NRC COMMENTS TO INITIAL EXAM SUBMITTAL INCLUDING ES-401-9 AND OPERATING COMMENTS FOR THE DAVIS-BESSE INITIAL EXAMINATION FEBRUARY 2008
- k.
Check austbns that are samoled for conformance with the approved WA and those that are designatedSRO-ooly(WA and license level mismatches are unacceptable).
Based on the reviewefs judgment, is the question as written (U)nsalisfactory (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atiifactory?
At a minimum. explain any u ratings (e.g.. how the Appendix E psychometric attributes are not being met).
- 6.
- 7.
Written Examination Review Worksheet Form ES-401-9 Esplanation
[Refer to Section D of ES-401 and Appendix B for additional information regarding each of the following concepts.]
Enter the level of knowledge (LOK) of each question as eimer (F)un&mertal or (H)igher cognitive level.
Enter the level of difficuhy (LOD) of each question using a 1 - 5 (easy - difficult) rating scale (questions in the 2 - 4 range are acceptable).
Check the appropriate box if a psychmetric flaw is identfied:
The stem lacks sufficient focus to elich the correct answer (e.g., unclear intent, more information is needed, or t w much needless information)
The stem or distractors contain cues (i.e., clues, specific determiners, phrasing, length, etc).
The answer choices are a collection of unrelated IrueJfalse statements.
The distractors are not credible; single implausible d6tractors should be repaired, more than one is unacceptable.
One or more distractors is (are) partially correct (e.9.. il the applicant can make unstated assumptions that are not contradicted by stem).
The question is not linked to the job requirements (i.e.. the question has a valid WA but, as written. is not operational in content).
The questim requires the recall of knowledge that is t w specific for the closed reference test mode (i.e., it is not required to be known from memory)
The question contains data with an unrealistic level of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons).
The question requires reverse logic or application compared to the job requirements.
Check the appropriate box il a job content error is identfied:
ES-401 2
Form ES-401-9
- red.
Partial Job-Minutia
- /
Back-Q= SRO Explanation Dist.
Link units ward WA Only S
New.
1 E
E -
E -
E -
S New. In distractor B. is there any significance to the number 40 gpm?
not, then change to 25 gpm.
RESOLUTION: The number in distractor B was changed to 25 gpm.
New. Typos: In distractors A thru D, change 'INDENTIFIED" TO
'IDENTIFIED."
RESOLUTION: Canment incorporated.
New. In distractor C, add the word "autanatcally^ before the word "trip and change to 'CCW Pump 1 will trip."
RESOLUTION: Comment incorporated.
New. Chanae distractor B to sav "Lock out Waste Gas Cwnoresson" insteao 01 -L&k out Waste Gas bmpressor 1 "
RESOLUTlOh Canmenl incorporated.
Bank t t U
~
New. Based on NOTE 3.2.2 in DB-OP-06oO3, why isn't distractor D tht wrrect answer instead of distractor C? Need to see additional referencs material.
RESOLUTION: Distractor D is the wrrect answer. Switched distractws and D so that the new distractor C is the correct answer.
U New. 1) The Question Stem should be changed to "being in a one-out-of-three logic" instead d a %-out-of-three logic." 2) Need plant information that shows that Panel Y1 feeds RPS Channel 1.
RESOLUTION: 1) Re-worded questwn stem so that the correct answer that there is a trip of the breaker on Bus Y1 that supplies power to RPS channel 1 that will result in ARTS being in a 2/3 logic for a Turbine Trip.
- 2) Information was provided.
S Modified.
- 3. Psychometric Flaws E
S list.
X New. Editorial: In distractors C and D, add a semi-colon after the word "actuate."
RESOLUTION: Comment incorporated.
New
- 4. Job Content Flaws I 5. Other U
- 6.
J/E/S New. 1) Disuractors C and D are not plausible, since these are MCCs and not buses. Suggesl changing the question stem to delete the word
'Bus," and changing the distractors to iwlude the word 'Bus" or 'MCC" as appropriate. 2) LOD = 1, since applicants should know that 480 V Bus El feeds all Pump 1 ESF cwnponents.
RESOLUTION: Reworded question to increase Level of Difficulty and to make distractors olausible.
- 7.
Explanation E
New. EdRorial: In the question stem, fully capitalize the word "INITIALLY."
RESOLUTION: Comment incorporated.
E S
IMcdified Bank. 1) Need more informaton to verify that distractor C is the correct answer. 2) The structure of the question stem is such that only the first dashed items in the distractors apply to the question stem. Need to expand the question stem such that he other dashed items in the distractors are included. 3) In the distractors. change the word "should" to "would" or some other word that is more definite.
RESOLUTION: 1) Addnional information provided. 2) Re-worded aueslion stem. 31 Comment incomrated.
E s
INew.
hew The question stem has a conattion mat 'SG 1 pressLre 1s 3 pslg and lowenng. Is.t realistc 10 reaa 3 psig on the MCB meters? If no1 then cnange to a more reasonab e nnnber (e g, 0 pslg or 10 ps g1 RESOLUTION Deletea me last 5 bdllelw dems from the question stem, E
Bank restored 10 Ct us 2) Editorla In distractor C, ae ete the wora the.
RESOLUTION Comments incowrated
- 1) In distractor B. aelele the words 'after contror power nas been
artia
- 4. Job Content f
.ink unit!
X
- 6.
JIEIS
- 7.
Explanation U
New. Q # WA. since the WA is associated wm the Process Radiation Monitoring System and the questwn is associated with the Area Radiation Monitoring System.
RESOLUTION: Replaced question. m e replacement question is New and at the Higher Ccgnitive Level.
S New.
S New.
E New. In distractor D, change 'should-to MII."
RESOLUTION: Comment incorporated.
New. 1) Since valve RC225A is outside containment, why would this valve fail closed on a loss of IA to containment? It appears that distract0 B (correct answer) is not correct. 2) Change question type from Fundamental to Higher Cognitive Level.
RESOLUTION: 1) In distractor 8, changed valve to RC225A
- 2) Comment incorporated U
S New.
E Modified. Change question from New to Modified.
RESOLUTION: Comment incorporated.
New. 1) Distractor D (correct answer) says overlap between the IR and SR must occur when the SR is at 1O.ooO CPS. whereas procedure DB-OP-06912 says overlap must occur by 100,oW CPS. 2) In distractors 8 and D. use the exponent notation for the CPS. if the meten read out in exponent notation.
RESOLUTION: 1) Distractor D changed to IO5 CPS. Changed distractor B to IO'CPS.
- 2) Changed to exponent notaihn for the CPS number in distractors Band D.
New. For distractor D to be a more unnplete answer (correct answer),
does PZR twnperature need to be transferred to lT RCI 5-2 per step 4.1.5 of DB-OP-O2532?
RESOLUTION: Changed distractor D to reflect transferring the PZR temperature transmiller.
U E
S New.
Q#
4 8
H 4%
50 51 52 53+
5 4
H 55 56+
57 58 59+
60 61 3ist.
- 1.
LOH (FM F
H H
H F
H F
H F
F H
H
- 4. Job Content F b w o b Minutii J-
- 5. Omer
- 6.
J/US S
- 7.
Explanation New.
S S
(New New.
E qlestion stem.
RESOLUTION Comments incorporated first to start on BUS CI because New 11 In me qdestwn stem. change me order of me LOOPAOCA such that a LOCA occurs first and me a LOOP occurs 2) Ednorial In me queston stem, fuiiy Caplfaltze me word 'FIRST "
- 3) S.nce the distractors refers to PumD 1 canwnents add 10 the S
/Bank S
S lNew New.
S New.
E S
~~
~
~
~
New. 1) In the questiin stem, change the word "recovering" to "recovery." 2) Typo: In distractor B, change the word "breaks" to "breakers.'
RESOLUTION: Comments incorporated.
New U
New. This question is at the SRO level as a Tech Spec Bases question per 10 CFR 55.43.(b).(2). unless mere is a specaic Learning Objective fc the RO to know this information.
RESOLUTION: Replaced question. The replacement question is New and at the Fundamental Level.
S New.
S New.
E New.
- 1) In distractor B (correct answer). delete the "within one hour" from dEtractors B and C. 2) In distractor D, delete the "within six hours,'
since are not required to know 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> action requirements f r m memory RESOLUTION: CMnments incorporated.
Fla
- red list.
inial i t F -
- 7.
- 6.
IIEIS Expbnation E
New. In the question stern, change the word "should" to" will."
RESOLUTION: Gnnment incorporated.
S New.
S New.
S New.
S Bank.
U New. 1) The Explanation on the Question Worksheet states that if Group 38 i s m,
to refer to DB-NE-Wm. However. DB-OP-02005 states that if Group 38 is inooerable to refer to DB-NE-03220.
- 2) How can one determine if Group 38 is operable or inoperable?
RESOLUTION Replaced question. The replacement question is New and at the Fundamental Level.
S New.
S Modiied.
E New. Add the word "ANNUAL" after the word "rems" in dstractOE B. C.
and D.
RESOLUTION: Cwnment incorporated.
New. 1) This question appears to be an SRO-related knowledge item instead of something that an RO would be expected to know.
- 2) Distractor A would also be wrrect. il the problem is not resolved within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. Suggest adding to diatractor A: ", ii the problem is not resolved mthin 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the initml sample."
RESOLUTION: Replaced question. The replacement question is New and at the Fundamental Level.
U S
New.
S IMdified
u) 3 w
3 X
X 3
X X
m c
Lo I
I 3
X I x 1-m r
Dist.
X X
- 4. Job Content Flaws
- 5. Omer
- 6.
- 7.
Explanation New. 1) Q # WA. since the question does not require use of the alarm response procedures. 2) Obtaining the correct answer relies on one knowing subsequent actions well into an EOP. One is not required to know every action in an EOP, unless the action is based on a system I
1 1
1 1 level undeffitandina.
tt X
RESOLUTION: ~eplaced quesiwn. The replacement quastion LS NEW and at me Higher Cogntlive Level New. 1) An applicant does not need to know Tech Spec 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> actwn statemenls f r m memory. Where does the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> clock from distractor A (correct answer) m e
irom? 2) Distractm C is not plausible that m e would need to know a 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> action Statement f r m memory.
RESOLUTION: Replaced question. The replacement question is New and at the Fundamental Level.
1 I I X I
- 2) Distractor D could also be consdered correct. since without anv DHR pump, core temperature could not be maintained less than 212°F:
RESOLUTION: 1) Cwnment incorporated. 2) Replaced distractor.
X X -
X E
E -
S New. Wah the Quench Tank Vent valve open. QT pressure may not rise. Thus, delete pressure in the question stem, delete the first word and in distractors B and C, and change distractor D to say level will rise requiring Quench Tank Circ Pump to be stalted manualiy...%
RESOLUTION: Comment incorporated.
New. In distractor B (correct answer). change the second part of the distractor to due to exceeding the maximum allowable flux value.
RESOLUTION: Comment incorporated.
New.
X X - S New.
U New. 1) An applicant is not required to know 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> requirements from memory. Include the Event Notification procedure DB-OP-00002 as a reference. 2) In the question stem. change NRC Region Ill to Resden Inspector to agree with wording in Section 6.4.3 of DB-OP-00002.
RESOLUTION: Replaced question. The replacement question is New and at the Fundamental Level.
I UA
- 4. Job %tent Flaw Only D= 4 SRO 6' 1 X
X
- 7.
U New Need to go over wtn tacilq now me conect answer IS obta ned.
RESOLUTION Dlstranor D was delerm nec to not be correct. resJlting in no wrrect answer Rep aced qdeston. The replacement question is New an0 at the Higher Cognitive Level.
New. Distranor D coud also be omsidered to be correct. since the Fue Handling Director pedorms me independent venticatwn per DE-OP-00030. and also directs me bndge operatof to perform a specific Iw nunoer from the Fuel Mwement Sequence Sheets (per step 6 7 I 0 DE-OP-00030)
RESOLUTION Replaced questan. The replacement qdestion IS New and at the Fundamental Leve U
-lanation x
S Bank.
X New. In the question stern (in the 2m paragraph). change lhe word
' a f f d to "effect."
RESOLUTION: Comment incorporated.
l x I E I E
Bank. 1) Since there are no longer any Temporary Mcdiflcations, change distractor E to a different distractor. 2) Editorial: Add the word "ONLY" to dStractor A. 3) Typo: Change the title of distractor D from "A to "13".
RESOLUTION: Comments mmrporated.
X S
New.
x S
New.
DAVIS-BESSE FEBRUARY 2008 INITIAL LICENSE EXAM OPERATING EXAM COMMENTS Source Admln JPM A
[Calculate RCS Flow with F755 Inoperable)
RO Comment
- 1) Page 3, step 3 - Instead of providing a summary page with the computer point values already given, have the applicant obtain the values of the parameters from the computer.
- 2) As written, step 3 is not a Critical Step, since one is just copying information from a given sheet to Attachment 7 of the specified procedure.
- 3) The specific volume number calculated in steps 2 and 4 is given to 5 digits. However, since the 2 values being extrapolated against are only to 4 digits, the final extrapolated value should only be to 4 digits.
This JPM Is inltlallv Unsatisfactory, since the task only involves multiplying 3 numbers together. No matter how one extrapolates the specific volume between the 2 given values of RCS pressure, an RCS flow value within the acceptable range will be obtained.
[Comments above during initial review before onsite validation]
[Comments below were during onsite validation]
- 4) In the Initial Conditions, add that SPDS is not available.
Resolution
- 1) Comment incorporated.
- 2) Step changed such that candidate needs to obtain point values from the simulator computer. Step is now a Critical Step.
- 3) Changed extrapolated ilalues to 4 digits.
I)
Comment incorporated I
DAVIS-BESSE FEBRUARY 2008 INITIAL LICENSE EXAM OPERATING EXAM COMMENTS Admin JPM A (Perform an On-Line Rlak Determlnatlon)
[Review an Auxiliary Feedwater Surveillance Test and Determine Operability]
SRO NOTE: This JPM was replaced from that given on the outline, since this task is better related to being only an SRO task.
- 1) Page 1 -The intake temperature during Winter is given as 58°F. A lower value seems more appropriate.
- 2) Step 2 -Add an Evaluator Note to state that components modeled in the PSA have a Type "PM" in the Safety Monitor.
- 3) in step 10, what Service Water Pump is stopped? Is it SW pump 3?
- 4) In steps 14 and 20, add a Comment with what the risk is at this step (e.g., Green Risk or White Risk).
[Comments above during initial review before onsite validation]
[Comment below were during onsite validation]
- 5) Delete steps 20 and 21, since these steps will not be DerfOned.
- 1) In step 2, change "1274.4 psid" to "1275 psid" as the correct AP.
- 2) At the end of step 5, add a CUE for the Evaluator to ask if there are any Tech Spec operational implications associated with the AFW pump being inoperable (if the applicant determines that the AFW pump is inoperable)
(i.e., 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> clwk or be in HSD within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />).
[Comments above during initial review before onsite validation]
[Comment below were during onsite validation]
- 3) Change step 4 such that it is not a Critical Step, since on pump speed is provided in surveillance.
- 1) The velue was changed to 40°F.
- 2) Comment incorporated.
- 3) Step 10 changed to say SW Pump 3.
- 4) Comment was ncorporated for step 14.
Step 20 was deleted based 3n comment during onsite Jalidation.
- 5) Comment incorporated.
- 1) Comment incorporated.
2 ) Comment incorporated.
- 3) Comment incorporated.
2
DAVIS-BESSE FEBRUARY 2008 INITIAL LICENSE EXAM OPERATING EXAM COMMENTS Admln JPM C
[Review a Tagout and Determine it Is Incorrect]
- 1) On page 1, change the Task Standard to say:
"Review a safety tagout and correct errors."
- 2) On page 1, add at the end of the Initiating Cue: "and determine whether it is acceptable."
- 3) Change JPM to a different component that is not a direct lookup from a procedure (Le., that requires the applicant to look at P&IDs. electrical prints). Also, include more than one type of erroi (e.g., include a sequence error in addition to a wrong component listed).
Thlc JPM was lnltiallv Unsatisfactoy, since tne JPM is a direct lookup to get the coirect tagout from a procedure.
[Comments above during initial review before onsite validation]
[Comments below were during onsite validation]
- 4) In the General References to be available to the candidates. add "NOBP-OP-1001, Clearance Program" and "Operations Schematic OS-3."
- 5) In the Initiating Cue, add to the Evaluator Note to provide the applicant with a copy of Operations Schematic OS-3, the Cover Sheet, the Index Sheet, and the tagout sheet.
- 6) In step 4, delete the corrections to the tagging list provided after stating that Breaker AC111 is hung second.
- 7) in step 4 and on the Manual Clearance Tag List, change the incorrect breaker from AD1 12 to AD111.
I) Comment incorporated.
?) Comment incorporated.
- 3) Changed component to in HPI pump, whose safety agout is not from a mcedure.
- 1) Comment incorporated.
i) Comment incorporated.
i) Comment incorporated.
') Comment incorporated.
3
DAVIS-BESSE FEBRUARY 2008 INITIAL LICENSE EXAM OPERATING EXAM COMMENTS Admln JPM D
[Calculate radiation Release using SGTL Abnormal Procedure, 1 RO and SRO DB-OP-02531, Admln JPM E
[Make E-Plan Notification]
- 1) In step 6, add an Evaluator Note that the Chemistry Sheets are hanging in the Simulator.
- 2) In step 7, change the acceptable range to 2.0 to 2.20.
- 3) At the end of step 7, add a CUE for the Evaluator to ask if there are any Tech Spec operational implications associated with the calculated SG tube leak (Le., Tech Spec 3.4.6.2).
- 4) On page 1, change the Task Standard to say:
"Determine SG leakrate and applicable Tech Spec for high SG leakrate.
[Comments above during initial review before onsite validation]
[Comment below were during onsite validation]
- 5) in step 2, change the SJAE radiation monitor readings such that if one uses the higher reading, one obtains a SG leak rate ~ 1 5 0
- gpd, and if one uses the lower reading one obtains a SG leak rate 4 5 0 gpd
- 1) On page 1, change WA importance factors from "3.2/3.8" to "2.8/3.5".
- 2) Change the initiating Cue such that it is given that 3 minutes ago an ALERT classification was made.
- 3) Change the Time to stop the Notification from step 2 to step 4 (when Ottawa County and Lucas County are first notified). Add a comment to step 4 that it is critical to make the notifications in 12 minutes.
[Comments above during initial review before onsite validation]
[Comments below were during onsite validation]
- 4) Add to the Initiating Cue that this JPM is Time Critical.
- 5) Delete the CUE in step 1, since this information was added to the Initiating Cue.
- 6) In step 6, add a CUE, that once the State of Ohio phone number is found, to have the applicant dial x8282 for the State of Ohio.
- 7)
In step 7, add a CUE for the booth operator to repeat back the information as the State of Ohio.
- 1) thru 5) Comments incorporated.
- 1) thru 7) Comments ncorporated.
4
DAVIS-BESSE FEBRUARY 2008 INITIAL LICENSE EXAM OPERATING EXAM COMMENTS Admln JPM E
[Security Event Classlflcation and Notltlcation]
[Loss of Servlce Water Loop 1 to Primary Loads]
- 1) On page 1, change WA importance factors from "3.2/3.8" to "2.8/3.5".
- 2) At the end of the Initiating Cue, add "Perform required actions."
- 3) in the initiating Cue, instead of saying that the plant has received information from a reliable source, say that the plant has received information from the Lucas County Police Department.
[Comments above during initial review before onsite validation]
[Comments below were during onsite validation]
- 4) On page 1 in the General References, add the candidate SAP numbers, the NRC Security Authentication Code Book, and change the title of procedure '"Security Events or Threats" from DB-OP-02245 to DB-01P-02544.
- 5) Add to the initiating Cue that this JPM is Time Critical.
- 6) Delete the CUE in step 1, since this information was added to the Initiating Cue,
- 7) in step 4, change the CANS number to the number listed in Revision 9 of the procedure.
- 8) Delete step 5, since this step was not in Revision 9 of the procedure.
- 9) For step 9, provide a list to the Evaluators of the candidates SAP numbers.
- 10) In step 12, provide CUES to act as the NRC ODerations Office and to ask for the NRC Security Authentication Code for the ENS call.
- 1) On page 1, change WA importance factors from "3.1/3.1" to "3.2/3.3.
- 2) At step 10, add an Evaluator Note that the Alternate Path starts here.
[Comments above during initial review before onsite validation]
[Comment below were during onsite validation]
- 3) On page 2. change the MALFUNCTIONS/FAILURE TO iNSERT to sav to fail the SW Header pressure instrument to
<30 psig instead of c50 psig. Also, add a statement that valve SW1395 is initially closed.
I) thru 10) Comments ncorporated.
) thru 3) Comments Icorporated.
5
- 9.
- 10.
- 11.
DAVIS-BESSE FEBRUARY 2008 INITIAL LICENSE EXAM OPERATING EXAM COMMENTS Control Room System JPM B
[Transfer LPI Suction to the Containment Emergency Sump]
Control Room System JPM C
[Putting RPS In Shutdown Bypass]
Control Room System JPM D
[Manually Actuate SFAS After Some Components Blocked]
- 1) On page 1, change the Time Critical Task statement from YedNo" to "No".
- 2) At step 6, add an Evaluator Note that the Alternate Path starts here.
[Comments above during initial review before onsite validation]
[Comments below were during onsite validatior
- 3) On page 2 in the Simulator Instructions, add that valves HP 2A, 38, 2C, and 2D are initially open, and that valves MU 621 19 thru 22 are initially open.
- 4) In step 9. add to the STANDARD that the valve THROTTLED lights are lit.
NOTE: This JPM was changed from the origina exam outline to avoid duplication from the Audi Exam.
On page 1, in the Initiating Cue, add that the Prerequisites for Section 3.3 are complete.
[Comments above during initial review before onsite validation]
[There were no comments on this JPM during onsite validation]
- 1) Where is the Alternate Path for this JPM?
- 2) For the Initial Conditions, make the wording on Page and on page 4 the same.
- 3) In step 2, the Comment should be changed t "Step 2 must be performed prior to step 4."
- 4) In step 3, the Comment should be changed t "Step 3 must be performed prior to step 5."
- 5) In steps 6 and 7, in the Comment section, ac the word "start" after the word "manually."
[Comments above during initial review before onsite validation]
[Comment below were during onsite validation]
- 6) In step 8, there were additional valves that needed to be closed to complete the JPM satisfactorily. Add these valves to step 8, and put them in Level 1 through Level 4 order.
I) thru 4) Comments ncorporated.
- omment incorporated
) There was no Alternate lath in the JPM. JPM hanged to reflect that this PM is not Alternate Path.
) thru 6) Comments icorporated.
6
- 12.
- 13.
- 14.
- 15.
On page 1, change the Initial Conditions to read
'The plant is in Mode 5." similar to what it says DAVIS-BESSE FEBRUARY 2008 INITIAL LICENSE EXAM OPERATING EXAM COMMENTS Comment incorporated, Control Room System JPM E
[Purge Containment]
[No comments during initial review before onsite validation]
[Comments below were during onsite validation]
- 1) In the Initiating Cue, add that an Equipment Operator is standing by and ready to help.
- 2) Delete the Cue in step 3, since this verification can be performed by the candidate without a Cue.
- 3) In step 3, add a Comment that the disconnect is located in a differently in the simulator than in the plant.
- 4) Add page numbers to the JPM.
- 5) Add CUES to steps 9, 10, and 11 for the booth operator to repeat back information.
- 6) Add Comment to step 11 that the booth operator will close ABS 34620.
Control Room System JPM F
[CRD Sequence Fault Reset]
- 1) thru 6) Comments incorporated, Control Room System JPM G
[Respond to Hlgh Ststlon Vent Radiatlov Alarm]
Control Room System JPM H
[Synchronize the Main Generator to the Grid1 on page 3.
[Comments above during initial review before onsite validation]
[There were no comments on this JPM during onsite validation1,
~~
~
~
~
I Comment incorporated.
On page 1, add a 3" initial condition "Annunciator 5-6-E CRD SEQ FAULT has just been received," similar to what is given on page 3.
I
[Comment above during initial review before onsite validation]
[There were no comments on this JPM during onsite validation]
[No comments during initial review before onsite validation]
[Comment below were during onsite validation]
Comment incorporated In step 6 add "(If asked)" to preface the CUE.
