Text
Tennessee Valley Authority, Post Office Box 2000, Spring City, TN 37381-2000 August 27, 2009 10 CFR 50.4(b)(6) 10 CFR 50.34(b) 10 CFR 2.390(d)(1)
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN P1-35 Washington, D.C. 20555-0001 In the Matter of
)
Docket No. 50-391 Tennessee Valley Authority
)
WATTS BAR NUCLEAR PLANT (WBN) - UNIT 2 - FINAL SAFETY ANALYSIS REPORT (FSAR), AMENDMENT 94 This letter transmits WBN Unit 2 FSAR Amendment 94 (A94), which reflects changes made since the issuance of Amendment 93 on April 30, 2009 (Reference 1). This Unit 2 amendment incorporates changes resulting from TVA's ongoing design/reverification effort in support of the finalizing of the WBN Unit 2 design basis. This letter also responds to NRC's letter dated June 12, 2009 (Reference 2), requesting TVA to verify the schedule for providing information amending the FSAR. Specifically, NRC requested TVA to verify the schedule dates for submitting amendments on specific Safety Evaluation Report (SER) sections depicted in the enclosure to NRC's June 12 letter. Enclosure 1 contains TVA's updated schedule dates for submitting amendments for the FSAR sections listed in NRC's letter. also includes FSAR sections that were initially scheduled to be reverified and submitted in other amendments, but were already completed and ready to be included in this amendment. Those SER sections and corresponding FSAR sections that were scheduled to be incorporated into this amendment but did not achieve "design complete" status have been rescheduled as shown in the enclosure. contains a "Summary Listing" of the location and corresponding Unit 2 FSAR change package numbers associated with the A94 changes. This is a listing of FSAR sections in which TVA has completed its design/reverification review and determined that design-related activities were complete, the verbiage is consistent with the Unit 1 Updated FSAR, as appropriate, and the section is ready for NRC review.
FSAR A94 is contained on the enclosed Optical Storage Media (OSM #1) (Attachment 1).
The FSAR contains security-related information identified by the designation "Security-Related Information - Withhold Under 10CFR2.390." TVA hereby requests this information be withheld from public disclosure in accordance with the provisions of 10CFR2.390. A redacted version of the FSAR is contained on OSM #2 (Attachment 2), which is suitable for public disclosure. Enclosure 3 contains a listing of the FSAR pages that have been redacted.
n05-a Printed on recycled paper
U.S. Nuclear Regulatory Commission Page 2 August 27, 2009 There are no new commitments contained in this letter. If you have any questions, please contact me at (423) 365-2351.
I declare under the penalty of perjury that the foregoing is true and correct. Executed on August 27, 2009.
Sincerely, Edwin E. Freeman Cost and Scheduling Manager, Watts Bar Unit 2
References:
- 1. TVA letter to the NRC dated April 30, 2009, 'Watts Bar Nuclear Plant (WBN) - Unit 2 - Final Safety Analysis Report Amendment 93"
- 2. NRC letter to TVA dated June 12, 2009, 'Watts Bar Nuclear Plant Unit 2 - Confirmation of Schedule for Submission of Information to Support Operating License Application Review"
Enclosures:
- 3. Watts Bar Nuclear Plant Unit 2 FSAR Amendment 94, "Summary of Redacted Pages" Attachments:
Withhold Under 10CFR2.390
\\TVA WBN-2 FSAR Security-Related Version Files 001 through 028 (326,984,693 bytes)
\\TVA WBN-2 FSAR Oversized Figures - Security-Related Version Files 001 through 038 (131,112,035 bytes)
\\TVA WBN-2 FSAR Oversized Tables - Security-Related Version File 001 (2,899,519 bytes)
\\TVA WBN-2 FSAR Public Version Files 001 through 028 (297,070,292 bytes)
\\TVA WBN-2 FSAR Oversized Figures - Public Version Files 001 through 038 (131,112,035 bytes)
\\TVA WBN-2 FSAR Oversized.Tables - Security-Related Version File 001 (2,899,519 bytes) cc: See page 3
U.S. Nuclear Regulatory Commission Page 3 August 27, 2009 cc (w/enclosures):
Lakshminarasimh Raghavan U.S. Nuclear Regulatory Commission MS 08H4A One White Flint North.
11555 Rockville Pike Rockville, Maryland 20852-2738 Patrick D. Milano, Senior Project Manager U.S. Nuclear Regulatory Commission MS 08H4 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 Loren R. Plisco, Deputy Regional Administrator for Construction U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Resident Inspector Unit 2 Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381
ENCLOSUREI TVA's Schedule for Specified Topic Items and Corresponding Sections of the FSAR SER SER TITLE FSAR FSAR TITLE Scheduled Section Section Submittal Date 1.
1.0 INTRODUCTION
1.1 INTRODUCTION
Aug 2009 1.1.1 METRICATION N/A N/A 1.1.2 PROPRIETARY INFORMATION N/A N/A 1.1.4 ADDITIONAL INFORMATION N/A N/A 1.3.0 COMPARISON W/SIM FACILITY 1.3.1 COMPARISONS WITH SIMILAR Jan 2010 DESIGNS FACILITY DESIGNS 1.3.1 COMPARISON W/THE 1.3 COMPARISON TABLES Jan 2010 SEQUOYAH NUC PLANT 1.3.2 COMPARISON WITH OTHER 1.3 COMPARISON TABLES Jan 2010 FACILITIES 1.4.0 IDENTIFICATION OF AGENTS &
1.4 IDENTIFICATION OF AGENTS AND Aug 2009 CONTRACTORS CONTRACTORS 1.7.0
SUMMARY
OF OUTSTANDING N/A N/A ISSUES 1.9.0 LICENSE CONDITIONS N/A N/A 1.10.0 UNRESOLVED SAFETY N/A N/A 2.1.0 GEOGRAPHY & DEMOGRAPHY 2.1 GEOGRAPHY AND DEMOGRAPHY Aug 2009 2.1.1 SITE LOCATION &
2.1.1 SITE LOCATION AND DESCRIPTION Aug 2009 DESCRIPTION SITE CHARACTERISTICS 2.1.2 EXCLUSION AREA AUTHORITY 2.1.2 EXCLUSION AREA AUTHORITY AND Aug 2009
& CONTROL CONTROL AUTHORITY 2.1.3 POPULATION DISTRIBUTION 2.1.3 POPULATION DISTRIBUTION Aug 2009 2.
1.4 CONCLUSION
S N/A N/A 2.2.0 NEARBY INDUST. TRANS & MIL 2.2 NEARBY INDUSTRIAL, Aug 2009 FACILITY TRANSPORTATION, AND MILITARY FACILITIES 2.2.1 TRANSPORTATION ROUTES 2.2.1 LOCATION AND ROUTE Aug 2009 2.2.2 NEARBY FACILITIES 2.
2.2 DESCRIPTION
S Aug 2009 2.
2.3 CONCLUSION
S 2.2.3 EVALUATIONS OF POTENTIAL Aug 2009 ACCIDENTS 2.3.0 METEOROLOGY 2*3 METEOROLOGY Aug 2009 2.3.1 REGIONAL CLIMATOLOGY 2.3.1 REGIONAL CLIMATE Aug 2009 2.3.2 LOCAL METEOROLOGY 2.3.2 LOCAL METEOROLOGY Aug 2009 2.3.3 ONSITE METEOROLOGICAL 2.3.3 ONSITE METEOROLOGICAL Aug 2009 MEASUREMENTS MEASUREMENTS PROGRAM 2.3.4 SHORT-TERM (ACCIDENT) 2.3.4 SHORT-TERM (ACCIDENT)
Aug 2009 DIFFUSION EST DIFFUSION 2.3.5 LONG-TERM (ROUTINE) 2.3.5 LONG-TERM (ROUTINE) DIFFUSION Aug 2009 DIFFUSION EST ESTIMATES 2.5 GEOLOGICAL, SEISMOLOGICAL, 2.5 GEOLOGY, SEISMOLOGY, AND Nov 2009 GEOTECH GEOTECHNICAL ENGINEERING
SUMMARY
OF FOUNDATION CONDITIONS 2.5.1 GEOLOGY 2.5.1 BASIC GEOLOGY AND SEISMIC Nov 2009 INFORMATION 2.5.2 SEISMOLOGY 2.5.2 VIBRATORY GROUND MOTION Nov 2009 2.5.3 SURFACE FAULTING 2.5.3 SURFACE FAULTING Nov 2009 2.5.4 STABILITY OF SUBSURFACE 2.5.4 STABILITY OF SUBSURFACE Nov 2009 MATERIALS MATERIALS 2.5.5 STABILITY OF SLOPES 2.5.5 SURFACE FAULTING Nov 2009 2.
