RBG-46815, Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems

From kanterella
(Redirected from ML081410456)
Jump to navigation Jump to search

Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems
ML081410456
Person / Time
Site: River Bend Entergy icon.png
Issue date: 05/15/2008
From: Roberts J
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
G9.5, GL-08-001, RBF1-08-0059, RBG-46815
Download: ML081410456 (7)


Text

Entergy Operations, Inc.

River Bend Station 5485 U. S. Highway 61N St. Francisville, LA 70775

.- I11FIf'f1J'Tel 225 381 4149

'6"ý (Fax n tfffl 225 635 5068 jrober3@entergy.com Jerry C. Roberts Director, Nuclear Safety Assurance May 15, 2008 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555

Subject:

Three Month Response to NRC Generic Letter 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems" River Bend Station Docket No. 50-458 License No. NPF-47 Reference 1: Letter No. RBG-46803, dated April 9, 2008, Interim Response to Generic Letter 2008-01 File No.: G9.5 RBF1-08-0059 RBG-46815

Dear Sir or Madam:

The Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2008-01 dated January 11, 2008, to request that each licensee evaluate the licensing basis, design, testing, and corrective action programs for the Emergency Core Cooling Systems (ECCS), Decay Heat Removal system, and Containment Spray system, to ensure that gas accumulation is maintained less than the amount that challenges operability of these systems, and that appropriate action is taken when conditions adverse to quality are identified.

The NRC, in GL 2008-01, requested each licensee to submit a written response in accordance with 10 CFR 50.54(f) within nine months of the date of the GL to provide the following (summarized) information:

(a) a description of the results of evaluations that were performed pursuant to the requested actions of the GL; (b) a description of all corrective actions that were determined necessary; and

(c) the schedule for completion of the corrective actions, and the basis for that schedule.

Additionally, the NRC requested that if a licensee cannot meet the requested nine month response date, the licensee "shall provide a response within 3 months of the date of this GL." This time period was extended to May 16, 2008, as described in Entergy's letter dated April 9, 2008 (Ref. 1): In the three month response, the licensee was requested to describe "the alternative course of action that it proposes to take, including the basis for the acceptability of the proposed alternative course of action." to this letter contains the River Bend Station (RBS) three month response to NRC GL 2008-01. Attachment 2 contains the commitment made in this letter.

If there are any questions or if additional information is required, please contact David Lorfing at 225-381-4157.

I declare under penalty of perjury that the foregoing is true and correct. Executed on May 15, 2008.

Sincerely, J.erry C. Roberts Director - Nuclear Safety Assurance Attachments:

1. RBS Three Month Response to NRC Generic Letter 2008-01
2. Licensee-identified Commitments Table cc: NRC Senior Resident Inspector River Bend Station Saint Francisville, LA 70775 U. S. Nuclear Regulatory Commission Regional Administrator, Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 Mr. Jack N. Donohew Jr.

U.S. Nuclear Regulatory Commission Mail Stop OWFN/O-8G14 11555 Rockville Pike Rockville, MD 20852-2738

Attachment I RBG-46815 River Bend Station Three Month Response to NRC Generic Letter 2008-01 to RBG-46815 Page 1 of 2 River Bend Station Three Month Response to NRC Generic Letter 2008-01 This response to Generic Letter (GL) 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems," addresses the three month response requested in NRC GL 2008-01, which was dated January 11, 2008. This response discusses:

" The required evaluations that will not be complete by October 11, 2008 (nine months from the date of GL 2008-01),

  • The alternative course of action planned, and 9- The basis for the acceptability of the alternative course of action.

For River Bend Station (RBS), the following systems are considered to be within the scope of GL 2008-01:

The requested information for the nine month response to GL 2008-01 includes "A description of the results of evaluations that were performed..." and a description of the resulting corrective actions. The requested evaluations are those necessary to ensure that the subject systems are sufficiently filled with water and can reliably perform their intended functions. The Generic Letter does not specifically require walkdowns of affected piping systems to be performed. However, there has been an emphasis on performing walkdowns as a part of the evaluations. River Bend is currently evaluating the need to perform these walkdown as part of the response to the GL. Walkdowns determined to be necessary for those systems or portions of systems will be performed.

Portions of the piping in the aforementioned systems are located such that inspection of the piping would require one or more of the following:

  • entry into the drywell, which is an exclusion area during power operations,

" scaffolding in sensitive areas,

  • prolonged containment entries during power operation, or,
  • the need for (or restrictions on) removal of insulation from piping.

Portions of piping identified as requiring inspection located in these areas may not be fully inspected prior to October 11, 2008. River Bend does not have planned outage prior to this date, thus, there is no opportunity for performing refueling outage walkdowns or documenting the results prior to the 9 month response. Walkdowns of any piping segments that are determined to need in-field verification that have not been completed prior to October 11, 2008, will be tracked to completion. The due date for the final documentation of any necessary walkdowns will be no later than one month after the restart from refueling outage no. 15.

to RBG-46815 Page 2 of 2 Completion of any required in-field verifications and associated evaluation after the nine month response to the GL is considered to be acceptable. Detailed evaluations of the as-built piping drawings will be complete prior to the nine month response, including detailed reviews of the drawings for the piping segments requiring in-field verifications. The in-field verifications to be performed are expected to confirm the conclusions of the completed drawing evaluations. Also, the evaluation of site procedures, which ensure the piping systems are sufficiently full of water to perform their function, is expected to be complete prior to the nine month response.

Attachment 2 RBG-46815 Licensee-identified Commitments Table to RBG-46815 Page 1 of 1 Licensee-identified Commitments Table This table identifies actions discussed in this letter for which Entergy commits to perform. Any other actions discussed in this submittal are described for the NRC's information and are not commitments.

TYPE (Check one) SCHEDULED ONE- COMPLETION DATE CONTINUING (If Required)

COMMITMENT TIME COMPLIANCE ACTION Walkdowns of any piping segments that are x One month after restart determined to need in-field verification that from refueling outage have not been completed prior to October 11, no. 15.

2008, will be tracked to completion. The due, date for the final documentation of any necessary walkdowns will be no later than one month after the restart from refueling outage no. 15.

Text

Entergy Operations, Inc.

River Bend Station 5485 U. S. Highway 61N St. Francisville, LA 70775

.- I11FIf'f1J'Tel 225 381 4149

'6"ý (Fax n tfffl 225 635 5068 jrober3@entergy.com Jerry C. Roberts Director, Nuclear Safety Assurance May 15, 2008 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555

Subject:

Three Month Response to NRC Generic Letter 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems" River Bend Station Docket No. 50-458 License No. NPF-47 Reference 1: Letter No. RBG-46803, dated April 9, 2008, Interim Response to Generic Letter 2008-01 File No.: G9.5 RBF1-08-0059 RBG-46815

Dear Sir or Madam:

The Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2008-01 dated January 11, 2008, to request that each licensee evaluate the licensing basis, design, testing, and corrective action programs for the Emergency Core Cooling Systems (ECCS), Decay Heat Removal system, and Containment Spray system, to ensure that gas accumulation is maintained less than the amount that challenges operability of these systems, and that appropriate action is taken when conditions adverse to quality are identified.

The NRC, in GL 2008-01, requested each licensee to submit a written response in accordance with 10 CFR 50.54(f) within nine months of the date of the GL to provide the following (summarized) information:

(a) a description of the results of evaluations that were performed pursuant to the requested actions of the GL; (b) a description of all corrective actions that were determined necessary; and

(c) the schedule for completion of the corrective actions, and the basis for that schedule.

Additionally, the NRC requested that if a licensee cannot meet the requested nine month response date, the licensee "shall provide a response within 3 months of the date of this GL." This time period was extended to May 16, 2008, as described in Entergy's letter dated April 9, 2008 (Ref. 1): In the three month response, the licensee was requested to describe "the alternative course of action that it proposes to take, including the basis for the acceptability of the proposed alternative course of action." to this letter contains the River Bend Station (RBS) three month response to NRC GL 2008-01. Attachment 2 contains the commitment made in this letter.

If there are any questions or if additional information is required, please contact David Lorfing at 225-381-4157.

I declare under penalty of perjury that the foregoing is true and correct. Executed on May 15, 2008.

Sincerely, J.erry C. Roberts Director - Nuclear Safety Assurance Attachments:

1. RBS Three Month Response to NRC Generic Letter 2008-01
2. Licensee-identified Commitments Table cc: NRC Senior Resident Inspector River Bend Station Saint Francisville, LA 70775 U. S. Nuclear Regulatory Commission Regional Administrator, Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 Mr. Jack N. Donohew Jr.

U.S. Nuclear Regulatory Commission Mail Stop OWFN/O-8G14 11555 Rockville Pike Rockville, MD 20852-2738

Attachment I RBG-46815 River Bend Station Three Month Response to NRC Generic Letter 2008-01 to RBG-46815 Page 1 of 2 River Bend Station Three Month Response to NRC Generic Letter 2008-01 This response to Generic Letter (GL) 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems," addresses the three month response requested in NRC GL 2008-01, which was dated January 11, 2008. This response discusses:

" The required evaluations that will not be complete by October 11, 2008 (nine months from the date of GL 2008-01),

  • The alternative course of action planned, and 9- The basis for the acceptability of the alternative course of action.

For River Bend Station (RBS), the following systems are considered to be within the scope of GL 2008-01:

The requested information for the nine month response to GL 2008-01 includes "A description of the results of evaluations that were performed..." and a description of the resulting corrective actions. The requested evaluations are those necessary to ensure that the subject systems are sufficiently filled with water and can reliably perform their intended functions. The Generic Letter does not specifically require walkdowns of affected piping systems to be performed. However, there has been an emphasis on performing walkdowns as a part of the evaluations. River Bend is currently evaluating the need to perform these walkdown as part of the response to the GL. Walkdowns determined to be necessary for those systems or portions of systems will be performed.

Portions of the piping in the aforementioned systems are located such that inspection of the piping would require one or more of the following:

  • entry into the drywell, which is an exclusion area during power operations,

" scaffolding in sensitive areas,

  • prolonged containment entries during power operation, or,
  • the need for (or restrictions on) removal of insulation from piping.

Portions of piping identified as requiring inspection located in these areas may not be fully inspected prior to October 11, 2008. River Bend does not have planned outage prior to this date, thus, there is no opportunity for performing refueling outage walkdowns or documenting the results prior to the 9 month response. Walkdowns of any piping segments that are determined to need in-field verification that have not been completed prior to October 11, 2008, will be tracked to completion. The due date for the final documentation of any necessary walkdowns will be no later than one month after the restart from refueling outage no. 15.

to RBG-46815 Page 2 of 2 Completion of any required in-field verifications and associated evaluation after the nine month response to the GL is considered to be acceptable. Detailed evaluations of the as-built piping drawings will be complete prior to the nine month response, including detailed reviews of the drawings for the piping segments requiring in-field verifications. The in-field verifications to be performed are expected to confirm the conclusions of the completed drawing evaluations. Also, the evaluation of site procedures, which ensure the piping systems are sufficiently full of water to perform their function, is expected to be complete prior to the nine month response.

Attachment 2 RBG-46815 Licensee-identified Commitments Table to RBG-46815 Page 1 of 1 Licensee-identified Commitments Table This table identifies actions discussed in this letter for which Entergy commits to perform. Any other actions discussed in this submittal are described for the NRC's information and are not commitments.

TYPE (Check one) SCHEDULED ONE- COMPLETION DATE CONTINUING (If Required)

COMMITMENT TIME COMPLIANCE ACTION Walkdowns of any piping segments that are x One month after restart determined to need in-field verification that from refueling outage have not been completed prior to October 11, no. 15.

2008, will be tracked to completion. The due, date for the final documentation of any necessary walkdowns will be no later than one month after the restart from refueling outage no. 15.