current placement in the Action Matrix. When we are notified by your staff of your readiness for the NRC to conduct a supplemental inspection, we will schedule a 95001 inspection to facilitate the review of actions you have taken to address the White finding. We also plan on conducting several special and infrequently performed Inspection Procedures (IPs) which include: IP 60855.1, "Operation of an Independent Spent Fuel Storage Installation at Operating Plants"; IP 92709, "Licensee Plans for Coping with Strikes"; and IP 71002, "License Renewal."
B. Allen The enclosed inspection plan details the inspections, less those related to security scheduled through June 30, 2011. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.
Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle review.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Jamnes Cameron at 630-829-9833 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Steven West, Director Division of Reactor Projects Docket No. 50-346 License No. NPF-3
Enclosure:
Davis-Besse Inspection/Activity Plan cc w/encl: Distribution via ListServ
Inspection / Activity Plan 2
03/01/2010 - 06/30/2011 Planned Dates Start End Inspection Activity Title No. of Staff on Site Davis-Besse BI ENG
- ENGINEERING INSERVICE INSPECTION 1
IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 02/15/2010 03/05/2010 IP Inservice Inspection Activities - PWR 7111108P 02/15/2010 03/05/2010 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/01/2010 03/05/2010 IP Occupational ALARA Planning and Controls 71124.02 03/01/2010 03/05/2010 BI ENG
- TRIENNIAL FIRE INS INFO GATHERING TRIP 3
IP Fire Protection [Triennial]
7111105T 04/12/2010 04/16/2010 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 04/19/2010 04/23/2010 IP Reactor Coolant System Activity 71151-BI01 04/19/2010 04/23/2010 BI ENG
- TRIENNIAL FIRE PROTECTION INSPECTION 3
IP Fire Protection [Triennial]
7111105T 04/26/2010 05/14/2010 BI EP
- EP ROUTINE INSPECTION / PI VERIFICATION 2
IP Radiological Environmental Monitoring Program 7111402 04/26/2010 04/30/2010 IP Emergency Response Organization Augmentation Testing 7111403 04/26/2010 04/30/2010 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 04/26/2010 04/30/2010 IP Drill/Exercise Performance 71151-EP01 04/26/2010 04/30/2010 IP ERO Drill Participation 71151-EP02 04/26/2010 04/30/2010 IP Alert & Notification System 71151-EP03 04/26/2010 04/30/2010 TI
- TEMPORARY INSTRUCTION 2515/180 1
IP Inspection of Procedures and Processes for Managing Fatigue 2515/180 05/18/2010 05/18/2010 ISFSI
- ISFSI INSPECTION 1
IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 07/01/2010 07/31/2010 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 08/30/2010 09/03/2010 IP RETS/ODCM Radiological Effluent 71151-PR01 08/30/2010 09/03/2010 STRIKE
- STRIKE CONTINGENCY - OPS/MAINT/RP 2
IP Licensee Strike Contingency Plans 92709 10/02/2010 11/01/2010 BI OL
- LIC. OPERATOR REQUAL. PROGRAM EVALUATION 2
IP Licensed Operator Requalification Program 7111111B 11/15/2010 11/19/2010 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
IP Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2515/179 11/29/2010 12/03/2010 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/29/2010 12/03/2010
Inspection / Activity Plan 2
03/01/2010 - 06/30/2011 Planned Dates Start End Inspection Activity Title No. of Staff on Site Davis-Besse BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
IP Occupational ALARA Planning and Controls 71124.02 11/29/2010 12/03/2010 IP Occupational Exposure Control Effectiveness 71151-OR01 11/29/2010 12/03/2010 BI ENG
- TRIENNIAL ENGINEERING PERM MODS/50.59 1
IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 01/10/2011 01/28/2011 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 01/24/2011 01/28/2011 IP Occupational Dose Assessment 71124.04 01/24/2011 01/28/2011 IP Reactor Coolant System Activity 71151-BI01 01/24/2011 01/28/2011 RENEWAL
- LICENSE RENEWAL 71002 4
IP License Renewal Inspection 71002 04/25/2011 05/13/2011 BI EP
- EP EXERCISE INSPECTION / PI VERIFICATION 3
IP Exercise Evaluation 7111401 05/16/2011 05/20/2011 IP Drill/Exercise Performance 71151-EP01 05/16/2011 05/20/2011 IP ERO Drill Participation 71151-EP02 05/16/2011 05/20/2011 IP Alert & Notification System 71151-EP03 05/16/2011 05/20/2011
B. Allen The enclosed inspection plan details the inspections, less those related to security scheduled through June 30, 2011. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.
Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle review.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Jamnes Cameron at 630-829-9833 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Steven West, Director Division of Reactor Projects Docket No. 50-346 License No. NPF-3
Enclosure:
Davis-Besse Inspection/Activity Plan cc w/encl: Distribution via ListServ See Previous Concurrences DOCUMENT NAME: G:\\1-Secy\\1-Work in Progress\\2009 EOC Letters\\Davis-Besse EOC 2009 Letter.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII NAME PVoss:dtp*
JCameron*
SWest DATE 02/22/10 02/22/10 03/03/10 OFFICIAL RECORD COPY
Letter to B. Allen from S. West dated March 3, 2010.
SUBJECT:
ANNUAL ASSESSMENT LETTER - DAVIS-BESSE NUCLEAR POWER STATION (05000346/2010001)
DISTRIBUTION:
RidsNrrDorlLpl3-2 Resource Susan Bagley RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource