ML080310684

From kanterella
Jump to navigation Jump to search

LB Order (Board Questions for the NRC Staff and Applicant)
ML080310684
Person / Time
Site: Pilgrim
Issue date: 01/31/2008
From: Abramson P, Cole R, Austin Young
Atomic Safety and Licensing Board Panel
To:
SECY RAS
References
06-848-02-LR, 50-293-LR, RAS 15007
Download: ML080310684 (5)


Text

1 Entergys Initial Statement of Position on Pilgrim Watch Contention 1 and Supporting Exhibits (Jan. 8, 2008).

2 NRC Staff Initial Statement of Position on Contention 1 and Supporting Exhibits (Jan.

8, 2008).

3 Licensing Board Order (Revising Schedule for Evidentiary Hearing and Responding to Pilgrim Watchs December 14 and 15 Motions) (Dec. 19, 2007).

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD PANEL Before Administrative Judges:

Ann Marshall Young, Chair Dr. Paul B. Abramson Dr. Richard F. Cole In the Matter of:

ENTERGY NUCLEAR GENERATION COMPANY AND ENTERGY NUCLEAR OPERATIONS, INC.

(Pilgrim Nuclear Power Station)

Docket No. 50-293-LR ASLBP No. 06-848-02-LR January 31, 2008 ORDER (Board Questions for the NRC Staff and Applicant)

The Board received the initial filings of direct testimony from the Applicant on January 8, 2008,1 and from the NRC Staff on January 30, 2008.2 In response to these filings the Board hereby directs both the NRC Staff and the Applicant to answer the following questions in detailed filings by February 11, 2008. These questions are considered to be in addition to any other questions the Board might present to the parties on or before February 18, 2008, pursuant to our scheduling order of December 19, 2007.3 DOCKETED 01/31/08 SERVED 01/31/08 Board Questions

1.

With regard to the Condensate Storage System (CSS) -

a. What is the minimum leakage rate that is certain to be detectable by the testing of the condensate storage tank (CST) water level every four hours, and, conversely, what is the maximum leakage rate that would not be detected by that testing? Provide a detailed statement of the basis of and sources for your answer.
b. What is the minimum leakage rate that is certain to be detected by the quarterly testing of the water flow from the reactor core isolation cooling (RCIC) pump and the high pressure cooling injection (HPCI) pump, and, conversely, what is the maximum leakage rate that would not be detected by that testing? Provide a detailed statement of the basis of and sources for your answer.
c. What is the smallest leakage rate that could reasonably be expected to challenge the ability of the CSS system piping at issue to fail to satisfy its intended function(s) as relevant for license renewal? Provide a detailed statement of the basis of and sources for your answer.
2.

With Regard to the Salt Service Water (SSW) system -

Explain how any leak in the SSW buried pipes that might carry radioactive water from the plant to the canal that dumps into the bay could challenge the ability of the SSW system to satisfy its intended function(s)? For example, is there any correlation between any potential leak in those pipes and any potential plugs in them that might prevent them from discharging water from the SSW, thereby impeding the ability to remove heat from the RBCCW? Provide a detailed statement of the basis of and sources for your answer.

4 Copies of this Order were sent this date by Internet electronic mail transmission to counsel for (1) the Licensee, (2) the NRC Staff, and (3) Intervenor.

The Parties shall provide thorough technical support for their answers, including appropriate affidavits.

It is so ORDERED.

THE ATOMIC SAFETY AND LICENSING BOARD4 Ann Marshall Young, Chair ADMINISTRATIVE JUDGE Dr. Paul B. Abramson ADMINISTRATIVE JUDGE Dr. Richard F. Cole ADMINISTRATIVE JUDGE Rockville, Maryland January 31, 2008

/RA/

/RA/

/RA/

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of

)

)

ENTERGY NUCLEAR GENERATION CO.

)

AND

)

ENTERGY NUCLEAR OPERATIONS, INC. )

Docket No. 50-293-LR

)

)

(Pilgrim Nuclear Power Station)

)

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing LB ORDER (BOARD QUESTIONS FOR THE NRC STAFF AND APPLICANT) have been served upon the following persons by U.S. mail, first class, or through NRC internal distribution.

Office of Commission Appellate Adjudication U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Administrative Judge Ann Marshall Young, Chair Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Administrative Judge Richard F. Cole Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Administrative Judge Paul B. Abramson Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Susan L. Uttal, Esq.

David Roth, Esq.

Kimberly Sexton, Esq.

James E. Adler, Esq.

Office of the General Counsel Mail Stop - O-15 D21 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 David R. Lewis, Esq.

Paul A. Gaukler, Esq.

Pillsbury, Winthrop, Shaw, Pittman, LLP 2300 N. Street, N.W.

Washington, DC 20037-1128

2 Docket No. 50-293-LR LB ORDER (BOARD QUESTIONS FOR THE NRC STAFF AND APPLICANT)

Perry H. Buckberg, Project Manager Plant Licensing Branch I-I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O11-F1 Washington, DC 20555-0001 Mary Lampert, Director Pilgrim Watch 148 Washington Street Duxbury, MA 02332 Sheila Slocum Hollis, Esq.

Town of Plymouth MA Duane Morris, LLP 1667 K. Street, N.W.

Suite 700 Washington, DC 20006 Mark D. Sylvia, Town Manager Town Managers Office 11 Lincoln Street Plymouth, MA 02360 Terrence A. Burke, Esq Entergy Nuclear 1340 Echelon Parkway Mail Stop: M-ECH-62 Jackson, MS 39213 Chief Kevin M. Nord Fire Chief & Director Duxbury Emergency Management Agency 668 Tremont Street Duxbury, MA 02332

[Original signed by Evangeline S. Ngbea]

Office of the Secretary of the Commission Dated at Rockville, Maryland this 31st day of January 2008