L-09-078, 10 CFR 50.55a Request Numbers 1-TYP-4-B3.120-1 and 2-TYP-3-C6.10-1, and Beaver Valley Power Station Inservice Inspection Plans

From kanterella
(Redirected from ML091070244)
Jump to navigation Jump to search

10 CFR 50.55a Request Numbers 1-TYP-4-B3.120-1 and 2-TYP-3-C6.10-1, and Beaver Valley Power Station Inservice Inspection Plans
ML091070244
Person / Time
Site: Beaver Valley
Issue date: 04/14/2009
From: Sena P
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-09-078
Download: ML091070244 (52)


Text

FENOC Beaver Valley Power Station P.O. Box 4 FirstEnergy Nuclear Operating Company Shippingport, PA 15077 Peter P. Sena III 724-682-5234 Site Vice President Fax: 724-643-8069 April 14, 2009 L-09-078 10 CFR 50.55a ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station, Unit Nos. 1 and 2 By-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 10 CFR 50.55a Request Numbers 1-TYP-4-B3.120-1 and 2-TYP-3-C6.10-1, and Beaver Valley Power Station Inservice Inspection Plans Pursuant to 10 CFR 50.55a(a)(3)(ii), FirstEnergy Nuclear Operating Company (FENOC) hereby requests Nuclear Regulatory Commission (NRC) approval of proposed alternatives for the Beaver Valley Power Station (BVPS) Unit No. 1 fourth inservice inspection program interval and BVPS Unit No. 2 third inservice inspection program interval.

Visual examination of the BVPS Unit No. 1 pressurizer surge nozzle is proposed as an alternative to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) Section Xl, Table IWB-2500-1 volumetric examination requirement or the enhanced visual examination requirement of 10 CFR 50.55a(b)(2)(xxi), which may be performed instead of an ultrasonic examination. The details of this alternative are described in Enclosure A, 10 CFR 50.55a Request Number 1-TYP-4-B3.120-1, Revision 0.

Surface examination of accessible portions of the BVPS Unit No. 2 recirculation spray pump casing welds to the maximum extent possible is proposed as an alternative to the ASME Code Section Xl, Table IWC-2500-1 surface examination requirement. The details of this alternative are described in Enclosure B, 10 CFR 50.55a Request Number 2-TYP-3-C6.10-1, Revision 0.

FENOC requests approval of the proposed alternatives by April 30, 2010.

-Wo(7

I Beaver Valley Power Station, Unit Nos. 1 and 2 L-09-078 Page 2 FENOC also provides for information in Enclosure C, the BVPS inservice inspection ten-year plans for Unit Nos. 1 and 2 in accordance with ASME Code Section XI, Paragraph IWA-1400(c).

There are no regulatory commitments contained in this submittal. If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager-Fleet Licensing, at 330-761-6071.

Sincerely, Peter P. Sena III

Enclosures:

A. 10 CFR 50.55a Request Number 1-TYP-4-B3.120-1, Revision 0 B. 10 CFR 50.55a Request Number 2-TYP-3-C6.10-1, Revision 0 C. Beaver Valley Power Station, Unit 1/2, 1/2-ADM-2039, BVPS ISI Ten-Year Plans cc:

NRC Region I Administrator NRC Senior Resident Inspector NRC Project Manager Director BRP/DEP Site BRP/DEP Representative

10CFR 50.55a Request Number 1-TYP-4-B3.120-1, Revision 0 Page 1 of 6 Proposed Alternative in Accordance with 10 CFR 50.55a(a)(3)(ii)

--Hardship or Unusual Difficulty without Compensating Increase in Level of Quality or Safety--

1.0 ASME CODE COMPONENTS AFFECTED Pressurizer Surge Nozzle Inner Radius Section RC-TK-1-RADIUS-6 at Beaver Valley Power Station (BVPS) Unit No. 1 2.0 APPLICABLE CODE EDITION AND ADDENDA American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) Section Xl, 2001 Edition, 2003 Addenda and the 1998 Edition with the limitations and modifications of 10 CFR 50.55a(b)(2)(xxi) 3.0 APPLICABLE CODE REQUIREMENTS Table IWB-2500-1, Examination Category B-D, Inspection Program B, Item No. B3.120 requires volumetric examination of pressurizer nozzle inside radius section.

Code of Federal Regulations paragraph 10 CFR 50.55 a(b)(2)(xxi) as amended by Federal Register Volume 73, No. 176, page 52749 permits enhanced visual examination of the exterior surface instead of ultrasonic examination as stated below.

(xxi) Table IWB-2500-1 examination requirements. "(A) The provisions of Table IWB-2500-1, Examination Category B-D, Full Penetration Welded Nozzles in Vessels, Items B3.40 and B3.60 (Inspection Program A) and Items B3.120 and B3.140 (Inspection Program B) of the 1998 Edition must be applied when using the 1999 Addenda through the latest edition and addenda incorporated by reference in paragraph (b)(2) of this section. A visual examination with magnification that has a resolution sensitivity to detect a 1-mil width wire or crack, utilizing the allowable flaw length criteria in Table IWB-3512-1, 1997 Addenda through the latest edition and addenda incorporated by reference in paragraph (b)(2) of this section, with a limiting assumption on the flaw aspect ratio (i.e., all = 0.5), may be performed instead of an ultrasonic examination."

4.0 REASON FOR REQUEST In accordance with 1 OCFR50.55a(a)(3)(ii), an alternative is proposed on the basis that compliance with the code requirement would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. The difficulty associated with access to either the exterior surface for the volumetric examination or to the interior surface for the enhanced visual examination is described below.

The BVPS Unit No. 1 pressurizer surge nozzle is integrally cast within the SA216 Grade WCC lower head. To perform the volumetric examination of the surge nozzle inner

1-TYP-4-B3.120-1, Rev. 0 Page 2 of 6 radius section, the outside surface of the lower head must be accessible. This surface is made accessible by removing the insulation surrounding the surge nozzle. The design of this insulation requires disconnecting the 78 heater cables from the immersion heaters prior to removing the insulation (see Figure 1). Each cable consists of two wires, each mechanically connected to the heater. Care must be taken while disconnecting and reconnecting to ensure the ceramic terminal blocks connecting the wires to the heater pins are not damaged. If damaged, an unbrazing/brazing evolution would be required to replace the blocks. The dose estimate for this exam assumes that no ceramic terminal blocks would require replacement. Another concern is the presence of asbestos in the cable jackets. Special monitoring and material control would be necessary due to the presence of friable asbestos. Though airborne radioactive contamination is not typically a concern in this area, respirators would be required to address the potential asbestos exposure. Additional cover-ails, suitable for asbestos work, would be required over the anti-contamination clothing, causing a heat stress concern.

The dose estimate below is based on a radiological survey obtained on February 13, 2006 during the seventeenth refueling outage (1R17). The hours estimated to perform the activities involved in disconnecting and reconnecting the cables are based on similar efforts performed during the eighth refueling outage (1 R08) when two cables were reworked due to potential short circuits. Comprehensive dry-run exercises were performed on a mock-up in preparation for the 1 R08 efforts. Therefore, the estimated times used in the dose estimate are believed to be reasonably accurate.

With the nozzle insulation removed from this area, the complete code required exam could be performed. Special equipment was designed to perform this specific examination. The other five top-head pressurizer inner radius sections have been successfully examined. No recordable indications were noted on these examinations.

Previous examinations of the adjacent safe-end to nozzle weld have been completed with satisfactory results. The next examination on this safe-end to nozzle weld will be performed during the nineteenth refueling outage (1 R1 9) in the spring of 2009. BVPS Unit Nos. 1 and 2 have over 50 years of combined operation, with no leakage in the surge nozzle area. The BVPS Unit No. 2 surge nozzle inner radius section and the surge nozzle to vessel weld were ultrasonically examined during the previous interval and no recordable indications were found. The BVPS Unit No. 1 surge nozzle inner radius section has not been examined. See Section 7 below for a discussion of previous relief requests.

The dose estimate for cable disconnection/reconnection, insulation removal/

reinstallation, surface preparation, and ultrasonic examination is 17.7 Rem. The dose estimate is based on a radiological survey conducted with the insulation installed. Once the insulation is removed the dose rates documented in the survey would likely increase. Shielding at this location is not practical since the radiation source is the component surface to be examined.

1-TYP-4-B3.120-1, Rev. 0 Page 3 of 6 ELEV VltW

'-S PL IT SPLIT LINL.

Figure 1

1-TYP-4-B3.120-1, Rev. 0 Page 4 of 6 DOSE ESTIMATE FOR THE PRESSURIZER SURGE NOZZLE INNER RADIUS SECTION VOLUMETRIC EXAMINATION Time Individuals Repetitions Dose rate Estimate (h rs)

(mR/hr)

(mR)

ELECTRICIANS:

Disconnect heater cables 0.25 1

78 200 3,900 Reconnect heater cables 0.75 1

78 200 11,700 INSULATORS:

Remove insulation 1

3 1

200 600 Reinstall insulation 2

3 1

200 1,200 BOILERMAKERS:

Weld preparation 1

2 1

60 120 EXAMINERS:

Perform exam 1

2 1

100 200 TOTAL:

17,720 A remote visual examination from the inside of the pressurizer was evaluated as an alternative to the ultrasonic examination. A screen located at the surge line nozzle and baffle plates in the lower section of the pressurizer restricts access to the area of interest. The surge nozzle contains a thermal sleeve that would significantly limit the examination, if access through the screen were possible. The distance from the manway to the surge nozzle area is approximately 40 feet, making positioning adjustments of the remote camera difficult. Because of these limitations, a remote visual examination from the inside of the pressurizer is not considered a viable alternative.

Several methods are available to detect leakage from this and other areas if a through-wall leak were to occur. Listed below are some examples:

a. Control room operators perform Operation Surveillance Test (OST) 1OST-6.2, "Reactor Coolant System Water Inventory Balance," every 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> with the plant operating at steady state conditions. Leakage would be discovered by the conduct of this test.
b.

Containment airborne radiation monitors continuously sample the containment atmosphere and alarm in the control room. This detection method is dependent on the size of the leak, reactor coolant activity, and containment background activity.

c. Leakage would cause an increase in containment pressure, temperature and humidity, which are indicated in the control room. Additionally, high containment pressure, produces an alarm in the control room.
d.

Substantial leakage would collect in the containment sump. The sump level is indicated and alarmed in the control room.

1-TYP-4-B3.120-1, Rev. 0 Page 5 of 6 There are no credible failure mechanisms other than fatigue for the surge nozzle.

Corrosion degradation protection is provided by the combination of the austenitic stainless steel cladding of the surge nozzle inner radius and by the chemistry controls on the reactor coolant system. Strict chemistry standards are maintained to ensure a non-corrosive environment. Oxygen, chloride, fluoride and other contaminant concentrations are maintained below the thresholds known to be conducive to stress corrosion cracking. Since the surge nozzle is cast, the typical failure mechanisms associated with weld material do not apply to this examination. Erosion and erosion/corrosion degradation is not credible at this location since the austenitic stainless steel cladding resists this mechanism. There is relatively low fluid velocity in the surge nozzle and reactor coolant chemistry minimizes the amount of particles in the fluid that could potentially cause erosion.

Fatigue degradation is a concern in this area due to the potential thermal cycling caused by the insurge and outsurge of the reactor coolant flow. Since the surge nozzle is cast with the bottom head, there is no nozzle to vessel weld. The inner radius is believed to be less susceptible to fatigue problems than a nozzle to vessel weld. Initiation of fatigue cracking may have equal potential at the inner radius as compared to a nozzle to vessel weld, but the chances of having a pre-existing flaw are less likely in the inner radius casting than at a nozzle to vessel weld due to the manufacturing process. For this hypothetical flaw to be present, it had to have been overlooked by the shop nondestructive examinations, which include surface, ultrasonic and radiographic examination. Inservice fatigue crack growth for such a flaw would be small since the pressurizer is hot during the insurges and outsurges resulting in relatively high fracture toughness of the material. A thermal sleeve installed in the surge nozzle provides a measure of protection from the affects of fluid temperature changes. Examinations are performed on the nozzle to safe-end weld, which is within 18 inches of the inner radius.

The nozzle to safe-end weld has been satisfactorily examined without limitation. The nozzle to safe-end weld is a stainless steel weld, not Alloy 82/182 material that is subject to primary water stress corrosion cracking.

The radiation exposure associated with this examination is considered a hardship. If performed, the examination would not significantly increase the level of quality and safety due to the low probability of the presence of a flaw in this area as discussed above.

5.0 PROPOSED ALTERNATIVE AND,BASIS FOR USE As an alternative to the applicable code examination requirements cited above, visual examination (VT-2) of the pressurizer surge nozzle area with the insulation installed will be completed in conjunction with the boric acid walk-down, performed every shutdown.

Also, this area is included and documented in the Mode 3 walk-down of the reactor coolant system boundary, performed during each startup following refueling outages, as required by Table IWB-2500-1, Examination Category B-P, Item No. B15.10. Both of these activities are performed by qualified VI-2 examiners. These examinations are augmented by the leakage detection methods noted above. If the insulation is removed

1-TYP-4-B3.120-1, Rev. 0 Page 6 of 6 for maintenance or other purposes, FENOC intends to perform the ultrasonic examination of the inner radius section.

6.0 DURATION OF PROPOSED ALTERNATIVE The proposed alternative is requested for use during the fourth 10-Year Inservice Inspection Interval at BVPS Unit No. 1.

7.0 PRECEDENT The BVPS Unit No. 1 surge nozzle inner radius section has not been examined.

Previous relief requests were granted based on the configuration of the nozzle, the lack of an adequate ultrasonic examination technique, and the dose associated with the examination. See the evaluation of relief request 1-TYP-3-B3.120-1 in Nuclear Regulatory Commission (NRC) safety evaluation dated December 29, 1998 and associated Technical Evaluation Report (NRC Agencywide Documents Access and Management System Accession Numbers 9901210340 and 9901210346).

1 OCFR 50.55a Request Number 2-TYP-3-C6.10-1, Revision 0 Page 1 of 2 Proposed Alternative in Accordance with 10 CFR 50.55a(a)(3)(ii)

--Hardship or Unusual Difficulty without a Compensating Increase in Level of Quality or Safety--

1.0 ASME CODE COMPONENTS AFFECTED Beaver Valley Power Station (BVPS) Unit No. 2 Recirculation Spray Pump (2RSS-P21A) Casing Welds listed below:

WELD NUMBERS 2RSS*P21A-C-9 2RSS*P21A-L-21 2RSS*P21A-C-10 2RSS*P21A-C-23 2RSS*P21A-C-17 2RSS*P21A-L-24 2RSS*P21A-C-18 2RSS*P21A-C-25 2.0 APPLICABLE CODE EDITION AND ADDENDA American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) Section Xl, 2001 Edition, 2003 Addendum 3.0 APPLICABLE CODE REQUIREMENTS Table IWC-2500-1, Examination Category C-G, Item Number C6.10 requires a surface examination of 100 percent of the pump casing welds.

ASME Code Case N-460, "Alternative Examination Coverage for Class 1 and Class 2 Welds," as an alternative approved for use by the Nuclear Regulatory Commission Staff, states that a reduction in examination coverage due to part geometry or interference by another component for any Class 1 and 2 weld is acceptable provided that the reduction is less than 10 percent (that is, greater than 90 percent examination coverage is obtained).

4.0 REASON FOR REQUEST In accordance with 10CFR50.55a(a)(3)(ii), an alternative is proposed on the basis that compliance with the code requirement would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. The hardship is associated with access to the pump casing welds to perform the required surface examinations as described below.

2-TYP-3-C6.10-1, Rev. 0 Page 2 of 2 The percentage of weld length that can be examined is specified in the middle column of the table presented below. Access to welds 9, 10, 17 and 18 requires removal of welded gusset plates; and disassembly of the pump and removal from the sump is required to examine the lower casing section welds 21, 23, 24 and 25. These examination evolutions risk damage to pump components, which have a proven reliability record throughout the industry.

WELD NUMBER EXAMINABLE INTERFERING PORTION CONDITION 2RSS*P21A-C-9 70%

Welded gusset plates 2RSS*P21A-C-10 70%

Welded gusset plates 2RSS*P21A-C-17 70%

Welded gusset plates 2RSS*P21A-C-18 70%

Welded gusset plates 2RSS*P21A-L-21 0%

Located in sump 2RSS*P21A-C-23 0%

Located in sump 2RSS*P21A-L-24 0%

Located in sump 2RSS*P21A-C-25 0%

Located in sump The noted conditions are applicable to all four recirculation spray pumps 5.0 PROPOSED ALTERNATIVE AND BASIS FOR USE As an alternative to the applicable code examination requirements cited above, surface examinations of the accessible portions of the pump 2RSS-P21A casing welds shall be performed to the maximum extent possible. If any of the recirculation spray pumps are disassembled for maintenance or other reasons, FENOC intends to perform the required examinations. The complete (essentially 100 percent) examination of the remaining 10 pump 2RSS-P21A casing welds, the periodic pump functional testing, and associated VT-2 examinations will provide an adequate measure of assurance of the integrity of the pump casing.

6.0 DURATION OF PROPOSED ALTERNATIVE The proposed alternative is requested for use during the third 10-Year Inservice Inspection Interval at BVPS Unit No. 2.

(Pagf 1 of 42)

RTL#:A5.800B Beaver Valley Power Station Unit 1/2 1/2-ADM-2039 BVPS ISI TEN-YEAR PLANS Document Owner Manager, Technical Services Engineering Revision Number 10 Level Of Use General Skill Reference Safety Related Procedure Yes Effective Date 04/14/09

(Page 2 of 42)

Procedure Number:

B ae ValyPower Station 1/2-AD.M-2039

Title:

UntLeeOfs:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference RevsionjJPae Nmber:

1 10 2 of 42 TABLE OF CONTENTS 1.0 PURPOSE......................................................................................................

3 2.0 SCOPE..........................................................................................................

3

3.0 REFERENCES

AND COMMITMENTS...................................................................

4 3.1 References...............................................................................................

4 3.2 Commitments............................................................................ -4 4.0 RECORDS AND FORMS....................................................................................

5 4.1 Records..................................................................................................

5 4.2 Forms.....................................................................................................

5 5.0 DEFINITIONS.................................................................................................

5 6.0 RESPONSIBILITIES.........................................................................................

5 7.0 PROCEDURE..................................................................................................

6 7.1 Basis.....................................................................................................

6 7.2 Code Cases..............................................................................................

7 7.3 Scheduling of Examinations...........................................................................

S8 7.4 Conduct of Examinations..............................................................................

9 7.5 Additional Exam inations.......................................................10 7.6 Risk-Informed Inservice, Inspection (RI-ISI).......................................................

10 7.7 NDE Personnel Qualifications.......................................................................

11 ATTACHMENT A RELIEF REQUESTS....................................................................

12 ATTACHMENT B EXAMINATION LEGEND............................................................

13 ATTACHMENT C BV1. EXAMINATION SCHEDULES.................................................

14 ATTACHMENT D BV2 EXAMINATION SCHEDULES.................................................

28 ATTACHMENT E PERIOD / INTERVAL DATES........................................................

42

(

(Page 3 of 42)

Procedure Number:

Beaver Valley Power Station 1o/2-ADM-2039

Title:

Unit:

Level Of Use:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number:

10 3of 42 1.0 PURPOSE 1.1 This program describes the Beaver Valley Power Station implementation of the Inservice Inspection (ISI) Program specified in the ASME Boiler and Pressure Vessel Code,Section XI as required by 10 CFR 50.55a(g).

2.0 SCOPE 2.1 This program applies to the inservice inspection of pressure vessels, piping systems, pumps, valves, and their supports, which are required by ASME Section XI, Subsections IWA, IWB, IWC, IWD, and IWF.

2.2 Pressure testing of components is administered per 1/2-ADM-2036.

2.3 The examination and testing of snubbers is administered by 1/2-ADM-2140, "Snubber Inservice Testing Program-General Requirements".

2.4 The inservice testing of pumps and valves (formerly ASME XI, Subsections IWP and IWV) is administered per 1/2-ADM-2111.

2.5 The inservice inspection of Steam Generator tubing is administered in accordance with Technical Specification T.S. 5.5.5 and 3.4.13.

2.6 Repairs, Replacements and Modifications (ASME XI 4000 series subsections) are administered in accordance with 1/2-ADM-0801.

2.7 ASME XI, Subsections IWE and IWL are administered in accordance with the Primary Containment Inservice Inspection Program Plan 2.8 The following long-term augmented examinations are beyond the scope of ASME XI requirements, but are included in the Ten Year Plans for ease of administration:

" High Energy Line Break Inspection Program based on the UFSAR; the Ten-Year Plans include the examinations specified in the UFSAR for postulated high-energy line break points. For BV2 only, the HELB inspection program has been incorporated into the RI-ISI program. The change to the HELB program has been made using the 10CFR50.59 change process based on WCAP 14572, Revision I-NP-A, and the NRC Safety Evaluation Report, dated 3/1/04.

" Reactor Coolant Pump Flywheel Examinations; these examinations are based on the NRC letter from B.W. Sheron to S.C. Jain, dated September 12, 1996.

(Page 4 of 42)

Beaver Valley Power Station ocdureN rAM 2 03 9

Title:

Unit:

Level Of Use:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number:

10 4 of 42 Alloy 600 Program, visual volumetric and surface examinations of the reactor vessel head based upon 10CFR50.55a(g)(6)(ii)(D) and ADME Code Case N-729-1. These examinations are included in the ISI 10-year plans as required by 10CFR50.55a(g)(6)(ii)(D)(1). Also, visual examinations of reactor coolant pressure boundary Alloy 600/82/182 components based upon 10CFR50.55a(g)(6)(ii)(E) and ASME Code Case N-722. These examinations are included in the ISI 10-year plans as required by 10CFR50.55a(g)(6)(ii)(E)(1).

3.0 REFERENCES

AND COMMITMENTS 3.1 References 3.1.1 1/2-ADM-2047, "Instruction for Preparation and Revision of Nondestructive Examination and Testing Procedures" 3.1.2 NOP-CC-5709, "Review and Approval of Contracted Nondestructive Examination Activities" 3.1.3 Regulatory Guide 1.26, "Quality Group Classifications and Standards for Water-, Steam-,

and Radioactive-Waste-Containing Components of Nuclear Power Plants" 3.1.4 NOP-CC-5002, "Control of Special Processes" 3.1.5 NOP-SS-3001, "Procedure Review and Approval" 3.1.6 NOP-LP-2001, "Condition Report Process" 3.1.7 1/2-ADM-2202, "Report Requirements" 3.1.8 1/2-ADM-2053, "EDG Maintenance Program" 3.1.9 1/2-ADM-0201, "BVPS Document Control Program" 3.2 Conunitments 3.2.1 10CFR50.55a 3.2.2 ASME Boiler and Pressure Vessel Code,Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components" 2001 Edition, 2003 Addenda 3.2.3 WCAP 14572, Revision 1-NP-A, Supplement 2, Westinghouse Owners Group Application of Risk-Informed Methods to Piping Inservice Inspection Topical Report.

(Page 5 of 42)

Procedure Number:

T 1/2-ADM-2039 Beaver Valley Power Station 12AM23

Title:

Unit:

Level Of Use:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number:

10 5 of 42 4.0 RECORDS AND FORMS 4.1 Records 4.1.1 All examinations, tests, and surveillances resulting from implementation of the Ten-Year Plans will be documented and reported in accordance with the applicable NDE implementing procedures.

4.1.2 After the completion of each scheduled refueling outage, the Program Owner will prepare a Ninety-Day Summary Report as specified in ASME Section XI, IWA-6230(c). This report will summarize the examinations, tests, repairs and replacements since the preceding report using the ASME XI NIS-1 Form.

4.2 Forms 4.2.1 None 5.0 DEFINITIONS 5.1 ISI - inservice inspection 5.2 Inspection Interval - ten years (120 months) 5.3 Inspection Period - one third of the inspection interval (40 months) 5.4 ISI Ninety-Day Summary Report - report submitted to the Nuclear Regulatory Commission (NRC) within 90 days of the last inspection of the refueling outage. This report identifies the examinations, tests, repairs and replacements performed since the preceding report.

5.5 NDE -nondestructive examination, including visual examinations 5.6 Program Owner - An individual assigned, by the Supervisor, Nuclear Programs, the programmatic responsibilities of implementing the ASME XI requirements relevant to the scope identified in Section 2.1 above.

5.7 RI-ISI - Risk-Informed Inservice Inspection 5.8 Ten-Year Plan - The ISI examination program, consisting of a program description and examination schedules for one inspection interval, also referred to as 1TYP-4 (BV1) and 2TYP-3 (BV2).

6.0 RESPONSIBILITIES 6.1 The Manager of Technical Services Engineering is responsible for the administration of the Inservice Inspection Ten-Year Plans at the Beaver Valley Power Station.

6.2 The ISI Program Owner is responsible for implementation of the Programs, which includes development of the examination scope and evaluation of the examination data.

(Page 6 of 42)

Procedure Number:

Beaver Valley Power Station f1/2-ADM-2039

Title:

Unit:

Level Of Use:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number:

10 6 of 42 7.0 PROCEDURE 7.1 Basis 7.1.1 The Ten-Year Plans are examination programs prepared in accordance with the requirements specified in the applicable ASME XI Code. The bases of the Ten-Year Plans are the ISI isometric drawings. In the absence of ISI isometric drawings, other site drawings, including construction, fabrication, vendor equipment drawings, etc. are utilized as needed to ensure the accuracy and completeness of the Ten-Year Plans. For ease of reference, the plans are designated 1TYP-4 and 2TYP-3.

7.1.2 In accordance with the requirements of 10CFR50.55a(g), the applicable Code for BV-I and BV-2 is the 2001 Edition, 2003 Addenda of Section XI of the ASME Boiler and Pressure Vessel Code.

7.1.3 ASME Code Class 1, 2, and 3 components will be examined during their service lives in accordance with the applicable edition and addenda of Section XI of the ASME Boiler and Pressure Vessel Code referenced in 10CRF50.55a, 12 months prior to the start of the 120 month interval.

7.1.4 Exceptions and/or alternatives to the Code rules will be in accordance with the requirements of 10CFR50.55a(3) or 1OCRF50.55a(g)(5)(iii).

7.1.5 The starting date of the fourth inspection interval for BV-1 is April 1, 2008. The ending date is March 31, 2018. The starting date of the third inspection interval for BV-2 is August 29, 2008. The ending date is August 28, 2018. Attachment E shows where each refueling outage is located within the 40-month Periods for the current BV1 and BV2 10-year intervals.

7.1.6 The Diesel Generator System, even though classified as Class 3 has been excluded from the Ten Year Plan for the following reasons: Technical Specification T.S. 3.8.1, 3.8.2, 3.8.3, and 1/2-ADM-2053 requires extensive testing of the diesel systems (see the 1/2.36 series of Operations Surveillance Tests). ASME examinations would be redundant to (but less frequent than) the tests already being performed. Regulatory Guide 1.26 is applicable only to water, steam, and radioactive-waste-containing systems. ASME Inquiry BC/77/666 states that systems containing other than water or steam were not originally considered by the committee when formulating the rules of Section XI.

7.1.7 Whenever possible, ultrasonic (UT) calibration blocks used during the previous examination(s) will be used for the current interval examination. It is recognized that emergent performance-based ultrasonic techniques mandated by the implementation of ASME Section XI, Appendix VIII may require calibration on newly-developed UT calibration standard designs. Ultrasonic sensitivity for calibration for the UT examination of piping welds and weld deposited structural weld overlays may be performed using the specialized and/or alternative calibration blocks as required or permitted by Performance Demonstration Initiative (PDI) UT examination procedures. In all cases, the FENOC UT Level III will specify and/or approve the applicable calibration standard(s) for UT examinations.

(Page 7 of 42)

Procedure Number:

Beaver Valley Power Station 1/2-ADM-2039

Title:

Unit:

Level Of Use:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number:

1 10 7 of 42 7.2 Code Cases 7.2.1 The following Code Cases will be used during implementation of the Ten-Year Plans:

Alternative Rules for 10-Year System Hydrostatic Testing for Class 1, 2, and 3 Systems, (Regulatory Condition - Prior to conducting the VT-2 examination of Class 2 and Class 3 components not required to operate during normal plant operation, a 10 minute holding time is required after attaining test pressure. Prior to conducting the VT-2 examination of Class 2 and Class 3 components required to operate during normal plant operation, no holding time is required, provided the system has been in operation for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for insulated components or 10 minutes for non-insulated components.)

N-504-3 (Conditionally Acceptable - Regulatory Guide 1.147 - Rev. 15) Alternative Rules for Repair of Class 1, 2, and 3 Austenitic Stainless Steel Piping (Regulatory Condition - The provisions of Section XI, Nonmandatory Appendix Q, "Weld Overlay Repair of Class 1, 2, and 3 Austenitic Stainless Steel Piping Weldments," must also be met.)

  • N-513-2, (Acceptable Case - Regulatory Guide 1.147 - Rev. 15) Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping
  • N-526 (95-S6) (Acceptable Case - Regulatory Guide 1.147 - Rev. 15) Alternative Requirements for Successive Inspections of Class 1 and 2 Vessels.
  • N-566-2, (98-S 12) (Acceptable Case - Regulatory Guide 1.147 - Rev. 15) Corrective Action for Leakage Identified at Bolted Connections
  • N-586-1 (04-S 1) (Acceptable Case - Regulatory Guide 1.147 - Rev. 15) Alternative Additional Examination Requirements for Class 1, 2, and 3 Piping, Components, and Supports
  • N-648-1, (01-S3) (Conditionally Accepted - Regulatory Guide 1.147 - Rev. 15 Alternative Requirements for Inner Radius Examination of Class 1 Reactor Vessel Nozzles (Regulatory Condition - In place of a UT examination, licensees may perform a visual examination with enhanced magnification that has a resolution sensitivity to detect a 1-mil width wire or crack, utilizing the allowable flaw length criteria of Table IWB-3512-1 with limiting assumptions on the flaw aspect ratio. The provisions of Table IWB-2500-1, Examination Category B-D, continue to apply except that, in place of examination volumes, the surfaces to be examined are the external surfaces shown in the figures applicable to this table.)

(Page 8 of 42)

Beaver Valley Power Station.

1/2-ADM-2039

Title:

Unit:

Level OfUse:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number:

1 10 8 of 42 N-649 (98-S 12) (Acceptable Case - Regulatory Guide 1.147 - Rev. 15) Alternative Requirements for IWE-5240 Visual Examination

  • N-652-1, (Acceptable Code Case - Regulatory Guide 1.47 - Rev. 15) Alternative Requirements to Categorize B-G-1, B-G-2 and C-D Bolting Examination Methods and Selection Criteria N-665 (01-SS) (Acceptable Case - Regulatory Guide 1.147 - Rev. 15) Alternative Requirements for Beam Angle Measurements Using Refracted Longitudinal Wave Search Units N-685 (01-S9) (Acceptable Case - Regulatory Guide 1.147 - Rev. 15) Lighting Requirements for Surface Examination
  • N-686 (01-S8) (Acceptable Case - Regulatory Guide 1.147 - Rev. 15) Alternative Requirements for Visual Examinations, VT-1, VT-2, and VT-3
  • N-700 (01-Si 1) (Acceptable Case - Regulatory Guide 1.147 - Rev. 15) Alternative Rules for Selection of Class 1, 2, and 3 Vessel Integrally Welded Attachlnents for Examination
  • N-706 (04-S7) (Acceptable Code Case - Regulatory Guide 1.47 - Rev. 15) Alternative Examination Requirements of Table IWB-2500-1 and Table IWC-2500-1 for PWR Stainless Steel Residual and Regenerative Heat Exchangers 7.3 Scheduling of Examinations 7.3.1 The inservice examinations scheduled over the ten-year interval are listed in the 1TYP-4 and 2TYP-3 Examination Schedules (Attachments C and D). A complete listing of all components within the scope of ASME XI is available in a computer database and on hard copy listings. Only those components scheduled for examination are included in the Examination Schedules. Attachment B contains the status symbols used in the Examination Schedules.

7.3.2 The Examination Schedules reflect the examination requirements of the 2001 Edition, 2003 Addenda of ASME XI, the alternative rules provided in the Code Cases referenced in Section 7.2, and the relief requests listed in Attachment A of this document.

7.3.3 Exams will be scheduled in accordance with the required completion percentages of Inspection Program B, noted in Tables IWB-2412-1, IWC-2412-1, IWD-2412-1, and IWF-2410-2. If less than three components are required for examination in a category, the components will be examined in any two periods, or in any one period if there is only one component, in lieu of the percentage requirements of these Tables.

7.3.4 The Code requires examination of certain components only upon disassembly, e.g., B61.90, B7.70, B12.50, etc. These components are not'included in the examination schedules.

However, the Program owner will review all ASME XI Repair/Replacement Plan forms (1/12-ADM-0801.F01) to determine if disassembly of any of these components is planned.

The required examinations will be scheduled as appropriate at that time.

(Page 9 of:

42)

BPProcedure Number:

Beaver Valley Power Station 1/2-ADM-2039

Title:

Unit:

Level Of Use:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number:

1 10 9 of 42 7.4 Conduct of Examinations 7.4.1 Outage Preparation 7.4.1.1 Prior to each planned unit outage, the Program Owner will determine from the Ten-Year Plan the examinations to be performed during the outage.

7.4.1.2 The Program Owner will inform Outage Scheduling through the notification process of the planned examinations so that affected station groups may determine manpower and equipment requirements to support the scheduled examinations.

7.4.1.3 The Program Owner will inform the NDE Level III of the examination scope.

7.4.1.4 The Program Owner will inform the site Authorized Nuclear Inservice Inspector (ANII) of the examination scope prior to the commencement of examinations.

7.4.1.5 All or part of the ISI examinations may be contracted to supplemental personnel. The NDE Level III will review supplemental personnel NDE qualifications as required by NOP-CC-5002, "Control of Special Processes" and NOP-CC-5709, "Review and Approval of Contracted Nondestructive Examination Activities". Any vendor NDE procedures shall be reviewed and approved in accordance with NOP-SS-3001, "Procedure Review and Approval". Additionally, the NDE Level III will arrange for the required support, monitor and assign examination assignments and review the results of NDE examinations.

7.4.2 Procedures 7.4.2.1 Qualified NDE personnel will perform examinations using approved procedures prepared in accordance with 1/2-ADM-2047 and approved in accordance with NOP-SS-3001.

7.4.3 Deficiency Resolution 7.4.3.1 ISI examinations that discover conditions exceeding the Code or engineering established acceptance criteria and programmatic deficiencies discovered while administering the Ten-Year Plans will be reported in accordance with NOP-LP-200 1.

The ISI Program Owner is responsible for resolution of deficiencies.

7.4.4 Ten-Year Plan Update 7.4.4.1 At the conclusion of the outage, the Program Owner will update the ISI Database to record the examinations performed since the last update.

7.4.4.2 At the end of each 40-month Period, the Ten-Year Plan will be reviewed to ensure the percentage requirements of Tables IWB-2412-1, IWC-2412-1, IWD-2412-1, and IWF-2410-2 have been satisfied. This review will be documented and filed by the Program Owner.

(Page 10 of 42)

Procedure Number:

Beaver Valley Power Station 1/2-ADM-2039

Title:

Unit:

Level OfUse:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number:

'10 10 of 42 7.4.4.3 During the final 40-month Period of the ten-year interval, a review will be performed to ensure all required examinations have been or will be performed during the current ten-year interval or the necessary relief has been identified to the NRC. This review will be documented and filed by the Program Owner.

7.4.4.4 The Ten-Year Plan will be revised in successive 120-month inspection intervals to comply with the requirements of the edition and addenda of ASME XI incorporated by reference in 1OCRF50.55a.

7.5 Additional Examinations 7.5.1 Additional examinations shall be performed in accordance with N-586-1, Alternative Additional Examination Requirements for Class 1, 2, and 3 Piping, Components, and Supports,Section XI. This Case provides alternatives to IWB-2430(a), IWC-2430(a),

IWD-2430(a), and IWF-2430(a) for additional examinations. The Case requires a root cause evaluation and additional examinations of items subject to the same root cause conditions and degradation mechanisms, rather than a sampling approach. This revision requires the additional examinations to be performed on all welds, areas, or supports that are subject to the same root cause and degradation mechanism during the current outage.

7.5.2 If it is deternined that there are no other welds or areas subject to the same root cause or no degradation mechanism exits, no additional examinations are required.

7.5.3 Whenever component support member defonnation is identified, examination of the support's welded attachments is required.

7.6 Risk-Informed Inservice Inspection (RI-ISI)

NOTE:

The initial RI-ISI program was first implemented at BVl during the 2nd Period of the 3 rd ten-year Interval and at BV2, during the 2ind Period of the 2,d ten-year Interval. The program requires an update at the beginning of each ten-year Interval.

Implementation of the RI-ISI program is pending NRC approval for the new ten-year Intervals at BV1 and BV2.

7.6.1 Inservice Inspection of BV1 and BV2 Class 1 and 2 piping welds will be performed in accordance with the RI-ISI methodology of WCAP 14572, Rev. 1-NP-A, Supplement 2.

The RI-ISI program was developed and will be maintained in accordance with this WCAP and the associated guidance documents. The RI-ISI program supersedes the ASME XI exam selection requirements of Examination Categories B-F, B-J, C-F-1 and C-F-2. The applicable aspects of the ASME XI Code not affected by the RI-ISI program will be retained.

7.6.2 Class 1 and Class 2 systems will continue to receive system pressure testing and NDE-VT-2 examination.

(Page 11 of 42)

Procedure Number:

Beaver Valley Power Station 1/2-ADM-2039

Title:

Unit:

Level OfUse:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number:

10 11 of 42 7.6.3 The RMSI program is a living program. Relevant indications from examinations at BVPS and throughout the industry will be evaluated to ensure the appropriate piping locations are distinguished as a High Safety Significant. The risk ranking of piping segments will be reviewed and adjusted every ISI Period in accordance with industry guidance developed by the Nuclear Energy Institute (NEI) RI-ISI Living Program. Significant changes (Regulatory actions, industry experience, etc.) may require more frequent adjustments.

Resubmittal of the RI-ISI program to the regulatory authority will be in accordance with the NEI RI-ISI Living Program.

7.6.4 Per Table 4.1-4 of the WCAP, the length for the UT examination volume shall be increased to include 1/2 inch beyond each side of the base metal thickness transition or counterbore.

7.7 NDE Persomnel Qualifications 7.7.1 All NDE personnel qualifications (BV Site, Resource Sharing and Supplemental Personmel) shall be reviewed by a NDE Level III qualified in the appropriate NDE method as required by NOP-CC-5002 and NOP-CC-5709. The results of this review will be transmitted to the ANII and maintained for review by oversight or regulatory organizations.

(Page 12

'of, 42)

Beaver Valley Power Station Procedure Number:

1/2-ADM-2039

Title:

Unit:

Level OfUse:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number.

10 12 of 42 ATTACHMENT A Page 1 of 1 RELIEF REQUESTS REOUEST NO.

TITLE 1-TYP-3-B3.120-1 Pressurizer Nozzle-to-Vessel Welds REQUEST NO.

TITLE REVISION 0

REVISION 0

0 2-TYP-3-C6.10-1 Recirculating Spray Pump / Safety Injection Pump Casing Welds RI-ISI Risk Informed Inservice Inspection Methodology for BV 1 and BV2 Class 1 and 2 Piping and BV2 BEZ

(Page 13 of 42)

Procedure Number:

Beaver Valley Power Station 1/2-ADM-2039

Title:

Unit:

Level Of Use:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number.

10 13 of 42 ATTACHMENT B Page 1 of 1 EXAMINATION LEGEND EXAMINATION LEGEND Scheduled "X"

To schedule a component, place the identifier "X" in the required period/outage.

Completed "C"

Upon exam completion for a scheduled component, an "X" will be updated to completed "C" Augmnented /

"A" To increase a work scope without taking code credit in the Expanded percentage calculations, enter an "A" "E"

Upon completion of an augmented / expanded scope, replace the "A" with an "E".

Partial "P'

To track partially completed component examination requirements enter a partial "P" Limited "L"

To track limited component examinations or limited completions of requirements enter "L" Baseline "b"

Scheduled baseline examination "B"

Completed baseline examination

(Page 14 of 42)

Procedure Number:

Beaver Valley Power Station 1/2-ADM-2039

Title:

Unit:

Level Of Use:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number-10 14 of 42 ATTACHMENT C Page 1 of 14 BV1 EXAMINATION SCHEDULES ATTACHMENT C BV1 EXAMINATION SCHEDULE SUM_NO 001800 003400 004600 007400 008400

.008900 010000 010400 012400 012900 017400 018400 018900 019000 019900 020100 023800 023900

'025900 H28600 031900 033300 036700 038000 040000 042300 044800 045200 046500 051300 051500 052600 053400 053500 054100 055500 055600 059000 060400 062600 065100 066100 068100 070900 072400 072800 073500 075700 075800 075900

.076700 076800 077900 078600 085200 085400 085800 085900 086400 087700 089000 089100 COMPID CH-1-0-PS-17 CH-98-R-PS-10 CHP98-R-PS-3 C1--140-PS-20 CH-140-A-PS-24 CH-1i40-PS-27 CH-142-P&-18 CH.142-PS-16 CH-142-PS-10 CH-142-PS-7 CH-96-2-PS-i CH-96-R-PS-4 CH-96-R-PS-7 CH-96-R-PS-8 CH-96-R-PS-12 CH-96-R-PS-t4 CH-:140-6-A-01.

CH-140-PS&2 CH-1404-PS-5 CH-141-PS-4 CH-96-6-PS-1 CH-96-9-F-13 CH-97W-7-S-07 CH-98-PS-1 CH-98-9-S-06 H-I126-R-2123 CH-23-PS-5 CH-231,PS-4 CH-23-PS-8 DG-50-R-PS-27 DGO-50-R-PS26 DG-50-PS-20 DG-50-5D-A-D2 DG-50ýA-PS1 8.

DGý50-RýPS-14 OGw50;VS-PS-9 DG59.R-PS-8 DG-56-PS-1 DG-56-PS-3 DG-52-PS-3 DG-47-PS-4 DG-47-PS-2 PS-244-VS-1 RC-71-LST-14 RC-7.1-LST'i0 RC-71-R-24 RC-71-LST-7 RC-71:SH-53 RC-71-6-A-01 RC-71-R-19 RC-71 -A-17 RC-71.R-17A RC-7.1-8-S-02 RC-71-9.-S-06 RC-72-4E-S-03 RC-72-4E-S-06 RC-72-5-A-01 RC-72-SH-8 RC-72-R-9 RC-72-R-.10 RC-72-7-F-09 RC-72-7-E-01 COMPDESC SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT

.SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT W/ATT SUPPORT PS-2 SUPPORT SUPPORT SUPPORT SUPPORT SOCKET WELD SOCKET WELD SUPPORT SOCKET WELD SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT W/ATT SUPPORT A-PS-18 SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SNUBBER SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT W/ATT SUPPORT R-19 SUPPORT SUPPORT SUPPORT BUTT WELD BRANCH CONN. WELD BUTT WELD BRANCH CONN WELD WIATT SUPPORT SH-8 SUPPORT SUPPORT SUPPORT BUTT WELD NOZZLE TO SAFE: END ITEM_ND METHOD FOIQ10A VT.3 FO1.1OR VT-3 FO1.IOR VT-3 FOI1OR VT-3 F01.10A VT-3 FOI.1OR VT-3 FOlDlQR VT-3 FOl.1OR VT-3 FI01.1OR VT-3 FO1.IOR VT-3 FO1IiA VT-3 FO1lOR VT-3 FO.IOR VT-3 FO11OR Vr'[3 FO1OR VT-3 FO1.10R VT-3 510.020 PT FOiQ.A VT-3 FO1:OR VT-3 FO*iOV VT-3 F01,10R VT-3 R1.12 VT-2 131.12.

VT-2 FOI1OA VT-3 R1,12 VT-2 FO1,1OR VT-3 FOi10S VT-3 FO1OR V-m3 FO*.1R VT-3 FO1.1OR VrT3 FO1OR VTm3 F01.IOR VT-3 B10.020 PT F01.1OA V.T3 FO1.1OR VT-3 F01,10V VT-S F0I1.JOR V.T3 FO1.1OS V-.3 FOl.OR VT-3 F01,OR i

VT,3 FO1..1OR VT-3 F01.OR VT.3 FO.ON VT-3 F01.OL V*T3 F0ol.0L VT-3 FO1.IOR VT-3 F01. IOL VT-3 F01. 108 vTr B10:020 PT FO.1OR VT-3 FO1,1OA VT-3 FOI'OR VTr3 R1.1.1 UT' Ri.12 VT'2 R11I UT R1.12 VT.2 810.020 PT FOli.OS VT-3 FO.1R VT.3 FO1.1OR VrT-3 RTi. 11 UT. PT R1.11.

UT ISO-NO 01 90A 0190A 0190A 0191A 0191A 0191A 0191A 0191A 0191A 0191A 0196A 0196A 0196A 0196A 0 196A 0196A 0243A 0243A 0243A 0244A 0246A 0246A 0247A 0248A 0248A 0253A 0254A 0254A 0254A 0'197A 0197A 0197A 0197A 0197A 0197A 0197A 0197A 0357A 0357A 0358A 0359A 0359A 0244A 0348Ao 0348A 0,348A 0348A.

0343A 0348A 0348A 0348B 0348B 0348B 0348B 0348D.

0343D 0348D.

0348D:

0348D, 0348D' 0348D 0348D 1st 2nd 3rd.

X_

X_

x-.

11-o-

X-X_

X-X-

X_

X-X-

X-X-

X-X-

XX xx xx xx* xx

/xx xX X-X-

÷- X-X-

it-X-

-x A-X-

i-XXX X-X-

-X xx xx xx xx X_

X" i-

-A

-X xx Xi-xx X_,

X-.

X_

X-X-.

X-X-

X-X_

X-X-

X-xx xx

(Page 15

'of 42)

Beaver Valley Power Station Procedure N erADM 2 3 9

Title:

Unit:

Level Of use:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number:

10 15 of 42 ATTACHMENT C Page 2 of 14 BV1 EXAMINATION SCHEDULES ATTACHMENT C SUMNO COMPID 089200 RC-104-1-E-01 089300 RC-104-1-F-01 091300 RC-107-SH-45 051400 RC-107-R-45A 094200 RC-104-2-PSSP-122A 094300 RC-104-2-PSSP-122B 095100 RC-97-1-E-01 095200 RC-97-1Fý01, 095300 RC-97-H-36 096500

.RC-98-1-E-02 096600 RC-98-1 -F-0.1 097000 RC-98-SH-51

097700 RC-98-H-38 097900 RG-99-1-E-03 098000 RC-99-1-F-01 099100 RC-99-H-40 099130 RC-99-1-A-12 138500 RC-53-VS,353-1

.141800 RC-75-PS-3 1.44000 RC-19<SH-3 144900 DLW-LOOP2,8-HSS-:103.

145000 DLW-LOOP2;8-HSS-104 146900 RC-39-SH-5

ý 148600 DLW-PRESS-2.E-01 151050 IRV-SMI-PENE-OD 151060 IRV-BMI-TUBE-WELDS 15i1o00 RC-R-1-0-1 151200 PC-R-1.-C-2 15i3o0 RC-R-:1-C-5 1.51400 RC-R-I.-C-8 1151500 RCwR-1 -C,9 151600 RC-R-1-CRDM-WS-E 151700 RC-R-.1-CRDM-WS-A 151800.

RC-R-1-CRDM-WS-B 151900 R.C-R-1-CRDM-WS-F 152000 RC-R-1-CRDM-WS-C.

1.52 100 RC-R-1-CRDM-WS-D 1.52200 RC-R-1 -CRDM-SUPP-1 15221.0 RC-R-1I-CRDM-S.UPP-2 152220 RC-R-1-CRDM-SUPP-3 152300 RC-R-1-CAVLIN-A 152400 RC-R-.1-CAVLIN-E 152500 RC-R-1-CAVLIN-C 152600 RC-R-1-CAVLIN-F 152700 RC-R-1-CAVLIN-B 152800 RC-R-1-CAVLIN-D 152900 RC-ES-1 153000 RCR-+!-S1 153100 RC-R-1-S2 1532100 RC-R-1-S3 153300 RC-R-I -S4 153400 RC-R-1-S5 153500 RC-R-1 -SO 153600 RC-,R-1-N-17 153700 RC-R-1-N-171R 153800 RC-R-1 -N-18 153900 RC-R-1-N-181R 154000 RC-R-1-N-19 154100 RC-R-1-N-191R 15420O0 RC-R-1-N-20 154300 RC-R-1-N-20IR 154400 RC-R-1-N-21 BV1 EXAMINATION SCHEDULE COMPDESC NOZZLE TO SAFE END BUTTWELD SUPPORT SUPPORT SNUBBER SNUBBER NOZZLE TO SAFE END BUTT WELD VALVE SUPPORT NOZZLE TO SAFE END BUTT WELD SUPPORT VALVE SUPPORT NOZZLE TO SAFE END BUTT WELD VALVE SUPPORT Wi ATr SUPPORT H-40 SNUBBER SUPPORT SUPPORT SNUBBER SNUBBER SUPPORT NOZZLE TO SAFE.END RV LOWER HEAD SMI:NOZZLES BMI TUBEWELDS SHELL TO FLANGE CIRC WELD CIRCUMFERENTIAL WELD CIRCUMFERENTIAL WELD CIRCUMFERENTIAL WELD LOWER HEAD CIRC WELD CRDM SEISMIC SUPPORT "E" CRDM SEISMIC SUPPORT "A" CRDM SEISMIC SUPPORT "B" CRDM SEISMIC SUPPORT "F" CRDM SEISMIC SUPPORT "C" CRDM.SEISMIC SUPPORT "D" CRDM SHROUD HOUSING SUPPORT CRDM SHROUD HOUSING SUPPORT CRDM SHROUD HOUSING SUPPORT PLATE TO CAVITY LINER LUG "A" PLATE TO CAVITY LINER LUG "E" PLATE TO CAVITY LINER LUG "C" PLATE TO CAVITY LINER LUG "F" PLATE TO CAVITY LINER LUG B" PLATE TOCAVITY LINER LUG "D" NEUTRON SHIELD TANKISKIRT LOOP 1.INLETNOZZLE SADDLE LOOP 1 OUTLET NOZZLE SADDLE LOOP 2 INLET NOZZLE: SADDLE LOOP 2 OUTLET NOZZLE SADDLE LOOP 3 INLET NOZZLE: SADDLE LOOP 3 OUTLET NOZZLE SADDLE INLET NOZZLE WELD NOZZLE INSIDE RADIUS OUTLET NOZZLE WELD:

NOZZLE INSIDE RADIUS INLET NOZZLE WELD NOZZLE INSIDE RADIUS OUTLET NOZZLE WELD NOZZLE INSIDE RADIUS INLET NOZZLE WELD ITEMNO METHOD R1,11

UT R1.11 UT, PT F01.10S VT-3 FOl.10R VT-3 F01,10N VT-3 F1O.f0N VT-3 R1.1 UT R111 UT, PT F01.40X VT-3 RI. 11 UT R1.1I UT. PT F01.10S VT-3 FO1.40X VT-3 R1 11 UT RPI.l ULT. PT FO1,40X VT-3 B1O.040 PT FO1.1ON VT-3 FOI:OR VT-3 F01.10S VT-3 F01:ION VT.3 FO1.1:ON VTw3 F01,10S V/T-3 R1.11 UT B 15:080 VE 815.100 VE B.01.*030 UT 801:01 1 UT Bi0,011 UT B01.011 UT 801.021 UT FO1 40E V'T3 F01,40E VT-3 FO1,40E VT-3 F01.40E VT-3 F01A40E VTý3 Fi0..OE VT-3 F01,40E VT-3 FP1,40E VT-3 F01.40E VT-3 F01.40E VT-3 FOI.40E VT-3 F01.40E VT-3 FO1,40E VT-3 F01.40E VT-3 F01.40E VT-3 F01.40E VT-3 FOi.40E VT-3 F01:40E VT-3 FO1.40E VT-3 F01,40E V-1`43 FOi.40E VT-3 FO1.40E VT-3 803:090 UT B03.100 UT B03;090 UT B03 100 UT 803.090 UT B03.100 UT 5035090 UT 803.100 UT 303;090 UT ISONO 0350A 0350A 0350A 0350A 0350A 0350A 03508 03508 0350B 0350B 0350B 0350B 03508 03508 0350B 0350B 03508 0358A 0379A 0999A

.0999B 09998 0999C 09990 E-001D E-001)

E-0O0A E-001A E-00.IA E-0O0A E-001A E-00.1 A E-OO1A E-00rA E-001A E-001A E-001IA E-O01A E-01,A E-001A E-001A E-00 IA E-O01A E-O01A E-001 A E-O01A E-O0lA E-001A E-00IA E-001A E001A E-001oA E-COlA.

E-001B E-0018 E-001B E-0018 E-OO1B E-00 1B E-O0O18 E-001B E-0OIB 1st 2nd 3rd 4

-A

-LX

-A

-A-b-

-A X.-

X-

-- X-X_-

A-A-

A-X-

X-X_

-* X-

-- X-X-

X-X-

(Page 16 of 42)

Procedure Number:

Beaver Valley Power Station 1/2-ADM-2039

Title:

Unit:

Level (fUse:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number:

1 10 16 of 42 ATTACHMENT C Page 3 of 14 BV1 EXAMINATION SCHEDULES ATTACHMENT C SUMNO COMPJID 154500 RC-R-1-N-21IR 1:54600 RC-R-1-N-22 154700.

RC-R-1N'22JR 154800 RC-R-1-LIG-0I TO 19 156700.

RC-R1 -LIG-20 TO 38 158600 RC.-R-11LIG-39 TO 58

160600, RC-R-tL-3 160700 RC-R-t-L-4 160800 RC-R-1-L-6 160900:

RC-R-I-L-7 161000 RC-R-1-L-10 1,61100:

RC-R-i-L-11 161200 RC-R-1-L-12 161300 RC-R-1-L-13 161400 RC-R-t-L-14 161500 RC-R-1-L-15 1616.0 RC0-R-1C-1 161700.

RC.-R-1-LOWER-INT 161800 RC-R-I -INT-ATT 162000 RC-R--ACC-INT 162100 RC-R-1-UPPER-INT 163202 RC-R41 CRD-43.

163203 RC-R-1-CRD-49 163204 RC-R-1-CRD-61 163640 RC-R-1-STUD41 TO 19 163650 RC-R-1-STUD-20 TO 38 163660 RC-R-1-STUD-39 TO 58 169440 RC-R-1NUT-1 TO 19 169450 RC-R-1-NUT-20 TO 38 169450 RC-R-1 -NUT-39 TO 58 175240 RC-R-1. -WASHER-I TO 19 175250 RC-R-I-WASHER-20 TO 38 175260 RC-R-1-WASHER-39 TO 58 180950 IRV-HEAD-OD 180960 1,RV-HEAD-PENE-.ID 181000 RC-E-1A-AH-3TO 16 182600 RC-E-1A-RADI.US(1H) 182640 RC-E-1A-N-11 182660 RC-E'IA-N-12 182700 RC.E-1A-RADIUS(1C) 182800 RC-E&1A-AC,1 TO 16 184400 RC-E,1A-SUPP 186100 RC-E-1B-RADIUS(2H) 186140 RC-E.1IB-N-11 186200 RC-E-18-RADIUS(2C) 169600 RC-E-1C-RADIUS(3H) 189540 RC-E-IC-N-11 189660 RC-E-1C-N-12 189700 RC.E-.I0C-RADIUS(3C) 191500 RC-E-IA-C-1 191800 IRC-TK.i.L-1 192000 RC-TK.1-L-3 192100 RC-TK-1-C-4 192400 RC-TK-1-C-7 192500 RC-TK-1-C-8 192600 RC-TK-1-RADIUS-1 192700 RC-TK-1 -RADIUS-2 192800 RC-TK-1-RADIUS-3 192900 RC-TK-1-RADIUS-4 193000 RC-TK-1 -RADIUS-5 193100 RC-TK-1-RADIUS-6 194900 RC-TK-1-SS-1 BVi EXAMINATION SCHEDULE COMPDESC NOZZLE INSIDE RADIUS OUTLET NOZZLE WELD NOZZLE INSIDE RADIUS THREADS IN FLG.

THREADS IN FLGO THREADS IN FLG.

LONGITUDINAL WELD LONGITUDINAL WELD LONGITUDINAL WELD LONGITUDINAL WELD LOWER HEAD MERIDIONAL WELD LOWER HEAD MERIDIONAL WELD LOWER HEAD MERIDIONAL WELD LOWER HEAD MERIDIONAL WELD LOWER HEAD MERIDIONAL WELD LOWER HEAD MERIDIONAL WELD LH CIRCUMFERENTIAL WELD CORE SUPPORT STRUCTURE INT ATT, BEYOND BELTLINE REGION INTERIOR CORE SUPPORT STRUCTURE CRD0 HOUSING WELD CRD HOUSING WELD CRD. HOUSING WELD BOLTING BOLTING BOLTING BOLTING BOLTING BOLTING BOLTING BOLTING BOLTING VESSEL HEAD OD.SUREACE RV HEAD PENETRATIONS BOLTING NOZZLE INSIDE RADIUS NOZZLE TOSAFE END (HOT LEG)

NOZZLE T.O:SAFE END (COLD LEG)

NOZZLE INSIDE RADIUS BOLTING LOWER SUPPORT STRUCTURE NOZZLE INSIDE RADIUS NOZZLE TO SAFE END.(HOT LEG)

NOZZLE INSIDE RADIUS NOZZLE INSIDE RADIUS NOZZLE TO.SAFE END (HOT LEG)

NOZZLE TOSAFE END (COLD.LEG)

NOZZLE INSIDE RADIUS CIRCUMFERENTIAL WELD LONGITUDINAL WELD LONGITUDINAL WELD CIRCUMFERENTIAL WELD CIRCUMFERENTIAL. WELD SKIRT CIRC WELD NOZZLE INSIDE RADIUS NOZZLE INSIDE RADIUS NOZZLE INSIDE RADIUS NOZZLE INSIDE RADIUS NOZZLE INSIDE RADIUS NOZZLE INSIDE RADIUS SKIRT SUPPORT ITEM NO METHOD 003,100 UT 603,090 UT 603.100 UT B06.040 UT 806.040 UT 806.040 UT 801.012 UT 801,012 UT B01.012 UT B01.01.2 UT B01.022 UT B01.022 UT 801:022 UT 801.022 UT 801.022 UT 601.022 UT B01,021 UT B13.070 VT-3 813:060 VT-3 B10.010 VT3 B13.070 VT-3 B14.010.

PT 614.0.10 PT 814,010 PT B06.020 UT 806.020 UT B06.020 UT B06.010 VT-1 B06.010 VT-I B06.010 VT-i B06.050 VT-1 806.050 VT-1 606:050 VT-I B04.030 VE:

B04.040 UT B07.030 VT-1 B03.140 VT-1 R1.1.1.

UT R1.11 UT B03.140 VT-1 B.07.030 VT-1 F01,40E VT-3 803.140 UT-I R1.11 U.T 803.140 VT-r B03.140 VT-i Ri1ll UT RIA1 UT B03140.

VT-1 B02:040 UT B02.012 UT 802:012 UT B02.011 UT 802:0.1,1 UT 810.010 UT B03.120 UT B03.120 UT 803.120 UT 503.120 UT B03.120 UT 803.120 VT-2 F01.40E VT-3 ISONO E-0016 E-0016 E,00.1 B E-0018 E-00.18 E-001B E4001C E-001C E-O01C E-O01C E-001 D E-0010 E-0010 E&001D E-0010 E-00 1D E-001D E-001F E-001F E-001F E-001 G E-001 D E-001D E-001D E-001L E-001L E-001L E-001L E-001L E-00IL E-001L E-001 L E-001 L E-0010 E-0010 E-001 M E-00AM E-001LI E-001M E-001M E-001 M E-0011M E-001M E-001M E-O01M E-001M E-00IM E-O0!M E-00IM E-OiN E&O0iP E-001P E-OO!P E-O1P E-001P E-001P E-001P E-001P E-001P E-001P E-001 P E-061P 1st 2nd 3rd X-.

X X

X-X7 X-IL-X-

X-XL-LX-I X

.X_

X_

IL-x X-

-A -

A

-X.

X -

X-x-

X-A---

X_...

X-x.

x-x x -

X-

-x

-x

-x

-x

-x AA AA AX

(Page 17 of 42)

Procedure Number:

Beaver Valley Power Station 1/2-ADM-2039

Title:

Unit:

Level Of Use:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number 10 17 of 42 ATTACHMENT C Page 4 of 14 BV1 EXAMINATION SCHEDULES ATTACHMENT C BV1 EXAMINATION SCHEDULE SUMNO 195000 195600 197300 207200 207500 207500 207700 207800 208200 208600 221700 224200 2531.00 255400 255700 256300 259000 261200 261500 261800 263600 264900 267200 267600 267900 2701800 271200 271:300 272200 272300 273200 273900 274200 274300 275000 283800 283900 284300 285400 286700 287200 287600 289310 289600 289900 290000 290100 290210 2906500 290600 292000 294000 294300 294400 296300 297600 298000 300300 301100 302800 304900 306500 COMP_ID RC-TK-1-SS-2 RC-P-,1AmSUPP RC-P-IA-B(F)-i TO 24.

RC-P-IA-C-1 RC P-IA-A-1 RC-P-IA-A-2 RC-P-1A-A-3 RC-P-IA-FLYWHEEL RC-P-1 8-FLYWHEEL RC-P-iC-FLYWHEEL MOV-RC-595-B3-25 TO 48 MOV-RC-595-NUTS DLW-LOoP1-I-F-01 DLW, LOOP 1-6-F-09 DLWwLOOP 1-6-8-10 DLW-LOOP1-7-F-I2 DLW-LOOP2-1-F-13 DLWýLOOP2-6-F-21 DLW-LOOP2-6-F-22 DLW-LO0P2-7-F-24 DLW-LOOP2-5-S-01 DLW-LOOP3,1-F,25 DLW-LOOP3-6-F-33 OLW-LOOP3-6-F-34 DLW-LOOP3-7-F;36 OLW.*LonP-7-S-02 RH-1i--A-01 TO 02 RH-1i-SH40 RH-1-R,38 RH-,i-2-S-02 RH-1-3-F-04 RH-23-SH-1 1F RH-23-i-1-ISS-123 RHw23-1 -tSS-124 RH-24-A-42 SI1-21-2-A-02 SMI 212 -RH-3 SI-121-R-4 SI-121-R-7 SI-1 21-OS-1 SI-121-6wS-01 SI-101-DS-1 SI-101-LST-110 SI-101-SH-1 1 SI-101-3B-A-07 TO 10 SI-101-R.24 SI-101-3B-A-1I TO 12 SIci01-LST-108 SI-101-4-A-01 TO,10 SI-iC01-R-221 SI-`Io1-5-S-05 SI-1,111-SH-16 SI-i 1.1-4-A-03 Sk.l1 -A-15 SI-11-5-S-06 SI-102-A-PS-2 SI-1 02-2A-F-.1A S1-106-1C-S-02 SI-23-R-PS-5 SI-134-2-S-03 SI-130-R-85 SI-29-5-S-01 COMP-DESC STRUCTURAL SUPPORT PUMP SUPPORT BOLTING CASING WELD WELDED SUPPORT WELDED SUPPORT WELDED SUPPORT FLYWHEEL FLYWHEEL FLYWHEEL.

BOLTING NUTSBUSHINGS.WASHERS SAFE END WELD BUTT WELD BUTT WELD SAFE END WELD SAFE END WELD BUTT WELD BUTT WELD SAFE END WELD BUTT WELD SAFE END WELD BUTT WELD BUTT WELD SAFE END WELD BUTT WELD W/ATT SUPPORT SH-40 SUPPORT SUPPORT BUTT WELD BUTT WELD VALVE SUPPORT SNUBBER SNUBBER SUPPORT W/ATT SUPPORT RH-3 SUPPORT SUPPORT SUPPORT SUPPORT BUTT WELD SUPPORT SUPPORT SUPPORT W/ATT SUPPORT R-24 SUPPORT W/ATT LST-108 SUPPORT W/ATT SUPPORT R-22 SUPPORT BUTT WELD SUPPORT W/ATT SUPPORT A-15 SUPPORT BUTT WELD SUPPORT SOCKET WELD SOCKET WELD SUPPORT BUTT WELD SUPPORT BUTT WELD ITEM-NO METHOD FO1.40E, VT-3 F01.40P VT-3 806-180:

UT 612.010:

VTF1 0310.03.0.

PT BI0.030:

PT B10.030 PT RG1.14 UT RG1.14 UT RG1.14 UT 506.210 UT 106.230 VT-1 RP1.1 UT RI.11 UT R1.11 UT R1.11 UT R1.1I UT Ri.l UT R1.11 UT Rtill UT RI.1 UT R1.1I UT R1.1 UT R1.11 UT R1.11 UT, PT B10.020 PT F01.10S:

VT-3 F01.1OR VT-3 R.1.11 UT R1,11 UT F01AOX VT-3 FOI.ION VT-3 F01.10N VT-"5 FOIN.10 VT-3 B10.020

'PT F011.10H VT-3 F01.10R VT,-3 F81.OR VT-3 F01.10D VT-3 R1.11 UT F01.100 VT-3 F01.101.

VT-3 F01,10 V-r-.3 B10.020:

PT F01.10R VT-3 B10,020 PT F0I.10L.

VT-3 130.020 PT FO1.10R VT,3 R1.II UT FOlI.OS VT,3 0310.020 PT F01.10A VT-3 R1.11 UT F01.1OA VT-3 R1.12 VT-2 R1.12 VT-2 FO1.1OR VT-3 R1.I UT F01.1OR VT-3 R1.11 UT ISONO E-001P E-0010 E7001R E-001S E-001T E-OOIT E-001T E-001T E-002A E-002A L-001A L-001A L-001A L-001A L-O02A L-O02A L-QQ2A L-002A L-002A L-003A L-003A L-03A L-003A L-003B 0074A 0074A 0074A 0074A 0074A 0107A 0107A 0107A 0108O 0106A 0106A 0106A 106A 0106A 0106A 0107A 0107A 0107A 0107A 0107A 0107A 0107A 01070 01070 0107B 01088 0108B 01086 01088 0200A 0200A 02000 0200B 0200C 0200C 0220C 1st 2nd. 3rd

.X X-A-

.X-A-

X_-.

A-

-A A-x-

X-

.x

-x A.

A-x-

x--

X.

A-A--

,Aw Xý

.X_

X.

x X

.x-x-.

x-X_

x-.

X-X_

X-XF -

X X-X_

X-x--

...X_

(Page 18 of 42)

Beaver Valley Power Station Procedure Number:

1!2-ADM-2039

Title:

Unit:

Level Of Use:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Reviion Page Numnber:

1 l0 18 of 42 ATTACHMENT C.

Page 5 of 14 BV1 EXAMINATION SCHEDULES ATTACHMENT C BV1 EXAMINATION SCHEDULE SUM_NO 308300 308500 309400 309900 310600 311400 311700 3111800 313400 314200 315700 315800 316200 316300 316400 318000 318800 319200 319400 32000 32,1200 322500 323200 325000 325400 326000 326500

.327000 327300 32.9700 330800 332300 332900 333400 334500 335700 363900 365600 370500 371200 371400 3n4500 371800 371900 373700

.375400 375800 375900 378700 38.1200 381500 382200 39.1500 392000 392700 395200 397700 398100 399400 399700 406100 406200 COMPID SI-29-R7213 SI-29-R-214 SI-29-9-S-02 SI-207DS-i SI-20-R-72A SI-20-VS-74A SI-20-8-A-03 TO 04 SI20-R-75A SI-20-10-S-02 8(4*0-11 -S-02 SI-30-3-A-01 TO 04 SI-30-R49 SI-30-3-A-05 SI-30'SH-52A SI-30-3-S-01 SI-30-5-S-02 SI-74-3-F-04 Sh74-4-HSS-420 SI-74-4-HSS-421 SI-74-OS-2 SI-74-5-HSS-422 SI-746-IS-01 SI-72-R7312A SI-72;DS-1 SI-72-R-323 SI-72-7-S-01 SI-72-8-S-01 SI-73-R-305A S1-73-5-F-06 Si-73-7:SS-4:18 SI-73,8-S-01 SI-104-1-F-02 SI-22-R-PS-18 SI-22-R-PS-15 SI-22-R-PS-9 SI-22-R-PS-2 RVCH-LUG-A WFPD-22-1-F-03 WFPD-23L1-F-03 WFPD-23-3-HSS-208A WFPD-23-3-HSS-207 WFPD-23-3-HSSw208 WFPD-23-3-A-01 TO 02 WFPD,23-SH-9.

WFPD-24-1-F-03 WFPO-24-SH-12

  • WFPD-24-5-A-03 TO 06
  • WFPD-24-R-1 1 SI-163-PSR-33B P11 -G-S-0Q P1 1-G-PSSP-36A SI-1684-R-36 SI-81-11-S-01 SI-81 -R-3.13 SI-81-R-89A SI-040-R-315 SI-82.-1*S-01 SI-82-PS-R-10 SI-83-PS-07 SI-83-PS-06 SI-85-PS-R-17 SI-85-3-A-02 COM PDESC SUPPORT SUPPORT BUTT WELD SUPPORT SUPPORT SUPPORT M/ATT SUPPORT R-75A SUPPORT BUTT WELD BUTT WELD WATT SUPPORT R49 SUPPORT W/ATT SUPPORT SH-52A SUPPORT BUTT WELD BUTT WELD.

BUTT WELD SNUBBER SNUBBER SUPPORT SNUBBER BUTT WELD SUPPORT SUPPORT SUPPORT BUTT WELD BUTT WELD SUPPORT BUTT WELD SNUBBER BUTT WELD SOCKET:WELD SUPPORT SUPPORT SUPPORT SUPPORT RV HEAD LIFTING LUG

.PIPE WELD PIPE WELD SNUBBER SNUBBER SNUBBER W/AT" SUPPORT SH-9 SUPPORT PIPE WELD SUPPORT WIATTSUPPORT R11,209,210 SUPPORT SUPPORT PIPE WELD SNUBBER SUPPORT PIPE WELD suPPORT SUPPORT SUPPORT SOCKET WELD SUPPORT SUPPORT SUPPORT SUPPORT WIAT7 SUPPORT PS-R-I7 ITEM NO METHOD F0.I OR VT-3 1`01.1011

\\/T-3 R1.Il UT F01.10D VT-3 FOI.1OR VT-3 Fo1..1oV VT-3 810.020 PT F01: !R VT-3 R1.11

UT Ri11 IuT B10.020, PT F01,10, VT-3 810.020 PT F01.10S VT.-3 R1,11 UT Rill UT R1.11 UT F01,10N V-3 F01.10N
  • VT-3 F01.19K VT-3 FP1.11N VT-3 FOi.OR VT-3 F01JOD VT-3 F01.0R VT-3 RI.1I UT R1.11

.UT FOI.OR

  • .Tý3 R1.11 UT F01,10N VT-3 R1.1I Ul.

R1.12 VT-2 FoII.0R VT-3 FOIAOR VT-3 FO1..IOR VT-3 FOItOR VT-3 e10.010

MT R1.11 UT Ri~ll UT R1.11

'UT F01.20N VT.3 F01.20N V'T-3

.FOt..20N

.VT-3

003.020 MT F01_20S VT-3 R1J1

.UT F01.20S VT-3 C03,020 MT F01:20R

VT-3 F01.20R VT-3 RI.i:1 UT F01.20N VT-3 F01.20R VT-3 R1.1I UT

.FO1..20R VT-3 F01.20R VT-3 F01.20R VT-3 R1.12 VT-2 FO1.20R VT-3 F01.20R V.T-3 F01.20R VT-3 FO1.20R VT-3 C03,020 PT ISO_NO 0220C 0220C 0220C 02222B 02228 02226 02228 0222B 0222B 02228 0223B 0223B 0223B 02238 02238 02238 0375C 0375C 0375C 6375C 03750 0375C 0375E 0375E 0375E 0375E 0375E 0375F 0375F 0375F 0375F 0376A 0376A 0376A 0376A 0376A E-001A 0062A 00628 0062B 0062B 0062B 0062B 00628 0062C 0062C 0062C 0062C 0114A 0115A 011:5A 0115A 0192A 0192A 0192A 0192A 0192A 0192A 0192A 0192A 0193A 0193A 1st 2nd, 3rd X-

÷* X-X-

X-X-

X-X-

X-X_

-X

_x

-x Xx X-X.

X-A-

X-X x-Xxx X-X-

X-X-

A-A-

-X X_

X_

XL

-X

_o x,.

x-X-

A-X-

X_

X_

xx xx X_

X_

X_

X_

X_

xx

(Page 19 of 42)

Beaver Valley Power Station Procedure Number:

1/2-ADM-2039

Title:

unit:

Level OfUse:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number:

1 10 19 of 42 ATTACHMENT C Page 6 of 14 BVI EXAMINATION SCHEDULES ATTACHMENT C.

SUMNO COMPID.

407500 SI-86-2-A-01 407600 SI-86-PS-0i 408800 SI-.57-PS-02 410600 S1-:87-PS-09 412200

.Si-87-PS-16 420100 CH-75-2B-S-07 420200

.CH-79,2B-S&10 420500 CH-79-PS-R-10 420700 CH-79-2B-F-1A-A 421900 CHi79-PS-R-9 422600 CH-78-?8-S-10 422700

.CH-78-2B-S-06 4122900 CH-76-PS-R-6 423100 CH-78-2B-F-I.A-A 4:25000 CH-77-2B-S 425200 CH-77-28-S-05 425300 CH-77-PS-R-2 425500

.CH-7772B-F-lArA 426400 CH-77-VS-3 426600 CH-77-PS-R-1 428600 C H-80-2-A,05 428700 CH-80-R-50 428900 CH-80-VS-S0A 430900 CH.-82-PS-R-2 431200 CH-82-1-A-01 431360 CH-82-PS-A-1 435600 CH-69-1-S-04 436000 CH-69-i -S-07 436700 CH-73-R-53

.437600 CHI73-R-64 439400 CH-J0-1-S-03 440000 CH-70-1-F-1X-A 4:40900 CH-74-1 -S-08 441500 CH-74-R-85 443600 CH-71-1 -S05 443800

.CH-71-1-S 107 445300

.CH-75-l -A-06

.445400 CH-75-R-86 450600 C H-81-R-1224 451100 CH-81-R-227 451800 CH-82-R-58 452600 CH-81-A-60 457600 CH-81-PS-R-19 459300 CH,94,PS-Rr26 460100 CH-94-PS-R-27 463600

.CHM95-PS-R-22 466900 CH-93-PS-SH-23 470350 CH-131-1-F-4X 470700 CH-125-R-74 471700 CH-i25,R,75A

.479500 CH-83-PS-R-1 495100 SI-75-R-66 495800 S1-75-R-67 496100 SI-75-R-68 496600 SI-.75-2-A-01 496700 SI-76-SHý230 498800 Si-60-R-230A 502800 SI-60-R-71 504000 CH,124-PS-2 509200

CH-124-10-F-098:

509900 CH-140-iB-PS-1.

5.12700 SI-81-iA-A01 8V1 EXAMINATION $CHEDULE COMPDESC WfATT SUPPORT PS-i SUPPORT SUPPORT SUPPORT SUPPORT SOCKET WELD BRANCH CONN. WELD SUPPORT PIPE WELD SUPPORT BRANCH CONN.: WELD SOCKET WELD SUPPORT PIPE WELD BRANCH CONN. WELD SOCKET WELD SUPPORT PIPE WELD:

VALVE SUPPORT SUPPORT W/ATT SUPPORT R-50 SUPPORT SUPPORT SUPPORT WIATT SUPPORT PS-A-1 SUPPORIT PIPE WELD PIPE WELD SUPPORT SUPPORT PIPE WELD.

SOCKET WELD PIPE WELD:

SUPPORT PIPE WELD PIPE WELD WMATT SUPPORT R-86 SUPPORT VALVE SUPPORT VALVE SUPPORT SUPPORT SUPPORT SUPPORT VALVE SUPPORT SUPPORT SUPPORT VALVE SUPPORT SOCKET WELD SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT WZATT SUPPORT SH-230 SUPPORT SUPPORT SUPPORT SUPPORT BRANCH CONNWELD SUPPORT W/ATT SUPPORT R-70 ITFMNO METHOD C03.020 PT F.0i.20A VT-3 F01.20R VT-3 F0i.20R VT.3 F01.20R VT-3 R1.12 VTý2 P1.12 VT-2 F01.20R VT-3 R.1l 11 UT F01.20R VT-3 R 112 VT-2 R1.12 VT-2 F01.20R.

VT-3 R111 UT R1.12 VT-2 R1.12 VT-2 F01.20R VT-3 R1,1I UT F01.40X VT-3 F01.20R VT-3 C03;020 PT F01.20R.

VT-3 F01.20V VT-3 F01I20R.

VT-3 C03.020 PT F01,2oA VT-3 R1,11 UT R1.12 VT-2 F01.20R VT'3 601.20R VI.3 R1.11 UT R1,12 VT-2 1 11 UT F01.2013 VT-3 R1.11 UT R1.12 VT-2 0:3.02.0 PT F01.20R VT-3 F.01,40X VT-3 F01,40X VT-3 F01.20R VT-3 F.O1.20A VT;3 F01.20R VT-3 F0140X VT-3.

F01.20R VT-3 F01,2613 V'F3 FO1.40X VT-3 R1.12 VT-2 F01.20R VT-3 F.1,2091 VT-3 F01.20R VT-3 FO. 20R VT-3 F01,20R VT1-3 F01.20R VT-3 C03.020 PT F01.20S VTw3 F.01 20R VT-3 F01,20R VT-3 F01,20R VT-3 R1,12 VT-2 F01.20R VrT3 C03.020 PT ISONO 0194A 0194A 0 194A 0194A 0194A 0265A 0265A 0265A 0265A 0265A 0265A 0265A 026m5 0265A 0265A 0265A 0265A 0265A 0265A 0265A 0265A 0265A 0265A 0266A 0266A 0266A 0267A 0267A 0267A 0267A 0267A 0267A 0267A 0267A 0267A 0267A 0267A 0267A 0267A 0267A 0267A 0267B 0267B 02676 02678 02678 0267B 0268A 0268A 0268A 0269A 0272A 0272A 0272A 0272A 0272A 0272A 0272A 0273A 0273A 0273A 0273B Ist 2nd 3rd x-x-

x xx x x xx xx x x xx xx x x xx xx xx x~x x~x xx XX X xx x x xx-xx xx x x x x xx x x x

X XX _X

(Page 20 'of 42)

Beaver Valley Power Station Procedure Number:

Title; BVPS ISI TEN-YEAR PLANS ATTACHMENT C Page 7 of 14 BVI EXAMINATION SCHEDULES ATTACHMENT C SUM NO COMPID 512800 SI-81-R-70 519800 SI-51-R-304 521300 SI-81-R-303A 5270Q00 81-130-R-265 530600 SI-140-R-97 531600 SI"i40-R-99 532200 SI-140-R-100 533100 SI-40-Rý20 538400 SI-4.1-7-F-06 538450 SI-41-7-L-23 540100 SI-44-R-32 544500 CH-15-R-10 554700 SI-40-R-10 558800 SI-133-VS-236 570500 S.133-A-103 571500 SI-133-7-A-01 571600 SI-133-S-1lolA 573600 RS-PSSP-009 573700 RS-PSSP-01.0 578900 SI-P.SR-006 587101 BN52799-01-WS-1 587111 BN52799-01--WS-2 567121 BN52799-01 -WS-3 587131 BN52799-01 -WS-4 587500 CH-P-1B-A-0t 588200 SI-TK-2-C-l" 588300 SI-TK-2-C-2 568400 SI-TK-2-N-3 588500 SI-TK-2-N-4 588650 SI-TK-2-WS-1 588750 SI-TK-2-WS-2 588850 SI-TK-2-WS-3 588900 SI-Tk-2-A-4 588950 SI-TK-2-WS-4 589000 SI-TK-2-STUD-1 589100 SI-TK-2-STUD-2 589200 SI-TK-2-STUD-3 589300 SIJTK-2-STUD-4 589400 SITK-2-STU.D45 589500 SI-UTK-2-STUD-6

-589600 SI-TK,2.STUD-7 589700 SI-TK-2-STUD-5 589800 SI-TK-2-8TUD-9 589900 SI-TK-2-STU D-10:

590000 SI-TK-2-STUD-1 1 590100 St-TK-2-STUD-12 590200 Sl-TK-2-STUD-13T 590300 SI-TK-2-STUD-14 590400 SI-TK-2-STOD-15.

590500 SI-TJK-2-STUD-16 593150 SI-7-1:-L.26 593200 SI-7-1-S-02 593250 S6-7-1 -L-25 593400 SI-7-1 -A-01 593500 SI-7-VS-13 596350 SI-S1-L-29 596400 SI-8-1-S:02 596450 SI-8-1-L'28 598850 SI-1-6-L-40 598900 S1-1-B-S-02 598950 SI-1-6-L-39 599300 SI-6-BH-52 BV1 EXAMINATION SCHEDULE COMP DESC SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT sUpPORT SUPPORT SUPPORT PIPE WELD LONGITUDINAL WELD SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT W/ATT SUPPORT SH-101A SUPPORT SNUBBER SNUBBER SUPPORT PUMP SUPPORT PUMP SUPPORT PUMP SUPPORT PUMP SUPPORT WIATT SUPPORT WS-.

CIRCUMFERENTIAL BUTT WELD CIRCUMFERENTIAL BUTT WELD NOZZLE-TO-VESSEL.WELD NOZZLE-TO-VESSEL WELD SUPPORT SUPPORT SUPPORT W/ATT WS-4 SUPPORT BOLTING BOLTING BOLTING BOLTING 8OLTING BOLTING BOLTING BOLTING BOLTING BOLTING BOLTING BOLTING BOLTING BOLTING BOLTING BOLTING LONGITUDINAL WELD PIPE WELD LONGITUDINAL WELD W/ATT SUPPORT VS-1 3 SUPPORT LONGITUDINAL WELD PIPE WELD LONGITUDINAL WELD LONGITUDINAL WELD PIPE.WELD LONGITUDINAL WELD SUPPORT ITEMNO METHOD F01.20R VT-3 F01.20R VT-3 F01.20R VT-3 FO1.20R VT-3 FO1,20R V"-3 F01.20R VT-3 F01.20R VT-3 R1,11 UT Rill UT F01.20R VT-3 F01.20R VT-3 FOI.20R V'-3 0F0 I20V VT-3 F01,20A VT-3 C03.020 PT F0i,20S VT-3 F01.20N VT-3 F.01.20N VT-3 001.20R Vr-3 F01.40P VT-3 F01.40P VT-3 F01.40P VT-3 F01,40P VT-3 C03,030 MT C01.020 UT C01.020 UT C02.021 UT, MT C02.021 UT, MT F01.40E VT-3 F01.40E VT,3 F01.40E VTr-3 C03.010 PT F01.40E VT-3 C04.010 UT.

C04,010 UT C04.010 UT C04.010 UT C04.010 UT C04.010 UT C04.010 UT C04,010 UT C04-010' UT C04.010 UT C04.010 UT C04.010

'UT 004.010 UT 004.010 UT C04.010 UT C04.010 UT R1.11 UT R1.11 UT Rill UT C03.020 PT C01.20V VT-3 Rll UT Rill UT R1 11 UT R1.1I UT Ri.l UT R.1.11 UT F01.205 VT-3 ISONO 02738 02738 0273B 0275A 0275A 0275A 0275A 0276A.

02768 0276B 0277A 02778.

0279A 0367A 0367A

0367A, 0367A 0726A 0726A 0727A E-0031H, E-003H E-003H E-003H E-003H E-0058 E-0056 E-005B

,E-065B EB-005B E-O05B E-005B E-005B E-0058 E-005B E-DO5B E-OOSB E-005B

&-o0S5:

E-005B E-005B E-O0513 E-005B E-005aB E-0055 E-005B E-005B E-005B E&005B E-005B1 0083A 0083A.

0083A

.0083A 0083A

.0083A 0083A 0083A 0083B 00835 0083B 00836 1st 2nd 3rd x--

X-i--

x-

.X

X_

x-X X_

x-X-

X_

X_

X X-X:

X_

x -

X-X_

Xý X_

X -

x X-X-

X-I,.

X-

X-

.X-x?

X-X_

X-X.

X_

X-X_

XL XL x-

(Page 21 tof 42)

Beaver Valley Power Station Procedure Number:

1/2-ADM-2039

Title:

Unit:

Level Of Use:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number:

1 l0 21 of 42 ATTACHMENT C Page 8 of 14 BV1 EXAMINATION SCHEDULES ATTACHMENT C SUM_NO*

COMP-ID 599700 SI-1-R-176 600000 SI-UTA-15 605320 SI-1-4,DL-01 605350 SI,1-4D-L-02 605400 SI-I-4D-S-04 605420 SI-1-40-L-03

606300 SI-1.5-S-02 614800 sI-2-6-S-o3 61.6600 S-2-5-A-15 TO 18 616700 81-2-R-17 617600 SI-2-A-I 1 622000 SI-28-SH-66 622750 SI,26-1AL-43 622800 SI-26-1A-S402 622850 Sl-26-1AAL44 623950 SI-16-6-L-81 624100 SI-16-6-HSS-212A 624200 SI-16-6-HSS-212B 624300 SI-16-7-F-34 624500 SI-16.8-F-22 624600 SI-16-8-F-09 625200 SI-18-1-S-04 630600 SI-26-PSR-070A 630700 S8126-3-S-i0 631.300 S1-26-3-S-02 635300 SI-i 6-3-s-1il 637400 SI-32-R-103 6.37900 S-32-1 G-F-N H 640600 SI-29-VS-1 640900 SI-29-R-3D-4 64.1400 SI-29-2A-OS-1 641600 SI-290R-6D-4 642300 SI-29-R-100-4 644200 SI-20-R-20-2.

644500 SI720-R-4D-2 6456000 SI-20-.RH-13D-2 648000 S1-30.1-A-01 TO 04 648100 SI-30-SH-57A 648620 SI37-1-F-19 648630 SI-37-1-F-23 648650 SI-36-1-F-26 648660 SI:3S1-F-29 648680 Si-145-1-F-01 650000 SI-74-1 -S-02 651000 SI-72-R-306A 652500 SIL72-R-31 1A 654000 SI-73-2-A-02 654100 S1-73-A-S05 65475O Si-P0-A-SUP 654800 SIP-1B-1 654900 SI-P-i6-2 655000 SI-P-1B-3:

655100 SI-P-1B-4 658900 SHP-56-3-HSS-202 659100 SHP-56-3-HSS-203 659500 SHP-56-3-A-1 5 TO 16 659600 SHP-56-S-3 662300 SHP-56-9-L-05 662400 SHP-56-9-L-06 662.500 SHP-56-9-F*:1 665600 BHP-57-4-L-05 665700 SIIHP-57-4-L-06 BV1 EXAMINATION SCHEDULE COMP-DESC SUPPORT SUPPORT LONGITUDINAL WELD.

LONGITUDINAL WELD PIPE.WELD LONGITUDINAL WELD PIPE WELD PIPE WELD WIATT SUPPORT R-17 SUPPORT SUPPORT SUPPORT LONGITUDINAL WELD PIPE WELDL LONGITUDIELtL WELD LONGITUDINAL WELD SNUBBER SNUBBER PIPE WELD PIPE WELD PIPE W'ELD PIPE WELD SUPPORT BRANCH CONN. WELD PIPE WELD BRANCH CONN. WELD SUPPORT PIPE WELD SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT WtATFl SUPPORT SH-57A SUPPORT SOCKETWELD SOCKET WELD SOCKET WELD SOCKET WELD SOCKET WELD PIPE WELD SUPPORT SUPPORT W/ATT SUPPORT A-305 SUPPORT PUMP SUPPORT PUMP CASING WELD PUMP CASING WELD PUMP CASING WELD PUMP CASING WELD SNUBBER SNUBBER WIATT.SUPPORT S-3 SUPPORT LONG WELD ALONG ELBOW LONG WELD ALONG ELBOW PIPE WELD LONG WELD ALONG ELBOW LONG WELD ALONG ELBOW ITEM_NO METHOD F01.2R VT-3 F01.20A VT'3 R1.11 UT R1,11 UT R111I UT R1. 1 UT Rl 1 UT R111 UT C03 020 PT F01.20R VT-3 F101.20A VT-3 F01.206 VT-3 ki:1,1 UT R1.11 UT R1.1 UT R1.11, UT F01.20N VT-3 F01.20N V"-3 RI11 LIT R1ll PT R1.11 UT RI.11 UT F01.20R VT-3 Ri.12 VT-2 R1,1 UT RI 12 VT-2 F01.20R VT-3 R1.11 UT FOI.20V vT-3 F01.20R VT-3 F01.20D VT-3 FOI.20R VT-3 FO1.20R VT-3 F01:20R VT-3 FO1..20R VT-3 F01:20H VT-3 C03,020 PT FOI.20S VT.3 R1:12 VT-2 R1,12 VT-2 R1.12 VT-2 R1.12 VT-2 R1.12 VT-2 RI.ll UT FO120R VT-3 FO.20R VT-3 C03.020 PT F01,20A VT-3 F0lo.40P V31,-3 006.010 PT C06:010 PT C06.010 PT C06&010 PT FO1.20N VT-3 F0120N VT-3 C03.020 MT F01.20V VT-3 RPll UT R1.11 UT p 1.1t UT R1.11 UT R1.11 UT ISO_NO 00838 00838 0083C 0083C 0083C 0083C 0083C 0083C 0083C 008X0 0083c 01 09A 0I 09A 0109A 0109A 0109A 0109A 0109A 0109A O109A 0109A 0109A 01 14A 01 14A 01 14A 01i5A 0220A 0220A 02208 02206 02208 0220B 0220B 0222A 0222A 0222A 0223A 0223A 0360A 0360A 0360A 0360A 0360A 03756 0375D 0375D 037.50 0375D E-005C.

E-005C E-005C E-005C E-005C 0001A.

0001A 0O01A 0001A 0001A 0001A 0001A:

0001B 0001.1 1st 2nd 3rd X-X-

  • - X-X-

x-x-

X-X-

x-

-' X_

X-X_-

X-

-=--

x- -

x-X.

-- x-X X-x-.

x*

X-x x-

-- x-X-

x-

-- X -

X_ -

ux xx XX X-X-

X- -

X_

X-X-

X-X-

-X X-X,

.. x xx X-X..

(Page 22 'of 42)

Beaver Valley Power. Station Procedure Number:

M 1/2-ADM-2039

Title:

Unit:

Level OfUse:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number-10 22 of42 ATTACHMENT C Page 9 of 14 BV1 EXAMINATION SCHEDULES ATTACHMENT C SUM_NO COMPID 665800 SHP-57-4-F-07 66680o SHP-58 f1AA-0i 666900 SHP-58-:SH-7 670700 SHP-58-7-L-05 670800 SHP-58-7-L-06 670900 SHP-58-7-F-09.

671000 SHP-56-10-P-12 671100 SHP-56-10-S-44 671200 SHP-56-10-S-49 671300 SHP-1E6-10-S-)6 671400 SHP-56-10-S-15 671800 S$1P-56-10-$-48 671900 SHP-56-10-S-13 672000 SHP-56-10-S-14 675800 SHP-57-5-F-08.

675900 SHP-57-5-S-44 676000 SHP-57-5-S-49 676100 SHP-57-5-S-16 676200 SHP-57-5,S-1 5 676600 SHP-57-5-S-48 676700 SHP-57-5-S-13 61060 SHP-57-5-S-i4 660000 SHP-57ý5-A-01 680100 SHP-57-.SH-15 680600 SHP-58-5-F-10 680700 SHP-58-5-S-44 660800 SHP-58-5-S-49 680900 SHP-58-5-S-16 681000 SHP-58-5-S-15 661400 9HP-58-5-S-48 681500 SHP-58-5-S-13 6816Q0 SHP-5685-S-14 685310 SDHV-I-I-F-06 685350 SHP-31-1-F-13 685400 RC-E-1A-C-2 686100 RC-E-1AzN-9 686200 RC-E-IA-N-91R 686500 RC-E-1A-SUP-1 686550 RC-E-IA-SUP-2 666050 0C-E-lA-A-i 688700 RC-E-IC-C-8 659700 RH-i8-1-A-01 690700 RH-18-R-33 6909.10 RH118-1-*,.0 691000 RH-18-1.-S-09 691010 RH-18-1-L-11 691020 RH-18-1-L-12 693900 RH-18-R-31 694900 RH-5-1-F-01 694920 R.H-5-I-L-12 694950 RH-5-i-L-13 695100 RH-5-l-F-02 696150 RR-12-1-L-15 696200 RH-12-1-S-12 696500 RH-12-SH-10 697500 RH-12-1-S-06 697550 RH-12:-1.-L-37 698400 RH-12-DS-5 698800 RH-A-1-F-01 698850 RH-4-1 -L-1 8 698880 RH-4-1-L-19 699000 RH-4-1 -F-02 BV1 EXAMINATION SCHEDULE COMP_DESC PIPE WELD W/ATT SuPPORT S.-7 SUPPORT LONG WELD ALONG ELBOW LONG WELD ALONG ELBOW PIPE WELD PIPE WELD LOWER SADDLE WELD (UPSTRM)

LOWER SADDLE WELD (DWNSTRMI UPPER SADDLE WELD (OUTER)

UPPER SADDLE BRANCH WELD PIPE WELD INNER SADDLE/ BRANCH WELD OUTER SADDLE WELD PIPE WELD LOWER SADDLE WELD (UPSTRM)

LOWER SADDLE WELD (DWNSTRMI UPPER: SADDLE WELD (OUTER)

UPPER SADDLE BRANCH WELD PIPE WELD INNER SADDLE / BRANCH WELD OUTER SADDLE WELD WIATT SUPPORT SH-15 SUPPORT PIPE WELD LOWER SADDLE WELD (UPSTRM)

LOWER SADDLE WELD (DWNSTRM)

UPPER SADDLE WELD (OUTER)

UPPER SADDLE BRANCH WELD PIPE WELD INNER SADDLE / BRANCH WELD

.OUTER: SADDLE WELD PIPE WELD PIPE WELD CIRCUMFERENTIAL BUTT WELD NOZZLE-TO-VESSEL WELD NOZZLE: INSIDE RADIUS UPPER RESTR ASSEMBLY LOWER SUPPORT TRUNNION WELD CIRCUMFERENTIAL BUTT WELD W/ATT SNUBBER HSS107,105,+

SUPPORT LONGITUDINAL PIPE WELD PIPE WELD LONGITUDINAL PIPE WELD LONGITUDINAL PIPE WELD SUPPORT

PIPE WELD

.LONGITUDINAL WELD LONGITUDINAL WELD PIPE WELD LONGITUDINAL WELD PIPE WELD SUPPORT PIPE WELD LONGITUDINAL WELD SUPPORT PIPE WELD LONGITUDINAL WELD LONGITUDINAL WELD PIPE WELD ITEM NO METHOD R1.11 ULT C03.020 MT F01.20:

VT-3 R1.,11 UT R1.11 UT R1.1 1 UT R1.11 UT C03.020 MT C03,020 MT 0039020 MT R1.12 MT R1.11 UT, MT R1,12 MT 003.D20 MT R1,1I UT C03.020 MT C03.020 MT C03.020 MT R1.12 MT R1 i1 UT, MT RI.12 MT 003.020 MT C03.020 MT F01.20S VT-S R1.11 UT 1C03.020 MT C03.020 MT C03:020 MT RI.12 MT RIA I UT, MT R112 MT C03.020 MT R1PI UT R1.11 UT C01.030 UT C02,02.i UT, MT C02.022 UT F01 40E VT-3 F01..40E VT-3 c03.010 MT C01.020 UT C03.020 PT F01l20R VT-3

.R1.11 UT R1.11 UT R1..11 UT R1.1I UT F01.20R VT-3 R1.11 UT k1.11 t

UT R1.11 UT Rill UT R1.11 UT R1.11 UT F01 20S V-T-S Ri11 UT R1,11 UT F01,200 VT-3 R1.11 UT R1.11 UT R1.11 UT R1..11 UT ISO NO 0001:B

0001C, 0001c:

0001C.

0001C 0001C 0002A 0002A 0002A 0OD2A 0002A

0002A, 0002A 0002A 0002B 00028 0002B 00028:

00028

0002B, 0002B 00026 0002B 00028 0002C:

0002C:

0002C 0002C 00020 0002C:

0002C 0002C

.0006A 0082A E-001N E-001N E-001N E-COiN E-001N E-001N E-00iN.

.0074B:

0074B:

007,4B 0074B 00741:

0074B 00748 0074C 0074C 0074C 0074C

.0074C, 0074C

,0074*

0074C 0074C 0074C 0074C 0074C 0074C 0074C 1st 2nd 3rd x-

-- X N-

.- A-A-

A-A-

X-

-÷ X-A-

A-A-

A-A-

A-

.. X-X-

A-X-

A-A-

A-A-

X-X-

X- --

X-N -

X-X-

X-

.- X X-X-

X-X-

x-.

N-X-

A-X-

X-X-

X-

-- X-

-- X_

X-N-

A A-A-

A-X-

X-X-

(Page 23,of 42)

Beaver Valley Power Station 1/2-A

Title:

Unit:

Level Of Use:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number:

1 10 23 of 42 ATTACHMENT C Page 10 of 14 BV1 EXAMINATION SCHEDULES ATTACHMENT C BV1 EXAMINATION SCHEDULE SURNO COMP_A D 699850 RH4-3-L-21 200100 RH-4-3A-F-SA 700800 RH-8-1-S-15 700850 RH-8-i-L-23 701800 RH-8-SH-15 702050 RH-8-1-L-32.

702100 RH-8-t-S-01 703200 RH-8-SH-17 703450 RH-8& L-35 703500 RH-8-I-S-11 7014400 RH-10-2-S-04 704450 RH-10-2-L-41 705900 RH-9-1-S-12 705950 RH-9-1-L-44 706400 RH-9-*i-S-07 706450 RH-9-I-L-47 706500 RH-,-R-25A 707500 RH-9-1-S-14 708100 RH-9-A-27 708450 RH-12-2B-L-50 708500 RH-12-2B-S-06 709200 RH112-2-S-09 710500 RHI12-R-5 710750 RH-12-4-L-56 710800 RH-1t2-4-S-01 710850 RH--12-4-L-:57 711500 RH-12,SH-4 711650 RH-13-1-F-02 719000 RH,16..1-A-01 719100 RH-16-A-1 719300 RH-16-R-1A 720700 RH-16-VS-10G 721000 RH-16-3-HSS-121 721100 RH-16-3-HSS-122 721400 RH-E-1A-C-1 721500 RH-E-IA-C-2 721500 RH-E-iA-N-3 721700 RH-EA`IA-N-4 721710 RH-E-1A-N-5 721720 RH-E-1A-N-7 721730 RH-E-1A,-N-8 721740 RH-E-1A-N-6 721800 RH-E-1A-A-0i TO 08 722000 RH-E-1A-WS-1 722100 RH-E,1A-WS-2 725700 RH-P-1A-CS-1 725800 RH-P-1A-CS.2 725900 RH-P-1A-CS.3 729650 RS-4-2-L-25 729700 RS-4-2-S-03 729750 RS-4-2-L-24.

742850 RSw12-6-L-70 742k00 RS-12-6-S-01 742950 RS-12-6-L-71 754250 RS, I4ýL,1 15 754300 RS-1-4-S-05 754350 IRS-I-4-L-1 16 755300 RS-25-1-F-01 755350 RS-25-1-L-01 757450 RS-2.5-3N-L-1li 757500 RS-25-3N-S-04 757550 RS-25-3N-L-130 COMPDESC LONGITUDINAL WELD PIPE WELD PIPE WELD LONGITUDINAL WELD SUPPORT LONGITUDINAL WELD PIPE WELD SUPPORT LONGITUDINAL WELD PIPE WELD PIPE WELD LONGITUDINAL WELD PIPE WELD LONGITUDINAL WELD PIPE WELD LONGITUDINAL WELD SUPPORT BRANCH CONN. WELD SUPPORT LONGITUDINAL WELD PIPE WELD BRANCH CONN. WELD SUPPORT LONGITUDINAL WELD PIPE WELD.

LONGITUDINAL WELD SUPPORT FLANGE WELD WIAT-SUPPORT A-I SUPPORT SUPPORT SUPPORT SNUBBER SNUBBER CIRCUMFERENTIAL BUTT WELD CIRCUMFERENTIAL BUTT WELD NOZZLE-TO;VESSEL WELD (INLET)

NOZZLE-TO-VESSEL WELD (OUTLET)

RE-INF PLATE TO: INLET NOZZLE RE-INF PLATE TO VESSEL (INLET)

RE-INF PLATE TO VESSEL (OUTLET)

RE-INF PLATE TO OUTLET NOZZLE WIATT SUPPORT LOWER FOOT SUPPORT NO. 1 LOWER FOOT SUPPORT NO. 2 PUMP SUPPORT PUMP SUPPORT PUMP SUPPORT LONG WELD.

PIPE WELD LONG WELD LONG WELD PIPE WELD LONG WELD LONG WELD PIPE WELD LONG WELD PIPE WELD LONGITUDINAL WELD LONG WELD PIPE WELD LONG WELD.

