ME0969 & ME0970, Follow-up RAIs from Eeeb Amendment Request for Extension AOT in TS3.8.1
ML092160462
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/16/2009
From: Bhalchandra Vaidya
Plant Licensing Branch 1
To: Coddington C, Filchner D, Hoffman C, O'Rourke B
Susquehanna
vaidya B, NRR/Dorl/lpl1-1, 415-3308
References
TAC ME0969, TAC ME0970
Download: ML092160462 (3)


Text

From: Vaidya, Bhalchandra Sent: Thursday, July 16, 2009 3:48 PM To: 'dlfilchner@pplweb.com'; 'Coddington, Cornelius T';

'ckhoffman@pplweb.com'; 'O'Rourke, Brenda W' Cc: Salgado, Nancy; Guzman, Richard; Boska, John; Wilson, George; Miller, Kenn; Waig, Gerald; Marrero, Abraham

Subject:

Susq Units 1 & 2, TAC Nos. ME0969 & ME0970- Draft Follow-up RAIs from Electrical Engineering Branch (EEEB)

SUBJECT:

PPL Susquehanna, Units 1 and 2. - REQUEST FOR ADDITIONAL INFORMATION (RAIs) RE:

License Amendment Request for One-time extension of Allowable Outage Time in TS 3.8.1, LCO ACTION A3, from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 10 days for replacement of Transformer ST-20 (TAC NOS. ME0969 and ME0970)

By letter dated March 24, 2009, supplemented by letters dated April 30 and May 12, you submitted a license amendment request for One-time extension of Allowable Outage Time in TS 3.8.1, LCO ACTION A3, from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 10 days for replacement of Transformer ST-20. You responded to Electrical Engineering Branch (EEEB) RAIs by letter dated July 6, 2009.

Based in its review of your responses, the EEEB needs additional information to complete its review of the license amendment request mentioned above. The Draft Follow-up RAIs are provided below:

Based on the phone conf NRC staff had with the licensee on 6/24/09 where licensee staff stated that the spare EDG has adequate capacity by itself to supply safe shutdown loads on both units (equivalent to GDC 17 delayed access offsite circuit), NRC staff has the following questions:

1) Is paragraph one stating that indeed the spare EDG does fulfill the requirements stated above? If so, what is paragraph 5 stating (seems to conflict with paragraph 1 in that case)?
2) Do the procedures described in paragraph 4 fully address operation of the spare EDG supplying safe shutdown loads on both units by itself?
3) Is paragraph 6 saying that the spare EDG is credited in the SBO analysis?

This would not be acceptable if it is being credited as the replacement circuit for the ST 20 circuit.

4) In addition, assuming the licensee has the expected answers to the above questions, NRC staff requires the RAI response be revised to include detailed discussion outlining the design calculation bases demonstrating the spare EDGs capability to supply all necessary safe shutdown loads for both units with adequate voltage and frequency. Also provide detailed discussion about the operating procedures in place to use the spare EDG in this capacity.
====================================

On July 20 and July 23, 2009, during the telephone discussions between the NRC Staff and the licensee, the NRC staff modified the above follow-up RAIs as follows:

"The precedence has been set by NRC staff to require that when an off-site power source is taken out of service, it will be replaced with a source that has the capacity and capability to provide the ability for Safe Shutdown with non-accident loads on both Units without exceeding design parameters and without requiring a blow-down of the Reactor Vessel.

Therefore, please show that the licensee can meet the requirements described in the above paragraph ."

Please let me know ASAP, the convenient time for a phone call discussion for the clarification of the NRC staff concerns and requirements. The call could be arranged as early as Monday, July 20, 2009.

Bhalchandra K. Vaidya Licensing Project Manager NRC/NRR/DORL/LPL1-1 (301)-415-3308 (O) bhalchandra.vaidya@nrc.gov E-mail Properties Mail Envelope Properties ()

Subject:

Susq Units 1 & 2, TAC Nos. ME0969 & ME0970- Draft Follow-up RAIs from Electrical Engineering Branch (EEEB)

Sent Date: 07/16/2009 3:29:14 PM Received Date: 07/16/2009 3:47:00 PM From: Vaidya, Bhalchandra Created By: Bhalchandra.Vaidya@nrc.gov Recipients:

dlfilchner@pplweb.com ('dlfilchner@pplweb.com')

Tracking Status: None ctcoddington@pplweb.com ('Coddington, Cornelius T')

Tracking Status: None ckhoffman@pplweb.com ('ckhoffman@pplweb.com')

Tracking Status: None BWORourke@pplweb.com ('O'Rourke, Brenda W')

Tracking Status: None Nancy.Salgado@nrc.gov (Salgado, Nancy)

Tracking Status: None Richard.Guzman@nrc.gov (Guzman, Richard)

Tracking Status: None John.Boska@nrc.gov (Boska, John)

Tracking Status: None

George.Wilson@nrc.gov (Wilson, George)

Tracking Status: None Kenneth.Miller2@nrc.gov (Miller, Kenn)

Tracking Status: None Gerald.Waig@nrc.gov (Waig, Gerald)

Tracking Status: None Abraham.Marrero@nrc.gov (Marrero, Abraham)

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 43737 07/16/2009 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: