Letter Sequence Other |
|---|
TAC:ME0157, Control Room Habitability, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration, Control Rod SCRAM Time Testing, TSTF-1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling, Minimum Vs. Steady State Voltage and Frequency (Approved, Closed) |
|
MONTHYEARML0835701922008-11-20020 November 2008 License Amendment Request (LAR) Changes to Technical Specification 5.6.5, Core Operating Limits Report (COLR) Project stage: Request ML0900600462009-01-0606 January 2009 E-Mail Acceptance Review for License Amendment Request Project stage: Acceptance Review ML0834704082009-01-0808 January 2009 Request for Withholding Proprietary Information from Public Disclosure, License Amendment Request to Revise Technical Specification 5.6.5, Core Operating Limits Report (COLR) Project stage: Other ML0902701982009-01-21021 January 2009 License Amendment Request 2009-01, Application for Technical Specifications (TS) Change to Adopt NRC Approved Generic Changes TSTF-163, TSTF-222, TSTF-230, and TSTF-306 to the Improved Technical Specifications Project stage: Request RBG-46883, Unit 1, Supplement to License Amendment Request, Application for Technical Specification Change to Adopt NRC Approved Generic Changes TSTF-163, -222, -230 and 3062009-01-23023 January 2009 Unit 1, Supplement to License Amendment Request, Application for Technical Specification Change to Adopt NRC Approved Generic Changes TSTF-163, -222, -230 and 306 Project stage: Supplement ML0906200672009-03-0303 March 2009 Acceptance Review Project stage: Acceptance Review ML0908305222009-03-24024 March 2009 Acknowledgement of Change in Commitment Project stage: Other RBG-46926, Unit 1 - Supplement to License Amendment Request (Lar), to Implement Changes Consistent with TSTF-163 on Diesel Generator Surveillance Requirements2009-06-22022 June 2009 Unit 1 - Supplement to License Amendment Request (Lar), to Implement Changes Consistent with TSTF-163 on Diesel Generator Surveillance Requirements Project stage: Supplement ML0920103702009-08-11011 August 2009 License Amendment No. 165, Modify Technical Specifications to Adopt NRC-approved Generic Changes TS Task Force (TSTF)-163, TSTF-220, TSTF-230, and TSTF-306 Project stage: Other RBG-46943, Supplement to License Amendment Request (LAR) Changes to Technical Specification 5.6.5, Core Operating Limits Report (Colr)2009-08-12012 August 2009 Supplement to License Amendment Request (LAR) Changes to Technical Specification 5.6.5, Core Operating Limits Report (Colr) Project stage: Supplement ML0924301452009-09-29029 September 2009 Issuance of Amendment No. 166, Revise Technical Specification 5.6.5, Core Operating Limits Report (Colr), to Add Reference to Analytical Method Project stage: Approval RBG-46981, Correction of Technical Specification Typographical Errors2009-11-30030 November 2009 Correction of Technical Specification Typographical Errors Project stage: Request ML0933605812009-12-14014 December 2009 Correction of Errors in Amendment Nos. 165 and 166 Project stage: Other 2009-12-14
[Table View] |
Text
From:
Fred Lyon Sent:
Tuesday, March 24, 2009 2:20 PM To:
'BURMEISTER, BARRY M' Cc:
LORFING, DAVID N
Subject:
RE: River Bend Change in Commitment (TAC No. ME0157)
The NRC staff acknowledges the change in commitment and has no objections.
From: BURMEISTER, BARRY M [1]
Sent: Tuesday, March 24, 2009 2:03 PM To: Fred Lyon Cc: LORFING, DAVID N
Subject:
River Bend On November 20, 2008 River Bend submitted an amendment request to add a reference to an analytical method that will be used to determine core operating limits to Technical Specification (TS) 5.6.5, Core Operating Limits Report (COLR). Reference TAC ME0157.
In Attachment 3 of this application a commitment was made to:
"Entergy has not completed analyses to determine whether a change to the TS Minimum Critical Power Ratio (MCPR) safety limits will be required for the RBS reload. If analyses indicate that a change to the MCPR safety limit is required, the TS change will be requested separately."
The analysis necessary to determine if a change to the TS Minimum Critical Power Ratio (MCPR) safety limits will be required has been completed. The results of this analysis confirm no change to the TS MCPR safety limits will be required for the RBS reload.
If you have any questions please contact; Barry Burmeister River Bend Licensing 225-381-4148 E-mail Properties Mail Envelope Properties ()
Subject:
RE: River Bend Change in Commitment (TAC No. ME0157)
Sent Date: 03/24/2009 2:16:19 PM Received Date: 03/24/2009 2:19:00 PM From: Fred Lyon Created By: Fred.Lyon@nrc.gov
Recipients:
BBURMEI@entergy.com ('BURMEISTER, BARRY M')
Tracking Status: None DLORFIN@entergy.com (LORFING, DAVID N)
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 11111 03/24/2009 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: