MONTHYEARML0518101532005-07-0606 July 2005 (BVPS-1 and 2) - Request for Additional Information (RAI) - Relaxed Axial Offset Control (TAC Nos. MC5904 and MC5905) Project stage: RAI L-05-133, Supplement to License Amendment Request Nos. 310 and 1822005-08-0808 August 2005 Supplement to License Amendment Request Nos. 310 and 182 Project stage: Supplement ML0603306362006-02-27027 February 2006 License Amendment, Issuance of Amendment Relaxed Axial Offset Control (RAOC) and Fq Surveillance Methodologies Project stage: Approval ML0605905492006-02-27027 February 2006 Technical Specifications Pages Re Relaxed Axial Offset Control (RAOC) & Surveillance Methodologies Project stage: Other ML0710202262007-04-0404 April 2007 Letter Transmitting Edwin I. Hatch, Joseph M. Farley, and Vogtle 2006 Annual Occupational Radiation Exposure Reports Project stage: Request ML0712204712007-04-30030 April 2007 Enclosure 3, Vogtle, Units 1 & 2 - Annual Radioactive Effluent Release Report for 2006 Project stage: Request ML0713600572007-05-14014 May 2007 Annual Radiological Environmental Operating Report for 2006 Project stage: Request NL-07-1261, Applicant'S Environmental Report Operating License Renewal Stage2007-06-30030 June 2007 Applicant'S Environmental Report Operating License Renewal Stage Project stage: Other ML0721300842007-08-15015 August 2007 Federal Register Notice: Vogtle Electric Generating Plant, Units 1 and 2 Project stage: Request ML0721403372007-08-21021 August 2007 FRN - Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process Project stage: Request ML0724001362007-09-0505 September 2007 Environmental Site Audit Regarding Vogtle Electric Generating Plant, Units 1 and 2, License Renewal Application (TAC Nos. MD5905 and MD5906) Project stage: Other ML0728405292007-09-27027 September 2007 Environmental Scoping Meeting Transcripts for Vogtle, Units 1 and 2, License Renewal Application Project stage: Meeting ML0728405302007-09-27027 September 2007 Environmental Scoping Meeting Transcripts for Vogtle, Units 1 and 2, License Renewal Application Project stage: Meeting ML0727502612007-10-0101 October 2007 Scoping Fleeting Handouts; Presentation Project stage: Request ML0728409632007-10-12012 October 2007 Summary of Public Environmental Scoping Meetings Related to the Review of the Vogtle Electric Generating Plant, Units 1 and 2, License Renewal Application (TAC Nos. MD5905 and MD5906) Project stage: Meeting ML0728411072007-10-24024 October 2007 Request for Additional Information Regarding Severe Accident Mitigation Alternatives for Vogtle Electric Generating Plant, Units 1 and 2, License Renewal (TAC Nos. MD5905 and 5906) Project stage: RAI NL-07-2119, License Renewal Application - Environmental Site Audit Information Request - Follow Up Response2007-11-12012 November 2007 License Renewal Application - Environmental Site Audit Information Request - Follow Up Response Project stage: Other ML0731201192007-11-16016 November 2007 Summary of Conference Call with Southern Nuclear Operating Company, Inc., to Discuss the Severe Accident Mitigation Alternatives Requests for Additional Information for Vogtle Electric Generating Plant, Units 1 and 2 Project stage: RAI ML0731112132007-11-19019 November 2007 Summary of Site Audit Related to the Review of the License Renewal Application for Vogtle Electric Generating Plant, Units 1 and 2 (TAC Nos. MD5905 and MD5906) Project stage: Approval ML0735200772007-12-0505 December 2007 E-mail from Karen Kaniatobe of Absentee Shawnee Tribe License Renewal for Vogtle, Units 1 & 2 Project stage: Other NL-08-0109, License Renewal Application, Follow Up to Severe Accident Mitigation Alternatives Request for Additional Information Review Questions2008-02-0101 February 2008 License Renewal Application, Follow Up to Severe Accident Mitigation Alternatives Request for Additional Information Review Questions Project stage: Request ML0811202792008-04-21021 April 2008 FRN - Notice of Availability of the Draft Plant-Specific Supplement 34 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants (TAC MC5905 and TAC MD5906) Project stage: Draft Other ML0810802992008-04-30030 April 2008 NUREG-1437 Supp 34 Dfc, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Regarding Vogtle Electric Generating Plant, Units 1 & 2. Project stage: Acceptance Review ML0816201172008-06-0303 June 2008 Transcript of Vogtle License Renewal Draft SEIS Public Afternoon Meeting on June 3, 2008 in Waynesboro, Georgia Project stage: Draft Approval ML0816500462008-06-0303 June 2008 License Renewal Dseis Meeting Evening Transcript Project stage: Meeting ML0816404022008-06-10010 June 2008 Response in Regard to License Renewal Application Review on Impacts to Historic Properties Project stage: Other ML0824905462008-06-10010 June 2008 Comment (9) of Karen Anderson-Cordova on Behalf of the Georgia Department of Natural Resources Approving the License Renewal Application Review of Vogtle Electric Generating Plant, Units 1 and 2 Project stage: Other ML0819000162008-06-26026 June 2008 Comment (1) of Heinz J. Mueller, on Behalf of the United States Environmental Protection Agency, on Draft Generic Supplemental Environmental Impact Statement, Vogtle Electric Generating Plant Site, Supplement 34, NUREG-1437 Project stage: Request NL-08-1038, Comment (6) of T. E. Tynan on Behalf of Southern Nuclear Operating Company, Inc., on Draft Generic Environmental Impact Statement for License Renewal of Vogtle, Units 1 & 2, Supplement 342008-07-14014 July 2008 Comment (6) of T. E. Tynan on Behalf of Southern Nuclear Operating Company, Inc., on Draft Generic Environmental Impact Statement for License Renewal of Vogtle, Units 1 & 2, Supplement 34 ML0819902122008-07-14014 July 2008 License Renewal Application Comments on Draft Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 34 ML0825200082008-07-18018 July 2008 Comment (7) of Gregory Hogue on Behalf of Us Dept of Interior, Draft Generic Environmental Impact Statement, NUREG-1437, Supplement 34 for License Renewal Nuclear Plants, Regarding Vogtle Electric Generating Plant, Units 1 and 2 ML0821000892008-07-18018 July 2008 Lr Dseis Comments from Dept. of Interior Project stage: Request ML0821908132008-07-22022 July 2008 Comment (3) of Sara Barczak on Behalf of Southern Alliance for Clean Energy (Sace) on the Dseis for Vogtle License Renewal (Revised Comments, in Place of 07/16/2008 Comments) Project stage: Other ML0824905452008-08-0101 August 2008 Comment (8) of Vivianne Vejdani on Behalf of the South Carolina Department of Natural Resources on the License Renewal Application Review of Vogtle Electric Generating Plant, Units 1 and 2 Project stage: Other ML0821406992008-08-0101 August 2008 Scdnr Comments on Vogtle License Renewal Dseis Project stage: Other ML0824905422008-08-0505 August 2008 Comment (4) of Roy E. Crabtree on Behalf of National Marine Fisheries Service on Generic Environmental Impact Statement, and Biological Assessment for Vogtle, Units 1 and 2, License Renewal Application Review Project stage: Other ML0823809492008-09-0303 September 2008 Project Manager Change for the License Renewal Environmental Review for Vogtle Electric Generating Plant, Units 1 and 2 Project stage: Other ML0831204212008-12-0808 December 2008 Notice of Availability of the Final Plant-Specific Supplement 34 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Vogtle Electric Generating Plant, Units 1 and 2 Project stage: Other ML0833803252008-12-31031 December 2008 NUREG-1437 Supplement 34 Generic Environmental Impact Statement for the License Renewal of Nuclear Plants Regarding Vogtle Electric Generating Plant, Units 1 and 2, Final Report Project stage: Acceptance Review 2007-08-21
[Table View] |
|
---|
Category:Letter
MONTHYEARML24032A0252024-02-0505 February 2024 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026-2023009 ML24010A0712024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports and Recordkeeping and Suspicious Activity Reporting) ML24031A6102024-01-31031 January 2024 Cyber Security Inspection Report 05200026/2024401 - Public ML24029A0592024-01-30030 January 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report Enclosure 2, GAE-NRCD-RF-LR-000002 P-Attachment, Rev. 0 ML24016A1132024-01-30030 January 2024 Correction of Unit 1 Amendment Nos. 96 and 190 and Unit 2 Amendment Nos. 74 and 173 Adoption of Standard Technical Specifications Westinghouse Plants NL-24-0031, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R232024-01-29029 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R23 IR 05000424/20244032024-01-26026 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000424/2024403; 05000425/2024403 NL-24-0020, Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report2024-01-22022 January 2024 Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report ML23347A2092024-01-17017 January 2024 Voluntary Requests for Data, Information, And/Or Observation ML23279A0042024-01-17017 January 2024 Amendment No. 194 to Remove Combined License Appendix C NL-23-0926, Correction of Technical Specification Typographical Error2024-01-12012 January 2024 Correction of Technical Specification Typographical Error ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23345A1312024-01-0303 January 2024 Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) ML23317A2072023-12-22022 December 2023 Issuance of Amendments 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-1448 ML23335A1222023-12-19019 December 2023 Safety Evaluation Regarding Implementation of Mitigating Strategies Related to Order EA-12-049 (EPID L-2023-LRQ-0002) - Letter ML23353A1702023-12-19019 December 2023 LAR-22-002, TS 3.8.3 Inverters Operating Completion Time Extension Letter ML23310A2922023-12-0707 December 2023 Issuance of Amendment for Exception to Regulatory Guide 1.163, LAR 23 007 ML23339A1812023-12-0707 December 2023 Correction Letter Regarding License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 ML23338A2182023-12-0606 December 2023 Project Manager Reassignment NL-23-0878, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation ML23289A1632023-11-28028 November 2023 Letter and Amendment 195 and 192 LAR-23-006R1 TS 3.1.9 More Restrictive Action NL-23-0827, Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.142023-11-17017 November 2023 Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.14 ML23318A4582023-11-14014 November 2023 Integrated Inspection Report 05200025/2023003 ML23312A3502023-11-14014 November 2023 Integrated Inspection Report 05200026/2023003 ML23306A3552023-11-0808 November 2023 NRC Initial Test Program and Operational Programs Integrated Inspection Report 052000/262023008 ML23268A0572023-11-0707 November 2023 Issuance of Amendments 194 & 191 Request for License Amendment Relocation of Technical Specification 3.7.9, Spent Fuel Pool Makeup Water Sources (LAR-23-003) IR 05000424/20234022023-11-0606 November 2023 Security Baseline Inspection Report 05000424/2023402 and 05000425/2023402 IR 05000424/20230032023-10-27027 October 2023 Integrated Inspection Report 05000424/2023003 and 05000425/2023003 ML23291A1512023-10-18018 October 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 0520026/2024401 ML23263A9852023-10-12012 October 2023 Issuance of Amendments Nos. 221 and 204, Regarding Technical Specification 5.5.11.C, Acceptance Criteria for Charcoal Filter Testing ML23283A0472023-10-0808 October 2023 Neop Letter Dated October 8, 2023 - Vogtle 3 & 4 - TS 3.7.6 License Amendment Request NL-23-0750, Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr2023-10-0404 October 2023 Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr NL-23-0745, Refueling Outage 1R24 Steam Generator Tube Inspection Report2023-09-22022 September 2023 Refueling Outage 1R24 Steam Generator Tube Inspection Report ML23254A2032023-09-13013 September 2023 Initial Test Program and Operational Programs Inspection Report 05200025/2023013 ML23241B0212023-09-12012 September 2023 Review of Quality Assurance Topical Report ML23234A2352023-09-0808 September 2023 Request for Withholding Information from Public Disclosure Notification of Full Compliance of Required Action for NRC Order EA-12-049 Mitigation Strategies for Beyond-Design-Basis External Events IR 05000424/20230912023-09-0505 September 2023 Plan Units 1 and 2 - NRC Investigation Report 2-2022-006 and Notice of Violation - NRC Inspection Report 05000424/2023091 and 05000425/2023091 ML23234A3002023-09-0101 September 2023 NRC Integrated Inspection Report 05200026/2023003 ML23243A0092023-08-31031 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 & 4 (Report 05200025 2023005 & 05200026 2023005) NL-23-0695, Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2)2023-08-31031 August 2023 Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2) ML23243B0252023-08-30030 August 2023 Exam Corporate Notification Letter (210 Day) IR 05000424/20230052023-08-29029 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 & 2 - Report 05000424/2023005 and 05000425/2023005 NL-23-0666, License Amendment Request: Remove Combined License Appendix C (LAR 23-008)2023-08-28028 August 2023 License Amendment Request: Remove Combined License Appendix C (LAR 23-008) 2024-02-05
[Table view] |
Text
September 3, 2008 Mr. Tom E. Tynan Vice President Vogtle Electric Generating Plant Southern Nuclear Operating Company, Inc.
7821 River Road Waynesboro, GA 30830
SUBJECT:
PROJECT MANAGER CHANGE FOR THE LICENSE RENEWAL ENVIRONMENTAL REVIEW FOR VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 (TAC NOS. MC5905 AND MD5906)
Dear Mr. Tynan:
This letter is to inform you that effective immediately, NRC Environmental Project Manager responsibility for the Vogtle Electric Generating Plant, Units 1 and 2, license renewal environmental review is transferred from Mr. J.P. Leous to Mr. Samuel Hernandez.
All correspondence for the Project Manager should be sent to:
Mr. Samuel Hernandez, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-11F1 Washington, DC 20555 Mr. Hernandez may be reached at 301-415-4049 or by e-mail at samuel.hernandez@nrc.gov.
Sincerely,
/RA/
David L. Pelton, Chief Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425 cc: See next page
ML082380949 OFFICE DLR:LA DLR:PM:RPB1 DLR:PM:RPB1 DLR:BC:RPB1 NAME I.King S.Hernandez D.Ashley D.Pelton DATE 9/2/08 9/3/08 9/3/08 9/3/08
Letter to T. Tynan from D. Pelton, dated September 3, 2008 DISTRIBUTION:
SUBJECT:
PROJECT MANAGER CHANGE FOR THE LICENSE RENEWAL ENVIRONMENTAL REVIEW FOR VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 (TAC NOS. MC5905 AND MD5906)
HARD COPY S. Hernandez E-MAIL RidsNrrDlr D. Pelton R. Franovich B. Pham D. Ashley R. Jervey T. Chandler G. McCoy S. Shaeffer DLR/RPB1 DLR/RPB2 DLR/RERB S. Uttal M. Notich
Vogtle Electric Generating Plant Units 1 and 2 cc:
Mr. Tom E. Tynan Arthur H. Domby, Esquire Vice President - Vogtle Troutman Sanders Vogtle Electric Generating Plant Nations Bank Plaza 7821 River Road 600 Peachtree Street, NE, Suite 5200 Waynesboro, GA 30830 Atlanta, GA 30308-2216 Mr. N. J. Stringfellow Resident Inspector Manager, Licensing Vogtle Plant Southern Nuclear Operating Company, Inc. 8805 River Road P.O. Box 1295 Waynesboro, GA 30830 Birmingham, AL 35201-1295 Office of the County Commissioner Mr. Jeffrey T. Gasser Burke County Commission Executive Vice President Waynesboro, GA 30830 Southern Nuclear Operating Company, Inc.
P.O. Box 1295 Mr. David Kyler, Executive Director Birmingham, AL 35201-1295 Center for a Sustainable Coast 221 Mallory Street, Suite B Mr. Steven M. Jackson St. Simons Island, GA 31522 Senior Engineer - Power Supply Municipal Electric Authority of Georgia Ms. Sara Barczak 1470 Riveredge Parkway, NW Southern Alliance for Clean Energy Atlanta, GA 30328-4684 428 Bull Street, Suite 201 Savannah, GA 31401 Mr. Reece McAlister Executive Secretary Ms. Bobbie Paul, Executive Director Georgia Public Service Commission Atlanta Womens Action for New Directions 244 Washington Street, SW 250 Georgia Avenue, SE, Suite 202 Atlanta, GA 30334 Atlanta, GA 30312 Mr. Harold Reheis, Director Savannah River Site Campaign Coordinator Department of Natural Resources Blue Ridge Environmental Defense League 205 Butler Street, SE, Suite 1252 3417 Sutton Place Atlanta, GA 30334 Augusta, GA 30906 Attorney General Mr. Bob Masse Law Department Resident Manager 132 Judicial Building Oglethorpe Power Corporation Atlanta, GA 30334 Vogtle Electric Generating Plant 7821 River Road Mr. Laurence Bergen Waynesboro, GA 30830 Oglethorpe Power Corporation 2100 East Exchange Place P.O. Box 1349 Tucker, GA 30085-1349
Vogtle Electric Generating Plant Units 1 and 2 cc:
Mr. Don L. Klima, Director Mr. T. C. Moorer - Project Manager -
Advisory Council on Historic Preservation Environmental Office of Federal Agency Programs Southern Nuclear Operating Company, Inc.
1100 Pennsylvania Ave, NW, Suite 803 40 Inverness Center Parkway Washington, DC 20004 P.O. Box 1295 Birmingham, AL 35201-1295 Mr. Strant Colwell, Supervisor U.S. Fish and Wildlife Service Walter Dukes 4270 Norwich Street Georgia Power Brunswick, GA 31520 699 Broad St.
Augusta, GA 30815 Mr. David Bernhart Assistant Regional Administrator Teresa Carter National Marine Fisheries Service American Cancer Society 263 13th Avenue South 2607 Commons Blvd.
St. Petersburg, FL 33701 Augusta, GA 30909 Dr. Ray Luce Eilis Godbee Historic Preservation Division/DNR 616 Godbee Road 34 Peachtree Street NW, Suite1600 Waynesboro, GA 30830 Atlanta, GA 30303-2316 Billy Hopper Mr. Stanford M. Blanton, esq. 416 McIntosh Dr.
Balch & Bingham LLP Waynesboro, GA 30830 P.O. Box 306 Birmingham, AL 35201 Karen Patterson Tetra Tech Ms. Moanica M. Caston 900 Trail Ridge Rd.
Vice President and General Counsel Aiken, SC 29803 Southern Nuclear Operating Company, Inc.
40 Inverness Center Parkway Merv Waldrop P.O. Box 1295 Burke County Board of Commissioners Birmingham, AL 35201-1295 P.O. Box 89 Waynesboro, GA 30830 Mr. Michael A. Macfarlane Southern Nuclear Operating Company, Inc. Sean Hayes 40 Inverness Center Parkway Georgia Dept of Natural Resources P.O. Box 1295 1885 Tobacco Rd.
Birmingham, AL 35201-1295 Augusta, GA 30906
Vogtle Electric Generating Plant Units 1 and 2 cc:
Sandy Shields 808 Main St.
Byron, GA 31008 Beverly Black Capital City Bank 615 Liberty St.
Waynesboro, GA 30830 Dick Byne Waynesboro City Council 537 Jones Ave Waynesboro, GA 30830 Chalmer R. Meyer Southern Nuclear Operating Company, Inc.
40 Inverness Center Parkway P.O. Box 1295 Birmingham, AL 35201-1295