ML043490070

From kanterella
Jump to navigation Jump to search

Tech Spec Pages for License Amendments 170 & 156, Pressure-Temperature Limits
ML043490070
Person / Time
Site: LaSalle  
(NPF-011, NPF-018)
Issue date: 12/10/2004
From:
NRC/NRR/DLPM
To:
SANDS S, NRR/DLPM, 415-3154
References
TAC MB7795, TAC MB7796
Download: ML043490070 (7)


Text

RCS P/T Limits 3.4.11 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.11.1


NOTE--------------------

Only required to be performed during RCS heatup and cooldown operations, and RCS inservice leak and hydrostatic testing.

Verify:

30 minutes

a.

RCS pressure and RCS temperature are within the applicable limits specified in Figures 3.4.11-1. 3.4.11-2, 3.4.11-3 for Unit 1 up to 20 EFPY, and Figures 3.4.11-4, 3.4.11-5, and 3.4.11-6 for Unit 2 up to 20 EFPY;

b.

RCS heatup and cooldown rates are

< 100OF in any 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period; and

c.

RCS temperature change during system leakage and hydrostatic testing is

  • 200F in any one hour period when the RCS pressure and RCS temperature are not within the limits of Figure 3.4.11-2 for Unit 1 up to 20 EFPY and Figure 3.4.11-5 for Unit 2 up to 20 EFPY.

SR 3.4.11.2 Verify RCS pressure and RCS temperature are Once within within the criticality limits specified in 15 minutes Figure 3.4.11-3 for Unit 1 up to 20 EFPY prior to and Figure 3.4.11-6 for Unit 2 up to 20 control rod EFPY.

withdrawal for the purpose of achieving criticality (continued)

I LaSalle I and 2 3.4. 11-3 Amendment No.170/156

RCS P/T Limits 3.4.11 1400 13w 12W0 l100 Is U) in a:

0 1a00

0.

9 0

-J w

U, SW U)w en Co 300 20 100 0S INITIAL RTndt VALUES ARE F FOR BELTLINE, 40F FOR UPPER VESSEL, AND 47*F FOR BOTTOM HEAD ~

BELTLINE CURVES ADJUSTED AS SHOWN:

EFPY SHIFT (-F) 20 114 HEATUP/COOLDOWN RATE OF COOLANT

' 20'F/HR

-UPPER VESSEL AND BELTLINE LIMITS

.b.o

.BOTTOM HEAD CURVE 0

25 50 75 100 125 150 175 2X MINIMUM REACTOR VESSEL METAL TEMPERATURE (OF)

Figure 3.4.11-1 (Page 1 of 1)

Unit 1 P-T Curves for Hydrostatic or Leak Testing up to 20 EFPY LaSalle 1 and 2 3.4. 11-6 Amendment No.170/156

RCS P/T Limits 3.4.11 INITIAL RTndt VALUES AR

-30'F FOR BELTLINE.

40F FOR UPPER VESSEL, AND l

47'F FOR BOTTOM HEAD 1100 laSM t1o

a.

g 0

I-Cn a

-J W

t, 0

700 z

0 BELTLINE CURVES ADJUSTED AS SHOWN:

EFPY SHIFT ('F) 20 114 HEATUPICOOLDOWN RATE OF COOLANT

< 100'IR 200 100 0

-UPPER VESSEL AND BELTLINE LIMITS


BOTTOM HEAD CURVE 0

25 50 75 100 125 150 175 200 MINIMUM REACTOR VESSEL METAL TEMPERATURE

(.F)

Figure 3.4.11-2 (Page 1 of 1)

Unit 1 P-T Curves for Heatup by Non-Nuclear Means, Cooldown Following a Nuclear Shutdown and Low Power Physics Testing up to 20 EFPY LaSalle I and 2

3.

4.11-7 Amendment No.170/156

RCS P/T Limits 3.4.11 14C 130 1100 Iw l-W U)

C,,

o 700 W

I-CD, W

3 1 I 1-1 I / I 1

_'I

/ I=

~

Minimum Criticality l

Temperature 72'F INITIAL RTndt VALUES ARE

-30F FOR BELTLINE, 40'F FOR UPPER

VESSEL, AND 47F FOR BOTTOM HEAD BELTLINE CURVE ADJUSTED AS SHOWN:

EFPY.

SHIFT (F) 20 114 HEATUPICOOLDOWN RATE OF COOLANT

< 100-F/HR BELTLINE AND NO N-B ELTL I NE LIMITS 100 0

0 25 S0 75 100 125 130 175 200 225 MINIMUM REACTOR VESSEL METAL TEMPERATURE

(*F)

Figure 3.4.11-3 (Page 1 of 1)

Unit 1 P-T Curves for Operation with a Core Critical other than Low Power Physics Testing up to 20 EFPY LaSalle 1 and 2 3.4. 11 -8 1Amendment No.170/156

RCS P/T Limits 3.4.11 14W 1300 1200 1 100

.a jWo C-0I-UJ O

70 i0 0

I:

'Ii lU,_

w 4W a.

30 2aa 10 0

INITIAL RTndt VALUES ARE 52F FOR BELTLINE, 40F FOR UPPER VESSEL, AND 49 F FOR BOTTOM HEAD BELTLINE CURVES ADJUSTED AS SHOWN:

EFPY SHIFT ('F) 20 25 HEATUP/COOLDOWN RATE OF COOLANT

< 20FIHR

-UPPER VESSEL AND BELTLINE LIMITS BOTTOM HEAD CURVE 0

25 o

7S 100 12S ISO 175 200 MINIMUM REACTOR VESSEL METAL TEMPERATURE (OF)

Figure 3.4.11-4 (Page 1 of 1)

Unit 2

.P-T Curves for Hydrostatic or Leak Testing up to 20 EFPY LaSalle l and 2 3.4. 11-9 Amendment No.170/156

RCS P/T Limits 3.4.11 lWO INITIAL RTndt VALUES ARE 52F FOR BELTLINE, 40'F FOR UPPER VESSEL.

AND 49'F FOR BOTTOM HEAD ssaw rn 1a00 o low

=

0 III RO 7W U

It W z

E 500 A:

S w

It w)a 0n 0:

EL BELTLINE CURVES ADJUSTED AS SHOWN:

EFPY SHIFT ('F) 20 25 HEATUP/COOLDOWN RATE OF COOLANT

< 100FHR

-UPPER VESSEL AND BELTLINE LIMITS BOTTOM HEAD CURVE a

0 25 50 75 100 12 190 175 MINIMUM REACTOR VESSEL METAL TEMPERATURE (F)

Figure 3.4.11-5 (Page 1 of 1)

Unit 2 P-T Curves for Heatup by Non-Nuclear Means, Cooldown Following a Nuclear Shutdown and Low Power Physics Testing up to 20 EFPY LaSalle 1 and 2 3.4. 1 -10 Amendment No.170/156

RCS P/T Limits 3.4.11 1Ga INITIAL RTndt VALUES ARE 520F FOR BELTLINE.

40°F FOR UPPER VESSEL.

AND 49'F FOR BOTTOM HEAD 100 ox b

1 a.

w

-j W o I-Us a:

GW z

w U)

Lis u.

M:

BELTLINE CURVE ADJUSTED AS SHOWN:

EFPY SHIFT (F) 20 25 HEATUPICOOLDOWN RATE OF COOLANT

< 100FIHR I

-BELTLINE AND NON-BELTLINE LIMITS I

10 a

o 25 50 75 100 125 150 175 2X 25 150 MINIMUM REACTOR VESSEL METAL TEMPERATURE (OF).

Figure 3.4.11-6 (Page 1 of 1)

Unit 2 P-T Curves for Operation with a Core Critical other than Low Power Physics Testing up to 20 EFPY LaSalle 1 and 2 3.4.11-11.

Amendment No.170/156