Meeting Notice, Pre-Application Meeting with Progress Energy Florida to Discuss the Status of the Extended Power Uprate at Crystal River, Unit 3
ML090620090
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/03/2009
From: Farideh Saba
Plant Licensing Branch II
To: Boyce T
Plant Licensing Branch II
Saba, F E, NRR/DORL/LPL2-2 301-415-1447
References
Download: ML090620090 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 r'1arch 3, 2009 MEMORANDUM TO: Thomas H. Boyce, Chief Plant Licensing Branch 11-2 Division of Operating Reactor Licensing FROM:

Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing SUB..IECT:

FORTHCOMING MEETING WITH PROGRESS ENERGY FLORIDA DATE & TIME:

Wednesday, April 1, 2009 9:00 a.m. - 12:00 p.m.

LOCATION:

U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 0-11 B2 Rockville, Maryland PURPOSE:

Pre-application meeting to discuss the status of the extended power uprate at Crystal River, Unit 3.

CATEGORY 1:*

This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the Nuclear Regulatory Commission (NRC) after the business portion, but before the meeting is adjourned.

MEETING CONTACTS:

Farideh E. Saba, I\\JRR Marlayna G. Valier, NRR 301-415-1447 301-415-3178 farideh.saba@nrc.gov marlayna.valler@nrc.gov

  • Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" (67 FR 36920), May 28,2002.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print),

please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

- 2 PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Reactor Regulation, Office of Reactor Research, and the Office of the General Counsel.

NRC Progress Energy T. Boyce, NRR M. Vaaler, NRR J. Franke D. Westcott F. Saba, NRR Et al.

S. Huntington T. Williams K. Wilson L. Wells M. Rigsby P. Ezzel J. Seals K. Greenwood Docket No. 50-302

Enclosure:

Agenda cc w/encl: Distribution via ListServ

AGENDA FOR THE APRIL 1! 2009, PUBLIC IVIEETII\\JGw BETWEEN THE NRC AND PROGRESS ENERGY FLOBl.Q.6 FINAL PRE-APPLICATION MEETING REGARDING EXTENDED POWER UPRATE (EPU}

CRYSTAL RIVER UNIT 3

1.

INTRODUCTIONS AND MEETING OBJECTIVES

a.

Nuclear RegUlatory Commission

b.

Progress Energy 9:00am

2.

LINKED OR RELATED AMENDMENT REQUEST STATUS

a.

Rod Ejection Accident Methodology

i.

Consistency with Evolutionary Power Reactors Topical Ii.

Acceptance review iii.

Schedule iv.

Requests for additional information (RAls) 9:10am

b.

Conversion Between E-BAR and Dose Equivalent Xenon

i.

Acceptance review Ii.

Schedule iii.

RAls 9:25am

c.

Setpoint Methodology 9:35am

i.

Revision 4 of TSTF-493 being finalized and converted to Consolidated Line Item Improvement Process ii.

Plan to commit to final TSTF*493 resolution in EPU application and separately BREAK 9:50am

3.

EPU TECHNICAL ISSUE DETAILS 10:00am

a.

Low pressure injection cross-tie

i.

Boron precipitation ii.

Core flood line break

b.

Secondary Depressurization 10:10am

i.

Larger safety-related atmospheric dump valves ii.

Circuit enhancements

c.

Meteorological data (X/Q) 10:20am

d.

Main Steam Line Break 10:30am

  • Tentative Schedule - Topics and time subject to change

- 2

e.

Performance of Large Transient Tests 10:40am

f.

Confirmatory Modeling/AREVA Workshop 10:50am BREAK 11 :OOam

4.

EPU AMENDMENT

a.

Submittal Sctledule/Format

i.

FormaVContent 11:1 Oam

1.

RIS-001

2.

GINNA (Most recently completed pressurized water reactor EPU)

3.

Nuclear Energy Institute guidelines Ii.

Schedule Challenges 11 :20am

1.

Linked submittals

2.

Reactor coolant system structural inputs

3.

Equipment qualification evaluation phase

b.

Environmental Report 11 :30am

i.

Consistency with license renewal environmental report

5.

CONCLUSIONS/QESTIONS AND ANSWERS 11 AOam ADJOURN 12:00pm

- 2 PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Reactor Regulation, Office of Reactor Research, and the Office of the General Counsel.

NRC Progress Energy T. Boyce, NRR M. Vaaler, t\\lRR J. Franke D. Westcott F. Saba, I'JRR Et al.

S. Huntington T. Williams K. Wilson L. Wells M. Rigsby P. Ezzel J. Seals K. Greenwood Docket No. 50-302

Enclosure:

Agenda cc w/encl: Distribution via ListServ DISTRIBUTION:

PUBLIC LPLlI-2 R/F RidsNrrDorlLpl1-1 RidsNrrPmCrystalRiver RidsNrrLaCSola RidsNrrDorl RidsAcrsAcnw_MailCTR RidsOpaMail RidsOgcMailCenter RidsNrrPmTAlexion RidsRgn2MailCenter Receptionists (OWFNITWFN)

PMNS ACCESSION NO ML090620090 NRC-001 OFFICE LPLlI-2/PM LPLlI-2/LA LPLlI-2/BC NAME FSaba CSoia TBoyce DATE 03/03/09 03/03/09 03/03/09 OFFICIAL RECORD COpy