ITEM NO METHOD Ri,11 UT RI,11 UT R1.11 UT Ri.11 UT F01 20S VT-3 R:1. 11 UT R1.11 UT F01 20S VT-3 R1.1l UT R:I.11 UT R1 11 UT Ri,11 UT R1.11 UT R1311 UT 41,111 UT R1 11 UT FO.20R VT'3 R1.12 VTý2 F01.20A VT-3 R1i.1 UT R1,11 LIT RIAI UIT R1.12 VT-2 F01 20R VT-3 RI I

UT R1.11 UT R1.1 UT F01.20S VT-3 R1A 1 UT C03.020 PT F01.20A VTf3 F01.20R VT-3 F0120V VT_3 F,01.20N VT-3 F01.20N VT,-3 C01.020 VT-2 001.010 VTý2 C02,033 VTr2 C02.033 VT-2 C02.:031 VT-2 C02.031 VT-2 C002.031 VT-2, C02,031 VT-2 C03,"i 0 PT F01.40E VT-3 FOI.40E VT-3 F01.40P VT-3 FO1.40P VT.3 F01.40P VT-3 R 1I UT R1.11 UT R1.11 UT R11.:I LIT R1.11 UT RI 1,1 t UT R1.:11 UT R1,1I UT R1. I 1 UT R1.1I UT R1,1l UT R.I.t1 UT R111 UT Ri 11 UT ISO-NO 0074C:

0074C 0074C 0074C 0074C 00740 0074C 0074:

0074*

0074C 0075A

'0075A 0075A 0075A 0075A.

0075A 0075A.

0075A 0075A

0075A 0075A 0075A 0075B 0075B 0075B:

0075B 00758

.0075B

.0208A 0208A 0208A 0208A 0208A

.0208A

E-004A
Er004A, E-004A E-004A E-O04A
E-004A E-004A E-004A E-004A:
E-004A

.E-004A E-004B E-004B E-0048 0078A 0078A 0078A 0078D 002780 00780 0079A 0079A 0079A 00798 00798 00798 0079B

.007191 Ist 2nd 3rd

-- X-

-- x-

-- N-N- --

xx xx N-N-X-N-

N x -

X-

x. -

N N-

-- N

-.. x _

I-

-- N

(Page 24 of 42)

Procedure Number:

Beaver Valley Power Station 1/2-ADM-2039

_______________________________________________1/2-ADM-203 9

Title:

Unit:

Level OfUse:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number:

10 24 of 42 ATTACHMENT C Page 11 of 14 BV1 EXAMINATION SCHEDULES ATTACHMENT C BV1 EXAMINATION SCHEDULE SUMNO COMP-ID 762450 RS-2-3-L-157 762500 RS-2-3-S-04 762550 RS-2--L-l56 763600 RS-26-1-F-01 763650 RS-26-1-L-61 764300 RS-26-R-11 766350 RS-26,2G-L-169 766400 RS-26&2G-S'04 766450 RS-26-2G-L-1:68 768450 RS-1 1-2-L-208 768500 RS-:I 1-2-S-03 768550 RS-1 12-L-207 782850 RS-3-6-L-245 782900 RS-3-6-S-01 782950 RS-3-6-L-246 790 50 RS--1Ol-L-04, 700500 RS-9-1 0-S-04 790550 RS-9-14D-L-05 792600 RS-9-SH-48 792700 RS-9-2-1F-01 793650 RS-10-1-L-06.

793700 RS-10-1-S-07 793750 RS-1 0-1-L-07 793800 RS-10-1-A-01 TO 02 795400 RS-10-R-71 795700 RS-10-2-F-01 800200 RS-P-2A-1 804040 RS-P-2A-3 D0606O RS-P-2A-A-7 800650

.RS-P-2A-SUP 801000 RS-P026-2 801200 RS-P-2B-4 802750 FW-P-2-CS-1 802751 FW-P-2-CS-2:

802752 FW-P-2-CS-3 802753 FW-P-2-C$-4 803100 WAPD-2-RH-5 804200.

WAPD-1-R-19 804420 FW-P-3A-CS-1 804421

.FW-P-3A-CS-2 804422 FW-P-3A-CS-3 804423 FW-P-3A-CS-4 805800 WAPD-25-PSR003 806000 wAPID25-1 1-A-05 806.100 WAPD-25-PSAO0I 806400 WAPD-25-PSSH-035:

809700 CC-22-R-18 809800 CC-83;4-A-06 809900.

CC-470-SH-122 810200 CC-323o3A-A-05 810300 CC-323-A-95 811300 Cc-1 02-2-A-08 TO 13 811400 CC-102-VS-15B 812100 CC-106-R-15 812500 COC-i06-R-36.

813200 CC-8-R-54 813700 CC,35-1 BA-06: TO 09 813800 CC-41-R-1 11 814200 CCL513-RH4-48 815456 CC-P-IA-CS-I 815451 CC-P-IA-CS-2 815452 C=P-IA-CS-3 COMPDESC LONG WELD PIPE WELD LONG WELD PIPE WELD LONGITUDINAL WELD SUPPORT LONG WELD PIPE WELD LONG WELD LONG WELD PIPE WELD LONG WELD LONG WELD PIPE WELD LONG WELD LONGITUDINAL WELD PIPE WELD LONGITUDINAL WELD SUPPORT PIPE WELD LONGITUDINAL WELD PIPE WELD LONGITUDINAL WELD WIATTSUPPORT SHN28 (PAD)

SUPPORT PIPE WELD PUMP CASING WELD PUMP CASING WELD W/ATV PUMP SUPPORT PUMP CASING WELD PUMP CASING WELD PUMP SUPPORT PUMP.

SUPPORT PUMP SUPPORT

.PUMP SUPPORT SUPPORT SUPPORT PUMP SUPPORT PUMP SUPPORT PUMP SUPPORT PUMP SUPPORT SUPPORT

  • W/ATT SUPPORT PSAO01 SUPPORT SUPPORT SUPPORT W/ATT SUPPORT SH-1 22 SUPPORT W/IATT SUPPORT A-95 SUPPORT W/ATT SUPPORT VS-15B SUPPORT SUPPORT SUPPORT SUPPORT WIATT SUPPORT A-1 11 SUPPORT SUPPORT PUMP SUPPORT PUMP SUPPORT PUMP SUPPORT ITEMNO METHOD R1ll UT R1.11 UT R1,1!

UT R1.11 UT R0 1 UT FO1.20R VT-3 R1.11 UT R1.11 UT R1.11 UT R1.11 UT Ri,11 UT RIll UT R1.1.1 UT R1.11 UT 81.11 UT R1.11 UT R1.11 UT Ri,11 UT FO1:20S VT-3 RI.1 UT R1.1i UT R1.11 UT R1.11 UT C03.020 PT P01.20R VT-3 RPilI UT C00.010 PT C00.010 PT C03 030 PT F01.40P VT-3 "C06.010 PT C06.010 PT F01:40P VT-3 F01.40P VT-3 F01A-OP VT-3 F01.40P VT-3 F01.30H VT-3 F01.30R VT-3 F01AOP VT-3 FOI:40P VT-3 F01.40P VTr-3 F01:40P VýT-3 F01.30R VT.3 D01.020 VT-I F01.30A VT-3 F01.30S VT-3 F01.30R VT-3 D01.020 VT-1 F01.305 VT-3 D01.020 VT.I F01.30A VT-3 001.020 VT-.1 F01,30V VT-3 F01.30R VT-3 P0*.30R VT-3 FOI.30R VT-3 001.020 yT-1 F01,30R VT-3 F01.30H VTý3 161.400P VT-3 F01.40P VT-3 F01.40P VT73 ISONO 0080A 0080A 0080A 00808 00808 0080B 00OSB 00808 0080B 0081A 0081A 0081A 0081D 00810 0081D 01 12A 0112A 011 2A 0112A 01 2A 0112B 0112B 01 12B 01128 01126 01128 E-007C E-007C E-007C E-007C E-007C

.E-007C 0-010A E,010A.

E,010A E-010A,

0065A 0065A E-010A E-010A E-010A E.0O10A 0775A 6775A 0775A 0775A 0049A 0049A 0049A 0049A 0049A 0049B 00498 0049B 004.96 0050A 0050A 0050A 0050A E0-010A E-OIOA E-010A 1st 2nd: 3rd X_

X.

-- X-mm-X_

X_

X_

X_

X_

X_

X_

X_

X, X-X-

X_

X_

X_

X_

X_

X_

X-X-

X_

X_

x X_

X, X_

(Page 25 c-*

42)

Procedure Number:

Beaver Valley Power Station 1r/2-ADN203r9

Title:

Unit:

Level Of Use:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number:

. 10 25 of 42 ATTACHMENT C Page 12 of 14 BV1 EXAMINATION SCHEDULES ATTACHMENT C SUMNO COMPID 815453' CC.-P-1A7CS-4 815600 CC-1-VS-71 816100.

CC-2-RH-70A 816500 OCC-2-R-68 817600.

CC-2-R-64 817900 CC-3-1B-A-08 818000 CC-3-SH-65A 818400 CC-58-6BA-05 TO 06 818500 CC-58-R-43 819700 CC-54-R-55 820500 CC-5i-6-A-01 820600 CC-5a-R-141 821100 CC-48-1-A-03 TO 06 82-1200 CC-46-R-35 822300 CC-465-R-80 823800 CC-321-R-139 824100 CC1112-RH-25 825600 CC0130-R-40C-2 826800 CC-1 30-R-7C-4 827300 CC-i 30-8-A:) 2 TO I5 827400 CC-130,R-12C-4 828500.

C0-116-Rr330-1 829100 CC-116-4-A-1 1 829200 CC-116-R-27C-2.

830200 CC-1I6-LST-405A 830400 CC-Ii 6-5-A-01 TO02 850500 CC-115-R-18C-3:

834100 CC-251-A-108-4 837100 CC-258-R-23C-2 838500 CC-265-R-43C-3 839600 CC-265-VS-8C-3 839900 CC-259-R;. 11C-3.

841200 CC-114-R-150-3 84.3300.

CC-I 4-R-40OD-844300 CC-1 14-R-180 847281 CC-1:78-R-296 850500 CC-262-A-264 851200 CC-1i2-R-207 852000 CC-510-R-237 853100 CC-527-PSSPw300A 653200 CC-527mPSSP-300B 853750 CC-202-1 -A703 TO 06 853760 CC-2027A-16C-1 855000 CC-EwIAWS-l 855100 CC-E-1A-WS-2

.855200 CC-E-1ArA-1 855300 CC-E-tA-A-2 855200 CC-TK-1-WS-1 886210 CC-TK-1 -WS-2 856220 CC-TK-1-WS-3 856230 CC-TK-1 -WS-4 856300 CC-TK-1 -A-01 856310 CC-rK-I -A--2 856320 CC-TK-1-A-03 856330 CC-TK-1 -A-04 856400 NS-E-1-WS-1 856410 NS-E-1,A-01 856500 NS-E-i-A-02 859000

.WD-22-4A-A-01 859100 WD-22.SH,14 859600 WD-22-VS-15A 860200 WD-23-4-A-09 BV1 EXAMINATION SCHEDULE COMPDESC ITEMNO METHOD PUM.P SUPPORT F01.40P VT-3 SUPPORT F01.30V VT-3 SUPPORT F001,30H Vr-3 SUPPORT F01.30R VT-3 SUPPORT F01.30R VT-3 W/ATT SUPPORTSSH-65A D01.020 VT-I SUPPORT F01.30S VT-3 W/ATT SUPPORT R-43 D01.020 VT-1 SUPPORT F01.30R VT-3 SUPPORT F01.30R VT-3 WATT SUPPORT.R-141 D01.020 VT-1 SUPPORT F01.30R VT-3 WIATT SUPPORT R-35 001.020.

VT-i SUPPORT F01..30R VT-3 SUPPORT F01.30R

  • VT-3 SUPPORT F01:30R VT-3 SUPPORT F101.30H VT-3 SUPPORT F01,30R VT-3 SUPPORT FO'1:30R VT-3 WIATT SUPPORT R-12C-4 DD01.20 VT-i SUPPORT F01.3 R VT-3 SUPPORT F01,OLR VT-3 W/ATT SUPPORT.R27C-2 001.020 VT-1 SUPPORT F01-30R VT-3 SUPPORT F01.30L VT-3 W/ATT SUPPORT.R-18C-3 D01.020 VT.i SUPPORT F01.30R VT-3 SUPPORT F01.30A VT-3 SUPPORT F01.30R VT-3 SUPPORT F01.30R VT-3 SUPPORT F01.30V VT-3 SUPPORT F01.30R VT-3 SUPPORT F01.30R VT-3 SUPPORT F01.30R VT-3 SUPPORT F01.30R VT-3 SUPPORT F01,30R VT-3 SUPPORT FO1:30A

',VT-3 SUPPORT F01.30R VT-3 SUPPORT FOI..30R Vr-3 SNUBBER F01-30N VT-3 SNUBBER F01-30N

.VTý3 WIATT' SUPPORT A-15C(1).

D01.020 VT-I SUPPORT F01. 30A VT-3 SUPPORT RING F01.40E VT.3 SUPPORT RING F01,40E VT-3 WELDED PAO FOR WS-i D01.010 VT--

WELDED PAD FOR WS-2 001.010 VT-1 SUPPORT LEG F01.40E VT-3 SUPPORT LEG F01.40E VT-3 SUPPORT LEG F01.40E VT-3 SUPPORT LEG F01.40E VT-3 W/ATT SUPPORTWS-1 D01.010 VT-1 WYATT*SUPPORT.WS-2 001.010 VT-1 W/AT-SUPPORTWS-3 D01,010 VT-1 W/ATT SUPPORT WS-4 D01.0iO VT-1 NEUTRON SHIELD COOLER SUPPORT F01.40E VT.3 W/ATT SUPPORT WS-1 D01,010 VT-1 WMATT SUPPORT WS-1 D01.010 VT-1 W/ATT SUPPORT SH-14 D01.020 VT-1 SUPPORT F0-30S VT-3 SUPPORT F01.3DV VT-3 W/ATT SUPPORTR-21 001.020 VT-1 ISO_NO E-010A 0051A 0051A 0051A 00518 0051B 0051B 0054A 0054A 0054B 0055A 0055A 0057A 0057A 0057A 0131A 0131.B 0164A 0164A 0164A 0164A 0164A 0164A 0164A 0164A 0164A 0164A 0175A 0178A 0178A 0178A 0178A 0179A 0.179A 01 79A 0183A 0188A 0284A 0284A 0285A 0285A 0286A 0286A E-010A E-01 0A E-010A E-010A E-0C0A E-010A E-O10A E-010A E-010A E-010A E-010A E-O10A 0211A 02lA 021 1A 0063A 0063A 0083A 0083A 1st 2nd 3rd X-X-

X-X-

x-X-

- x-X--

Xo X-X-

  • rX

-" X -

X_

7-X_

X_

X_

X_

X_

X_

X_

X_

X-X-

X_

xl-X-

X_

X-

'X-X-

X.

X

.. X-

-- X-

-- X-X-

X.

X-X-

X-X-

X-X-

X-X-

x,

(Page 26 of 42)

Procedure Number:

Beaver Valley Power Station 1/2-ADM-2039

Title:

Unit:

Level Of Use:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number:

1 l10 26 of 42 ATTACHMENT C Page 13 of 14 BV1 EXAMINATION SCHEDULES ATTACHMENT C SUMNO COMPjI 860300 WD-23-R-21

.860900 WDm23-R,28 861200 WVD-24-RH-33

.862100 wD-25-A-38 862700 FCo9-2-A-06 862800 FC-9-R-20 863500 FC-9-2K-A-01 TO 04 863600 FC-9ýR-16 865150 FC-P-IA-CS-I 865i51 FC-P-IA-CS-2 865500 FC-5-RH-2 865810 FC-E-1A-A-01 865811 FC-E-1A-WS-I 865812 FC-EA1A-A-02 865513 FC-E-iA-WS-2 866200 FC-4-HSS-5A 867300 FC-l-SH-25A 867900 FC-31-PSST-206 868100 FC-31-VS-206A 868300 RH-BE-1A-A-17 TO 22 868400 RH-E-iA-RSTR-3 868700 RH-E,2A-WS-1 868500 RH-E-2A-A-01 869500 WR-28-R-81 870400 WR-19-HS.S-300 870500 WR-l 9-7-A-01 8706001 WR-19-R-24 871.000 WR-!9-R-21 872M00 WR19-2-A-16 TO 17 872700 WR-19-R-49 572900 WR-19-R,31 873500 WR-19-VS-29A 874500 VVR-19-6-A-05 874500 WR-19-SH-23 875500 WR-9-HSS-313 877300 WR-17-VS-19 877600 WR-17-R-17 879800 WR-17-1-A-02 879900 WR-17-SH-66 882200 WR-20-1 0-A-01 TO 02 882300 WR 20-R-57 885000 WR-20-6-A-03 885100 WR-20-R-61 888100 WR-53-IRH-94 888700 WR-43-2-A-01 868800 WR-43-A-91 890500 WR-i 19-R-152 892835 WR-670-PSST-3 892850 WR-P-1C-RSTR,1 892852 WR-P-I.C-RSTR-2 892860 WR-P-6A-MS-1 893000 WR-5-R-298 893900 WR-1-R-294 894500 WR-99.R-291 895030 WR-172-1-A-0O 805031:

WR-172-R.275 895125 WR-676-PSR-4 895190 RV HEAD LIFT RIG 895790 RV INTERNALS LIFT RIG 896800 RC.RUMP MOTOR ITEM I 896900 RC PUMP MOTOR ITEM 2 896950 RC PUMP.MOTOR ITEM 5 BVW EXAMINATION SCHEDULE CoMP_DESC SUPPORT SUPPORT SUPPORT SUPPORT W/ATT SUPPORT R-20 SUPPORT WIATT SUPPORT R-16 SUPPORT PUMP SUPPORT PUMP SUPPORT SUPPORT WIAT-SUPPORT WSI SUPPORT WATT SUPPORT WS-2 SUPPORT SNUBBER SUPPORT SUPPORT SUPPORT UPPER LUG WIATT UPPER RESTRAINT ASSEMBLY SADDLE STRUCT. SUPP SADDLEATTACHMENT FOR WS-1 SUPPORT SNUBBER W/ATT SUPPORT R-24 SUPPORT SUPPORT W/ATT SUPPORTR-49 SUPPORT SUPPORT-SUPPORT WATT SUPPORT:SH-2 3 SUPPORT SNUBBER SUPPORT SUPPORT W/ATT SUPPORT SH-68 SUPPORT WIATT SUPPORT.R-57 SUPPORT WIATT SUPPORT.R-61 SUPPORT SUPPORT W/ATT SUPPORT A-91 SUPPORT SUPPORT SUPPORT PUMP.SUPPORT PUMP SUPPORT PUMP SUPPORT SUPPORT SUPPORT SUPPORT W/ATT SUPPORTR-275 SUPPORT SUPPORT LIFTING DEVICE LIFTING DEVICE SPREADER ASSY WELD SIDE PLATES WELD MASTER LINK ITEMNO METHOD F01.30R VT-3 F0.1 30R VT-3 F01.30H VT-3 FO1.30A VT-3 D01,020 VT-1 F01,30R VT-3 D01.020 VT-1 FO1. 30R VT-3 601,40P VT-3 FO1.40P V-3 F01.30H VT-3 001.010.

VT-1 FOQ.40E VT-3 D01.010 VT-1 F01.40E VT-3 F01.30N VT-3 F91.30S VT-3 F01.30T VT-3 F01.30V VTr3 D01.010 VT-1 F01.40E VT-3 F01,40E VT-3 001.010 VT-1 FO1.3OR VT-3 F01,30N VTý3 001.020 VT-1 FOl1.3OR VT-3 F01,30R VT-3 D01,020 VT-i F01.30R VT-3 FO1.30R VT-3 F01.30V VT-3 D01.020 VT-1 F01.30S VT-3 FOI.30N VT-3 F01.30V VT-3 F01.3CR VT-3 001:020 VT-1 FP1.30S VT-3 D01.020 VT-1 FO1.30R VT-3 D01,020 VT-1 FO1.3CR VT-3 FO1.30H VT-3 D01.020 VT-i F01.30A VT-3 F01.30R VT-3 FO1.30T VTr3 FO 1.40P VT-3 F01.40P VT-3 F01.40P VT-3 F01.30R VT-3 F01,30R VT-3 F01.3R VT-3 001.020 VT-1 FO,30R vr-3 F01.30R VT-3 GL81,07 AE GL81-07 AE GL81-07 MT GL81-07 MT GL81-07 MT ISO_-NO is 0063A 0063A 0063A 0064A 0070A 0070A 00708 00708 E-O1OA E-OOA 0071A X-0071A A 0071A 0071A

-0071A II-0071A 0150A 01 50A 0150A E-OiOA X-E-004A X-E-010A X-E-010A X-0066A 0067A 0067A X-0067A X-0067A 0068A 0068A 0068A X-0068A 0068A 0068A 0069A

0069A, 0069B X-0069B X-
0128A, 0128A 01285 X-01288 X-0224A 0225A X-0225A X-0229A 8084A E-0I0A.

E-OIOA 0801A 0801A 080.3A 0804A

0804A, 8085A WCAP-1016 WCAP-101.69 --

WCAR-i109

-0 WCAP-10169 --

VVCAP-10169--

t 2nd 3rd x -

X X_

x -

x -

x -

x X

x -

x -

x X_

A x

x x -

x x -

x -

x -

x -

x -

x -

x -

X -

X-X -

X-1 X -

X-.

X -

x -

X -

x -

x -

X_

X -

x -

X-X -

(Page 27 of' 42)

Procedure Number:

yPower Station 1/2-ADM-2039

Title:

Unit:

Level OfUse:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number:

10 27 of 42 ATTACHMENT C Page 14 of 14 BV1 EXAMINATION SCHEDULES ATTACHMENT C BV1 EXAMINATION SCHEDULE SUM-NO 899020 8991.50 899200 899210 901270 903910 903915 903980 903985 903997 907150 907200 907210 907220 908110 908120 908130 9081.40 909850 912790 91.2850 913850 913870 913885 914850 916200 929500 929600 929700 930000 930010 930100 930200 930300 930350 930400 COMPID OS-2-R-46 QS-2-2L-L-79 QS-2-3-F-05 QS02-3-L78 QS-4-PSST-504 QS 1iC-A01 TO.02 QS-4-RH-406 QS 4-1OE-A-01 TO 02 QS-4-A-10 QS-4-10G-HSS-202 QS1-2-L-207 OS-1.-2-S-06 QS 2-L-206 QS-i-R.R049 QS-P-lA-MS-I QS-P-!A-MS-2 US-P-IA-MS-3 QS-P-1A-MS4.

QS-69-PSR-254 QS-3-R-21 QS-3-Rfi-22 OS-9-1 -F-01 OH-57-1-S-22 CH-.123-I-F-01 CH-149-1-S-22 CH--149-1-S-17 CH-99-1.-$-48 CH-100-1-S-42 CH-A0l-I-S-38 1 CNNMT-LINER 1ICNMT-LINER-AREA-3 1 CNMT-MO[STBARR 1 CNMT-BLDFLG 1 CNMT-EQUHATCH 1CNMT-PENE-BLTG 1CNMT-CONCRETE COMPPESC SUPPORT LONGITUDINAL WELD PIPE WELD LONGITUDINAL WELD SUPPORT W/ATT :SUPPORT RH-406 SUPPORT WIATTSUPPORT A-1I SUPPORT SNUBBER LONGITUDINAL WELD PIPE WELD LONGITUDINAL WELD SUPPORT PUMP SUPPORT PUMP SUPPORT PUMP SUPPORT PUMP SUPPORT SUPPORT SUPPORT SUPPORT PIPE WELD SOCKET WELD SOCKET WELD SOCKET WELD SOCKET WELD SOCKET WELD SOCKET WELD SOCKET WELD CONTAINMENT LINER CONTAINMENT LINER MOISTURE BARRIER FUEL CANAL BLIND FL. BOLTING EQUIPMENT HATCH BOLTING PENTRATION.BOLTING:

CONTAINMENT CONCRETE ITEMLNO METHOD F01.20R VT-3 R1.11 UT R1.11 UT R1,11 UT F01.20T VT-3 C03.020 PT F061.20H VT-3 C03.020 PT F0i,20A VT-3 F01.20N VT-3 R1,11 UT R1.i11 UT F0!20DH VT-3 F01.40P VT,3 F01.40P VT-3 F01.40P VT-3 F01.40P VT,3 F01.20R VT-3 F01.20R VT.3 F01.20S VT-3 R1i1 UT R1.12 VT-2 R1A.2 VT-2 R1.12 V'T-2 R1.12 VT-2 R1.12 VT-2 R112 VT-2 R1.12 VTý2 E0 o11 GV E01.01.

UTT E01.030 GV E61.011 VT-3 E01.01-1 VT-3 E01.011 V"T-3 L01.01 VT\\3C ISO-NO 0o11c 0111.0 0111c 01.1:C 01110 0111A 0111A 0:11A 0111A.

0111A 01.13A 011.3A 0113A 01 13A E-006F E7006F E-006F E-006F 01138 01.138 01138 0111C 01703 1.042A 1254A 1254A 1518A 1 538A 151 OA 1st 2nd 3rd x.-

X_

X-x-

,XT X-X.

X_

-X_

X-r.r x.

x-xx xx xx xx xx xx XX XX:

XX xx xx Xx Xx xx xx X-X-x-

.A-A-

A-

  • x-X-X-

x-x-,X-X-X-X-

-X

(Page 28.

oý 42)

Procedure Number:

yPower Station 1/2-ADM-2039

Title:

Unit:

Level Of Use:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number:

10 28 of 42 ATTACHMENT D Page 1 of 14 BV2 EXAMINATION SCHEDULES ATTACHMENT D SUMNO COMPID 001100.

2CHS-PSR038 002000 2CHS-PSST037 002200 2CHS-PSR034 004600 2CHS-PSSH658X 007200 2CHS-PSSHO20B 007.300 2CHS-PSST019 009500 2CHS-PSR665 015600 2CHS-PSST732X

.016400 2CHS-PSR676X 018300 2cHS-PSST006A 01800 2CtHS,.PSST717X 019300 2CHS-PSR657X 026600 2CHSwPSSHO50 027100 2CHS-PSSP016X 027400 2CHS-PSR049 029400 2CHS-PSST044 033500 107425-MJ-04-8-1 TO 4 034200 2CHS-PSR653X 034500 2CHS-PSR654X 035100 2CHS-PSSP025X 030100 2CHS-PSR781 036400 2CHS-PSR679 037700 2CHS-PSR067A 03820W 2CHS-PSR066X 039800.

2CCHS-PSA6.16 039900 2CHS÷PSR615 040500 2CHS-PSRb20 043000 2CHS-PSR075X 0436O0 20HS-PSST077 046900.

2CHS-PSA611 049500.

2CHS-PSST072 050000 201HS-PSR073 050500 2CHS-PSSTO52 051500 2CHS-PSSH278 056100 2CHSPSR694 056200 2CHS-PSST12U 056900 2CHS-PSROO2 057000 2CHS-PSR003 057200 2CHS-PSR004X 060300.

2DGS-PSST840B

.062500 20GS-PSR104 062900 2DGS-PSR103 063200 200S-PSSP879 063300 2DGS-PSR053 064700

.200S-PSR092 065100 200S-PSRO9.5 065800 2DGS-PSR099 066100 2DGS-PSR101 D66200 2.DGS-PSAIO02 082200 2RCS-PSSTOOB 082800 2RCS-PSRO71X 085100 2R0.S-PSRO37 087300 2RCS-PSSH076X 106600 2RCS-PSRBSO 107700 2RCS-PSSH652 BV2 EXAMINATION SCHEDULE COMPDESC SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SNUBBER SUPPORT SUPPORT PIPE BOLTING STUD BOLTS SUPPORT SUPPORT SNUBBER SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SNUBBER SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT ITEM-NO METHOD FO1,1OR VVT-3 FO1.1OT VT-3 FO1lOR VT-3 FOIAS VT-3 FOIOS VT-3 F01,1OT VT-3 FOIOR VT-3 FO.I1OT VT-3 FOI.1OR VT-3 FOI.10T VT-3 F0I,10T VT-3 FO1.1OR VT-3 FOI1OS VT.-3 F01O0N VT-3 FOllOR VT-3 FOIOT VT-3 B07,050 VTI" FO1.10R VT-3 FOlOR VT-3 FO1.1ON "VT3 FO1,1OR "VT-3 FOIlOR V/T-3 FO,1OR VT-3 FO,b10R VT-3 F01.10A VT-3 FO1.OR VT.-3 FOIOR VT-3 FOl.OT VlT-3 F01.10A VT-3 F01.IOT VT-3 FOI OR VT-3 FO110T VT-3 F01.106 VT-3 F01.IOR VT-3 FO.OT VT-3 FO:.1 OR VT-3 F01.1OR VT-3 FO1.1OR VT-3 FOl.1OT VT-3 F01.1OR VT-3 FO1.1OR VT-3 FOI.10N V'T-3 FO!.10R VT-3 FO1,.1OR VT-3 FO1.1OR VT-3 FoIlOR VT-:3 FOI.1OR VT-3 FO!.1QA VT-:3 FO1,OT VT-3 FO1R0 VT-3 F0I1OR VT-3 F01.10S VT-3 FP01.OR VT-3 F01liOS VT-3 ISq.NO 107404 107404 107404 107405 107413 107413 107414 107419 107419 107419 107419 107420 107424 107424 107424 107425 107425 107428 107428 1107175 1107175 1107175 110733 110733 110734

'110734 S1.0734 110735 110735 110738 110739 110739 110739 110765 110768 110768 110768 110768 110769 110771 110771 110771 110772 110772 110772 110772 110772 110772 110772 107004 107004 107004 107005 107009 107009 ist 2nd 3rd x

X-K-

X-.

X-X-

X-X-

K-X-

A-A-

A.

X-x K-X-

X-K-

K-X-

X-K-

K.

X-x -

K-K-

X-X-

X_

X_

X-

- X X-

.K

(Page 29 of 42)

Beaver Valley Power Station Procedure Number:

1/2-ADM-2039

Title:

Unit:

Level Of Use:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number:

10

.29 of 42 ATTACHMENT D Page 2 of 14 BV2 EXAMINATION SCHEDULES ATTACHMENT D BV2 EXAMINATION SCHEDULE SUM NO COMPID 108100 2RCS-PSSP026 100N00 2RQS-PSST042 127600 2RCS-PSR089X 129100

ýRCS-PSSP.035 129500 2RCS-PSSH052X 133.700 107015wMJ-01-B-1 TO 8 135600 2RCS-003-FOI 136000 2RCS-003-F02 137300 2RCS-006-FO1 137800 2RCS-006-F02 139200 2RCS-00.9-F02 139400 2RCS-MOV595-B-1 TO 24 139500 2RCS-MOV595-B-1 TO 24 141300 2RCS-001.-F03 141600 2RCS-001-F04 142600 2RCS-004-F03 143800 2RCS-007-F03 144500 2RCS-002-F03 147000 2RCS-005-3-2 148500 2RCS-008-3A-2 j48700 2RCS-084-F+3 149000 2RCS-PSSH001X "o0000 2RCS-021-F503 151000 2RCS-020-2B-2 15'1600 2RCS-041-F503 152600 2RCS-040-2B-2 153200 2RKg-061-F503 154300 2RCS-0602-2 154630 2RCS-044-F07 154660 2RCS-024-S03 156800 2RCS-PSA058 158100 2RCS-PSR115 1 60800 2RCS-PSSH058X 162000 2RCS-PSST024 162400 2RCS-080-F503 163500 2RCS-PSST027 164900 2RCS-PSSHIOOI 166400 2RCS-PSR006 168300 2RCS-081-F503 168400 2RCS-PSST013A 170100 2RCS-PSST015 171000 2RCS-PSA029 172800 2RCS-202-FOl 172900 2RCS-107-F01 173300 2RCS-PSSHO32X 174000 2RCS-PSR033 176800 2RCS-PSSH052 177600 2RCS-PSSP022X 177700 2RCS-PSSP022Y 178800 2RCS-101-F01 180950 2RCS-RV551A-SUP 181700 2RCS-1 03-FO0 1 84W0 2RC51024F01 187600 2RCS*PRE21-101A 187700 2RCS*PRE21-102B COMPODESC SNUBBER SUPPORT SUPPORT SNUBBER SUPPORT 2RCS-FE482 "STUD BOLTS PIPE WELD PIPE WELD PIPE WELD PIPE WELD PIPE WELD 2RCS-MOV595 STUDS 2RCS-MOV595 BOLTING PIPE WELD NOZZLE TO SAFE-END PIPE WELD PIPE WELD PIPE WELD PIPE WELD PIPE WELD PIPE WELD SUPPORT PIPE WELD PIPE WELD PIPE WEELD PIPE WELD PIPE WELD.

PIPE WELD SOCKET WELD SOCKET WELD SUPPORT SUPPORT SUPPORT SUPPORT PIPE WELD SUPPORT SUPPORT SUPPORT PIPE WELD SUPPORT SUPPORT SUPPORT PIPE WELD PIPE WELD SUPPORT SUPPORT SUPPORT SNUBBER.

SNUBBER PIPE WELD:

VALVE SUPPORT PIPE WELD PIPE WELD NOZZLE-TO-SAFE-END, SAFETY NOZZLE-TO=SAFE-END, SAFETY iTEMNO METHOD F01,10N V'.3 FOliOT vr-:3 F01.10R VT-3 Fo1.1N VT73 F01.10S VT-3 607.050 VT-I R1.11 UT R1.11 UT R1.11 UT RIl..1 UT R1.11 UT B06,210 UT 806.230 VT-1 RI.11 UT R1A 1 UT R1.11 UT R1..1i1 UT R1.11 LIT R1..1 UT R1.A1 LIT R1.11 UT F01.10S VT-3.

R1.11 UT R1.1i UT RiAi uT RI,11 UT Bill1 UT R1.11 UT R1,12 VT-2 R1.12 VT-2 P0I1*iA V1t3 F0!.10R VT-3 FOiAOS VTý$

F01.10T VTm3 R1i l UT F01.10T VT-3 FOl 10S VT-3 F01.10R VT-3 R1.11 UT F0t.10T VTr3 F01.IOT VT-3 F01-i0A VT-3 R1.11 UT R 1.Ill UT F01,10S VT-3.

F01.10R VT-3 F01.10S VT-3 F01.10N VTP3 F01.1ON VT-3.

Ri.1i UT F01 40X VT-3 R1.11 UT Bill1 UT R1.11 LUT RIM1 UT ISONO 107009 107009 107014 107014 107014 107015 110226 110226 110227 110227 110228 1102ý8 110228 110229 110229 110230 110231 110232 110233 110234 110235 110235 110236 110236 110237 110237 110i2 110238 110454 110456 1107139 1107140 110902 110902 110903 110903 110904 110904

.110906 110906 110906 110907 110907 110908 110908 110908 110909 110909 110909 110910 RVA43A 110911 110912 E-1D E-1D 1st 2nd 3rd X-X.

X_

X-A-

A-A-

A-

)(-

X_

A-X-

A- -

A-X-

x-X- --

x-A-

x-xx XX xx X-xx xx xx

-x x-

-x X-X-

A- *-

X-X, X-A-

-- X-X-

X-A-

A-A-

A-A-

(Page 30 o'f 42)

Procedure Number:

Beaver Valley Power Station 1/2-ADM-2039

Title:

Unit:

Level Of Use:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number:

10 30 of 42 ATTACHMENT D Page 3 of 14 BV2 EXAMINATION SCHEDULES ATTACHMENT D SUMNO COMPJID 187800 2RCSP.RE21-103C 187900 2RCS*PRE21-107Z 188000 2RCS'PRE21-202Z 188100 2RCS'PRE21-84Z 189800 2RCS'PRE21-C-1 190100 2RCS'PRE21-C-7 190300 2RCS'PRE21-L-2

190500, 2RCS*PRE21 -L-6 190600 2RCS*PRE21-N-09 190700 2RCS"PRE21-N-OOIR 190800 2RCS'*RE21-N-10 190900 2RCS*PRE21-N-I.IR 11)*l00 2RCS'PRE21-N--1I 191100 2RCS*PRE21-N-1:1IR 191200 2RCS*PRE21-N-12.

151300 2RCS*PRE21-N-121R 191400 2RCS'PRE21-N-1.3 191500 2RCS*PRE21-N-131R 191600 2RCSPRE21-N-,14 1W1700 2RCS'PRE2I-N-141R 191800 2RCS*PRE21-SS-l 191900 2RCS'PRE21-SS-2 192000 2RCS*PRE21-WL-1 192500 2RCS'P21A(FY-B01 TO B24 196100 2RCS*P21A-C-1 196600 2RCS*P21A-SUPP 205100 2RCS*REV21-C-IA 205200 2RCS*REV2 1-C-IB 205300 2RCS*REV21-C-2 205400 2RCS*REV21-C-3 205500 2RCS!REV21-C-4 209000 2RCSREV21-C-5 205700 2RCS'REV21-CAVLIN-A 205800 2RCS'REV21-CAVLIN-B 205900 2RCSýREV21-CAVLIN-C 206000 2RCS'REV21-CAVLIN-D 206100 2RCS!REV21-CAVLIN-E 206200 2RCS'REV21-CAVLIN-F BV2 EXAMINATION SCHEDUILE COMP DESC NOZZLE-T0-SAFE-END, SAFETY NOZZLE-TO 7SAFE-END, PORVS NOZZLE-TO-SAFE-END, SPRAY NOZZLE-TO-SAFE-END, SURGE CIRCUMFERENTIAL WELD CIRCUMFERENTIAL WELD LONGITUDINAL WELD LONGITUDINAL WELD NOZZLE-TO-VESSEL WELD NOZZLE INSIDE RADIUS.

NOZZLE-TO-VESSEL WELD NOZZLE INSIDE RADIUS NQZZLE-TO-VESSEL WELD NOZZLE INSIDE RADIUS NOZZLE-TO.-VESSEL WELD NOZZLE INSIDE RADIUS NOZZLE-TO-VESSEL WELD NOZZLE INSIDE RADIUS NOZZLE-TO-VESSEL WELD NOZZLE INSIDE RADIUS SKIRT SUPPORT STRUCTURAL SUPPORT INTEGRAL ATTACHMENT LUG MAIN FLANGE BOLT PUMP CASING WELD INTERMEDIATE SUPPORT RVCH FLANGE CIRC WELD CIRG WELD (FLG TO SIELL)

CIRCUMFERENTIAL WELD CIRCUMFERENTIAL WELD CIRCUMFERENTIAL WELD LH CIRCUMFERENTIAL'WELD, CAVITY LINER LUGS CAVITY LINER LUGS CAVITY LINER LUGS CAVITY LINER LUGS CAV!TY LINER LUGS CAVITY LINER LUGS ITEMNO METHOD R1,.1 UT R1.11 UT R1.11 UT R1l3l UT B02.011 UT B02.0!1 UT B02.012 UT 802.012 UT B03.110 UT B03.120 UT 803.110 UT 803.120:

UT B03.110:

UT 803.120 UT 8*03.11,0 UT 1030.120.

UT B03.0110 UT B03.120 UT B03.110 UT B03,120 UT F01.40E VT-3 F01.40E.

VT.3 810.010 MT B06.180 UT 812.010 VT-I F01:40P VT.3 801.040.

UT. MT B01.030:

UT 801.011 UT 801i011 ULt 801.011 UT 801.021 UT F01.40E VT-3 F0,40E:

VT-3 F01.40E VT-3 F01.40E VT-3 F01.40E VT-3 F01.40E VT-3 8307.080 VT-i B07,080.

VT-1 B07.080 VT-I B13.060 VT-3 ISO-NO E-iD E-1,1D E-1 D E-1D E-1D E-1D E-11)

E-I D E-1D E-I D E-1D

,-ID E-1D E-40D E-1D E-1D1 E-iD E-I:D E-113 E-1.1 E-113 E-1 C E-iD E-1A E-1A E-1A E-iD E-IA E-1A E-1A E-IA E-lA E-1A E-1A E-1A E-1A E-lA E-1A E-1A E-lA E-IA E-A E-1A E-iA E.1A E-1A E-1A E-IA 1st 2nd 3rd A-A-

X X-X-.

X-X-

X-X_

X-X-

X_

X-X-

X-X.

X-X-.

X-XX-X X-e-

IC-X-

X-XC-X_

X-e-

e-X_-

X-

-- X-AA AA AA AA AA AA AA AA AA AA AA AA AA AA AA AA AA AA

.X-X-

X-CX-206300 206400 206500 206700 206800 206950 206950 206970 206971 206972 206973 21Y7800 208200 208900 208910 208920 26930 2RCS!REV21-CONOSEAL-47 CONOSEAL ASSY 2RCS'REV21-CONOSEAL--49 CONOSEAL ASSY 2RCS*REV21-CONOSEAL-5I CONOSEALASSY 2RCS'REV21-CORE-ATT CORE RADIAL SUPPORT LUGS (4) 2RCS'REV21-CORE-SUP 2REV-HEAD-OD 2REV-HEAO-PENE-ID 2REV-HEAD-PENE-16 2REVý-HEAD-PENE-51 2REV*HEAD-PENE-56 2REV-HEAD-PENE-61 2RCSýREV21-CRDM-54 2RCS'REV21lCRDM,58 2RCS*REV21-CRDM-85, 2RCS*REV21-SHRD-SUP-1 2RCS*REV21-SHRD-SUP-2 2RCSREV21-SHRD-SUP-3 CORE UP/LOW SUPPORT STRUCTURE B1 3.070 VT.r3.

VESSEL HEAD OD SURFACE B04.010 VE VESSEL'HEAD PENETRATIONS B04.020 UT PENE IS REPAIR AREA B04.0,20 PT PENE 51 REPAIR AREA B04.020 PT PENE 56 REPAIR AREA B04.020 PT PENE 61 REPAIR AREA B04.020 PT CROM HOUSINGWELD B14.010 PT CRDM HOUSING:WELD B14.010 PT CRDM HOUSING WELD B14.010 PT COOLING SHROUD SUP LUG.

F01.40E VT-3 COOLING SHROUD SUP LUG F01.40E VT-3 COOLING SHROUD SUP LUG F1`.46E VT-3

(Page 31 of 42)

Beaver Valley Power Station Procedure Number:

1/2-ADM-2039

Title:

Unit:

Level Of Use:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number:

.10 31 of 42 ATTACHMENT D Page 4 of 14 BV2 EXAMINATION SCHEDULES ATTACHMENT D SUMMNO COMPJD 209000 2RCS&REV21-GRDMWWS.A 209100 2RCS*REV21-CRDM-WS-B 209200 2RCS'REV21-CRDM-WS-C 209300 2RCS*REV21-CRDM-WS-0 209400 2RCS*REV21-CRDM-WS-E 209500 2RCS'REV21.-CRDM-WSF 209700 2RCS'REV21-INT 209800 2RCS*REV21-L-06 209900 2RCS*REV21-L-07 210000 2RCS*REV21-L-08 210100 2RCS*REV21-L-09 210200 2RCS*REV21-L-i0 210300 2RCS*REV21-L-1 1 210400 2RCS-REV21 -L-12 210500 2RCS*REV21-L-13 210600 2RCS*REV21-L-14 210700 2RCS'REV21-LA15 210800 2RCS*REV21-L-16 210900 2RCSýREV21-LIG-01 TO 19 212800 2RCS'REV21-LIG-20 TO 38 214700 2RCS*REV2i-LIG-39 TO. 58 216700 2RCSREV21-N-17 216800 2RCS*REV21-N-17IR 216900 2RCS-REV21-N-14 217000 2RCS*REV21-N-1 8IR 217100 2RCS'REV21-N-19 217200 2RCS'REV21-N-191R 217300 2RCS*REV21-N-20 217400 2RCS'REV21 -N-20IR 217500 2RCS*REV21-N-21

.217600 2RCS*REV21-N-21 R 217700 2RCS'REV21-N-22 217800 2RCS'REV21 -N-221R 217900 2RCS*REV21-N-23 218000 2RCS*REV21 -N-24 218100 2RCS'REV21 -N-25 218200 2RCS*REV21-N-26 218300 2RCS*REV21-N-27 218400 2RCS*REV21-N-28 218540 2RCS'REV21-NUT-1 TO 19 218560 2RCSýREV21-NUT-20:TO 38 218560 2RCS*REV21-NUT-39 TO 58 MV2 EXAMINATION SCHEDULE COMPDESC CRDM SEISMIC SUPPORT CRDM SEISMIC SUPPORT CRDM SEISMIC SUPPORT CRDM SEISMIC SUPPORT CROM SEISMIC SUPPORT CRDM SEISMIC SUPPORT VESSEL INTERIOR LONGITUDINAL WELD LONGITUDINAL WELD LONGITUDINAL WELD LONGITUDINAL WELD LQNGITUDINAL WELD LONGITUDINAL WELD LONGITUDINAL.WELD LOWER HEAD MERIDIONALWELD LOWER HEADMERIDIONAL WELD LOWER HEAD MERIDIONAL WELD LOWER HEAD MERIDIONAL WELD THREADS IN FLANGE THREADS IN FLANGE THREADS IN FLANGE NOZZLE TO VESSEL WELD NOZZLE INSIDE RADIUS NOZZLE TO VESSEL WELD NOZZLE INSIDE RADIUS NOZZLE To VESSEL WELD NOZZLE INSIDE RADIUS NOZZLE TO VESSEL WELD NOZZLE INSIDE RADIUS NOZZLE TO VESSEL WELD NOZZLE INSIDE RADIUS NOZZLE TO VESSEL WELD NOZZLE INSIDE RADIUS NOZZLE-TOSAFE-END WELD NOZZLE-TO:SAFE-END WELD NOZZLE-TO-SAFE-E NO WELD NOZZLE-TO-SAFE-END WELD NOZZLE-TO-SAFE-END WELD NO77LE4TOoSAFE-END WELD BOLTING BOLTING BOLTING ITEM-NO METHOD F01.40E VT-3 FOI.40E VT-3 FOI:40E VT3 Fo1.40E VT-3 F01;40E VT-3 FS1;40E VT-3 B13.010 VT-3 B01.012, UT 801.012 UT B01.012 UT B01.012:

UT 101,012, UT 801.012 UT B01.012 UT B01.022 UT B0i,022:

UT 801.022 UT B01.022 UT 806.040 UT B06.040 UT B06,040 UT 803.090.

UT 803.100 UT 901.090 UT 803.1.00 UT B03,090 UT 803.1.00 UT 8030090 UT B03.100 UT 603.090 UT 903.1600 UT B03.090 UT B03.100 UT R1.11 UT, VE R1.11 UT, VE

Ri1, UT, VE R1.11 UT, VE R1.111 IT, VE R1.11 UTVE B06.010 VT-1 B06.010, V\\-I 806.010 VT-I B08.020 UT 806.020 UT 806.020 U`T B06.050 VT-I B06.050 VTr.1 806.050 VT-1 NR0612 MT NRO612 MT NR0812:

MT F01.40E VT-3 F01,40E VT-3.

FO1.40E VT-3 F ol4DE VT-3 IsO_NO E-1A E-1A E-1A E-1A F-1A E-1A E-1A E-1A E-1A E-1A E-1A E-1A E-1A E-1A E-1A E-1A E-1A E-1A E-1A E-IA E-1A E-1A E-1A E-1A E-1A E-1 A E-1A E-1A E-1A E-1A E-1A E-1A E-1A E&1A E-1A E-1A E-1A EE-A E-1A E-1 A E-1A E-1A E-1A E-1A E-1A E-1A E-1A e-iA E-lA E-1A E-1A E-1A Ist 2nd 3rd X-X-

X-X-

X-X-

X-X-

A-X-

AA XA A-X, A

XA P...A X-X-

X-X-

X-X-

X.

X-X -

X_

x-X.*

SXA X 4 AA AA XA

  • -° A-XI X.

X, X_

X-

-° X

X_

224340 224350 224360 23014*0 230150 230160 235810 235820 235830 235831 235832 235833 235834 2RCS*REV21-STUDw1 TO 19 BOLTING 2RCS*REV21.-STUD-20 TO 38 BOLTING 2RCS'REV21-STUD-39 TO 58 BOLTING 2RCS'REV21-WASH-! TO19 BOLTING 2RCS'REV21-WASNH20 TO 38 BOLTING 2RCS*REV21-WASH-39 TO 58 BOLTING 2RCS*RVH-iLUG-1 RV HEAD LUG #1 60.DEG AXIS 2RCS"RVH-LUG-2 RV HEAD LUG #2 180 DEG AXIS:

2RCS'RVH-LUG-3 RV HEAD LUG #3 300 DEG AXIS 2RCS'REV21-SUP-SAD-1 ALOOP OUTLET NOZZLE SADDLE 2RCS'REV2l-SUP-SAD-2 A LOOP INLET NOZZLE SADDLE.

2RCS'REV21-SUP-SAD-3 B LOOP OUTLET NOZZLE SADDLE 2RCS*REV21-SUP-SAD-4 B LOOP INLET NOZZLE SADDLE

(Page 32 of 42)

Procedure Number:

Power Station 1/2-ADM-2039

Title:

Unit:

Level Of Use:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number:

10 32 of 42 ATTACHMENT D Page 5 of 14 BV2 EXAMINATION SCHEDULES ATTACHMENT D SUMNO COMPJD 235835 2RCSREV21-SUP-SAD-5 235836 2RCSkREV2i -SU P-SAD-6 235839 2RCS'REV21-SUP-SKT 235840 2RCS'REV21-SUP2.1 235846 2REV-BMI-PENE-OD 235850 2REV-BMI-TUBE-WELDS 235860 2REv-HFAD-VENT-PENE 235911 2RCS*SG21A-H-SO1 TO $16 237511 2RCS'SG21AC-S01 TO*S16 239100 2RCS*SG2.1A-C-1 239200 2RCSSG2.1A-N-1AIR 239300 2RCS'SG21A-N-1 BIR 239410 2RCS*SG21A-SUPP 242800 2RCStSG21B-N-2AIR 242900 2RCS.'SG21B7N-28IR 246400 2RCS*SG21C-WN3AIR 246500 2RCS*SG21C-N-3BIR 247100 2RHS-PSSP521X 247300 2RHS-0015D 249500 2RHS-PSSH519X 250400 2RHS-MOV7O1B-B-1 TO 18 250600 2SIS-142-B-1 TO 18" 252300 2SIS-PSST608 253200 2SS.PSSH012A 253400 25IS-069-F804 253500 2SIS-069-F805 254600 2SIS-287-1A 255590 2SIS-148-B-1 TO 18 256050 2SIS-PSST669 256400 2SIS-PS$HOO3 257800 281S-PSROO5 258500 2SIS-PRRB04 259400 2SIS-289-1B 259800 2SIS-147-B-1 TO 18 262500 2SIS-PSSH011A 262600 2SIS-071-F508 263100 2SIS-PRR816 264000 2SIS-288-1 B 271700 2SIS-PSSTO28 277.500 2S*-PSR292 278400 2SISýPSR529 280700 2SIS-PSR524 281200 2SIS-PSA521 281800 2SIS-PSR518 283900 2SIS-PSR536 284500 2SIS-PSR553X 289700 2SIS-PSR086 N060 2SS-PSSHO93X 291200 2SIS-270-F06 292000 2i$.S-0!lS-lA 295100 2SIS-024-1A 295800 2SiS-,PsA0bo 296600 2SIS-PSSHO81B 296800 2SIS-269-F06 296900 2SIS-PSRO82 BV2 EXAMINATION SCHEDULE "COMPDESC C LOOP OUTLET NOZZLE SADDLE C LOOP INLET NOZZLE SADDLE REACTOR VESSEL SUPPORT SKIRT NEUTRON SHIELD TANK RV BMI NOZZLES BMI NOZZLE TO TUBE WELDS RV.HEAD VENT PIPE TO ELB. WELD PRIMARY MANWAY BOLTING PRIMARY MANWAY BOLTING CIRCUMFERENTIAL WELD NOZZLE INSIDE.RADIUS NOZZLE.INSIDERADIUS LOWER INT SUPPORT STRUCTURE NOZZLE INSIDE RADIUS NOZZLE INSIDE RADIUS NOZZLE INSIDE RADIUS NOZZLE INSIDE RADIUS SNUBBER PIPE WELD SUPPORT "2RHS-MOV701 B STUDS AND NUTS 2SIS-142 STUDS ANDNUTS SUPPORT SUPPORT W/ATT FOR 2SIS-PSSH01 2A W/ATT FOR 2,SS-PSSH012A.

PIPEWELOD.

2SIS-148 STUDS ANP.N.UTS SUPPORT SUPPORT SUPPORT SUPPORT PIPEWELD:

2SIS-147 STUDS AND.NUTS SUPPORT W/A1T FOR 2SIS-PSSH01 A SUPPORT PIPE WELD SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT PIPE WELD:

PIPE:WELD PIPE WELD:

SUPPORT SUPPORT PIPE WELD SUPPORT ITEM.No METHOD F01.40E VT-3.

F01 40E VT-3 FO1.4OE VT-3 F01,40E VT-3 B15.080 VE B15.100 VE 51,5.215 VE B07.030 VT-1 BOT030 VT-I B02.040 UT 603.140 VT-I' 0030140 VT.i F01 AOE VT-3 B03.140 VT, I 803.140 VT-i B03.140 VT-1 103:140 VT-I F01 ION VT-3 R1.1.1 UT F01.IOS VT-3 807.070 VT'1 807,070 VT-I

01.107 VT-3 F01..OS VT.3 810.020 PT 010.020 PT R1_11 UT 807,070 VT-1 F01.10T VT-3 F01 loS VT-3 FOI1OR VT-3 FOI.IOR VT-3 RI1i UT B07.070 VT.1 F01 10S VT-3 010.020 PT F01.1CR VT-3 R1.1i UT F01.10T VT-3 F01.OR VT-3 FD.:1OR VT-3 F01.10R VT-3 FO.10A VT-3 F01..OR VT-3 FO1.1OR VT-3 FOI:OR VT-3 F01.10R VT-3 F01.10S VT-3 R1.11 UT RI.11 UT R1.11 UTL F01..1OA VT-3 F01.1OS VT-3 RI,1l UT F01.l:R VT:3 ISO-NO E-IA E6-A E-1A E-IA E-1B E-113 E-18 E-113 E-IB E-11B

&1tB E-1B E-18B 107120 107120 107120 107120 108202 108202 108202 108202 108202 108202 108204 108204 108204 108205 108205 108205 108207 108207 108207 108207 108267 1107127 110789 110789 110790 110790 110790 110791 110791 110801 110801 110801 110801 110802 110817 110817 110817 110817 1st 2nd 3rd X-A-

A.

A-A-

A-x-

X_

X _

X-X-

X7 X- _.

A-A-

A-A-

A- ýA-X -

X-X-

X-A-

A-

(Page 33 ok. 42)

Procedure Number:

Beaver Valley Power Station 1/2-ADM-2039

Title:

Unit:

Level OfUse:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number:

10 33 of 42 ATTACHMENT D Page 6 of 14 BV2 EXAMINATION SCHEDULES ATTACHMENT D

$SUMNO COMPID 298700 2SIS-012-1A 299500 2SIS-PSSTO85 302100 2SIS-026-ID 302900 2SIS-271-F04 303200 2SIS-PSSP209A 303300 2SIS-PSSP209B 303400 2SIS-PSSH100 303600 2SIS-PSR101X 304300 2SIS-271-F06A 305200 2S]S-PSA103X 306200 2SIS-PSR105X 307500 2SIS-025-1.B 307650 2BDG-08-F-12 314050 2CHS-434-F02 315400 2-HS-071-F0B 315900 2CHS-PSR146 317450 2CHS-433-F02 318900 2CHS-070-F06 31:9600 2CHS-d72.F02 319.700 2CHS-PSR147 320100 2CHS-PSA148 3122500 2CHS-PSR151 322600 2CHS-072+F07 323000 2CHS-72 -SAIC 324000 2CHS-PSSP252Y 324650 2CHS-291 -F403 325800 2CHS-320-F404 329600 2CHS-PSA018 330700 2CHSmPSR015Y 331800 2CHS.PISR082R 332250 2CHS-124-F409 336000 2CHS-PSR144 338100 2CHS-PSR073Y 339600 2CHS-PSRQ68Y 341700 2CHS-PSR017Y 342500 2CHS-207-F02 342800 2CHS-PSR315F 344300 2CHS-PSR372F 353,00 2CHS-PSA29OF 354700 2CHS-PSR299F 356400 2CHS-PSR288F 358100 2CHS-PSA1 55 371900 2CHS-PSR203 373850 2CHS-056+F13 374300 2C.HS-015-F02 374500 2CHS-015-F03 376100 2CHS-015-FO6 376300 2CHS-015-F07 377600 2CHS-068-2-A 380900 2CHS-067-2A 381300 2CHS-PSR813 384300 2CHS-063-2-A 387200 2CHS-356-1B 387800 2CHS-069-F518 389400 20HS-278-F400 BV2 EXAMINATION SCHEDULE COMP_DESC PIPE WELD SUPPORT PIPE WELD PIPE WELD SNUBBER SNUBBER SUPPORT SUPPORT PIPE WELD SUPPORT SUPPORT PIPE WELD SOCKET WELD SOCKET WELD BUTT WELD SUPPORT SOCKET WELD:

BUTT WELD BuTT WELD SUPPORT SUPPORT SUPPORT BUTT WELD BUTT WELD SNUBBER SOCKET' WELD.

SOCKET WELD SUPPORT SUPPORT SUPPORT SOCKET WELD SUPPORT SUPPORT SUPPORT SUPPORT SOCKETWELD SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SOCKET WELD BUTT VVE.D BUTT WELD BUTT WELD BUTT WELD BUTT WELD BUTT WELD SUPPORT BUTT WELD BUTT WELD BUTT WELD SOCKET WELD ITEMNO METHOD R1.11 UT F*.i0T VT-3 R1.11 UT Ri.

UT F0I.10N VT-3 PFO1t0N VT-3 F01.10S VT-3 F01.10R VT-3 R1.11 UT F01,10A VT-3 F01.10R VT-3 RIl1 UT R1.12 VT-12 R1.12 VT-2 R1.11 UT F01.20R VI-3 R1.12 VT-2 R1.11 UT Ri.11 UT F01.20R VT-3 FO1.20A VT-3 1`01120R VT-3 R1.11 UT R1;1.1 PIT F01.20N Vr-3 R1;12 VT-2 R1.12 VT-2 F01,20A VT-3 F01.20R VT-3 F01.20R VT-3 R1.12 VT-2 F01.20R VT-3 F01.20R VT-3 F01.20R VT-3 F01 20R VT-3 R1.12 VT-2 F01.20R VT-3 F01.20R VT-3 F01.20A

\\/T-3 F01,20R VT-3 o01 20R Vr-3 F01.20A VT-3 101.20R VT-3 R1.12 V'rT2 Ri.,li UT R1.1i UT R1.11 UT R1.11 UT RIzll UT Ri.11 UT F01.20R V"-3 R1.11 UT R1.11 UT Ri.11 UT Ri,12 VT-2 ISO-NO 110818 11019.

110819 110829' 110829.

110829 110829 110829 110829.

110830 110830 110830 110447 108301 108301 108301 108302 108302 108302 108302 108302 108303 108303 108303 108303 108304 108304 108305 108305.

108308 108306 108308 108308 108309 108309 108313 108313 108313 1083i5-108316.

108317" 108318 100342 410466 108342 108342 108342 108342 108343 108344 108344 108345 108396 108396 108396.

1st 2nd 3rd X-X-

X-X-

X-X-

X-xx xx xx XX xx xx A-X-

X-X-

x-xx xx xx xx:

xx xx

ý?X-X_-

-X X

X_

X.,

X-X-

X_

X-X.

X-X-

X-X" X-Xo

-X X

XX:

(Page 34 Af 42)

Beaver Valley Power Station Procedure N erM 2

3 9

Title:

Unit:

Level OfUse:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number:

10 34 of 42 ATTACHMENT D Page 7 of 14 BV2 EXAMINATION SCHEDULES ATTACHMENT 0 SUMNO COMP_ID 389600.

2CHS-278-F401 389700 2CHS-PSR274Y 390200 2CHS-279-F500A 391009 2CHS-357-F13-C 391010 2CHS.357.`F12-C 391150 2CHS-PSSH867 392400 2CHS-PSST277Y 392900 2CHS-070-F512 3931,00 2CHS-PSR278Y 393500 2CHS-275-F400 393700 2CHS-275-F401 394400 2CH&276-FS02A 395400 2CHS-358-1B 397100 2CHS-07I-F5.12:

397700 2CHS-272-F400 397900 2CHS-272-.F401 398600 2CHS-273-F502A 399000 2CHS-PSR254Y 4Q2100 2CHS-PSR318 402200 2CHS-120-F514 402300 2CHS-120-F51 5.

402400 2CHS-120-F516 402500 2CHSA120-F517 404700 2CHS-PSR323 410300 2CHS-PSR217R 434700 2CHS-149-F25 452000 2CHS-PSR058C 453800 2CHS-PSR079C 461800 2CHS'E25A-SUPP 461900 2CHS-P21A-A-1 462000 2CHS*P21A-A-2 462100 2CHS*P21A-A-3 462200 2CHS*P21A-A-4 452300 2CHS'P21A-WS-1 462310 2CHS'P21A-WS-2 462320 2CHS*P21A-WS-3 462330 2CHS*P21A-WS-4 464900 2FWS-PSR003 466200 2FWS-PSSH002:

471650 2FWS-PSST185 471680 2FWS-022-F-801 471900 2FWS-PSSPO06 472000 2FWS-PSSH007 472800 2MSS-169-F01 474000 2MSS-PSST101B 474200 2MSS-037-F801 475600 2MSS-170-FOI 478400 2MSS-171-F01 BV2 EXAMINATION SCHEDULE COMP DESC SOCKET WELD SUPPORT BUTT WELD BuTT WELD BUTT WELD SUPPORT SUPPORT BUTT WELD SUPPORT SOCKET WELD.

SOCKET WELD BUTT WELD BUTT WELD BUTT WELD SOCKET WELD SOCKET WELD BUTT WELD SUPPORT SUPPORT W(ATT FOR 2CHS-PSR318 W/ATT FOR 2CHS-PSR318 W/ATT FOR 2CHS-PSR318 W/ATT FOR 2CHS-PSR3I8 SUPPORT SUPPORT SOCKET WELD SUPPORT SUPPORT LUBE OIL COOLER SUPPORT W/ATT FOR WS-4 W/ATT FOR WS-3 WIATT FOR WSr2 W/ATT FOR WS-I PUMP SUPPORT PUMP SUPPORT PUMP SUPPORT PUMP SUPPORT SUPPORT SUPPORT SUPPORT W/ATT FOR.2FWS-PSST185.

SNUBBER SUPPORT BUTT WELD SUPPORT W/ATT FOR 2MS$-PSST!.01B BUTT WELD BUTT WELD ITEMNO METHOD R1.12 VT.2 F01.20R

'"T 3 R1,11 UT R1.11 UT R1ll UT F0t.20S VT-3 F01.20T VrT3 R1.11 UT F01.20R VTý3 R1.12 VT-2 RI.12 VT-2 R1.11 UT R1.11 UT R1.11 LUT R1".12 VT-2 R1,.*2 VT:-2 RIl1 UT F01,20R VT.3 F01.20R VT-3 C03,020 PT C03.020 PT C03.020 PT C03.020 PT 1`0120R VT-3 FPt 20R VT-3 R1.12 VT-2 F01.20R VT-3 FOI.20R VT-3 F01.40E VT-3 C03.030 PT C03.030 PT C03-030 PT C03.030 PT F01.40P VT-3 F01.40P VT-3 F01,40P VT-3 F01.40P VT-3 F01,20R VT-4 F01.20S VT-3 F01.20T VT-3 C031020 MT F01.20N VT-3 F01.20S VT-3 R1.11 UT F01.20T VT-3 C03.020 MT R14.11 UT R1..11 UT ISO.NO 108396 108396 108396 263020 263020 263021 108397 108397 108397 108397 108397 106397 108398 108398 108398 108398 108398 106398 109940 109940 109940 109940 109940 109941 109943 110298 410312 410313 E-2H E-2H E-2H E&2H E-2H E42H E-2H E-2H E-2H 101702 101.702 101706 101706 101 706 101706 100206 100206 100206 100207 100208 100208 100210 100210 100210 100210 100210 100210 1st 2nd 3rd XX XX XX X-X-

X XX' XX XX XX XX XX X-XX XX XX XX XX XX X-X-

X-X-

XX XX XX X-e-.

x-X-

X-X-

X-X-

X-

-X-X-

X-X_

X

-X X

X X,

X-X, X-X e...

479350 483400 483600 483700 483900 484200 484400 2MSS-AOV101C-STUD1 TO 24 VALVE BOLTING 2MSS-PSST004 SUPPORT 2MSS-35 -6A BUTT WELD 2MSS-035-LO5 LONGITUDINAL WELD 2MSS-035-L06 LONGITUDINAL WELD 2MSS-PSR003 SUPPORT 2MSS-PSSPO06 SNUBBER C04.040 F01.20T R1.11 R1.11 R11.1 F01.20R FO1.20N UT VT-3 UT UT UT VT-3 VT.3

(Page 35 of 42)

Procedure Number:

yPower Station 1/2-ADM-2039

Title:

Unit:

Level Of Use:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number:

10 35 of 42 ATTACHMENT D Page 8 of 14 BV2 EXAMINATION SCHEDULES ATTACHMENT D SUMNO COMPID 531610 2RHS-0O6-F-502 53.1611 2RHS-006-F-503 531612 2RHS-006-F-504 53161.3 2RHS-006-F-505 531614 2RHS-006-F-802 531615

.2RHS-006-F-803 531616 2RHS-006-F-804 531617 2RHS-006-F-805 551900 2RHS-PSSP003 557600 2RHS-PSA511X 559200 2RHS-PSST517X 559700 2RHS-PSSH514X 560400 2RHS-PSA512X 561300 2RHS-PSR51OX 5§3500 2RHS-PSST506X 566500 2RHS-PSR453 570700 2RHS-PSR750 573200 2RHS*E21A-WS-1 573300 2.RHS'E21A-WS-2 573400 2RHS'E21A-C-2 573500 2RHS*E21A-A-1 573700 2RHS*E21A-N-3 573800 2RHS'E21A-N-4 57ý900 2RHS'E21A-C-1 575300 2RHSIP21A-A-1 575600 2RHS*P21A-WS-1 575700 2RHS*P21A-WS-2 575710 2RHS*P21A-WS-3 580550.

2RSS-PSST587A 580600 2RSS-004-F826 580700 2RSS-1004-F828 581100 2RSS-PS"H454A 551200 2RSS-004-F830 581300 2RSS-PSSH454B 581400.

2RSS-004-F831 583900 2RSS-PSSP465X 5861 DO 2RSS.PSR108 592400 2RSS-PSR131Y 597400 2RSS-PSSH122Y 597500 2RSS-009-F801 597600 2RSS-009-F802 597700 2RSS-009-F803 597800 2RSS-009-F804 613400.

ZRSS'E21A-WS-1 613600 2RSS*E2IA-WS-3 613t00 2RSS'E21A-N-12 613850 2RSS*E21A-N-12A 613900 2RSSýE21A-N-13 613950 2RSS*E21A-N-13A 6.14000 2RSS*E21A-WS-2

614200, 2RSSE21A-A.2 6.17100 2RSS*E21A-C-1 017200 2RSS'E21A-C-1l 617250 2RSS'E21A-C-17 617270 2RSS*E21A-C-18 BV2 EXAMINATION SCHEDULE COMPDESC ItEM NO METHOD WIATT FOR 2RHS-PSST035A/B C03020.

PT W/ATT FOR 2RHS-PSSTl035NB C03.020 PT W/ATT FOR 2RHS-PSSTO35AIB C03.020 PT WIATT FOR ZRHS-PSSTO35AJB C03.020 PT WIATT FOR 2RHS-PSSTO35AJB C03.020 PT WN/AT-FOR 2RHS-PSST035A/B C030020:

PT WtATT FOR 2RHS-PSSTO35A/B 003.020 PT WIATT FOR 2RHS-PSST035AB C03.020 PT SNUBBER F01.20N VT-3 SUPPORT.

F01.20A VT-3 SUPPORT F01.20T VT-3 SUPPORT F01,20S VT-3 SUPPORT F01.20A VT-3 SUPPORT F01.20R VT-3 SUPPORT F01.20T VT-3 SUPPORT F0I.20R VT-3 SUPPORT F01.20R VT-3 FOOT SUPPORT #1 F01.40E VT-3 FOOT SUPPORT #2 F01.40E VI-3 HEAD CIRCUMFERENTIAL WELD#2 C01.020 VT.2 WIATT FOR WS-1 C03.010 PT NOZZLE-TO-SHELL WELD:# 3 NOZZLE-TO-SHELL WELD # 4 SHELL CIRCUMFERENTIAL WELD # 1 WELDED ATTCHMENT FOR WS-1 PUMP SUPPORT PUMP SUPPORT PUMP SUPPORT SUPPORT W/ATT FOR 2RSS-PSST587A W/ATT FOR.2R$S-PSST587A SUPPORT W/ATT FOR 2RSS-PSSH454A SUPPORT W/ATT FQR.2RSS-PSSH454B

.SNUBBER SUPPORT SUPPORT SUPPORT WIATT :FOR 2RSS-PSSH122Y WIATl FOR 2RSS-PSSH122Y W/A'T FOR 2RSS-PSSHI22Y W/ATT FOR 2RSS-PSSH122Y MECHANICAL RESTRAINT MECHANICAL RESTRAINT C02.021 VT-2 C02.021 VT-2 01..010:

VT-2 C03.030 PT FO140P VT-3 F01.40P1 VT-3 F01.40P VT-3 F01.20T VT-3 C03,020 PT CO0 020 PT F01.20S VT-3 C03.020 PT F01.20S VT-3 C03,020 PT F01.20N VT-3 FO1.20R VT-3.

F01,20R VT-3 FO1.205 VT.3 C03.020 PT C03.020 PT C03.020 PT C03.020 PT FOPI40E VT-3 F01.401 VT-3 ISO-NO 107103:

107103 107103 107103 107103 1.07103 107103 107103:

107116 107121 107122.

107122.

1.07122 107122 108208:

110723 1107286 E-2P E-2P E-2P E-2P E-2P E-2P E-ZP E-2K E-2K E-2K E-2K 107950:

107950 107950' 107950 107950.

107950 107950:

107951

107952, 107964 107968 107968 107968 107968 107968 E-2L E-2L E.2L E-2L E-2L E-2L E-2L E-2L E-2L E-2L E-2L E-2L 1st 2nd 3rd X_

x-X-

X-X X.-

x-

    • X_

X.

X-SX.

X,-

X-x-

X-X-

X X-X-

X-X-

X-x-

X-X-

X-X-

X-X-

X.

X-X, X-X-

X-

.x-X.-

-X-X-

X-X-

.X_

X-X_

NOZZLE TO SHELL REINF PADWELD C02.011 PT NOZZLE TO SHELL REINP PAD WELD C02.011 PT NOZZLE TO SHELL REINF PAD WELD C02_011 PT NOZZLE TO SHELL REINF PAD WELD C02.011 PT STRUCTURAL SUPPORT F01.OE VT-3 WELDED ATTCHMENT FOR WSi C03.010 PT TUBESHEET TO.SHELL WELD # 1 C01.=30 UT TUBESHEET TO SHELL WELD# 11 C01,030 UT NOZZLE WELD C02.011 PT NOZZLE WELD C02.011 PT

(Page 36 of 42)

Procedure Number:

Beaver Valley Power Station 1/2-ADM-2039

Title:

Unit:

Level OfUse:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number:

10 36 of 42 ATTACHMENT D Page 9 of 14 BV2 EXAMINATION SCHEDULES ATTACHMENT D BV2 EXAMINATION SCHEDULE SUM-NO 621110 621400 621500 621600 621700 621800 621900 622000 622100 622200 622300 622900 623000 623100 623200 623400 623800 623900 624000 634200 636200 639100 640634 641400 641500 641650 6.42150 643350 644000 649700 650000 653200 654000 660100 661600 662900 664500 665709 669250 69300 670200 673500 673600 674900 676100 679500 680200 661350 681660 685600 686900 688500 690100 692300 694300 COMP0ID 2RSSTP21A-A-l 2RSSP21A-C-04 2RSSTPIlA-C-01 2RSS-P21A-N,02 2RSS0P21A-C,03 2RSS'P21A-C-05 2RSS'P21A-L-06 2RSS4P21A-C-07 2RSS'P21A-L-08 2RSSP21A-C-09 2RSS*P21A-C-10 2RSSýP21A-C-17 2RSS.*P21A-C-18 2RSS*P21A-C-19 2RSSNP21A-N,20 2RSS*P21A-L-22 2RSS*P21A-WS-1 2RSS*P21A-WS-2 2RSSP21A-WS-3 2SDS-PSAO27R 2SDS-PSR102R 2S0&PSR135R 2S18-243-A 2SIS-PSSP449A 2SISmPSSP449B 2SIS-PSST682A 2SIS-PSST682B 2SIS-305-F-02 2SIS-PSR351Y 2S61-005-F526 2SIS-PSR318Y 2SIS-PSST31`0X 2SIS-PSSH322X 2SIS-PSSJ1359Y 2SIS-PSR338Y 261S-006-F-22 2SIS-PSA331Y ZSIS-PSR340Y 2SIS-167-F-01 2SIS-PSSP301Y 2SIS-PSST607 2SIS-PSRO19 2SIS-PSR0188 2SIS-PSR017

.2SIS-PSR012.

2SIS-2486-AA 2SIS-PSR083Y 2SIS-392-Fl1 2SIS-PSR020 2SIS.PSR050.

2SI1-PSA053.

2SIS-PSR00 2SIS-PSR064 2S1S-029-7-A COMPDESC WELDED ATTCHMENT.o GUSSET PUMP CASING WELD #4 PUMP CASING. WELD # 1 PUMP CASING WELD #2 PUMP CASING WELD # 3 PUMP CASING WELD #5 PUMP CASING WELD #16 PUMP CASING WELD # 7 PUMP CASING WELD #8 PUMP CASING WELD #9 PUMP CASING WELD #10 PUMP CASING WELD #17 PUMP CASING. WELD #18 PUMP CASING WELD #19 PUMP cASING WELD #20 PUMP CASING WELD #22 PUMP SUPPORT NO. 1 PUMP SUPPORT NO. 2 PUMP SUPPORT NO. 3 SUPPORT SUPPORT SUPPORT BUTT WELD SNUBBER SNUBBER SUPPORT SUPPORT SOCKET WELD SUPPORT BUTT WELD SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT BUTT WELD SUPPORT SUPPORT SOCKET WELD SNUBBER SUPPORT.

SUPPORT SUPPORT SUPPORT SUPPORT BUTT WELD SUPPORT SOCKET WELD SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT BUTT WELD ITEM-NO METHOD C03.030 PT C06.010 PT C66.010 PT C06,010 PT C06.010 PT C06.010 PT C06.010 PT CD6.010 PT

.CO6,010 VT-2, PT C06.010 PT C06,0 10 PT 006.010 PT F01,40P VT-3 F01 40P VT-3 FO1.40P VT-3 F01.20A VT-3 F01.20R VT-3 F01.20R VTý3 R1,11 UT FO1.20N VT-3 F01,20N VT-3.

F01.20T VT-3 P01.20T VT-3 R1.12 VT-2 F01 20R.

VT-3 R1.11 UT F01.20R.

VT-3' F01.20T VT-3 F01.208 V'T-3 FO1.206S VT-3 F01.20R VT-3 R.I.- 11 UT F01.20A.

VTw3 F01.2CR.

Vr-3 R1.12 VT-2.

F01.20N VT-3 F01 0T VT-3 FO1.20R.

VT-3 F01..20R:

VT-3 F01..20R VTV-3 F01.20R VT-3 R1.11 UT F01.20R VT-3 Rt12 VT-2 FOI:.OR!

VT-3 F01 :2CR VT-3.

FO1.20A.

VT-3 F01 20R VT-3 FO1.20R VT-3 F1:.20R:

VT-3 R1.11 UT ISO NO E-2M E-2M E-2M E-2M E-2M E-2M E-2M E-2M E-2M E-2M E-2M E-2M E-÷2M E-2M E&2M E-2M E-2M E-2M E-2M

510070 510210 510219 108101 108103 108.103 108103 108103 108103 108103 108105 108105 108106 108106 108108 108 108 108109 1081:09 106110 108111 108111 108112 108307 108307 108307 108311 410ý54 108311 4108346 108346 108347 108347 108347 108349 1st 2nd 3rd X-X-

X-X:-

X- _

K-e-

X-eC e-X-

e-e-

e-X-

eý em Xv, X-X -

X-X7 x-X-

x X-XX XX XX K-,-

X-X-

X.

X-XK-XX Xx XX X-X-

X-KX.

