ML081220788
| ML081220788 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 02/25/2008 |
| From: | Valos N Operations Branch III |
| To: | FirstEnergy Nuclear Operating Co |
| Shared Package | |
| ML080920714 | List: |
| References | |
| 50-346/08-301 | |
| Download: ML081220788 (27) | |
Text
MISCELLANEOUS CORRESPONDENCE FOR THE DAVIS-BESSE INITIAL EXAM - FEBRUARY 2008
FirstEnergy Nuclear Operating Company 5501 North Safe Hoiilc 2 Oak Harbor Ohio 43449 Mark E. Beziiia Wce Presrdenl ~ Nucleai March 10, 2008 L-08-097 4 19-321~7fiifi Fax 4 IS1-32f-7S82 10 CFR 55 Mr. Nicholas A. Valos -ADDRESSEE ONLY Senior Operations Engineer - Region 111 United States Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352
Subject:
Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Submittal of Examination Documentation for the Initial Licensed Operator Examination Conducted at the Davis-Besse Nuclear Power Station On Thursday, February 28, 2008, the Nuclear Regulatory Commission (NRC) held a Debrief Meeting at the Davis-Besse Nuclear Power Station (DBNPS) Training Center following the NRC's onsite portion of the Initial Licensed Operator Exam. Additional written exams were administered by the DBNPS on Friday, February 29, 2008. In accordance with NUREG-I 021, "Operator Licensing Examination Standards for Power Reactors," (Revision 9) Section ES-501, Section C.l.a, which states that the licensee shall forward certain examination documentation to the NRC as soon as possible (within 5 working days, when practical) afler administering the examination, FirstEnergy Nuclear Operating Company hereby submits the following examination documentation:
A B
C D
E F
a written examination analysis G
the graded written examinations plus a clean copy of each applicant's answer sheet the master examination and answer key, annotated to indicate changes made while administering and grading the examination candidate questions (and answers given) during the written examination the written examination seating chart a completed Form ES-403-1, "Written Examination Grading Quality Checklist" Three Condition Reports written in response to Chief Examiner concerns:
08-36295, NRC License Exam Generic Weakness - Safety Tagging 08-36348, NRC License Exam Generic Weakness - DNB Parameters Technical Specification 08-36369, NRC Comments on the Quality of the License Written Exam Validation H
Student comments on individual examination questions.
Davis-Besse Nuclear Power Station, Unit 1 Page 2 of 2 L-08-097 The completed original Form(s) ES-201-3, "Examination Security Agreement," with a pre-and post-examination signature by every individual who had detailed knowledge of any part of the operating tests or written examinations before they were administered, is not available at the time of this submittal. This form(s) will be submitted as soon as practical within the next 30 days (Attachment 1).
If there are any questions or additional information required, please contact Mr.
Raymond A. Hruby, Jr., Manager - Site Regulatory Compliance, at (419) 321-8000.
Sincerely yours, Mark B. Bezilla LJS
Attachment:
1 Regulatory Commitment List
Enclosures:
A Written Examinations and Answer Sheets B Master Examination (annotated) and Master Key C Candidate Questions and Answers D Exam Seating Chart E Form ES-403-1, "Written Examination Grading Quality Checklist" F Examination Analysis G Three Condition Reports H Student Comments cc:
NRC Regional Administrator, Region 111 (w/o Enclosure)
Chief - Operations Branch, NRC Region 111 (w/o Enclosure)
DB-1 NRClNRR Project Manager (w/o Enclosure)
DB-1 NRC Senior Resident Inspector (w/o Enclosure)
USNRC Document Control Desk (w/o Enclosure)
Utility Radiological Safety Board (w/o Enclosure)
L-08-097 Regulatory Commitment List Page 1 of 1 The following list identifies those actions committed to by FirstEnergy Nuclear Operating Company (FENOC) for the Davis-Besse Nuclear Power Station (DBNPS) in this document. Any other actions discussed in the submittal represent intended or planned actions by FENOC. They are described only as information and are not Regulatory Commitments. Please notify Mr. Raymond A. Hruby, Jr., Manager - Site Regulatory Compliance, at 419-321-8000, of any questions regarding this document or associated Regulatory Commitments.
Requlatorv Commitment Due Date
- 1. Submit the original Form(s) ES-201-3, Examination Security the Examination Agreement, for the 2008 lntitial Licensed Operator Examination Within 30 days of submittal of Documentation (L-08-097)
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 2 IO LISLE, ILLINOIS 60532-4352 February 14,2008 Mr. Mark 8. Bezilla Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760
SUBJECT:
OPERATOR LICENSING EXAMINATION APPROVAL
Dear Mr. Bezilla:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Davis-Besse Nuclear Power Station.
The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and will separately provide a list of approved applicants to Mr. Robert C. Hovland, Training Manager. Note that any examination waivers have been addressed in separate correspondence.
The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9 of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, during the weeks of February 18, 2008, February 25, 2008, or March 3, 2008. The NRC staff will administer the operating tests during the weeks of February 18 and February 25,2008.
Please contact Mr. Nicholas A. Valos. at 630-829-9761 if you have any questions or identify any errorS or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at httD://www.nrc.qov/readina-rm/adams.html.
hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 DISTRIBUTION See next page
Mr. Mark 8. Bezilla Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Slop A-DB-3080 Oak Harbor, OH 43449-9760
SUBJECT:
OPERATOR LICENSING EXAMINATION APPROVAL
Dear Mr. Bezilla:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Davis-Besse Nuclear Power Station.
The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and will separately provide a list of approved applicants to Mr. Robert C. Hovland, Training Manager. Note that any examination waivers have been addressed in separate correspondence.
The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," during the weeks of February 18, 2008, February 25, 2008, or March 3, 2008. The NRC staff will administer the operating tests during the weeks of February 18 and February 25,2008.
Please contact Mr. Nicholas A. Valos. at 630-829-9761 if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at httD://www.nrc.qov/readinq-rm/adams.html.
Sincerely, IRA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 DISTRIBUTION See next page DOCUMENT NAME: G:\\DRS\\Work in Progress\\DAV 02-08 DRS exam approval Ilr.doc To receive a copy of this document, indicate in the box "c" =Copy wlo aHacWencl "E" = Copy with attachlencl "N" = No copy OFFICE RIII:DRS NAME JRKweiser:co 4 NAValos W J HPeterson &
DATE 02/(4/08 02/r4/08 OFFICIAL RECORD COPY
Letter to Mark B. Bezilla from Hironori Peterson dated February 14, 2008.
SUBJECT:
OPERATOR LICENSING EXAMINATION APPROVAL cc:
The Honorable Dennis Kucinich J. Hagan, President and Chief J. Lash, Senior Vice President of Manager - Site Regulatory Compliance - FENOC D. Pace, Senior Vice President of J. Rinckel, Vice President, Fleet Oversight - FENOC D. Jenkins, Attorney, FirstEnergy Corp.
Director, Fleet Regulatory Affairs - FENOC Manager - Fleet Licensing - FENOC Ohio State Liaison Officer R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Lucas County Board of Commissioners President, Ottawa County Board of Commissioners R. C. Hovland, Training Manager Nuclear Officer - FENOC Operations and Chief Operating Officer - FENOC Fleet Engineering - FENOC
Letter to Mark B. Bezilla from Hironori Peterson dated February 14, 2008.
SUBJECT:
OPERATOR LICENSING EXAMINATION APPROVAL cc:
The Honorable Dennis Kucinich J. Hagan, President and Chief J. Lash, Senior Vice President of Manager - Site Regulatory Compliance - FENOC D. Pace, Senior Vice President of J. Rinckel, Vice President, Fleet Oversight - FENOC D. Jenkins, Attorney, FirstEnergy Corp.
Director, Fleet Regulatory Affairs - FENOC Manager - Fleet Licensing - FENOC Ohio State Liaison Officer R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Lucas County Board of Commissioners President, Ottawa County Board of Commissioners R. C. Hovland, Training Manager Nuclear Officer - FENOC Operations and Chief Operating Officer - FENOC Fleet Engineering - FENOC DISTRIBUTION:
RAGI TEB SPSl TJW2 RidsNrrDirslrib MAS KGO JKH3 JER7 CAAl DRPlll DRSlll PLBI TXN NLS
'***+
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 2 IO LISLE, ILLINOIS 60532-4352 October 2,2007 Mr. Mark B. Bezilla Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760
SUBJECT:
FACILITY PREPARING EXAMINATION
Dear Mr. Bezilla:
In a telephone conversation on October 2, 2007, between Mr. C. Steenburgen, Operations Training Superintendent and Mr. N. Valos. Senior Operations Engineer, arrangements were made for the administration of licensing examinations at the Davis-Besse Nuclear Power Station the weeks of February 18 and February 25, 2008. In addition, the NRC will make an examination validation visit to your facility the week of January 21, 2008.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by November 26, 2007. The written examinations, operating tests, and the supporting reference materials identified in Attachment 2 to ES-201 will be due by January 2, 2008.
Pursuant to 10 CFR 55.40(b)(3), of the Code of Federal Regulations ( I O CFR 55..40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402. and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 31 50-0090). medical certifications (OMB approval number 31 50-0024),
and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30, 2009. The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions. gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJSl@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-I 0202, (31 50-001 8), Office of Management and Budget, Washington, D.C. 20503-0001.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Thank you for your cooperation in this matter. Mr. Steenburgen has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Nicholas Valos at 630-829-9761, or me at 630-829-9707.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice." a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room).
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 DISTRIBUTION See next page
OFFICE NAME DATE To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 31 50-0024),
and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 7995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30,2009. The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-5 F53), U S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJSl @nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503-0001.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Thank you for your cooperation in this matter. Mr. Steenburgen has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Nicholas Valos at 630-829-9761, or me at 630-829-9707.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at httD://www.nrc.aov/readina-rm/adams.html (the Public Electronic Reading Room).
Sincerely, RIII:DRS IC RIII:DRS Id I
I NValos:co @ad HPeterson &
1 OIOZIO7 lO/pQ7-y/I/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 DISTRIBUTION See next page
Letter to Mark B. Bezilla from Hironori Peterson dated October 2, 2007
SUBJECT:
FACILITY PREPARING EXAMINATION cc:
The Honorable Dennis Kucinich J. Hagan, President and Chief J. Lash, Senior Vice President of Richard Anderson, Vice President, Manager - Site Regulatory Compliance - FENOC D. Pace, Senior Vice President of J. Rinckel, Vice President, Fleet Oversight - FENOC D. Jenkins, Attorney, FirstEnergy Corp.
Director, Fleet Regulatory Affairs - FENOC Manager - Fleet Licensing - FENOC Ohio State Liaison Officer R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Lucas County Board of Commissioners President, Ottawa County Board of Commissioners R. Hovland, Training Department Nuclear Officer - FENOC Operations and Chief Operating Officer - FENOC Nuclear Support - FENOC Fleet Engineering - FENOC
Letter to Mark B. Bezilla from Hironori Peterson dated October 2, 2007.
SUBJECT:
FACILITY PREPARING EXAMINATION cc:
The Honorable Dennis Kucinich J. Hagan, President and Chief J. Lash, Senior Vice President of Richard Anderson, Vice President, Manager - Site Regulatory Compliance - FENOC D. Pace, Senior Vice President of J. Rinckel, Vice President, Fleet Oversight - FENOC D. Jenkins, Attorney, FirstEnergy Corp.
Director, Fleet Regulatory Affairs - FENOC Manager - Fleet Licensing - FENOC Ohio State Liaison Officer R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Lucas County Board of Commissioners President, Ottawa County Board of Commissioners R. Hovland, Training Department Nuclear Officer - FENOC Operations and Chief Operating Officer - FENOC Nuclear Support - FENOC Fleet Engineering - FENOC DISTRIBUTION:
RAG 1 TEB SPSl TJW2 RidsNrrDirslrib MAS KGO JKH3 JER7 CAAl DRPlll DRSlll PLBI TXN NLS
FENOC -
FirstEnsrgy Nuclear Operatinng Company Docket Number 50-346 License Number NPF-3 Serial Number 3361 August 2 9, 2007 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001
Subject:
Response to Regulatory Issue Summary 2007-1 7, Preparation and Scheduling of Operator Licensing Examinations Ladies and Gentlemen:
The Davis-Besse Nuclear Power Station (DBNPS) is providing information in response to NRC Regulatory lssue Summary 2007-1 7, Preparation and Scheduling of Operator Licensing Examinations, as requested. The attached NRC Form 536, Operator Licensing Examination Data, provides information through calendar year 201 1 for Operator License Examinations and through calendar year 2009 for the Generic Fundamentals Examination.