7
DAVIS-BESSE FEBRUARY 2008 INITIAL LICENSE EXAM OPERATING EXAM COMMENTS In-Plant JPM I
[Actions for Steam Blndlng of the Motor Drlven Feedwater Pump1 In-Plant JPM J
[Emergency Shutdown of an Emergency Diesel Generator]
- 1) In step 3, instead of saying to open the valve, say "Throttle open FW 1007, MDFP Casing Vent, until the casing temperature is substantially reduced." Also, in the "Comment" statement, change from "opened to '"throttled open."
- 2) In steps 5, 7, 9, and 11, say to 'Throttle open" the valve,instead of "open" valve. Also, in the
'"Comment" statement, change from "opened to
'"throttled open."
[Comments above during initial review before onsite validation]
[Comments below were during onsite validation]
- 3) In step 1, if the cabinet door can not be opened, provide a picture of what the cubicle interior looks like.
- 4) in step 3, change the CUE so that one just states that the casing temperature is substantially reduced instead of saying that the casing temperature is 100°F.
[No comments during initial review before onsite validation]
[Comments below were during onsite validation]
- 1) For both EDG sections, in step 6, add to the Comment that JPM steps 6 and 7 will not be performed if JPM step 8 is performed.
- 2) For both EDG sections, in step 8, add to the Comment that JPM step 8 will not be performed if JPM steos 6 and 7 are Derformed.
I ) and 2) Comments ncorporated, I) Picture provided for the ubicle interior.
I) Comment incorporated.
) and 2) Comments ncorporated.
8
- 18.
- 19.
DAVIS-BESSE FEBRUARY 2008 INITIAL LICENSE EXAM OPERATING EXAM COMMENTS In-Plant JPM K
[Primary Side Reactor Operator Control Room Evacuation Actions]
General Comment tor All Control R m
and In-Plant JPMs
- 1) In the Initial Conditions, add a statement regarding the status of Makeup Pump 1 (i.e., that the pump is running).
- 2) In step 2, by following the procedure Makeup Pump I could be stopped instead of Makeup Pump 2. A similar comment applies to steps 3, 4, and 5 regarding MU Pump 1 components instead of MU Pump 2 components.
3)Step 7(8) would be a Critical Step if MU Pump 1 (2)was stopped, and step 8(7) would not be a Critical Step.
[Comments above during initial review before onsite validation]
[Comments below were during onsite validation]
- 4) On page 4 before step 1. change so that it says that the sequence of steps 1 and 2 is not critical.
5 ) In step 3, add a Comment that the switch is not labeled and the bottom of the toggle switch should be depressed to stop the pump.
- 6) In step 4, delete mention of RED and GREEN lights since there are no lights. Instead, add a CUE that, if asked, the pump is otf by local indication.
- 7) Add a statement before step 7 that the sequence of steps 7 and 8 is not critical.
On page 1 of the JPM, add "Alternate Path with a "Yes" or "NO" added, to assist the Examiners in identitying if the JPM is an Alternate path.
[Comment above during initial review before onsite validation1
- 1) Comment incorporated.
- 2) Changed steps 2 though 5 to account for either MU Pump 1 or 2 being stopped.
- 3) thru 7) Comments ncorporated.
2omment incorporated.
9
DAVIS-BESSE FEBRUARY 2008 INITIAL LICENSE EXAM OPERATING EXAM COMMENTS Scenario No. 1
[No comments during initial review before onsite validation]
[Comments below were during onsite validation]
1 ) in the Initial Conditions, instead of stating the plant is in Middle of Life, state that the core age is 400 EFPD. Also, add this information to the Turnover.
- 2) In the General Description of the scenario, in the 5Ih paragraph, delete the sentence that says that the Tech Spec limit with a stuck rod and 3 RCPs is 45% power.
- 3) On page 2, add an option for the RO to reduce power using the SGlReactor Demand station and lowering power using the toggle switch.
- 5) On page 3, add a statement for the BOP to reset the ICs input and ICs Transfer alarms at the SASS panel.
- 6) On page 3, add a statement for the RO to add boric acid, as required, in accordance with the Reactor Operator Guidance sheet.
- 7) On page 6, change statement such that the crew requests Reactor Engineering to determine if adequate shutdown margin exists.
- 9) On page 8, delete mention of Specific Rule 4.
- 10) On page 9, when implementing Attachment 11 for HPi flow balancing, add to open valve MU 6421.
1 1 ) On page 1 1, when verifying proper SFAS actuation, add for the RO to close the containment vacuum breaker vaives.
- 12) On page 15, change the rate at which the 2500 gpm RCS leak comes in to a slower rate (i.e., from 1 minute to 5 minutes).
I) thru 12) Comments ncomorated.
- 21.
DAVIS-BESSE FEBRUARY 2008 INITIAL LICENSE EXAM OPERATING EXAM COMMENTS Scenario No. 2
- 1) On the Scenario Outline sheet, in the Turnover section, change the turnover so that it states that the plant is at 60% power (to agree with the Initial Conditions on the Scenario Outline sheet) instead of 50-60% power.
- 2) In Event 3, change the writeup so that the Shift Manager informs the Operator of a blown fuse instead of the NRC Examiner informing the Operator.
- 3) In Event 5, change the writeup such that the Ro monitors MU Tank level using "NNI-X powered indication" instead of "NNI-Y powered indication."
[Comments above during initial review before onsite validation]
[Comments below were during onsite validation]
- 4) In the Initial Conditions, instead of stating the plant is in Middle of Life, state that the core age is 400 EFPD. Also. add this information to the Turnover.
- 5) In the Turnover, add that LPI Pump 1 is 00s for maintenance on the motor bearinas.
- 6) On page 2, add a statement that the crew may oirect a local ooerator to trio closeci the AFPT 1 Trip Throttle valve.
- 7) On page 4, after control rod 5-8 drops, change the power level to which the RO reduces power from 50% to 45%.
- 8) On page 6, move up the step to monitor MU Tank level to the 3"step on the page.
- 9) Pages 9 and 10 - Re-order steps to control SG pressures using the Atmospheric Vent Valves to an earlier point, and add a statement about using Attachment 8 to place MUlHPllLPl in service.
- 10) On page 10, delete mention of performing, Primary Inventory Control Actions and performing Attachment 2, SG Inventory and Pressure Control Actions.
- 1) thru 10) Comments incorporated.
- 22.
- 23.
DAVIS-BESSE FEBRUARY 2008 INITIAL LICENSE EXAM OPERATING EXAM COMMENTS Scenario No. 3 Scenario No. 4
- 1) On the page after the Scenario Outline sheet that has a general description of the scenario, add a sentence at the end of the second paragraph as follows: "The crew will evaluate the ioss of Makeup Pump 1 and determine that T.S.3.1.2.4 applies.
[Comment above during initial review before onsite validation]
[Comments below were during onsite validation]
- 2) In the initial Conditions, instead of stating the piant is in Middle of Life, state that the core age is 400 EFPD. Also, add this information to the Turnover.
- 3) On page 6, where it states for the RO to maintain MU Tank level, add that the RO may transfer MU Tank suctions to the BWST.
- 4) On page 10, move the statements about implementing Attachment 8 for placing MU/HPI/LPI in service to an earlier step on page 9 (soon after the SGTR occurs).
INo comments dbr no initial review Defore onsite Lalidation]
[Comments below were during onsite validation]
- 1) in the Initial Conditions, instead of stating the plant is in Middle of Life, state that the core age is 400 EFPD. Also, add this information to the Turnover.
- 2) In Event 1, add a CUE that, if asked, the Shift Manager will inform the crew to maintain MVARS at the current value.
- 3) In Event 1, delete the NOTE concerning the Lead Examiner determining whether to have the crew perform the Manual Voltage Regulator exercise.
- 4) In Event 2, add a statement that, if required, the Shift manager will have the RO perform the actions in Section 4.1 of DB-OP-06405.
- 5) In Event 2, change bistable BA21 1 to BA209.
- 6) In Event 3, change the annunciator from PZR Level Hi to PZR Level Lo.
- 8) In Event 5, page 8, add if >200"F, to close MU 59A.
- 1) thru 4) Comments Incorporated.
- 1) thru 8) Comments ncorporated.