S--

K-xx xx xx X.--

-X K

X x

X-

(Page 37 or 42)

Procedure Number:

Beaver Valley Power Station 1/2-ADM-2039

Title:

Unit:

Level Of Use:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number:

10 37 of 42 ATTACHMENT D Page 10 of 14 BV2 EXAMINATION SCHEDULES ATTACHMENT 0 SUMNO COMP..J 694100.

2SISPSR044Y 69g7200.

2.SI-PSA.04 697210 2SIS-094-FP803 097700 2I.$-PISR002

702800, 2SIS-PSA114 703500' 2SIS-PSR*1 12 704000.

2SIS-PSR127 705500 2SIS-PSR108 715200 2SIS-PSR137Y 717050 2sIS-.093-F401 720500 2SIS-PSR155 722600 2SIS-PSST159 724100.

2SIS-102-2AA 725150 2SISn393-F23 727300 2SIS-PSA58OX 730100 2SIS-PSA590 735100 2SIS-PSR089R 736700 2SIS-PSA282X 737450 2SIS-215-F21A 741.100 2SIS-PSR642 747000.

21S-pFSA147R 749000 2SIS-104-14 750500 2SIS-PSR667 751450 2SIS-377-17 705900

ýSIS-PSR304R 759300 2SIS-PSSHO87X 75.9400 2$IS-011-F$00 759500 2SIS-01-1-F801 759600 2SIS-011-F802 759700 2SIS-011-F803 75.9400.

2SIS-011 F04 760800 2SIS-PSST035B.

762490.2 V5-PSR033A 762700 2SIS-PSRO31A 763700 2SIS-PSR043 767400 2SIS-PSST037B.

768100.

2S!S-PSRO38A 770100 2SIS-PSA220 771050 2SIS5-3652 772400 2SIS-102-8A 781300 2SIS-PSR371X 78.1.400 2SIS-009-F802

.781500 2SIS-009-F803 781600 2SIS.009*F804 781700 2SIS-009-F805 781800 2SIS009-F806 781900 2SIS-009-F807 782000 2SIS-009-F808 782100 2SIS-009-F809 178750 21S$-375-F40.2 787900 2SIS&096F508 789700 25IS-PSR322S 790800 2SIS-PSR321S 790900 2SIS-PSR237S 791200 2SIS-PSR256S BV2 EXAMINATION SCHEDULE cOMPDESC SUPPORT SUPPORT W/ATT FOR 2SIS;PSR004 SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SOCKET WELD SUPPORT SUPPORT BUTT WELD SOCKET WELD SUPPORT SUPPORT SUPPORT SUPPORT SOCKET WELD SUPPORT SUPPORT SOCKET WELD SUPPORT SOCKET WELD SUPPORT SUPPORT W/ATT FOR :2SIS.P$SH087X WIATT FOR 2SIS-PSSH087X WIATT FOR 2SIS-PSSHf)87X W/ATT FOR 2SIS-PSSH087X BUTT WELD SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SOCKET WELD BUT1T WELD SUPPORT WIATT FOR 251S-PSR371X W/ATT FOR 2SIS-PSR371X NWIATT FOR 2SIS-PSR371X W/ATT FOR 2SIS-PSR371X W/ATT FOR 2SiS-PSR371X W/ATT FOR 2SIS-PSR371X WIATT FOR 2SIS-PSR371X WIATT FOR 2SISPSR371X

.SOCKET WELD BUTT WELD.

SUPPORT SUPPORT SUPPORT SUPPORT*

ITEM NO METHOD FO1 20R VT-3 F011 V0A T-j C03.020:

PT FO..20R VT-3 F01.20A VT-3 F011.20R, VT'.3' F01.20R VT-3 F01.20R:

VT-3 F01.20R VT-3 R1.12 VT-2 F01.20R VT-3 F01 20T VT-3 RI.,11 UT R1.12 VT-2 F01.20A VT-3 F01.20A VT-3 F01.20R VT-3 F01.20A VT-3 R1.12 VT-2 F01,20R VT-3 F01.20A VT-3 R1. 12 VT-2 F01.20R VT-3 RI.12 VT-2 FFl0.20R VT-23 F01.20S VT-3 r03.020, PT C03,020 PT 003.020 PT C03,020 PT R1.1*i UT F01.20T VT-3 F801.20R V'I-3 FO1.20R V4-3 F01.20R VT-3 F01.20T VT-3 F01,.20R VTr-3 F01.20A VT-3 R1.12 V41-2 R1.11 UT F01.20R VT-3 C03.020.

PT C03.020 PT C03.020 PT C03.020 PT C03.020 PT C03.020 PT C031020 PT C03,020 PT R1.t12 VT-2 R1.11 UT F011.20R VT-3 F01.20R VT-3 F0..20R VT-.3 FO-20R V'r-3 ISO-NO 108349 16350 108350 108350 109923 109923 109925 109926 109931 109932 109933 109934 109935 510-258 11:0140 110142 110155 11:0165 110165 1120.174 11.0178 110178 110274 11:0274 1107124 11.07 124 1107124 1107124 1107124 1107124 1107125 1107125 11:07 126 11071Z6 1107129 1107130 1107131 110-009 1107138 110793 110793 110793 11.0793 110793 110793 1 10793 110793 110793 1160798 110798 11i0o2 111103 111104 111104 1st Znd 3rd X

X-X-

X-X XX xx Xx xx x-x-

x.

-X X.

X_

X.

-x X-

-x xx xx xx

x.

x-x-

X-X-

X X

X_

xx xx xx X_-

X-

"" X-X-

(Page 38 of 42)

Procedure Number:

yPower Station 1/2-ADM-2039

Title:

Unit:

Level OfUse:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number:

10 38 of 42.

ATTACHMENT D Page 11 of 14 BV2 EXAMINATION SCHEDULES ATTACHMENT D SUM NO COMPID 791400 2SIS-PSR273S 791500 2SIS&PSR282S 791900 2SISP21A-MS-1 791950 2SIS*P21A-MS-2 79580.0 2SVS-PSROi 9 795900 2SVS-PSSHI018 795910 2SVS-040-F-808 795920 2SVS-04QF-809 795930 2SVS-040ýF-81 0 795940 2SVS-940-F-81 1 800200 2SVS-11 -6AB 802300 2SVS-12 -7C 806400 2SVS-PSSH661 806550 2SVS-PSST693 8089ý0 2CCPP21B-CS-1,2 811700 2CCP-PSSP317A 811800 2CGP-PSSPW17B 813600 2CCP-PSSH329 813700 2CCP-471 -F-808 813800 2CCP-47 1 -F-809 813900 2CCP-471-F-810 8140w0 200P-471:F-m1 1 814300 2CCP-PSR068 814400 2CCP-473-F-500 814500 2CCP-473wF-501 814600 2CCP-473-F-502 814700 2CCP-473-F-503 815200 2CCP-PSA077 816900 20CP-PSR099 817900 2CCP-PSSTO94Y 818900 2CCP-PSR112 819400 2CCP-PSR104 820800 2CCP-PSR089 821600 2CCP-PSA033 821700 2CCP-332-F-504 822300 2CCP-PSR042 822900 2CCP-PSRD45Y 824300 ZCCP-PSROO8 826500 2CCP-PSA014 827200 2CCP-PSR002 827300 2CCP-431-F-502 8274*00 2CCP-431-F-503 827500 2CCP-431-F-504 827600 2CCP-431-F-505 829400 2CCP-PSA021 829500 2CCP-323-F-800 829800 2CCP-323-F-801 829700 2CCP-323-F-802 829800 2CCP-323-F-803 829900 2CCP*323-F-804 830000 2CCP-323-F-805 831460 2CCP-PSR058 832300 2CCP-PSST381B 832800 ZCCP-PSR053

.8329W0 2CCP-433-F-500 BV2 EXAMINATION SCHEDULE COMPDESC ITEM-NO METHOD SUPPORT F01.20R VT-3 SUPPORT F01.20R VT-3 STRUCT SUPTS. SKIPS, BOLTS. ETC.

F01.40P V\\--3 STRUCT SUPTS, SKIDS, BOLTS, ETC.

F01.40P VT-3 SUPPORT FOI.20R VT-3 SUPPORT P01.20S VT-3 W/ATT FOR SUPPORT PSSH018 C03,020 MT WtATT FOR SUPPORT PSSH018:

C03,020 MT WIATT FOR SUPPORT PSSH018 C03.020 MT W,*A-f FOR SUPPORT PSSH018 C03.020 MT BUTr WELD R1.11 UT BUTT WELD R1.11 UT SUPPORT F61.208 VTT3 SUPPORT F01,20T VT-3 PUMP SUPPORTS F01.40P VT-3 SNUBBER FO1.3QN VTý3 SNUBBER F0i.30N VT-3 SUPPORT F01.3OS VTz3 WI/AT FOR 2CCP-PSSH329 001.020 VT-i W/ATT FOR 2CCP0PSSH329 D01.020 VT-I W/ATT FOR 2CCP-PSSH329 D01.020 VT-1, W/AT-FOR 200P-PSSW329 001 020 VT-1 SUPPORT F01.30R VT-3 W/ATT FOR 2CCP-PSR068 001.020 v]--1 W/ATT FOR 2CCPiPSR068 D01.020 V-i1 W/ATT FOR 2CCP-PSR068 D01,020 VT-i WV/AlT FOR 2CCP7PSR068 001.020 VT-1 SUPPORT F01.30A.

VT.3 SUPPORT F01.30R VT-3 SUPPORT F01.30T VT-3 SUPPORT F01.30R VT-3 SUPPORT F01.30R VT-3 SUPPORT FO1.30R VT-3 SUPPORT F01.30A VTe3 W/ATr FOR 2CCPSA033 D01,020 VT-i.

SUPPORT F01.30R VT-3 SUPPORT F61.30R VT-3 SUPPORT Fo1.30R VT-3 SUPPORT F01.30A VT-3 SUPPORT*

F0,1.30R VT-3 W/ATT FOR 2CCP-PSR002 D01:020 VT-1 W/ATT FOR 2CCP-PSR002 D01.020 VT-1 W/ATT FOR 2CCP-PSRO02 D01.020 VT-.1 W/ATT FOR 2CCP-PSR002 D01.020 VT-1 SUPPORT F01.30A VT-3 WI/AT FOR 2CCP-PSA021 001.020 VT-1 WIATrT FOR 2CCP-PSA021 D01.020 VT-.1 W/ATT FOR 2CCP-PSA021 001.020 VT-1 W/ATT FOR.2CCP-PSA02.1 D01.020" VT-1 WIATT FOR 2CCP-P$A021 D01.920 VT-i W/ATT FOR 2CCP-PSA021 001.020 VT-i SUPPORT F01.30R VT-3 SUPPORT F01.30T VT-3 SUPPORT r01.30R VT-3 W/ATT FOR 2CCP-PSR053 D01 020.

VT-i ISONO 111104 r.-2N E-22N 100203 100203 100203 100203 100203 100203 100216 100216 100217 100217 107203 107203 107204 107204 107204 107204 1607204 107206 107206 107206 107206 107206 I07207 107208 107210 107210.

1.07211 107212 107214 107214 10721:5 107215 107216 10721.7 107217 10721.7 107217 107217 107217 107219 107219 107219 107219 107219 10721 9 107219 107221 1,07222 107222 1.07222 Ist 2nd 3rd

.x.. -

.X.

x-it-X-

it X_

X-

-x

  • x X-x-

X_.

X-X-

X_

-- X.-

X-X_

X-.

it-X-

X-_

X-X- --

X_

it-X -

X X-X- -

X-X -

X- -

S-X X'-

X-X-it t

it- -

x.. -.

X _.-- -

(Page 39 oP 42)

Beaver Valley Power Station ProcedNumber:

1/2-ADM-2039

Title:

Unit:

Level Of Use:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number:

10 39 of 42 ATTACHMENT D Page 12 of 14 BV2 EXAMINATION SCHEDULES ATTACHMENT D SUMNO COMPID 833000 2CCP-433-F-501 833100 2CCP-433;F4502 833200 2CCP-433-F-503 834600 2CCP-PSR081 835800 2CCP-PSR306 836300 2CCP-PSSH314 838000

.2CCP-PSR310 839600 2CCP-PkSR46 844$05Q 2CCP-PSST939 844200

.2CCP-PSR438X 846500

.2CCP-PSR302X 854700 2CCP-PSR048 856200 2CCP*E21A-WS-1 856300 2CCP*E21A-WS-2 856400 2CCP'E21A-A-1 856500 2CCP*E21AXA-2 857400 2CCPTTK21Avw$-1 857500 2CCP-TK21A.A-1 860638 2FNC-PSST920 860640 2FNO-PSSH178 860641 2FNC-0O4:F-)00 860642 2FNC-004-F-801 860643 2FNC-004-F-802 860644 2FNC-004-F-803 860680 2FNC-PSR161 861000 2FWE-PSAO20Y 861100 2FWE-076-F-800 862100 2FWE-PSRO59Y 862800 2FWE-PSR024Y 864350 2FNE*P22-CS-l TO CS-4 864400 2FWE-PSSP354A 864600 2FWE-PSSP354B 864N00 2FWE-PSSH016A 865000 2FWE-PSRO15Y 886600 2FWE-PSRo43Y 867200 2FWE-PSR060Y BV2 EXAMINATION SCHEDULE COMPDESC W/ATr FOR 2CCP-PSR053 W/ATT FOR 2CCP-PSR053 WIATT FOR 2CCP-PSR053 SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT FIXED SUPPORT SLIDING SUPPORT WELDED PAD FOR WS-1 WELDED PAD FOR WS-2 SKIRT SUPPORT W/ATT FOR WS-1 SUPPORT SUPPORT W/ATr FOR 2FNC-PSSH178 W/ATT FOR 2FNC-PSSH178 W/ATT FOR 2FNC-PSSH178 WIATT FOR 2FNC-PSSH176 SUPPORT SUPPORT W/ATT FOR 2FWEýPSA020Y SUPPORT SUPPORT PUMP SUPPORTS SNUBBER SNUBBER SUPPORT SUPPORT SUPPORT SUPPORT PUMP SUPPORTS SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT W/ATT FOR 2FWE-PSSH017 W/ATT FOR 2FWE-PSSH017 W/AT[ FOR 2FWE-PSSHO17 W/ATT FOR 2FWE-PSSH017 SUPPORT SUPPORT SUPPORT SNUBBER.

SUPPORT SUPPORT SUPPORT SUPPORT SUPPORT ITEMNO METHOD 01.020 VT1-001,020 VT-1 D01.020 VT-1 FO1.30R VT-3 F

O1.30R VT-3 F01.0S VT-3 F01.30R VT-3 F01.30R VT.3 FO1,30T VT-3 FO1.30R VT-3 FO13OR VT-3 FO1.30R VT-3 F01.40E VT-3 F01.40E VT-3 D01.010 VT*I D01.010 VT-1 F61 40M VT'3 D01.010 Vr-I FOI.30OT VT-3 F01.30S VT-3 001.020 VT-1

.001.020 VT-1 D01,020 VT-i P01.020

VTr, F01.3.OR VT-3 F01.30A VT-3 001,020 V'rT1 FO1.30R VT-3 FOI:30R VT-3 101.40P VT-3 F01.30N VT-3 F01.30N VT-3 F01.30S VTw3 F01.30R VT-3 F01.30R VT-3 F01.30R VT-3 F01.40P VT-3 F01.30R VT-3 F61.30R VT-3 F01,30A VTý3 F01.30T VT-3 F01120S VT-3 D01.020 VT-i D01.020 VT-1 01,020 VT-I 001.020 VT-I F01.20R VT-3 F01.20R VT-3 F01.20A VT-3 F0.20N VT-3 FOi.20R VT-3 F01.20T VT-3 F01.20R VT.3 F01.20R VT-3 F01.30R VT-3 ISO_NO 107222 107222 107222 107226:

1107703i 107704 107705r 1107022 110709 110710.

110753.

120722:

E-3A E-3A E-3A E-3A E-3D E-3D 107707 107707 107707 107707 107707 107707 107708 101601 101601 101:602.

101604 E-3K 101606 101606 101606 101606:

101608 101,609:

E-3K 101616 101622 101624 101625 101707 101707 101707 101707 101707 101707 101708 1.01708:

101709 101617 101618 101618 101619:

520043 1st 2nd 3rd Xý X-X-

x-X-

X-X-

X-X-

X-X_

X-X-

X-X-

X X_

X_.X

-X X-X-

868850 870100 872,100 B72700 873100 873322 873323 873324 673325 873326 873331 873341 873346 673357

'3341 873365 873367 87337i 874100 2FWE*P23B-CS-1 TO CS-4 2FWE-PSR029Y 2FWE.PSR332X 2FWE-PSA357X 2FWE-PSST349X 2FWE-PSSH01 7 2FWE-108-F-804 2FPVE-108-F-805 2FWE-108-F-806 2FWE-108-P-807 2FWE-PSRO1 2A 2FWE-PSRO21 2FWE-PSA028 2FWE-PSSP01O 2P.WE-PSRS4OX

.2FWE-PSST362X 2FWVE-PSR053Y 2FWE-PSRO48Y 2FWE-PSR004C X_

X_

X-.

X-.

(Page 40 ý.of 42)

Procedure Number:

Beaver Valley Power Station 1/2-ADM-2039

Title:

Unit:

Level OfUse:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number:

10 40 of 42 ATTACHMENT Q SUMNO COMPID 874500 2FWE-PSR004R 874900 2FWE-PSA002C 875500 2HVC'REF24A-SPT-1 875600 2HVC*REF24A-W1 876000 2HVCýPSA001 876900 2HVC-PSR007 877100 2MSS&PSR496:

877300 2MSS-PSSP476 877500 2MSS4PSST49.1 877800 2RHS*E21A-A-3 877900 2RMS'E2iA-WS-3 878200 2RHS'E22A-WS-1 878300 2RHS'E22A-A-1 878600 2SVS-PSR235Y 879800 2SVS-PSA238Y 879900 2SVS-028-F-800 879972 2SWS*P21 B-MS-I 879974 2SWS'P21 B-MS-2 879.970 2SWS'-P21B-MS-3 880t00 2SWS-PSSH760A 881:100 2SWS-PSR023 881700 2SW&-PSR025 883500 2SWS-PSST007 884100 2SWS-PSRO04 884500 2SWS-PSR002 885200 2SWS-PSR04.1 885400 2SWS-PSA140 885500 2SWS-188-F-504 886700 2SVVS-PSA139 886800 2SWS-185-F-504 887800 2SWS-PSR063Y 689400 2SWS-PSR076 889900 2SWS-PSA072 890000 2SWS-201-F-517 890100 2SWS-PSR071 89D300 2SWS-PSR070 894600 2SWS-PSR130Y 894900 2SWS-PSR128Y 895600 2SWS-PSR123Y 898350 2SWS-PSST373 895600 2SWS-PSSH761 900100 2SWS-PSSP773A 900200 2SWS-PSSP773B 902000 2SWS-PSR136Y 903200 2SWS-PSR823Y 907000 2SWS-PSR210 907100 2SWS-1 88-F-803 907200 2SWS-18BF-804 907300 2SWS-188-F-806 907460 2SWS-188-F;812 927900 2SWS-PSST657T 928000 2SWS-PSR656T 928700 2SWS-R299 931.000 2SSWS-R283 931100 2SWS-005-F-10A ATTACHMENT D Page 13 of 14 BV2 EXAMINATION SCHEDULES BV2 EXAMINATION SCHEDULE COMP_DESC ITEM-NO METHOD SUPPORT F01,30R VT-3 SUPPORT F101,3A VT-3 SUPPORT FO1.40E VT-3 INTEGRAL ATTACHMENT 101.010 VT-i SUPPORT F01.30A VT-3 SUPPORT FGl,30R VT-3 SUPPORT F01.3OR VT'3 SNUBBER F01,30N VT-3 SUPPORT F01.30T VT-3 W/ATT FOR WS-3 D01.010.

VT-I UPPER SUPPORT RESTR ASSEMBLY F01.40E VT-S SADDLE STRUCT SUPPORT FOA,40E VT-3 W/AFTIFOR WS-1 D01.010 VT-I SUPPORT F01,30R.

VT-3 SUPPORT FO1.3OA VT-3 WIATT FOR 2SVS-PSA238Y D01.020 VT-1 PUMP SUPPORT F0i.40P VT,3 PUMP SUPPORT F01.40P VT-3 PUMP SUPPORT FQl 40P VT-$.

SUPPORT F01,30S VT-3.

SUPPORT F01.30R VT-3 SUPPORT F01.30R VTý3 SUPPORT F01.30T VT-3, SUPPORT F01.30R VT-3 SUPPORT F0130R VT-3 SUPPORT F01.30R VT-S SUPPORT F01.30A V\\T-3 WJATT FOR 2SWS-PSA140 D01.020 VT-I SUPPORT F01.30A VT-3 WIATT FOR 2SWS-PSA139 D01.020 VT-i SUPPORT F01.30R VT-3 SUPPORT FOI.30R VT-3 SUPPORT F01.30A VT-3.

WATT FOR 2SVWS-PSA072 D01.020 VT-1 SUPPORT F01.30R VT-3

.SUPPORT F01.30R VT-3 SUPPORT F01.30R VT-3 SUPPORT F01,30R VT-3 SUPPORT F01.30R VT-3 SUPPORT F01.30T VT-3 SUPPORT F01.30S VT-3 SNUBBER F01.30N VT-3 SNUBBER F01.30N VT-3 SUPPORT F01l30R VT-3 SUPPORT F01.30R VT-3 SUPPORT F01,30R VT-3.

W/ATT FOR 2SWS-PSR210 D01 020 VT-1 WYATT.FOR 2SWS-PSR210 D01.020 VT-i W/ATT FOR 2SWS-PSR2iO D01.020 VT-I WIATT FOR 2SWS&PSR210 D01.020 VT-i SUPPORT F01.30T VT-3 SUPPORT F01 30R VT-S SUPPORT F0130H VT-3 SUPPORT F01.301 VT-3 W/ATT:FOR 2SWS-RZ83 D01.020 VT-1 190INO 520102 520147 173901 173501 100215 100219 101614 E-2P E72P E-3E E-3E 101613 101613 101613 E-3L E-3L E-3L 100403 10 1902 101903 101906 101906 101906 101908 101908 101908 101909 101909 101910 101912 101912 101912 101912 101912 101921 101921 101922 101924 101925 101926 101926 101997 106004 109915 109915 109915 109915 109915 120731 120731 311001 311002 311002 1st 2nd 3rd X.

x-X-

x-i--

x-X-

X-X.

x-x

1.

X-

.X-X, X.

X--

Xý 1X_

x-X_

(Page 41

,of 42)

Procedure Number:

Beaver Valley Power Station 1/2-ADM-2039

Title:

Unit:

Level Of Use:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number:

10 41 of 42 ATTACHMENT D Page 14 of 14 BV2 EXAMINATION SCHEDULES ATTACHMENT D SUM-NO COMPID 931200 2SWS-005-F-12.

931300 2SWS-005-F-29.

931400 2SWS-005*-F,34:

93i500 2SWS-005-F.35 931600 2SWS-005-F-41 932450 2SWE-PSR652T 932500 RV HEAD:LIFT RIG 932600 RV INTERNALS LIFT RIG 932700 RC PUMP-MOTOR LIFT RIG 941550 2MSS-933:-FSC 941.561:

2MSS-PSA499 999980 2CNMT-LINER 999983 2CNMT-MOISTBARR 999985 2CNMT-BLDFLG 999986 2CNMT-EQUHATCH 999987 2CNMT-PENE-BLTG 999990 2CNMT-CONCRETE BV2 EXAMINATION SCHEDULE:

COMP DESC ITEMNO W/ATT FOR 2SWS-R283.

001 020 W/ATT FOR 2SWS-R283 D01.020 WATT FOR 2SWSTR283:

DO1.:020 WiATT FOR 2SWS-R283 001 020 W/ATT FOR 2SWS-R283.

001.020 SUPPORT F01.30R NR06i 2 NR0612 NRO612 W/ATT FOR PSA499 D01.020 SUPPORT F01.30A CONTAINMENT LINER E01l.011 MOISTURE BARRIER EO1:030 FUEL CANAL BLIND-FLANGE EO1.011 EQUIPMENT HATCH BOLTING E01.011 CONTAINMENT BOLTING E0I.011 CONTAINMENT CONCRETE.

L01.010 METHOD VT-1 VT-1 VT-1 VT-3 AE AE MT VT-I VT-3 GV.

GV VT-3 VT-3 VT-3 VT-3C ISONO 311002 31.1002 31:1002

311002 31.1002 120729 WCAP-10709 5201.55 5201155 1st X-X-

X-X-

2nd A-X-

X-X4 3rd A-X-

X, X-X.

A-x-

X-X_

X4

(Page 42,,f 42)

Beaver Valley Power Station Procedure Number:

1/2-ADM-2039

Title:

Unit:

Level Of Use:

BVPS ISI TEN-YEAR PLANS 1/2 General Skill Reference Revision:

Page Number:

10 42 of 42 ATTACHMENT E Page 1 of 1 PERIOD / INTERVAL DATES PERIOD / INTERVAL DATES BV-1 FOURTH INTERVAL 1-April 08 1ST PERIOD 1R20 (10/10) 1-Aug 11 1R21 (4/12) 2-Dec 14 31-Mar-18 2ND PERIOD 1R22 (10/13)

Outage Date 1R19 (4/09) 1R23 (4/15) 3RD PERIOD 1R24 (10/16)

BV-2 THIRD INTERVAL 29-Aug 08 Outage 2R14 Date (10/09) 29-Dec 11 1ST PERIOD 29-Apr 15 2ND PERIOD 2R17 2R18 (4/14)

(10/15) 3RD PERIOD 2R19 (4/17) 28-Aug-18 2R15 (4/11) 2R16 (10/12)