Should you have any questions or require additional information, please contact Mr. Robert C Hovland, Site Training Manager, at (419) 321-8406.
Mark B. Bezilla 1
LJS Attachment Enclosure cc:
Regional Administrator. NRC Region 111 DB-1 NRC/NRR Project Manager DB-1 NRC Senior Resident Inspector Chief. Operations Branch, NRC Region 111 Utility Radiological Safety Board SEP 5 2007
Docket Number 50-346 License Number NPF-3 Serial Number 3361 Page 1 of 1 COMMITMENT LIST The following list identifies actions committed to by the Davis-Besse Nuclear Power Station (DBNPS) in this document. Any other actions discussed in the submittal represent intended or planned actions by the DBNPS. They are described only as information and are not regulatory commitments. Please notify the Manager - Regulatory Compliance at 41 9-32 1-8000, at Davis-Besse of any questions regarding this document or associated regulatory commitments.
COMMITMENTS DUE DATE None NIA
Docket Number 50-345 License Number NPF-3 Serial Number 3361 Form NRC - 536 Operator Licensing Examination Data (one page follows)
NRC FORM 536 1 8. 2 ~ 5 1 U.S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA EXPIRES: 08131i2008 APPROVED BY OMB: NO 3150-0131 Estimated burden per res onse to comply with this voiuntary intormal colladmn request: 1 hDUr. This \\ntormatlon Cdtectmn IS wed lo plan bud{
and ~BSOUICBL tor operator examinations Send Comments re ardln burs estimate 10 the Records and FOlNPrivaCy Services Branch 8-5 F83). 1 Nuclear Re ulatory Commission. Washington. DC 20555-0001, or b Intel e-mall to t n ~ ~ ~ ~ I I e ~ l ~ @ n r c.
ov and Io Ihe Derh Officer Office of Inyoma and Regulatory Attairr, NE8B-iO202. (3150-0131). Off& of Management,
Budget, Washington. DC 20503.
It a means used to impose an tntorrnal Coliecllon does not display a currently valid OM0 control number, the NRC r no1 conduct or sponsor. and a perron 1s not required to respond to.
mtormatm ~olle~tion.
FACILITY Davis-Besse Nuclear Power Station. Unit 1 NRC REGiON NRC Region Ill PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS cy201 1 -
cy2009 cy2010 CY 2008
~
1 1
0 1
0 0
0 0
CY 2008 -
PROPOSED NUMBER 4
NUMBER OF REACTOR OPERATORS CEO11 -
CEO1 0 -
CEO09 -
6 0
4 10 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 10 0
10 ESTIMATED NUMBER OF CANDIDATES 15
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 2 IO LISLE. ILLINOIS 60532-4352 June 19, 2006 Mr. Mark B. Bezilla Vice President-Nuclear, Davis-Besse FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760
SUBJECT:
CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS:
DAVIS-BESSE
Dear Mr. Bezilla:
In a letter dated May 10, 2006, (Serial # 3254), your staff requested we re-schedule the initial license operator examination currently scheduled during the month of September 2007.
Because of scheduling conflicts, we were not able to honor your primary date request.
However, we were able to support the alternate date you provided. We have tentatively re-scheduled the requested examination to occur during the weeks of February 18, 2008, and February 25, 2008. On-site validation of the examination is tentatively scheduled to occur at the station during the week of January 28, 2008. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.
Your letter scheduling the September 2007 examination indicated your staff will prepare the written examination and operating tests. We are assuming you still intend to develop the examination re-scheduled to February 2008. If this is incorrect, please notify us immediately as this will significantly impact the examination administration dates. Your letter indicated that you are training approximately 18 candidates for the examination. Please inform us if the number of candidates declines below nine as this will also impact the examination schedule. Please inform us at your earliest opportunity if you discover you need to change the scheduled date for the examination.
A supplementary letter will be sent to the training department approximately 120 days prior to the initial examination informing them of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Michael E. Bielby staff at 630-829-9762.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and
Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.aov/readina-rm/adams.html.
Hiionori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc:
The Honorable Dennis Kucinich G. Leidich, President and Chief J. Hagan, Senior Vice President of Director, Plant Operations Manager - Site Regulatory Compliance D. Pace, Senior Vice President of J. Rinckel, Vice President, Fleet Oversight D. Jenkins, Attorney, FirstEnergy Manager - Fleet Licensing Ohio State Liaison Officer R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Lucas County Board of Commissioners President, Ottawa County Board of Commissioners Nuclear Officer - FENOC Operations and Chief Operating Officer of Fleet Engineering
Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at httD://w.nrc.aov/readina-rmladams.html.
Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc:
The Honorable Dennis Kucinich G. Leidich, President and Chief J. Hagan. Senior Vice President of Director, Plant Operations Manager - Site Regulatory Compliance D. Pace, Senior Vice President of J. Rinckel, Vice President, Fleet Oversight D. Jenkins, Attorney, FirstEnergy Manager - Fleet Licensing Ohio State Liaison Officer R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Lucas County Board of Commissioners President, Ottawa County Board of Commissioners Nuclear Officer - FENOC Operations and Chief Operating Officer of Fleet Engineering DOCUMENT NAME: G:\\DRS\\Work in Progress\\DAV 06-06 DRS.wpd tl Publicly Available Non-Publicly Available 0 Sensitive Non-Sensitive
ADAMS Distribution:
DXCI SPSl SJC4 RidsNrrDirsfrib GEG KGO JER7 CAAl LSL (electronic IRs only)
C. Pederson. DRS (hard copy - IR's only)
DRPlll DRSlll PLBl JRKI ROPreRorts@nrc.aov (insDection reports. final SDP letters, any letter with an IR number)
MABl SMS
FENOC -
FirstEnergy Nuclear Operafing Company Mark E. Bezil/n Mce Presidenf - Nuclear 4 19-321-7676 Fax 4i9.32i-758~"
Docket Number 50-346 I.icense Number NPF-3 Scrial Number 3254 May 10, 2006 United Statcs Nuclear Regulatory Commission Ilocunient Control Desk Washington, D.C. 20555-0001
Subject:
Request to Rescind and Resubmit Operator Licensing Examination Data Submitted in Response to Regulatory Issue Summary 2005-19, "Preparation and Scheduling of Operator Licensing Examinations" Ladies and Gentlenini:
The Davis-Besse Nuclear Power Station (DBNPS) hereby rescinds information submitted on NRC Fonii 536, Operator Licensing Examination Data, under letter Serial Number 3 199, dated October 14, 2005, in response to NRC Regulatory Issue Summary 2005-1 9, "Preparation and Scheduling of Operator Licensing Examinations." The rescinded submittal proposed an Initial Operator License Examination date of September 10, 2007.
A revised NRC Form 536, Operator Licensing Examination Data, (Enclosure I ) provides amended infonnation through calendar year 2009 for Operator Licensing Examinations and information tluougli calendar year 2007 for the Generic Fundamentals Examination. The 2008 examination is expected to be ready for NRC review during October or November, 2007.
Should you have any qucstions or require additional information, please contact Mr. Mark A. 'Trump, Sile Training Manager, at (419) 321-8494.
Very truly yours, AT/.&
&MA d.Ay/s Mark I? Bezilla LJ S Attachment Enclosure cc:
Regional Administrator, NRC Region 111 DB-I NRCiNRR Project Manager DB-I NRC Senior Resident lnspector Chief, Operations Branch, NRC Region III Utility Radiological Safety Board MAY 16 2006
Docket Number 50-346 License Number NPF-3 Serial Number 3254 Page 1 of 1 COMMITMENT LlST The following list identilies actions committed to by the Davis-Besse Nuclear Powcr Station (UUNPS) in this document. Any other actions discussed in the submittal represent intended or planned aclions by the DBNPS. They are described only as infomalion and are not regulatory comniirinents. Please notify the Manager, Regulatory Compliancc (419-321-8585), at Davis-Uesse of any questions regarding this document or associated regulatory cominitnients.
COMMITMENTS DUE DATE None NIA
Docket Number 50-345 License Number NPF-3 Serial Number 3254 Revised Form NRC - 536 Operator Licensing Examination Data (one page follows)
U.S NUCLEAR REGULATORY COMMISSION I APPROVED BY OM0 NO 3150-0131 EXPIRES 0813112001 IRC FORM 536 I,cQ5 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS OPERATOR LICENSING EXAMINATION DATA CY 09 CY 08 -
CY 07 -
CY 06 0
1 0
1 0
0 0
0 Davis-Besse Nuclear Power Station 0
NUMBEROFREACTOR OPERATORS 0
NUMBER OF SENIOR REACTOR OPERATORS - INSTANT I
~~
0 6
3 0
12 3
I
- 4. PROPOSED EXAMINATION PREPARATION SCHEDULE NUMBER OF SENIOR REACTOR OPERATORS UPGRADE NUMBER OF SENIOR REACTOR OPERATORS LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE
~
0 0
0 3
0 0
0 0
01 12 112008 08 1312009 0211 812008 09/17/2009 PROPOSED ESTIMATED NUMBER OF CANDIDATES CY 06 CY 07
~._
MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBEF; 18
i
/(.
Y.J'.j'i++-
L/,,/.<.*,<, k A<'\\, / L < c, 5501 Noilh Slale Roure 2 Oak Harbor, Ohm 43449 FENOC -
{?L I
c FirrtEnergy Nuclear Operating Company Mark 8. BaziNa Vice Presidenl - Nuclear 419-321-7676 Fax 419-321-7582 Docket Number 50-346 License Number SPF-3 Serial Number 3 199 October 14, 2005 United Slates Nuclear Regulatory Commission Document Control Dcsk Washington, D.C. 20555-0001
Subject:
Response to Regulatory Issue Summary 2005-1 9, "Preparation and Scheduling of Operator Licensing Examinations" Ladies and Gentlemen:
The Davis-Bessc Nuclear Power Station (DBNF'S) is providing information in response to NRC Regulatory Issue Summary 2005-1 9, "Preparation and Scheduling of Operator Licensing Examinations," as rcquested. The attached NRC Form 536, Operator Licensing Examination Data, provides information through calendar year 2009 for Operator Licensing Examinations and through calendar year 2007 for the Generic Fundamentals Examination.
Should you have any questions or require additional information, please contact Mr. Mark A.
Trump, Site Training Manager, at (419) 321-8494.
Very truly yours,
/
J AWB Attachments cc:
Regional Administrator, NRC Region I11 DB-I KRC.'XRR Project Manager DB-1 XRC Senior Resident Inspector Chief, Operations Branch, SRC Region 111 Utility Radiological Safety Board
U.S. NUCLEAR REGULATORY COMMISSION APPROVEZ BY OM6 NO 3150-0131 EXPIRES 08i3112GC8 Ertimaled burden per response 10 Comply With lh#$ valunlarl 8nfcimaliOn iolleclior, req~esl 1 lour This information cillection 8s used 10 plan budgets ma i e m m e ~
lor operator examm180ns Send cornmenla re ardin burden til>mate IC the Records and FOlAPrlva~y Senices Branch R-5 F83). U S
~iicleai Re umatoly Commission. Wasntngton. OC 20555-00C1, or b internet e-mali IO ~n%collectr@nrc ov and lo the Desk Officer. CKce of In~ormatton Budgel. Washington. CC 20533 If a means used to mpme an information
~olleclion does "01 dsOlay a ~ ~ r l e n t l y valtd OM0 conti01 number, the NRC may not Conduct Or S O ~ n e o i, and a person 86 not required IO respond IO. the 8ofarmat~on
~0llecl80n NRC FORM 536
,b.ZC:f.
OPE RATOR L IC ENS IN (3 ana R~~~~~~~~
MI^^.^. NE88:iczaz. (375a.o13i). C I I ~ ~
e n a n m n j Ma EXAMINATION DATA F A L L - "
NRC REGICN Davis-Besse Nuclear Power Slation Ill A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 09 -
CY 08 -
CY 07 -
CY 06 -
PROPOSED NUMBER I
LICENSEE-PREPARED 0
ESTIMATED NUMBER OF EXAMINATIONS NRC-PREPARE0 0
ESTIMATED NUMBER OF EXAMINATIONS le. INITIAL OPERATOR LICENSE EXAMINATIONS I
1 0
1 0
0 0
PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS. INSTANT CY 09 -
CY 08 -
CY 07 -
CY 06 -
0 8
0 3
0 10 0
3 PRIMARY DATE ALTERNATE DATE NRC FORM 53E,8-2005:
PRINYEC ON RECYCLES PAPER 0
NUMBER OF SENIOR REACTOR OPERATORS. UPGRADE 0
NUMBER OF SENIOR REACTOR OPERATORS. LlMlTED PROPOSED DATES 3
0 3
0 0
0