6.0 REFERENCES
N/A N/A 3.1.1 CONFORMANCE WITH 3.1 CONFORMANCE WITH NRC GENERAL Aug 2009 GENERAL DESIGN CRITERIA DESIGN CRITERIA
ENCLOSURE 1 [Cont'd]
TVA's Schedule for Specified Topic Items and Corresponding Sections of the FSAR SER SER TITLE FSAR FSAR TITLE Scheduled Section Section Submittal Date 3.4.0 FLOOD LEVEL (FLOOD) DESIGN 3.4 WATER LEVEL (FLOOD) DESIGN Aug 2009 3.4.1 FLOOD PROTECTION 3.4.1 FLOOD PROTECTION Aug 2009 3.4.2 ANALYSIS PROCEDURE 6.2.6 CONTAINMENT LEAKAGE 6.2.6 CONTAINMENT LEAKAGE TESTING Jan 2010 TESTING 7.5.0 SAFETY-RELATED DISP 7.1.1 IDENTIFICATION OF SAFETY-Jan 2010 INSTRUMENTATION 7.5.1 RELATED SYSTEMS POST ACCIDENT MONITORING (PAM) 7.5.1 SYSTEM DESCRIPTION 7.5 INSTRUMENTATION SYSTEMS Jan 2010 IMPORTANT TO SAFETY 7.5.2 POST-ACCIDENT MONITORING 7.5.1 POST ACCIDENT MONITORING (PAM)
Jan 2010 SYSTEM 7.5.2 EMERGENCY RESPONSE FACILITIES DATA SYSTEM (ERFDS) 7.5.3 IE BULLETIN 79-27 N/A N/A 7.
5.4 CONCLUSION
S N/A N/A 7.9.0 DATA COMMUNICATION 7.5.2 EMERGENCY RESPONSE FACILITIE,<
Jan 2010 SYSTEM (SRPTOC)
DATA SYSTEM (ERFDS) 5.4.2 STEAM GENERATOR 5.5.4 STEAM OUTLET FLOW RESTRICTOR AUG 2009
[SG]
7.3.1 ENGINEERED SAFETY 5.5.5 MAIN STEAM LINE ISOLATION AUG 2009 FEATURES SYSTEM - SYSTEM SYSTEM DESCRIPTION 5.1.0 REACTOR COOLANT SYSTEM &
5.5.8 REACTOR COOLANT CLEANUP AUG 2009 CONNECTED SYSTEMS -
SYSTEM SYSTEM DESCRIPTION 10.4.7 CONDENSATE & FEEDWATER 5.5.9 MAIN STEAM LINE & FEEDWATER AUG 2009 SYSTEM PIPING 9.1.2 SPENT FUEL SYSTEM 9.1.2 SPENT FUEL STORAGE AUG 2009 9.2.4 POTABLE AND SANITARY 9.2.4 POTABLE AND SANITARY WATER AUG 2009 WATER SYSTEMS SYSTEMS 9.3.0 PROCESS AUXILIARIES 9.3.8 HEAT TRACING AUG 2009 9.4.4 TURBINE BLDG AREA 9.4.4 TURBINE BLDG AREA VENTILATION AUG 2009 VENTILATION SYSTEM SYSTEM 9.4.0 HEATING, VENTILATION, AND 9.4.8 CONDENSATE DEMINERALIZER AUG 2009 AIR CONDITIONING SYSTEM WASTE EVAPORATOR BLDG.
ENVIRONMENTAL CONTROL SYSTEM 9.5.3 LIGHTING SYSTEMS 9.5.3 LIGHTING SYSTEMS AUG 2009 9.5.7 EMERGENCY DIESEL ENGINE 9.5.7 DIESEL ENGINE LUBRICATION AUG 2009 LUBRICATION OIL SYSTEM SYSTEM 9.5.8 DIESEL GENERATOR 9.5.8 DIESEL GENERATOR COMBUSTION AUG 2009 COMBUSTION AIR INTAKE AND AIR INTAKE AND EXHAUST SYSTEM EXHAUST SYSTEM 10.4.7 CONDENSATE FEEDWATER 10.4.10 HEATER DRAINS AND VENTS AUG 2009 SYSTEM 10.3.0 MAIN STEAM SUPPLY SYSTEM 10.4.11 STEAM GENERATOR WET LAYUP AUG 2009 SYSTEM 12.2.0 RADIATION PROTECTION 12.1 ASSURING THAT OCCUPATIONAL AUG 2009 1__1_RADIATION EXPOSURES ARE ALARA 16.0.0 TECHNICAL SPECIFICATIONS 16.3 RELOCATED SPECIFICATIONS AUG 2009
ENCLOSURE2 List of Unit 2 FSAR Amendment 94 "Completed Sections and Required FSAR Changes" U2 FSAR U2 Specific Change(s) Resulted From Page U2 Update to U1 Number Change Reflect 10CFR50.59 License Item FSAR with Rev Package Adminl Current U2 Evaluation Amendment Other No.
