ML111741458
Letter Sequence Other | |
---|---|
TAC:ME3736, (Approved, Closed) | |
Initiation Administration Questions Answers | |
MONTHYEARML1009004602010-03-30030 March 2010
[Table View]Submittal of License Amendment Request, Extension of Completion Time for an Inoperable Diesel Generator - Technical Specification 3.8.1, AC Sources - Operating Project stage: Request ML1011803792010-04-28028 April 2010 Unit No.2 - E-mail from R. Guzman to J. Dosa Acceptance Review for LAR - Inoperable DG 14-Day Completion Time Extension Project stage: Acceptance Review ML1012601662010-05-0606 May 2010 E-mail from R. Guzman to J. Dosa Acceptance Review Revised Questions for License Amendment Requesting 14 Day Completion Time Extension for Inoperable EDG Project stage: Acceptance Review ML1012307272010-05-11011 May 2010 Acceptance Review Determination of License Amendment Request Extension of Completion Time for Inoperable Diesel Generator Project stage: Acceptance Review ML1016004522010-06-0101 June 2010 Submittal of Supplemental Information in Support of License Amendment Extension of Completion Time for an Inoperable Diesel Generator Project stage: Supplement ML1016003832010-06-11011 June 2010 Acceptance Review of License Amendment Request and Supplemental Information Extension of Completion Time for an Inoperable Diesel Generator Project stage: Acceptance Review ML1031302612010-11-0909 November 2010 Request for Additional Information, Extension of Completion Time for Inoperable Diesel Generator, Electrical Engineering Review Project stage: RAI ML1031303272010-12-15015 December 2010 Request for Additional Information Extension of Allowed Outage Time for Inoperable Diesel Generator, Probabilistic Risk Assessment Project stage: RAI ML1101101652010-12-29029 December 2010 Response to NRC Request for Additional Information on License Amendment Request Pursuant to 10 CFR 50.90: Extension of the Completion Time for an Inoperable Diesel Generator Project stage: Response to RAI ML1102502712011-01-14014 January 2011 License Amendment Request Pursuant to 10 CFR 50.90: Extension of the Completion Time for an Inoperable Diesel Generator - Response to NRC Request for Additional Information Project stage: Response to RAI ML1103906562011-02-0808 February 2011 E-mail from R.Guzman to D.Vandeputte - Request for Additional Information Div 3 EDG CT Extension LAR - PRA Review Project stage: RAI ML1105305442011-02-22022 February 2011 E-mail from R. Guzman to D. Vandeputte - Supplemental Request for Additional Information Extension of Completion Time for Inoperable DG Project stage: RAI ML1106704242011-02-25025 February 2011 License Amendment Request Pursuant to 10 CFR 50.90: Extension of the Completion Time for an Inoperable Diesel Generator - Supplemental Information Responding to NRC Follow-up Probabilistic Risk Assessment Review Question Project stage: Supplement ML1107006342011-03-11011 March 2011 E-mail from R. Guzman to S. Som Regarding Supplemental Information from Licensee Regarding License Amendment Request for Completion Time Extension - Division 3 DG Project stage: Other ML1106910202011-03-15015 March 2011 Supplemental Request for Additional Information, Extension of Completion Time for Inoperable Diesel Generator, Electrical Engineering Review Project stage: RAI ML11119A1372011-04-27027 April 2011 License Amendment Request Pursuant to 10 CFR 50.90: Extension of Completion Time for Inoperable Diesel Generator-Supplemental Information Responding to NRC Follow-up Electrical Engineering Branch Review Questions Project stage: Supplement ML1117414582011-06-23023 June 2011 E-mail from R. Guzman to J. Dosa Requesting Supplemental Information Boral Monitoring Program NMP2 Extended Power Uprate LAR Project stage: Other ML1116603882011-07-11011 July 2011 Request for Additional Information, Extension of Completion Time for Inoperable Diesel Generator, Technical Specifications Review Project stage: RAI ML11214A2142011-07-25025 July 2011 License Amendment Request, Extension of the Completion Time for Inoperable Diesel Generator - Response to NRC Request for Additional Information Project stage: Response to RAI ML1122200812011-08-0909 August 2011 E-mail from Alyse Peterson to Richard Guzman NRC Request for State Consultation for Proposed Amendment Regarding Allowed Outage Time Extension for Division 1 or Division 2 Diesel Generator Inoperable Project stage: Request ML1130400692011-10-31031 October 2011 E-mail from R. Guzman to A. Peterson NRC Response to State Comments for Proposed Amendment Regarding Allowed Outage Time Extension for Division 1 or Division 2 Diesel Generator Inoperable Project stage: Other ML1122001552011-10-31031 October 2011 Issuance of Amendment Regarding Extension of Completion Time for Inoperable Division 1 or Division 2 Diesel Generator Project stage: Approval 2011-10-31 |
ML111741458 | |
Person / Time | |
---|---|
Site: | Nine Mile Point ![]() |
Issue date: | 06/23/2011 |
From: | Richard Guzman Division of Operating Reactor Licensing |
To: | Dosa J Nine Mile Point |
Guzman R, NRR/DORL, 415-1030 | |
References | |
TAC ME3736 | |
Download: ML111741458 (1) | |
Similar Documents at Nine Mile Point | |
---|---|
Category:E-Mail
MONTHYEARML24008A0592024-01-0808 January 2024
[Table view]E-mail Dated 1-8-2024 from R. Guzman to R. Reynolds Correct TS Page 204 for License Amendment No. 250 Adoption of TSTF-505 ML24008A2622024-01-0808 January 2024 Acceptance Review Determination for Relief Request I5R-12, Concerning Installation of a FSWOL on RPV Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld ML23268A0022023-09-22022 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-264-A, Revision 0 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23255A2872023-09-12012 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative to Use the Successive Inspection Requirements of BWRVIP-75-A ML23237B3972023-08-24024 August 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative Request to Use Updated BWRVIP Guidelines ML23205A2432023-07-19019 July 2023 NRC Staff Follow-up Question on Audit Question 18 TSTF-505 and 50.69 Regulatory Audit (E-mail Dated 7/19/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23205A2412023-07-11011 July 2023 NRC Staff Follow-up Comments on Audit Questions 6a, 6b, and 6c TSTF-505 and 50.69 Regulatory Audit (E-mail Dated 7/11/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23205A2422023-07-11011 July 2023 NRC Staff Follow-up Comments on Audit Questions 17 and 19 TSTF-505 and 50.69 Regulatory Audit (E-mail Dated 7/11/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23209A7692023-06-14014 June 2023 Draft Audit Results File TSTF-505 and 50.69 (E-mail Dated 6/14/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23209A7672023-06-13013 June 2023 Share File Observations on Response to Question 06 and 22 TSTF-505 and 50.69 (E-mail Dated 6/13/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23149A0012023-05-29029 May 2023 Audit Agenda TSTF-505 and 50.69 (E-mail Dated 5/29/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23142A0222023-05-22022 May 2023 Regulatory Audit Questions (PRA) TSTF-505 and 50.69 (E-mail Dated 5/22/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23118A3882023-04-28028 April 2023 Regulatory Audit Questions TSTF-505 and 50.69 (E-mail Dated 4/28/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23104A3472023-04-14014 April 2023 Verbal Authorization for Relief Request I5R-14, Proposed Alternative Associated with N2E Dissimilar Metal Weld Overlay Repair with Laminar Indication ML23093A1782023-04-0303 April 2023 E-mail from T. Loomis to R. Guzman Proposed Alternative to Utilize Specific Provisions of Code Case N-716-3 ML23090A1302023-03-31031 March 2023 Verbal Authorization for Relief Request I5R-11, Proposed Alternative Repair of Recirculation Inlet Nozzle N2E Dissimilar Metal Weld ML23087A2912023-03-28028 March 2023 Request for Additional Information (3/28/2023 E-mail) - Proposed Emergent I5R-11 Alternative Associated with a Weld Overlay on RPV Recirculation Nozzle N2E DM Weld ML23061A0522023-03-0202 March 2023 Request for Additional Information (3/2/2023 E-mail) - Proposed Alternative Associated with a Weld Overlay Repair to the Torus ML23047A3832023-02-15015 February 2023 (2-15-2023 Email from J. Nelson to R. Guzman) Long Island Power Authority and Long Island Lighting Company Request for Threshold Determination ML23033A0142023-02-0202 February 2023 E-mail Dated 2-2-2023 from R.Guzman to R.Reynolds Correction to Error in NMP1 TSTF-505 and 50.69 Audit Plan ML23019A3092023-01-19019 January 2023 Acceptance Review Determination License Amendment Request to Adopt 10 CFR 50.69 Categorization Process ML23019A3032023-01-19019 January 2023 Acceptance