Unit 1, Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems, January 11, 2008
ML081080039
Person / Time
Site: River Bend Entergy icon.png
Issue date: 04/09/2008
From: Lorfing D
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-08-001, RBF1-08-0041, RBG-46803
Download: ML081080039 (2)


Text

Entergy Operations, Inc.

River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775 Enttergy Tel 225 381 4157 Fax 225 635 5068 dlorfin@entergy.com David N. Lorfing Manager-Licensing April 9, 2008 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Subject:

Interim Response to Generic Letter 2008-01 River Bend Station - Unit 1 Docket No. 50-458 License No. NPF-47

Reference:

Generic Letter 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems," January 11, 2008 File No.:

G9.5 RBG-46803 RBF1-08-0041

Dear Sir or Madam,

Generic Letter 2008-01 requires that licensees take certain actions with regard to the subject systems and provide a final response detailing completion of those actions within nine months of the date of the Letter. The Generic Letter also requires that licensees provide an interim notification to NRC within three months of the date of that Letter if it is anticipated that the required actions will not be completed by the 9 month due date.

Ongoing communications between industry representatives and the NRC established the need to allow an extension of the due date for the interim submittal. This letter is provided as confirmation that Mr. Danny Williamson of the River Bend Station staff contacted Mr. Jared Wermiel on this matter on April 8, 2008. Mr. Wermiel agreed to set a new due date for an interim submittal of May 16, 2008. This extension is necessary to allow the station to complete the specification of walk down requirements for portions of the subject systems that are inaccessible during plant operation. River Bend Station has no outage planned prior to the due date for the final response.

/

RBG-46803 Interim Response to Generic Letter 2008-01 April 9, 2008 Page 2 of 2 If you have any further questions on this matter, please contact me at 225-381-4157.

Sincerely, David N. Lorfing (iC/

Manager - Licensing cc:

U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 NRC Sr. Resident Inspector P. 0. Box 1050 St. Francisville, LA 70775 Mr. Jack N. Donohew Jr.

U. S. Nuclear Regulatory Commission OWFN Mail Stop 8 G14 11555 Rockville Pike Rockville, MD 20852-2738