Section Bars Number Editorial Information (See Note)
(See Note)
(See Note)
- 1.
1.1 1.1-1 2-A94-01 X
- 2.
1.4 1.4-1 2-A94-02 X
2.1-2 thru
- 3.
2.1 2.1-28 2-A94-03 X
2.1-49 2.1-50 2.2-1
- 4.
2.2 2.2-2 2-A94-04 x
2.2-4 2.2-5 2.3-2 thru 2.3-6 2.3-16 2.3-18 2.3-19
- 5.
2.3 2.3-20 2-A94-05 x
x 2.3-22 2.3-23 2.3-24 2.3-26 2.3-27 2.3-28 2.3-33 3.1-23
- 6.
3.1 2-A94-06 X
3.1-34
- 7.
3.4 Note 6 2-A94-07 X
- 8.
5.5.4 5.5-20 2-A94-08 Note 1
- 9.
5.5.5 Note 6 2-A94-09 Note 2
- 10.
5.5.8 Note 6 2-A94-10 Note 2
- 11.
5.5.9 Note 6 2-A94-11 Note 2
- 12.
9.1.2 Note 6 2-A94-12 X
Deleted
- 13.
9.2.4 Figure 2-A94-13 Note 3 9.2-30
- 14.
9.3.8 9.3-51 2-A94-14 Note 4 9.4-23 9.4-24
- 15.
9.4.4 9.4-25 2-A94-15 Note 5 9.4-26 9.4-27
- 16.
9.4.8 9.4-49 2-A94-16 X
- 17.
9.5.3 Note 6 2-A94-17 Note 2
- 18.
9.5.7 9.5-20 2-A94-18 X
ENCLOSURE2 List of Unit 2 FSAR Amendment 93 "Completed Sections and Required FSAR Changes" 9.5-22
- 19.
9.5.8 Figures 2-A94-19 X
9.5-29, -
30 Deleted Section and Figures
- 20.
10.4.10 10.4-27, 2-A94-20 Note 1 28, 29, 30, 31, 32, 33, 34, 35 Deleted Section
- 21.
10.4.11 and 2-A94-21 Note 1 Figure 10.4-37 1 1
1
- 22.
12.1 Note 6 2-A94-22 X
- 23.
16.3 16.3-1 2-A94-23 X
Note 1.
2.
3.
4.
5.
6.
es:
Safety Evaluation under Design Change E50038-A (Reference TVA to. NRC Letter dated October 18, 1999 for summary of change)
These sections remain unchanged since Amendment 91 and are acceptable as written.
Safety Evaluation under Design Change S40022-A (Reference TVA to NRC Letter dated October 18, 1999 for summary of change)
Safety Evaluation under Design Change E50064-A (Reference TVA to NRC Letter dated October 18, 1999 for summary of change)
Safety Evaluation under Design Change S39947-A (Reference TVA to NRC Letter dated October 18, 1999 for summary of change)
Administrative/Editorial change or reverification of information with no change involved only
ENCLOSURE3 WATTS BAR NUCLEAR PLANT UNIT 2 FSAR AMENDMENT 94 Summary of Redacted Pages CHAPTER PAGE~s)
SECTION No.
FIGURE No.
BASIS FOR REDACTION 1
1.2-15 1.2 1.2-1 Security Related, 10CFR2.390(d)(1) 1 1.2-16 1.2 1.2-2 Security Related, 10CFR2.390(d)(1) 1 1.2-17 1.2 1.2-3 Security Related, 10CFR2.390(d)(1) 1 1.2-18 1.2 1.2-4 Security Related, 10CFR2.390(d)(1) 1 1.2-19 1.2 1.2-5 Security Related, 10CFR2.390(d)(1) 1 1.2-20 1.2 1.2-6 Security Related, 10CFR2.390(d)(1) 1 1.2-21 1.2 1.2-7 Security Related, 10CFR2.390(d)(1) 1 1.2-22 1.2 1.2-8 Security Related, 10CFR2.390(d)(1) 1 1.2-23 1.2 1.2-9 Security Related, 10CFR2.390(d)(1) 1 1.2-24 1.2 1.2-10 Security Related, 10CFR2.390(d)(1) 1 1.2-25 1.2 1.2-11 Security Related, 10CFR2.390(d)(1) 1
-1.2-26 1.2 1.2-12 Security Related, 10CFR2.390(d)(1) 1 1.2-27 1.2 1.2-13 Security Related, 10CFR2.390(d)(1) 1 1.2-28 1.2 1.2-14 Security Related, 10CFR2.390(d)(1) 1 1.2-29 1.2 1.2-15 Security Related, 10CFR2.390(d)(1) 2 2.2-7 2.2 2.2-1 Security Related, 10CFR2.390(d)(1) 2 2.2-8 2.2 2.2-2 Security Related, 10CFR2.390(d)(1) 2 2.4-90 2.4 2.4-2 Security Related, 10CFR2.390(d)(1) 2 2.4-91 2.4 2.4-3 Security Related, 10CFR2.390(d)(1) 2 2.4-92 2.4 2.4-3a Security Related, 10CFR2.390(d)(1) 2 2.4-93 2.4 2.4-4 Security Related, 10CFR2.390(d)(1) 2 2.4-94 2.4 2.4-5 Security Related, 10CFR2.390(d)(1) 2 2.4-95 2.4 2.4-6 Security Related, 10CFR2.390(d)(1) 2 2.4-96 2.4 2.4-7 Security Related, 10CFR2.390(d)(1) 2 2.4-97 2.4 2.4-8 Security Related, 10CFR2.390(d)(1) 2 2.4-98 2.4 2.4-9 Security Related, 10CFR2.390(d)(1) 2 2.4-99 2.4 2.4-10 Security Related, 10CFR2.390(d)(1) 2 2.4-100 2.4 2.4-11 Security Related, 10CFR2.390(d)(1) 2 2.4-101 2.4 2.4-12 Security Related, 10CFR2.390(d)(1) 2 2.4-102 2.4 2.4-13 Security Related, 10CFR2.390(d)(1) 2 2.4-103 2.4 2.4-14 Security Related, 10CFR2.390(d)(1) 2 2.4-131 2.4 2.4-40a Security Related, 10CFR2.390(d)(1)
Sheet 1 2
2.4-132 2.4 2.4-40a Security Related, 10CFR2.390(d)(1)
Sheet 2 2
2.4-134 2.4 2.4-40b Security Related, 10CFR2.390(d)(1) 2 2.4-135 2.4 2.4-40c Security Related, 10CFR2.390(d)(1) 2 2.4-136 2.4 2.4-40d-1 Security Related, 10CFR2.390(d)(1) 2 2.4-141 2.4 2.4-40f Security Related, 10CFR2.390(d)(1)
Sheet 1 2
2.4-144 2.4 2.4-40g Security Related, 10CFR2.390(d)(1)
Sheet 1 2
2.4-201 2.4 2.4-76 Security Related, 10CFR2.390(d)(1) 2 2.4-204 2.4 2.4-79 Security Related, 10CFR2.390(d)(1) 2 2.4-207 2.4 2.4-82 Security Related, 10CFR2.390(d)(1) 2 2.4-208 2.4 2.4-83 Security Related, 10CFR2.390(d)(1) 2 2.4-213 2.4 2.4-88 Security Related, 10CFR2.390(d)(1)
ENCLOSURE3 WATTS BAR NUCLEAR PLANT UNIT 2 FSAR AMENDMENT 94 Summary of Redacted Pages CHAPTER PAGE~s) I SECTION No.
FIGURE No.
BASIS FOR REDACTION 2
2.4-214 2.4 2.4-89 Security Related, 10CFR2.390(d)(1) 2 2.4-215 2.4 2.4-90 Security Related, 10CFR2.390(d)(1) 2 2.4-223 2.4 2.4-98 Security Related, 10CFR2.390(d)(1) 2 2.5-473 2.5 2.5-185 Security Related, 10CFR2.390(d)(1) 2 2.5-274 2.5 2.5-185a Security Related, 10CFR2.390(d)(1) 2 2.5-515 2.5 2.5-225 Security Related, 10CFR2.390(d)(1) 2 2.5-516 2.5 2.5-226 Security Related, 10CFR2.390(d)(1) 2 2.5-517 2.5 2.5-226a Security Related, 10CFR2.390(d)(1) 2 2.5-557 2.5 2.5-273 Security Related, 10CFR2.390(d)(1) 2 2.5-692 2.5 2.5-358 Security Related, 10CFR2.390(d)(1) 2 2.5-936 2.5 2.5-592 Security Related, 10CFR2.390(d)(1) 3 3.5-57 3.5 3.5-3 Security Related, 10CFR2.390(d)(1) 3 3.5-58 3.5 3.5-4 Security Related, 10CFR2.390(d)(1) 3 3.6-41 3.6 3.6-21 Security Related, 10CFR2.390(d)(1) 3 3.6-42 3.6 3.6-22 Security Related, 10CFR2.390(d)(1) 3 3.6-43 3.6 3.6-23 Security Related, 10CFR2.390(d)(1) 3 3.6-44 3.6 3.6-24 Security Related, 10CFR2.390(d)(1) 3 3.7-215 3.7 3.7-39 Security Related, 10CFR2.390(d)(1) 3 3.7-216 3.7 3.7-40 Security Related, 10CFR2.390(d)(1) 3 3.7-217 3.7 3.7-41 Security Related, 10CFR2.390(d)(1) 3 3.7-220 3.7 3.7-44 Security Related, 10CFR2.390(d)(1) 3 3.8.3-62 3.8.3 3.8.3-6 Security Related, 10CFR2.390(d)(1) 3 3.8.3-63 3.8.3 3.8.3-7 Security Related, 10CFR2.390(d)(1) 3 3.8.4-88 3.8.4 3.8.4-2 Security Related, 10CFR2.390(d)(1) 3 3.8.4-89 3.8.4 3.8.4-3 Security Related, 10CFR2.390(d)(1) 3 3.8.4-90 3.8.4 3.8.4-4 Security Related, 10CFR2.390(d)(1) 3 3.8.4-91 3.8.4 3.8.4-5 Security Related, 10CFR2.390(d)(1) 3 3.8.4-92 3.8.4 3.8.4-6 Security Related, 10CFR2.390(d)(1) 3 3.8.4-95 3.8.4 3.8.4-9 Security Related, 1 0CFR2.390(d)(1) 3 3.8.4-103 3.8.4 3.8.4-17 Security Related, 10CFR2.390(d)(1) 3 3.8.4-104 3.8.4 3.8.4-18 Security Related, 10CFR2.390(d)(1) 3 3.8.4-105 3.8.4 3.8.4-19 Security Related, 10CFR2.390(d)(1) 3 3.8.4-106 3.8.4 3.8.4-20 Security Related, 10CFR2.390(d)(1) 3 3.8.4-110 3.8.4 3.8.4-24 Security Related, 10CFR2.390(d)(1) 3 3.8.4-114 3.8.4 3.8.4-28 Security Related, 10CFR2.390(d)(1) 3 3.8.4-121 3.8.4 3.8.4-35 Security Related, 10CFR2.390(d)(1) 3 3.8.4-122 3.8.4 3.8.4-36 Security Related, 10CFR2.390(d)(1) 3 3.8.4-123 3.8.4 3.8.4-36a Security Related, 1 OCFR2.390(d)(1) 3 3.8.4-126 3.8.4 3.8.4-37 Security Related, 10CFR2.390(d)(1) 3 3.8.4-143 3.8.4 3.8.4-50 Security Related, 10CFR2.390(d)(1) 3 3.8.4-144 3.8.4 3.8.4-51 Security Related, 10CFR2.390(d)(1) 3 3.8.6-19 3.8.6 3.8.6-7 Security Related, 10CFR2.390(d)(1) 6 6.2.2-14 6.2.2 6.2.2-4 Security Related, 10CFR2.390(d)(1) 6 6.2.3-64 6.2.3 6.2.3-4 Security Related, 10CFR2.390(d)(1) 6 6.2.3-65 6.2.3 6.2.3-5 Security Related, 10CFR2.390(d)(1) 6 6.2.3-66 6.2.3 6.2.3-6 Security Related, 10CFR2.390(d)(1) 6 6.2.3-67 6.2.3 6.2.3-7 Security Related, 10CFR2.390(d)(1)
ENCLOSURE3 WATTS BAR NUCLEAR PLANT UNIT 2 FSAR AMENDMENT 94 Summary of Redacted Pages CHAPTER PAGE(s)
SECTION No.