Review Determination License Amendment Requets to Adopt TSTF-505 ML23013A3332023-01-13013 January 2023 Acceptance Review Determination Proposed Alternative for Weld Overlay Repair to the Torus ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22342B1462022-11-21021 November 2022 NRR E-mail Capture - Acceptance Review for TSTF 295A ML22314A2262022-11-10010 November 2022 E-mail Dated 11/10/2022 Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps ML22301A0902022-10-28028 October 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-301, Revision 2 ML22252A1522022-09-0909 September 2022 Acceptance Review Determination Partial Adoption of TSTF-568 to Revise TS 3.3.1 for Primary Containment Oxygen Concentration ML22207A0192022-07-26026 July 2022 (E-mail Dated 7/26/2022) Setup of Online Reference Portal for Revision to Alternative Source Term Calculation for MSIV and Non-MSIV Leakage ML22207A0122022-07-26026 July 2022 Acceptance Review Determination Revision to Alternative Source Term Analysis for Containment Leakage ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22194A9412022-07-13013 July 2022 Request for Additional Information Relief Request CS-PR-02 (7/13/2022 e-mail) ML22173A0802022-06-22022 June 2022 E-mail Dated 6/22/2022, Acceptance of Requested License Amendment Request to Revise Surveillance Requirements to Reduce Number of Fast Starts of EDGs ML22075A0362022-03-16016 March 2022 Acceptance Review Determination - Relief Request CS-PR-02 Associated with Pump Periodic Verification Test of Core Spray System Pumps, E-mail Dated 3/16/2022 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21320A3472021-11-16016 November 2021 Request for Additional Information LAR to Revise TSs to Adopt TSTF-582, Revision 0 ML21306A3312021-11-0202 November 2021 Request for Additional Information Alternative Request GV-RR-10 (11/2/2021 e-mail) ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21298A0912021-10-25025 October 2021 E-mail Dated 10/25/2021, Acceptance of Requested License Amendment Request to Adopt Technical Specification Task Force Traveler 582 ML21292A2122021-10-19019 October 2021 NRR E-mail Capture - NRC Notification to the State of New York Regarding a Nine Mile Point Nuclear Station, Unit 2 Amendment - Adopt TSTF-501, Rev. 1 ML21278A6872021-10-0505 October 2021 Acceptance Review Determination - Relief Request GV-RR-10 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0482021-09-0707 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21168A3462021-06-17017 June 2021 Acceptance of Requested Licensing Action License Amendment Request - Adoption of TSTF-501, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (EPID L-2021-LLA-0096) (Email) 2024-01-08 |
Text
From: Guzman, Richard To: "Dosa, John J"
Subject:
Supplemental information needed for RAI-3 Date: Thursday, June 23, 2011 11:18:00 PM
- John, The staff has determined that NMPNS has not provided sufficient information to complete its review of the Boral monitoring program (RAI-3). See follow-up question below. If necessary, we can have a call early next week to discuss prior to NMPNS providing its supplemental response on the docket.
- Thanks, Rich Guzman Sr. Project Manager NRR/DORL US NRC 301-415-1030 Richard.Guzman@nrc.gov In its response dated June 13, 2011, the licensee states that, NMPNS will conduct in-situ Boron -10 Areal Density Gauge for Evaluating Racks (BADGER) testing on the Phase 1 Boral Spent fuel racks installed at NMP2 in 2001 on a 10-year frequency, beginning in 2012.
Based on this response, the NRC staff understands that the licensee plans to perform in-situ testing of their Boral spent fuel pool racks installed in 2001; however, the staff notes that NMPNS did not provide information regarding the acceptance criteria for the in-situ test. While the NRC staff views the licensees proposed plan to conduct in-situ testing as acceptable, the staff has determined that the acceptance criteria information is needed to complete its safety evaluation for the Boral monitoring program. Please note that the original RAI-3 in NRC letter dated February 3, 2011, requested the licensee to provide the acceptance criteria for its surveillance/monitoring program. Accordingly, the staff requests NMPNS to provide the acceptance criteria for the in-situ test, including the corrective actions taken if the acceptance criteria is not met.