Tech Spec Pages for Emergency Amendment 221 Regarding Drywell Floor Drain Sump Monitoring System
ML082401523
Person / Time
Site: Dresden Constellation icon.png
Issue date: 08/22/2008
From:
Plant Licensing Branch III
To:
Gratton C, NRR/DORL 415-1055
References
TAC MD9467
Download: ML082401523 (3)


Text

f. Surveillance Requirement 4.9.A.10 - Diesel Storage Tank Cleaning-(Unit 3 and Unit 2/3 only)

Each of the above Surveillance Requirements shall be successfully demonstrated prior to entering into MODE 2 on the first plant startup following the fourteenth refueling outage (D3R14).

3. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations: 10 CFR Part 20, Section 30.34 of 10 CFR Part 30, Section 40.41 of 10 CFR Part 40, Sections 50.54 and 50.59 of 10 CFR Part 50, and Section 70.32 of 10 CFR Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

A. Maximum Power Level The licensee is authorized to operate the facility at steady state power levels not in excess of 2957 megawatts (thermal), except that the licensee shall not operate the facility at power levels in excess of five (5) megawatts (thermal), until satisfactory completion of modifications and final testing of the station output transformer, the auto-depressurization interlock, and the feedwater system, as described in the licensee's telegrams; dated February 26, 1971, have been verified in writing by the Commission.

B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 2 2 1 , are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.

C. Reports The licensee shall make certain reports in accordance with the requirements of the Technical Specifications.

D. Records The licensee shall keep facility operating records in accordance with the requirements of the Technical Specifications.

E. Restrictions Operation in the coastdown mode is permitted to 40% power.

Renewed License No. DPR-25 Amendment No. 221

RCS Leakage Detection Instrumentation 3.4.5 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.5 RCS Leakage Detection Instrumentation LCO 3.4.5 The following RCS leakage detection instrumentation shall be OPERABLE:

a. Drywell floor drain sump monitoring system(a); and
b. Primary containment atmospheric particulate sampling system.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Drywell floor drain A.1 Restore drywell floor 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> sump monitoring drain sump monitoring system"a' inoperable. system"a) to OPERABLE status.

B. Primary containment B.1 Restore primary 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> atmospheric containment particulate sampling atmospheric system inoperable. particulate sampling system to OPERABLE status.

C. Required Action and C.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met. AND C.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (a) For Unit 3 only, the drywell equipment drain sump monitoring system may be used to satisfy requirements applicable to the drywell floor drain sump monitoring system until the system is repaired during a Unit 3 outage of sufficient duration, but no later than startup from D3R20.

Dresden 2 and 3 3.4.5-1 Amendment No. 185/221

RCS Leakage Detection Instrumentation 3.4.5 SURVEILLANCE REQUIREMENTS _

SURVEILLANCE FREQUENCY SR 3.4.5.1 Perform primary containment atmospheric 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> particulate sampling.

SR 3.4.5.2 Perform a CHANNEL FUNCTIONAL TEST of 31 days drywell floor drain sump monitoring system"a) instrumentation.

SR 3.4.5.3 Perform a CHANNEL CALIBRATION of drywell 12 months floor drain sump monitoring system"a' instrumentation.

(a) For Unit 3 only, the drywell equipment drain sump monitoring system may be used to satisfy requirements applicable to the drywell floor drain sump monitoring system until the system is repaired during a Unit 3 outage of sufficient duration, but no later than startup from D3R20.

Dresden 2 and 3 3.<4.5-2 Amendment No. 185/221