FIGURE No.
BASIS FOR REDACTION 6
6.2.3-68 6.2.3 6.2.3-8 Security Related, 10CFR2.390(d)(1) 6 6.2.3-69 6.2.3 6.2.3-9 Security Related, 10CFR2.390(d)(1) 6 6.2.3-70 6.2.3 6.2.3-10 Security Related, 10CFR2.390(d)(1) 6 6.2.3-79 6.2.3 6.2.3-18 Security Related, 10CFR2.390(d)(1) 6 6.2.3-80 6.2.3 6.2.3-19 Security Related, 10CFR2.390(d)(1) 8 8.1-23 8.1 8.1-1 Security Related, 10CFR2.390(d)(1) 8 8.2-13 8.2 Security Related, 10CFR2.390(d)(1) and 8.2-14 8
8.2-30 8.2 8.2-3 Security Related, 10CFR2.390(d)(1) 8 8.2-31 8.2 8.2-4 Security Related, 10CFR2.390(d)(1) 8 8.2-44 8.2 8.2-11 Security Related, 10CFR2.390(d)(1) 8 8.3-99 8.3 8.3-1 Security Related, 10CFR2.390(d)(1) 8 8.3-101 8.3 8.3-2 Security Related, 10CFR2.390(d)(1) 8 8.3-102 8.3 8.3-3 Security Related, 10CFR2.390(d)(1) 8 8.3-104 8.3 8.3-4b Security Related, 10CFR2.390(d)(1) 8 8.3-207 8.3 8.3-46 Security Related, 10CFR2.390(d)(1) 8 8.3-220 8.3 8.3-59 Security Related, 10CFR2.390(d)(1) 9 9.2-208 9.2 9.2-40 Security Related, 10CFR2.390(d)(1) 9 9.4-286 9.4 9.4-21 Security Related, 10CFR2.390(d)(1) 9 9.4-290 9.4 9.4-22c Security Related, 10CFR2.390(d)(1) 9 9.4-291 9.4 9.4-23 Security Related, 10CFR2.390(d)(1) 9 9.4-292 9.4 9.4-24 Security Related, 10CFR2.390(d)(1) 9 9.5-43 9.5 9.5-16 Security Related, 10CFR2.390(d)(1) 9 9.5-44 9.5 9.5-17 Security Related, 10CFR2.390(d)(1) 12 12.3-41 12.3 12.3-1 Security Related, 10CFR2.390(d)(1) 12 12.3-42 12.3 12.3-2 Security Related, 10CFR2.390(d)(1) 12 12.3-43 12.3 12.3-3 Security Related, 10CFR2.390(d)(1) 12 12.3-44 12.3 12.3-4 Security Related, 10CFR2.390(d)(1) 12 12.3-45 12.3 12.3-5 Security Related, 10CFR2.390(d)(1) 12 12.3-46 12.3 12.3-6 Security Related, 10CFR2.390(d)(1) 12 12.3-47 12.3 12.3-7 Security Related, 10CFR2.390(d)(1) 12 12.3-48 12.3 12.3-8 Security Related, 10CFR2.390(d)(1) 12 12.3-49 12.3 12.3-9 Security Related, 10CFR2.390(d)(1) 12 12.3-50 12.3 12.3-10 Security Related, 10CFR2.390(d)(1) 12 12.3-51 12.3 12.3-11 Security Related, 10CFR2.390(d)(1) 12 12.3-52 12.3 12.3-12 Security Related, 10CFR2.390(d)(1) 12 12.3-53 12.3 12.3-13 Security Related, 10CFR2.390(d)(1) 12 12.3-54 12.3 12.3-14 Security Related, 10CFR2.390(d)(1) 12 12.3-55 12.3 12.3-15 Security Related, 10CFR2.390(d)(1) 12 12.3-56 12.3 12.3-16 Security Related, 10CFR2.390(d)(1) 12 12.3-57 12.3 12.3-17 Security Related, 10CFR2.390(d)(1) 12 12.3-58 12.3 12.3-18 Security Related, 10CFR2.390(d)(1) 12 12.3-59 12.3 12.3-19 Security Related, 10CFR2.390(d)(1) 12 12.4-7 12.4 12.4-1 Security Related, 10CFR2.390(d)(1)